This document has been Seafront Masterplan - A Delivery Framework produced with support from: Wyre Borough Council

June 2009 Regeneration simon fenton partnership Peter B Hunter GH Architect and Development Consultant

71 Charlecote Road Poynton, Stockport Cheshire SK12 1DJ T 01625 411517 Gordon Hood M 07515 397213 Regeneration Consultant E [email protected] Contents

1. Executive Summary ������������������������������������������������������������� 04 4. The Seafront Vision �������������������������������������������������������������� 24 4.1 Introduction �������������������������������������������������������������������������� 24 2. Introduction �������������������������������������������������������������������������������� 08 4.2 Fleetwood Seafront Vision ������������������������������������������������ 28

3. Context ����������������������������������������������������������������������������������������� 10 5. Zoning of the Seafront �������������������������������������������������������� 30 3.1 Introduction �������������������������������������������������������������������������� 10 Zone 1: Wyre Wing Picnic Area ����������������������������������������������� 32 3.1.1 Background ������������������������������������������������������������������ 10 Zone 2: Model Boating Lake ���������������������������������������������������� 33 3.1.2 Fleetwood Masterplan ��������������������������������������������������� 12 Zone 3: Marine Lake ������������������������������������������������������������������ 34 3.1.3 Expanding on the Vision ������������������������������������������������ 13 Zone 4: Adventure Sports Clubhouse ������������������������������������ 35 3.2 The Wyre Way Coastal Trail ������������������������������������������ 16 Zone 5: Wheels Park ������������������������������������������������������������������ 36 3.3 Results of Consultation ��������������������������������������������������� 18 Zone 6: Pitch and Putt ��������������������������������������������������������������� 37 3.3.1 Introduction ������������������������������������������������������������������ 18 Zone 7: Discovery Centre ��������������������������������������������������������� 38 3.3.2 The Seafront ����������������������������������������������������������������� 18 Zone 8: Outdoor Events Arena ������������������������������������������������ 40 3.3.3 Modified Proposals ������������������������������������������������������� 19 Zone 9: Marine Hall - Cultural & Conference Centre ����������� 41 3.4 Key Parameters ������������������������������������������������������������������� 20 Zone 10: Leisure Hub ������������������������������������������������������������������� 46 3.4.1 Present Situation ����������������������������������������������������������� 20 Zone 11: Bowling Greens and Children’s Play Area �������������� 47 3.4.2 Land Uses Assessment ������������������������������������������������ 20 Zone 12: The �������������������������������������������������������������������������� 49 3.5 The Framework ������������������������������������������������������������������� 22 Zone 13: The Lighthouse Quarter ��������������������������������������������� 50 3.5.1 Strategic Parameters ���������������������������������������������������� 22 Zone 14: Mount Gardens ������������������������������������������������������������ 53 3.5.2 Local Character Influences �������������������������������������������� 22 Zone 15: The Promenade ����������������������������������������������������������� 54 1. Executive Summary

Fleetwood Seafront has For decades the Town’s residents and visitors alike it has suffered from prolonged under-investment. have appreciated the unspoilt natural environment, Key facilities now tend to look tired, and too few long been recognised stunning views, and range of recreational and new elements and attractions have been added cultural facilities offered by the area, and continue to to maintain the competitiveness of the offer – and as a major physical do so to this day. On a coastline as world renowned despite the best efforts of local groups including as Fylde’s, with major resorts such as , the Council, numerous volunteers and local interest asset to the Town, Cleveleys, and all offering organisations who have contributed so much and more recently distinctive and diverse attractions to tourists, time and effort to maintaining the area, it is widely Fleetwood’s Seafront is perhaps rather understated accepted that the Seafront is failing to meet its has increasingly and most certainly underrated. full potential. It is too large, too visible and too remarkably attractive to be anything less than been viewed as Anchored by the handsome Marine Hall, opened in the key driver of the Town’s economic future. 1935 and still Wyre’s pre-eminent seafront venue; Rather than being a pleasing surprise for having the potential overlooked by the graceful Mount Pavilion, the outsiders unaware that Fleetwood has a Seafront centrepiece of inspired town planning by Decimus of such scale and natural beauty, it ought to to become an equally Burton; and blessed with spectacular sea views over be the prime motivation for visiting the Town in Morecambe Bay; Fleetwood’s Seafront is at the very the first place. Such a step-change is definitely significant economic least the equal of any other in North West . deliverable and will not require timescales of such and social asset. a length that few people could ever realistically However, as a working town with an economy be enthusiastic about becoming involved – the based around not only tourism, but a long legacy Fleetwood Seafront Masterplan outlines a series of of fishing and fish processing, Fleetwood has interventions that, if given the necessary support, suffered as much as any northern town during the could transform the area’s fortunes within a economic restructuring witnessed over the past matter of a few years, whilst also setting in place 40 years. The iconic Seafront has remained, but a longer-term programme of rejuvenation.

