R. Local Government Profile
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Chugiak-Eagle River Comprehensive Plan Update
Chugiak-Eagle River Comprehensive Plan Update December 2006 Planning Department Municipality of Anchorage CHUGIAK-EAGLE RIVER COMPREHENSIVE PLAN UPDATE Adopted December 12, 2006 Assembly Ordinance 2006-93(S-1) Prepared by the Physical Planning Division Planning Department Municipality of Anchorage Mark Begich, Mayor C HUGIAK-EAGLE R IVER C OMPREHENSIVE P LAN U PDATE -ii- MUNICIPALITY OF ANCHORAGE Assembly Dan Sullivan, Chair Debbie Ossiander, Vice-Chair Paul Bauer Janice Shamberg Chris Birch Ken Stout Dan Coffey Allan Tesche Anna Fairclough Dick Traini Pamela Jennings Planning and Zoning Commission Toni Jones, Chair Art Isham, Vice-Chair Lamar Cotten Nancy Pease Jim Fredrick Bruce Phelps Andrew Josephson Thomas Vincent Wang Jim Palmer Planning Department Tom Nelson, Director Physical Planning Division Cathy Hammond, Supervisor Tom Davis Van Le Susan Perry Parks and Recreation Department Eagle River John Rodda Information Technology Department GIS Services Lisa Ameen Jeff Anderson C HUGIAK-EAGLE R IVER C OMPREHENSIVE P LAN U PDATE -iii- Chugiak-Eagle River Comprehensive Plan Update Citizens’ Advisory Committee Jim Arnesen, Eklutna, Inc. Andy Brewer, South Fork Community Council Susan Browne, Eagle River Valley Community Council Michael Curry, Eklutna, Inc. Gail Dial, Chugiak, Birchwood, Eagle River Rural Road Service Area Judith Fetherolf, Eagle River Community Council Bob Gill, South Fork Community Council Susan Gorski, Chugiak-Eagle River Chamber of Commerce Bobbie Gossweiler, Eagle River Community Council Lexi Hill, Chugiak-Eagle River Parks & Recreation Board of Supervisors Charlie Horsman, Eagle River Community Council Val Jokela, Birchwood Community Council Ted Kinney, Chugiak Community Council Linda Kovac, Chugiak Community Council Diane Payne, Birchwood Community Council Tim Potter, Eklutna, Inc. -
Area Management Report for the Sport Fisheries of Northern Cook Inlet, 2017–2018
Fishery Management Report No. 20-04 Area Management Report for the Sport Fisheries of Northern Cook Inlet, 2017–2018 by Samantha Oslund Sam Ivey and Daryl Lescanec January 2020 Alaska Department of Fish and Game Divisions of Sport Fish and Commercial Fisheries Symbols and Abbreviations The following symbols and abbreviations, and others approved for the Système International d'Unités (SI), are used without definition in the following reports by the Divisions of Sport Fish and of Commercial Fisheries: Fishery Manuscripts, Fishery Data Series Reports, Fishery Management Reports, and Special Publications. All others, including deviations from definitions listed below, are noted in the text at first mention, as well as in the titles or footnotes of tables, and in figure or figure captions. Weights and measures (metric) General Mathematics, statistics centimeter cm Alaska Administrative all standard mathematical deciliter dL Code AAC signs, symbols and gram g all commonly accepted abbreviations hectare ha abbreviations e.g., Mr., Mrs., alternate hypothesis HA kilogram kg AM, PM, etc. base of natural logarithm e kilometer km all commonly accepted catch per unit effort CPUE liter L professional titles e.g., Dr., Ph.D., coefficient of variation CV meter m R.N., etc. common test statistics (F, t, χ2, etc.) milliliter mL at @ confidence interval CI millimeter mm compass directions: correlation coefficient east E (multiple) R Weights and measures (English) north N correlation coefficient cubic feet per second ft3/s south S (simple) r foot ft west W covariance cov gallon gal copyright degree (angular) ° inch in corporate suffixes: degrees of freedom df mile mi Company Co. -
Black History in the Last Frontier