4 FLEETWOOD, SEAFRONT MASTERPLAN FLEETWOOD, SEAFRONT MASTERPLAN 5 1. Executive Summary

The objectives of the Fleetwood Seafront Seafront will never benefit if some areas are neglected The aims within the Vision are recognised and Masterplan are derived from the findings of the at the expense of others – but there is recognition expanded upon within the Seafront Masterplan 2007 Fleetwood Town Centre Masterplan, the within the Masterplan that certain zones represent and further details of specific proposals aimed at strategic aims of the Fylde Cultural Strategy priorities in terms of funding requirements, timescales delivering, in aspirational but realistic terms, the and the emerging Wyre Local Development and potential impacts. Marine Hall, the most iconic Seafront Fleetwood needs and deserves are also Framework, extensive onsite analysis of the and important building on the entire Seafront, is an provided. Consequently the Masterplan should be area, and ongoing liaison with both the general example of these priorities. As the visual and activity viewed as the cornerstone of every proposal and public and specifically the people who work in hub of the area what happens to the Hall will define application to secure financial and administrative and around the Seafront area. Every objective the perceptions of what is happening across the assistance for the rejuvenation of Fleetwood Seafront. has behind it a logical and practical rationale, Seafront, especially in the shorter-term, and it will be enabling this Masterplan to be developed in a imperative for all parties charged with delivering this transparent and coherent manner. Every proposal Masterplan that the resident and business communities and recommendation within the Masterplan of Fleetwood continue to be engaged in the process seeks to meet these objectives meaning that – and this will be most effectively achieved by making no intervention, however large or small, is being clear and significant progress as soon as possible. undertaken in isolation. For the purposes of The stakeholder engagement thus far has led to the simplicity the large Seafront area has been divided production of an agreed Seafront Vision: into a series of ‘zones’, determined principally by a combination of existing character and ‘To create a sustainable and distinctive future potential. It is hoped that in years to come every zone will represent a perfect fusion of local seafront with a mix of facilities, good individuality within a clear strategic framework, quality of life, and connectivity, built so that in essence each zone can be seen to be around enhancing the key assets of representing a talented player in a strong team. No zone is more important than any other – the the Marine Hall and the open setting.

6 FLEETWOOD, SEAFRONT MASTERPLAN FLEETWOOD, SEAFRONT MASTERPLAN 7 2. Introduction

The Fleetwood Seafront Masterplan has been but also the broader role the Seafront can play in The first factor is a constant due to the historical produced during early 2009 initially in response to terms of delivering the objectives of the North West role, physical scope, and current offer of the Seafront the identification in the broader 2007 Fleetwood Development Agency’s Regional Economic Strategy, and is beyond dispute. It is the second factor that Masterplan and Regeneration Framework of the Economic Partnership’s Sub-Regional underpins the need for, and objectives of, this the Seafront as an area where significant future Action Plan the 2008-2011 Fylde Coast Multi-Area Masterplan. Fleetwood Seafront is simply a fantastic investment offered the greatest opportunity to assist Agreement (MAA); the 2009 Fylde Cultural Strategy; place, a balanced combination of natural beauty the regeneration of the entire Town. Furthermore and the emerging Cultural Framework for the Wyre framed by an urban setting. For lovers of beachsport, recent months have seen a wealth of other studies Coast. It recognises that Fleetwood’s Seafront has recreation, culture, nature, and architecture, it is and potential funding programmes emerge that have multiple roles depending on the perspective taken – be key destination. Yet it is also recognised by all crystallised the need for an up-to-date and coherent it serving the local population as an area for recreation stakeholders with an interest in the area that it could development framework to ensure Fleetwood’s and leisure; attracting visitors into Fleetwood; being a be even better. More facilities could be provided whilst Seafront is in a position to both capitalise on any key link in a longer trail between other Wyre settlements still maintaining the character of the area; existing opportunities for investment which may emerge, such as Cleveleys and Rossall; or even being part of a facilities could be enhanced; and the whole area and to assist in the delivery of strategic cultural Fylde-wide cultural and tourist offer working in tandem could be better linked, managed and marketed. Doing and economic goals aimed at the Wyre, Fylde and with Blackpool and Lytham St Annes. In addition this will of course take considerable resources, both Lancashire coastal areas. this study is in part being the Fylde Coast and Fleetwood are an important financial and human, and it is with these requirements funded through the Commission for Architecture and link between the Morcambe Bay and Ribble Estuary in mind that Wyre Borough Council instigated the the Built Environment’s (CABE) Sea Change Fund. Regional Parks. Whatever the perspective taken, two development of this Masterplan, to provide direction This fund is one of the potential sources that Wyre factors remain constant: and co-ordination for future efforts. The rationale for Borough Council are seeking assistance from in intervention already exists – both in the local needs order to deliver their aspirations for the Seafront. • Fleetwood Seafront is an integral part of any clearly evident in Fleetwood’s economy and in the economic and cultural proposals at a local, strategic policy set out at the sub-regional level. The This Masterplan therefore not only draws upon the authority or sub-regional level; Fylde Coast MAA states that ‘it is the tourism offer analysis of earlier studies examining how best to • All areas, at every level, will benefit from a thriving of the Fylde Coast as a whole and not just Blackpool catalyse the economic regeneration of Fleetwood, and prosperous Fleetwood Seafront. that must be promoted. Indeed, areas of Fylde

8 FLEETWOOD, SEAFRONT MASTERPLAN 2. Introduction

and Wyre offer significant higher-level tourism offers. The coastal conurbation also provides a significant proportion of the Fylde Coast’s population and its employment and economic growth opportunity’.

This document starts by setting out the context in which proposals have been developed – the findings of the 2007 Fleetwood Masterplan; the challenges facing Fleetwood at a local level; and the strategic opportunities emerging that Fleetwood needs to engage with; before examining the Seafront area in more detail. Analysis is provided of the strengths and weaknesses of the current offer; opportunity areas where new facilities could be provided; how these facilities would inter-relate; and a Vision of what Fleetwood Seafront should eventually seek to become. It is hoped that this Masterplan, supported by key documents such as the Seafront Delivery Plan and Business Plan, will make a compelling case as to why Fleetwood’s Seafront is such an exciting area and why it deserves local and strategic support.

FLEETWOOD, SEAFRONT MASTERPLAN 9 3. Context

3.1 Introduction 3.1.1 Background

The following chapter seeks to outline the Fleetwood has over recent years suffered from the policy and research background that has led effects of the decline in its traditional employment to Fleetwood Seafront being viewed as an sectors. Rather than the typical northern English area of great importance to achieving social, town’s experience of manufacturing decline, economic and environmental progress in the Fleetwood’s loss has been mainly in the fishing and Town. Building upon the findings of earlier work, tourism industries. The decline in fish stocks and public consultation and stakeholder engagement introduction of quotas has diminished the industry. it is possible to define the general development The still vital fish processing sector is reliant on parameters that exist for guiding future proposals stock trucked into the Town, and suffers from in the Waterfront area; and to enable these fragmented and ageing building stock in parts. As proposals to be fairly and transparently assessed across much of Britain in the past 40 years package so as to ensure that they provide the maximum holidays, cheap airfares and changing leisure benefits not only for the Seafront area, but for the expectations have gravely impacted on Fleetwood whole of Fleetwood. as a holiday destination.