Black History in the Last History Black Frontier Black History Black History in the Last Frontier provides a chronologically written narrative to encompass the history of African Americans in in the Last Frontier Alaska. Following an evocative foreword from activist and community organizer, Ed Wesley, the book begins with a discussion of black involvement in the Paciÿc whaling industry during the middle and late-nineteenth century. It then discusses how the Gold Rush and the World Wars shaped Alaska and brought thousands of black migrants to the territory. °e ÿnal chapters analyze black history in Alaska in our contemporary era. It also presents a series of biographical sketches of notable black men and women who passed through or settled in Alaska and contributed to its politics, culture, and social life. °is book highlights the achievements and contributions of Alaska’s black community, while demonstrating how these women and men have endured racism, fought injustice, and made a life and home for themselves in the forty-ninth state. Indeed, what one then ÿnds in this book is a history not well known, a history of African Americans in the last frontier. Ian C. Hartman / Ed Wesley C. Hartman Ian National Park Service by Ian C. Hartman University of Alaska Anchorage With a Foreword by Ed Wesley Black History in the Last Frontier by Ian C. Hartman With a Foreword by Ed Wesley National Park Service University of Alaska Anchorage 1 Hartman, Ian C. Black History in the Last Frontier ISBN 9780996583787 National Park Service University of Alaska Anchorage HIS056000 History / African American Printed in the United States of America Edited by Kaylene Johnson Design by David Freeman, Anchorage, Alaska. -
RELOCATION GUIDE You Belong Here
HOMER RELOCATION GUIDE You Belong Here 2018 Thank you for your interest in our beautiful city - Discover Homer Homer, Alaska! Quality of life rarely found in one location: endless opportunities for outdoor recreation, arts, and culture-- a great place to raise kids and a profound sense of community. On behalf of the Homer Chamber of Commerce, the Mayor and the City's Economic Development Commission, we are excited to provide you with an overview about the numerous opportunities and benefits Homer has to offer year-round. Enclosed you will find general information about our area including employment opportunities, cost of living and annual weather. We are also excited to share the wonderful aspects of Homer that residents enjoy such as friendly people, quality public schools, comprehensive health and wellness care, a vibrant arts scene, fantastic restaurants and world class recreational opportunities. If you’re making a pre-relocation visit to Homer, or just want to get better acquainted with Homer, please explore the Chamber of Commerce website (www. homeralaska.org) for information on local attractions, area wide businesses and maps – you’ll find everything you need to feel right at home! In addition, you will soon receive a copy of the Homer Visitor’s Guide The City of Homer was established spectacular views of Kachemak Rounding out Homer’s economic which provides further information regarding the many as a first class municipality in Bay, the Kenai Mountains, and drivers are healthcare services, activities and adventures that await you in Homer. March 1964. Named for Homer several volcanic peaks across Cook the arts and independent farm Pennock, a con man who arrived Inlet including Mt. -
Area Management Report for the Recreational Fisheries of Northern Cook Inlet
Fishery Management Report No. 92-3 Area Management Report for the Recreational Fisheries of Northern Cook Inlet bY Larry J. Engel and Doug Vincent-Lang November 1992 Alaska Departmentof Fish and Game Division of Sport Fish I PREFACE This report is divided into two sections. Section I presents an introductory overview of the Northern Cook Inlet Management Area. Included in this section is a general geographic and organizational description of the management area; an overview of the Alaska Board of Fisheries processes; fishery resources of the management area; an inventory of the available fishery resources of the management area; a historical perspective of recreational angler effort and harvest within management area waters; an approximation of the economic value of the recreational fisheries of the management area; and, a general descrip- tion of stocking, research, management, partnership, aquatic education, view- ing, and access activities being conducted in the management area. A summary of the major fishery and social issues that presently occur in the Northern Cook Inlet Management Area is presented, as well as any recommendations for solving them including, but not limited to, research, management, access, regulatory