The outward signs of this decline are in the Town Centre where the loss of visitor expenditure and competition from out-of-town facilities has led to a decline in the quality of the shopping offer and the lack of investment to plough back into the improvement of the physical infrastructure and environment.

10 FLEETWOOD, SEAFRONT MASTERPLAN 3. Context

Context Plan Fleetwood also lays claim to some of the most severely deprived wards in the region. The Town’s ability to respond to this major structural shift is severely hampered by a number of factors. Firstly, it is located at the end of a peninsula and access is therefore a concern. Although the M55 serves the Blackpool area, routes from the motorway are generally regarded as poor. There is also no direct rail service beyond Poulton-le-Fylde. Secondly the Town has its extensive coastal and resort infrastructure to maintain – a massive burden for a relatively small borough. Thirdly, although the Town is striving to cope with these issues, the area has not generally been given priority by external funding agencies. Any regeneration must therefore be led by the Council working with the private sector, the local community and other local public bodies – it is primarily with these issues in mind that the Fleetwood Town Centre Masterplan was initiated in December 2006.

FLEETWOOD, SEAFRONT MASTERPLAN 11 3. Context

3.1.2 Fleetwood Masterplan The Masterplan was developed during the first half of 2007 with significant input from local businesses, Wyre Borough Council, supported by the retailers, landowners and politicians, and supplemented North West Development Agency and English with the views and commercial knowledge of developers Heritage funded the Masterplan. Its aims were and agents active or potentially active across the broader outlined as follows: Fylde sub-region. The overall vision for Fleetwood • Identify a Vision for Fleetwood, encompassing reached by this work was: ‘To create a sustainable and how the Town’s cultural heritage and unique distinctive coastal town with a mix of facilities, good environment can be protected and enhanced, quality of life and connectivity built around enhancing together with seeking new roles for the Town Fleetwood’s key assets of a unique heritage and to fulfil to ensure it remains a source of pride waterfront setting’. The Masterplan’s objectives involved for the community and an attractive location focusing on three key areas of the Town, which were for new investment; deemed as being the sites most able to catalyse much • Ensure that the Council, other statutory needed wider regeneration. These three areas were: bodies, businesses, residents and any other stakeholders in Fleetwood contribute to, and • The Waterfront - the aim is to transform this area and support, the Vision; provide a modern range of facilities and experiences • Develop a range of physical and economic creating a better all year round destination; proposals that assist in the rejuvenation • The Town Centre - the aim is to improve the retail of the Town Centre; maximise the future offer, create better pedestrian linkages between Lord vibrancy and sustainability of uses Street, Fleetwood Market and Freeport; improve the on the Seafront; highlight deliverable environment and buildings and create public places; development and redevelopment • The South Docks - the aim is to provide a better opportunities; and improve linkages gateway to the town and create a sustainable between Fleetwood’s key areas; commercial quarter with improved transport links.

12 FLEETWOOD, SEAFRONT MASTERPLAN 3. Context

Fleetwood Masterplan Focus Area 3.1.3 Expanding on the Vision

‘To create a sustainable and distinctive coastal town with a mix of facilities, good quality of life and connectivity built around enhancing Fleetwood’s key assets of a unique heritage and waterfront setting.’

The public and stakeholders supported the Masterplan Vision during the consultation processes of 2007, particularly the specific references to its unique heritage and waterfront setting. Visions are very useful in summarising great swathes of much more detailed work, but they can also be viewed as simplistic and bland if not supported by a series of slightly more defined aims or objectives which expand on what it is hoped the work being done will achieve.

FLEETWOOD, SEAFRONT MASTERPLAN 13 3. Context

In Fleetwood after ongoing deliberation between The balance of the objectives reflected the differing needs conflicts or debates over the value of particular proposals the public, the Council, local businesses, and wishes of stakeholders. No one objective is more it is hoped that the objectives provide a logical ‘test’ – i.e. strategic policy-makers and funders and the important than another – as indeed it is unlikely that any how many objectives does a particular proposal achieve, masterplanning team, the following seven one objective could be realistically be achieved without and could other proposals achieve more? This is the others also be supported. If in some instances there are approach used later in this report – see section 3.4 below. objectives were drawn up and eventually adopted:

1. Ensure the Town’s cultural heritage and unique environment be protected and enhanced; 2. Ensure as far as possible that the Council, other statutory bodies, businesses, residents and other stakeholders in Fleetwood support the Vision; 3. Develop a range of physical and economic proposals that assist in the rejuvenation of the Town; 4. Maximise the future vibrancy and sustainability of uses on the Seafront; 5. Highlight deliverable development and redevelopment opportunities; 6. Improve linkages between Fleetwood’s key areas; 7. Consider a range of innovative ways for utilising the Council’s property portfolio.

14 FLEETWOOD, SEAFRONT MASTERPLAN 3. Context

FLEETWOOD, SEAFRONT MASTERPLAN 15 3. Context

3.2 The Wyre Way Coastal Trail cultural experiences of regional and potentially Wild Wyre Bird Observation Centre national significance. In parallel with the preparation of this Fleetwood Seafront Masterplan, Wyre Borough Council has The proposed Coastal Trail will cover eleven miles of also commissioned Stephen Broadbent Associates striking coastline, connecting Blackpool to Fleetwood via to produce a cultural framework document for the Cleveleys. It is a part day cycling or full day walking, or whole of the Wyre Seafront. This document, the part walking, part tram experience suitable for all ages. Wyre Way Coastal Trail Visioning Document and The report proposes that the Trail be complemented by the Fleetwood Seafront Masterplan have been a full calendar of events and activities, environmental made possible through a successful Commission improvements, visitor facilities, wayfinding and public art. for Architecture and the Built Environment (CABE) The Trail aims to improve the environmental, ecological administered Sea Change Feasibility Study bid and cultural opportunities that the Wyre Coast has to by Wyre Borough Council. In addition to setting offer to local communities and visitors. out long term strategies: a Cultural Framework in the case of the Wyre Way and a Development The document recognizes the richness and variety of Framework for the Fleetwood Seafront area, the the Fleetwood Sea Front including: the internationally two documents, aim to highlight potential cultural important wildlife heritage, its historic Town Centre, initiatives that can be put forward for a Sea Change its unique trams and traditional , active Funding Application in June 2009. sports, Marine Hall and ornamental gardens, bowling greens, boating lakes and pitch and putt and The Wyre Way Coastal Trail Visioning Document miniature golf courses. The town also has museums, a draws upon the wealth of studies that highlight marina, a thriving market, the Freeport retail outlet and the assets and economic opportunities of the town centre shopping, a working harbour, and a nature Wyre Seafront and its diverse settlements, and reserve. These are all facilities that will be a major draw presents what could be a unique trail of on the Wyre Way Coastal Trail.

16 FLEETWOOD, SEAFRONT MASTERPLAN 3. Context

On the Fleetwood Seafront, the Coastal Trail Vision Document complements the Fleetwood Seafront Masterplan by proposing a new outdoor performance space at Fleetwood’s Marine Hall, and suggesting that the Euston Park area be subject of an international design competition to enhance its important position within the heart of historic Fleetwood. Elsewhere on the Trail the document proposes:

• At Cleveleys, the Mythic Coastline, a part-day or evening promenade experience and annual festival, which links directly into the town and its shopping experience, contributing to the town’s economy and social well being. • A dramatic Beachcombing promenade at Rossall. • The Wild Wyre Bird Observation Centre, a visitor centre celebrating Wyre’s outstanding coastal habitat, open daily to visitors, school groups and special interest groups.

In addition the document proposes to establish a Wyre Way Partnership - comprising the local authority, stakeholders, educationalists, artists, local businesses, interested parties and others. It is the intention that this body would manage and animate the Trail.