changes, aquatic education, partnership, stocking, or habitat options. Section II provides a more detailed summary of all the major fisheries that occur in the Northern Cook Inlet Management Area. Included in this section is a description and historical perspective of each fishery; the objective governing the management of each fishery; description of the recent performance of each fishery; a description of recent Board of Fisheries actions with respect to each fishery; a description of any social or biologi- cal issues surrounding each fishery; and a description of any ongoing or recommended research or management activities directed at each fishery. -
6 Transportation Analysis
Interior Alaska Transportation Plan November 2010 6 Transportation Analysis 6.1 Highway Transportation Analysis The highway transportation analysis considers the following factors: Roadway Operations: planning assessment based on highway traffic forecasts. Safety: crash data assessment, special interest areas, safety plans (Highway Safety Improvement Program (HSIP), SHSP), and predictive safety improvements. Roadway Conditions and System Needs: roadway system needs, planned improvements, resource needs (i.e. pipeline), railroad (grade separation), and local community access. Maintenance & Operations: maintenance stations, deferred and preventive maintenance, and maintenance management systems. Pavement Preservation and Management: pavement preservation, pavement management, and weight restrictions. Security: border crossing and the Alyeska Pipeline. Tourism Enhancements: scenic byways and rest areas (signage and accessibility). 6.1.1 Roadway Capacity Using the 2030 forecast traffic volumes, a comprehensive roadway capacity evaluation was completed for all of the major rural highways. A planning level assessment based on the existing highway characteristics and 2030 traffic forecasts revealed no major roadway capacity constraints. Under long-term conditions, all roadway facilities within the study area will continue to operate at a LOS C or better, with most facilities forecast to operate at LOS A and B. As discussed in Section Error! Reference source not found. Highway Traffic Forecasts, the potential impacts of future resource and economic development would have the greatest impact on rural highway operations. However, based on the future traffic operations assessment assuming a relatively average (i.e. medium growth) annual growth in highway traffic, traffic volumes would have to double or even triple on average in order to impact the capacity needs in the system. -
Bryant Army Airfield Bird-Wildlife Aircraft Strike Hazard (BASH) Plan Environmental Assessment
Bryant Army Airfield Bird-Wildlife Aircraft Strike Hazard (BASH) Plan Environmental Assessment Final EA Alaska Army National Guard P.O. Box 5800 JBER, AK 99505 October 2018 Alaska Army National Guard Bryant Army Airfield BASH Final EA ENVIRONMENTAL ASSESSMENT ORGANIZATION This Environmental Assessment (EA) evaluates the potential environmental, socioeconomic, and cultural effects of the Alaska Army National Guard’s (AKARNG’s) proposed implementation of a Bird-Wildlife Aircraft Strike Hazard (BASH) Plan for Bryant Army Airfield (BAAF), which is a component of the 73,000-acre Joint Base Elmendorf-Richardson (JBER). JBER is located in Anchorage, a 1,961-square- mile unified home rule municipality in Southcentral Alaska. As required by the National Environmental Policy Act of 1969 (NEPA; 42 United States Code (USC) 4321 et seq.), the Council on Environmental Quality (CEQ) Regulations Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] 1500-1508), and 32 CFR Part 651 (Environmental Analysis of Army Actions, Final Rule), the potential effects of the Proposed Action are analyzed. This EA will facilitate the decision-making process by the AKARNG and the National Guard Bureau (NGB) regarding the Proposed Action and its considered alternatives, and is organized as follows: EXECUTIVE SUMMARY: Describes the Proposed Action and its considered alternatives; summarizes environmental, cultural, and socioeconomic consequences; and compares potential effects associated with the two considered alternatives, including the No Action Alternative. SECTION 1.0: PURPOSE OF AND NEED FOR THE PROPOSED ACTION: Summarizes the purpose of and need for the Proposed Action, provides relevant background information, and describes the scope of the EA. -