FLEETWOOD, SEAFRONT MASTERPLAN 17 3. Context

3.3 Results of Consultation Fleetwood’s long-term economic decline to occur, all three • A ‘Family Quarter’ to improve the area next to areas need to be addressed as well as improving the the main summer beach as a family destination. 3.3.1 Introduction linkages between these areas. Creating better water play facilities, table tennis, trampolines and picnic area. These Public consultation on the Fleetwood Masterplan improvements could help to provide a better took place in July and August 2007. Widespread 3.3.2 The Seafront gateway to the Waterfront; support was forthcoming for the South Docks and Town Centre proposals (often referred to as The original Masterplan proposed significant • A ‘Beach Sports’ area based around the existing the Southern Gateway and Lord Street proposals intervention at Fleetwood Seafront. Proposals were put Fleetwood Kite Club and shop. Fleetwood is a respectively). The South Docks are represented the out to community in the July 2007 consultation process prime location for this activity due to the extent most deliverable step in Fleetwood’s regeneration which outlined the following broad development zones: of beach and climatic conditions; – accessible, developable sites made it an ideal area for hosting Fleetwood ‘Fish Park’, a specialist • A ‘Discovery and Entertainment’ area around • A ‘Waterfront Living’ area on the smaller miniature modern fish processing hub supported by ancillary the Marine Hall. It was noted that there was golf course. This was justified on the basis that it users. With support from the processors and potential to remodel and refurbish the building would help fund improvements to the rest of the Lancashire County Developments Ltd, Wyre to provide a more efficient and practical internal Seafront and Marine Hall area. It would also help Borough Council has begun investigating the layout so it can host more events; and to provide revitalise this part of the Waterfront bringing activity deliverability of the Fish Park. If it could be viewed a fully glazed elevation to the rear of the Hall to the area. that the South Docks area was primarily about incorporating a restaurant/bar or café facility and tackling Fleetwood’s need to protect and grow local take advantage of beach and Seafront location; Public consultation was strongly opposed to these business, the other two areas of focus could be Waterfront proposals, primarily based on the seen as proposals to improve the attractiveness of • A ‘Health and Fitness’ area next to the Marine Hall inclusion of a residential element, and particularly Fleetwood as a place to live, shop and visit. The to provide better indoor fitness and recreational because it was felt that the residences would common thread through all the Masterplanning work facilities for people visiting and living in Fleetwood. reduce views and lead to a loss of green space. has been that for any realistic opportunity to reverse This could include an hotel or spa facility; Whilst only 6% (of over 1,400 respondents) did

18 FLEETWOOD, SEAFRONT MASTERPLAN 3. Context

not agree with the South Docks proposals, and a proven driver of high quality and high value similarly small minority (8%) disagreed with the Lord development in many towns throughout the Street proposals, 75% disagreed with the Seafront UK and this would not only help to improve proposals, a number clearly significant enough to the locality but would have a significant effect require a new approach to be taken. on raising investor confidence across all commercial sectors in the Town Centre.

3.3.3 Modified Proposals At this time of analysis in early 2008 an important benefit was felt to be that the The original proposal to develop the pitch and putt revenue raised by allowing some residential course for residential purposes was subsequently use (on other sites besides the pitch and dropped from the Masterplan. Given the strategic putt course) could be ploughed back into importance of the Seafront to Fleetwood and the the redevelopment or refurbishment of public wider Masterplan it was decided that alternative facilities. Consequently the creation of a proposals should be examined before any further waterside mixed-use scheme was proposed public consultation took place. The Council’s to maximise the area’s potential. However, the consultants were then instructed to undertake feasibility work revealed that in the then present feasibility work on alternative development ideas, (and ongoing) economic climate it was unlikely layouts and options for the Seafront Area. It was that there would be any residential development considered vital that there was a clear indication as interest. It was suggested that this downturn to the pros and cons of each option, whether the in the market could last for 3 years or possibly options were feasible, viable and likely to attract longer – Fleetwood was always viewed as an investors. The rationale behind developing the area of market risk and even after economic Seafront remained the same as at the start of the recovery begins confidence will be fragile for Masterplan – i.e. that waterside development is a considerably longer.

FLEETWOOD, SEAFRONT MASTERPLAN 19 3. Context

3.4 Key Parameters facilities for families, developing beach sports, providing better eating facilities and a waterfront hotel. This feedback, 3.4.1 Present Situation combined with the knowledge that without intervention at the Seafront Fleetwood’s holistic regeneration will falter, Having thoroughly assessed the public and provided the genesis for the development of a Cultural commercial views on Fleetwood Seafront, Wyre Centre based in and around the Marine Hall. Borough Council found that solutions were not readily forthcoming. Yet the views of the Masterplan, that the Seafront has significant potential and its 3.4.2 Land Uses Assessment revitalisation is fundamental to Fleetwood Town Centre’s regeneration remain as true now as when With the Masterplan having now been formally adopted they were first defined two years ago. Indeed given as the regeneration framework for Fleetwood, it is the the current economic conditions, Fleetwood’s duty of Wyre Borough Council and partners to seek structural weaknesses – lack of employment in to explore all avenues for delivering the Seafront that growth sectors; over reliance on declining sectors; Fleetwood’s residents, visitors and businesses want and poor transport links; expensive and ageing physical need. The Masterplan’s strategic focus provides the stock – highlight the need for the Council and its Council and partners with a clear overview of the Town partners to bring forward plans for the Seafront area. and its environs. The availability and potential of sites and areas across the whole northern tip of the Fylde peninsula The public consultation for the Masterplan showed are understood better now than at any time in the past. that, whilst the development of some sites would Consequently there is a healthy understanding of the be unacceptable, a considerable local appetite Seafront’s role – not only in terms of its own on-site uses, existed for rejuvenating the Seafront, and in particular but also as to what role it needs to play to sit in harmony refurbishing the Marine Hall and developing it further, with other areas of development potential in and around with feedback requesting such additions as more Fleetwood. The Masterplan has set clear parameters

20 FLEETWOOD, SEAFRONT MASTERPLAN 3. Context

for all focus areas ensuring they are developed in a co- Strategic Assessment matrix in Appendix I – it is intended ordinated and as far as possible complimentary fashion. to show that the Seafront Framework developed and outlined in section 3.5 below has not been arrived at by Common sense dictates that some uses are not suited chance – it genuinely reflects the only realistic land use to some areas – i.e. industrial uses on the Seafront – criteria that would suit the Waterfront and contribute yet without a clear and reasoned strategy debates on towards the delivery of Fleetwood’s strategic objectives. preferred uses can become highly subjective, and what is seen as common sense to one party may be viewed It has been noted that there are significant environmental as completely the opposite by a group of stakeholders designations in and around Fleetwood’s Seafront. The with different interests. Therefore for the interests of clarity most notable of these include the Special Protection and accountability it is always best to be thorough in Area (SPA) status held by Morecambe Bay, initiated making decisions especially in a publically owned and under the guidance of the European Union’s Directive used area such as the Seafront where the number of on the Conservation of Wild Birds (79/409/EEC); the potential stakeholders is at its highest. The Masterplan Bay’s RAMSAR designation for its importance to wading went through a considerable amount of public and other birds; and its designation as a Site of Special Scientific stakeholder scrutiny before being adopted. It now sits as Interest (SSSI). On the land comprising the Seafront the overarching framework document and its vision and focus area, a significant proportion is designated as a objectives should be applied to each sub-area as per County Biological Heritage Site (BHS), a non-statutory the wishes of the many people who fed into preparing designation that does not preclude development it. To this end it is useful to assess the Masterplan’s but seeks to ensure that all proposals made actively objectives specifically against all the potential land uses enhance the area’s natural habitat. No proposals that could ever be suggested for the Waterfront to emerging in this Seafront Framework should conflict with evaluate which uses are most likely to fulfil the Seafront’s any environmental designations in principle - although role in Fleetwood’s regeneration. By including all possible each development will have to be assessed on its own land uses in this assessment – please see the Stage 1 merit in due course.