Final Vapor Intrusion Study Report for Joint Base Elmendorf–Richardson Restoration Program Sites, Alaska
FINAL VAPOR INTRUSION STUDY REPORT FOR JOINT BASE ELMENDORF–RICHARDSON RESTORATION PROGRAM SITES, ALASKA Prepared for: Department of the Air Force 722 ESS/PKB 2261 Hughes Avenue, Suite 163 Lackland Air Force Base, TX 78236-9853 Contract FA8903-08-D-8772 Task Order 0066 Prepared by: HydroGeoLogic, Inc. 581 Boston Mills Road, Suite 600 Hudson, OH 44236 June 2018 FINAL VAPOR INTRUSION STUDY REPORT FOR JOINT BASE ELMENDORF–RICHARDSON RESTORATION PROGRAM SITES, ALASKA Prepared for: Department of the Air Force 722 ESS/PKB 2261 Hughes Avenue, Suite 163 Lackland Air Force Base, TX 78236-9853 Contract FA8903-08-D-8772 Task Order 0066 Prepared by: HydroGeoLogic, Inc. 581 Boston Mills Road, Suite 600 Hudson, OH 44236 June 2018 This page was intentionally left blank. TABLE OF CONTENTS Page 1.0 INTRODUCTION ................................................................................. 1-1 1.1 SCOPE OF WORK ....................................................................... 1-1 1.2 PROJECT OBJECTIVES ............................................................... 1-2 1.3 PROJECT ORGANIZATION .......................................................... 1-2 2.0 BACKGROUND ................................................................................... 2-1 2.1 JBER REGULATORY HISTORY .................................................... 2-1 2.1.1 Installation History ............................................................ 2-1 2.1.2 Regulatory Background ...................................................... 2-2 2.1.3 National Priorities Listing -
Page 1 2016-0001 CLOSE 10/1/2015
U.S. Department of Transportation Federal Highway Administration 8/17/2017 Freedom Of Information Act (FOIA) Log Searched for: Fiscal year request opened on 2016 CONTROL DATE REQUESTER REQUESTING STATUS SUBJECT NUMBER RECEIVED LAST NAME FIRM 2016-0001 CLOSE 10/1/2015 Anderson WRDW News Fee benefit requested Fee waiver 12 requested Expedited processing requested Dear FOIA Officer I request access to and copies of documents pertaining to weight violations for commercial vehicles in Georgia and South Carolina from 2010 to October of 2015. I would like to receive the information in electronic format. As a representative of the news media I am only required to pay for the direct cost of duplication after the first 100 pages. Through this request, I am gathering information on the number of cited andor documented overweight vehicles on Georgia and South Carolina roads that is of current interest to the public because overweight vehicles aren't just a safety concern; they also cost taxpayers a lot of money in the form of road repairs. This information is being sought on behalf of WRDW News 12 for dissemination to the general public. Please waive any applicable fees. Release of the information is in the public interest because it will contribute significantly to public understanding of government operations and activities. If my request is denied in whole or part, I ask that you justify all deletions by reference to specific exemptions of the act. I will also expect you to release all segregable portions of otherwise exempt material. I, of course, reserve the right to appeal your decision to withhold any information or to deny a waiver of fees. -
Susitna-Watana Hydroelectric Project (FERC No. 14241) Transportation
Susitna-Watana Hydroelectric Project (FERC No. 14241) Transportation Resources Study Study Plan Section 15.7 Initial Study Report Prepared for Alaska Energy Authority Prepared by DOWL-HKM February 2014 Draft INITIAL STUDY REPORT TRANSPORTATION RESOURCES STUDY (15.7) TABLE OF CONTENTS Executive Summary ..................................................................................................................... vi 1. Introduction............................................................................................................................ 1 2. Study Objectives .................................................................................................................... 1 3. Study Area .............................................................................................................................. 2 4. Methods and Variances in 2013 ............................................................................................ 2 4.1. Collect and Review Data ................................................................................................ 2 4.1.1. Variances................................................................................................................. 2 4.2. Inventory Assets and Conduct Any Field Studies ......................................................... 2 4.2.1. Variances................................................................................................................. 2 4.3. Document Existing Conditions ..................................................................................... -
Joint Base Elmendorf-Richardson
2019 Joint Base Elmendorf-Richardson WILDLAND FIRE MANAGEMENT PLAN Prepared by CHLOETA 2501 Liberty Pkwy, Ste 176 Midwest City, OK 73110 +1 877 245 6382 chloeta.com [email protected] Cover Photos: Prescribed fire Joint Base Elmendorf-Richardson, 2015. Joint Base Elmendorf-Richardson WFMP 2019 Page 2 of 149 TIER 1 Wildland Fire Management Plan Installation: ______________________________________________________Joint Base Elmendorf-Richardson Effective Date: ____________________________________________________ Approved By: Signature: _____________________________Date: ______________________ PATRICIA A. CSÀNK, Col., USAF Installation Commander, 673 ABW Signature: _____________________________Date: ______________________ MICHELLE STEINMAN, GS-13 Chief, Air Force Wildland Fire Branch AFCEC/CZOF This Wildland Fire Management Plan has been prepared in accordance with regulations, standards and procedures of Section E3.8 of the Department of Defense Instruction 6055.06, DoD Fire and Emergency Services (F&ES) Certification Program, 21 December 2006 and Section 13 of the Air Force Instruction 32-7064, Integrated Natural Resources Management, 22 Nov 2016. The signature above indicates approval of the Plan for Implementation. The completion of this plan alone does not satisfy the requirements of a Prescribed Fire Plan. Joint Base Elmendorf-Richardson WFMP 2019 Page 3 of 149 Table of Contents Executive Summary 9 Chapter 1. Introduction 11 1.1 Purpose of the WFMP 11 1.2 General Description of the WFMP Area 12 Figure 1.1: JBER and GSUs Vicinity Map 14 -
Chapter 25 Operations, Wheeled Vehicles
Chapter 25 Operations, Wheeled Vehicles Commercial Vehicle Size, Weight & Permit Regulations Comprehensive Includes New Regulations Effective December 6, 2018 The Alaska Department of Transportation and Public Facilities, Division of Measurement Standards and Commercial Vehicle Enforcement provides a reproduction of the regulations of 17 AAC 25 as a public courtesy. The Division cannot guarantee the absolute accuracy of this reproduction of 17 AAC 25. For the official published version of the regulations, please consult the Alaska Administrative Code (AAC, Register 190). Department of Transportation and Public Facilities Division of Measurement Standards & Commercial Vehicle Compliance Suite 2, Building M 11900 Industry Way Anchorage, Alaska 99515 Phone: 907-365-1210 Fax: 907-365-1220 This publication was released by the State of Alaska, Department of Transportation and Public Facilities, Division of Measurement Standards and Commercial Vehicle Compliance, produced at a cost of $4.00 per copy, for the primary purpose of informing the public of the changes to the Weights and Measures regulations. Chapter 25 Operations, Wheeled Vehicles Article 1. Commercial Motor Vehicles: Size and Weight. (17 AAC 25.010 - 17 AAC 25.110) 2. Commercial Motor Vehicles: Safety and Hazardous Materials. (17 AAC 25.200 - 17 AAC 25.250) 3. Oversize and Overweight Vehicles. (17 AAC 25.300 - 17 AAC 25.380) 4. Waivers. (17 AAC 25.800) 5. General Provisions. (17 AAC 25.900) —————————— Article 1 Motor Vehicles: Size and Weight Section 10. (Repealed). 11. Prohibited vehicles and loads. 12. Legal vehicle size. 13. Legal vehicle weight. 14. Allowable long combination vehicle length on certain routes. 15. Specialized equipment. 16. (Repealed).