FLEETWOOD, SEAFRONT MASTERPLAN 21 3. Context

3.5 The Framework 3.5.2 Local Character Influences

3.5.1 Strategic Parameters The Masterplan noted that Fleetwood has retained much of its nineteenth century fabric with the origins of a planned The use assessment in Appendix 1 town still visible in the layout of streets and gardens. In recommends that uses such as leisure, general there exists an integrity and coherence to the recreation, civic facilities and some limited urban structure. The traditional network of streets and retail use are best suited to the Waterfront. pavements is largely continuous and uninterrupted offering Educational uses could in theory be supported a highly permeable and legible urban structure. The oldest but would need to clearly prove their broader buildings of the Town are situated where it had its origins value to the area. Green spaces are also towards the waterfront. Some of its earliest and finest viewed as highly important, though generally buildings remain such as the North Euston Hotel and where possible they should act as areas of Queens Terrace. These listed buildings were designed recreational potential and not simply be a by and form part of the original planned Queens Terrace dormant use between more vibrant uses. The town. The majority of the Waterfront area contributes little Wyre Trail needs to traverse the site and be fully to creating a successful series of spaces and does not integrated into all emerging proposals so as to really work as a cohesive area. In general development ensure that Fleetwood Waterfront is simply one does not create a clear structure of routes through the part of a co-ordinated rejuvenation of Wyre’s area or provide attractively enclosed or overlooked spaces. coast – and indeed the whole Fylde Peninsula. Blank frontages of utilitarian design in large areas of surface The Fleetwood Masterplan clearly demonstrates car parking set back from the road create an unattractive the need for uses on the Waterfront to be environment, obscure any views of the sea and block both vital, in usage terms, and critically to also an easy pedestrian route east to west. At present the be sustainable, in both environmental and pedestrian route through the area is very poor. It is not economic terms. overlooked in places, convoluted, unclear and the public

22 FLEETWOOD, SEAFRONT MASTERPLAN 3. Context

Decimus Burton’s Masterplan realm is of a relatively poor quality. The frontage to the Waterfront in this area around Marine Gardens is weak. Built development (including the Marine Hall) forms unattractive dead frontages overlooking the water and blocks any views of the beach and water from The Esplanade. Whilst the rationale at the time was to create a wind break to the prevailing winds off the , it effectively turned its back on the water and has done little to create positive animated spaces along the Waterfront itself.

In summary, the Masterplan suggested that the physical strength of Fleetwood lay in its fascinating street pattern, and some of the examples of architecture, particularly along the Esplanade. The Marine Hall became a particular source of debate with a broad mix of views on its merits and weaknesses – however the general conclusions were that it most certainly represented a key landmark in Fleetwood and deserved careful analysis. The main weaknesses of the Town highlighted were how poorly some areas sat together, failing to encourage exploration or create a sense of place, and the poor visual quality of main buildings and views that had the potential to be so much more attractive.

FLEETWOOD, SEAFRONT MASTERPLAN 23 4. The Seafront Vision

4.1 Introduction Seafront Structure

Having recognised the role of the Fleetwood Masterplan Vision in setting development parameters for the Seafront and the rest of the Town Centre, it is now necessary to look in more specific detail at the opportunities that exist within the Seafront itself. Firstly, it is worth noting for clarity at this point that the term ‘Seafront’ has supplanted ‘Waterfront’ during this ongoing study, as key stakeholders felt it important to draw attention to the presence of the sea at Fleetwood, as opposed to simply a river or canal side setting. Secondly, the usage of the term Seafront as a title is intended to highlight the specific focus area lying between Fleetwood Golf Course and the site of the former Pier, as well as the inland sites at the Mount and Euston Park, rather than the entire sea facing coastline of the Town.

24 FLEETWOOD, SEAFRONT MASTERPLAN 4. The Seafront Vision

FLEETWOOD, SEAFRONT MASTERPLAN 25 4. The Seafront Vision

As noted in section 3, the Fleetwood Masterplan Seafront Vision Vision was developed through significant stakeholder debate and tested successfully through various rounds of public consultation, as were the seven objectives which underpin it. By using these seven objectives to test different land uses for the Seafront area we have effectively utilised the Masterplan at the level it was intended – i.e. as a guideline for development of major sites in Fleetwood. With these parameters now set it is necessary to modify the Vision and supporting objectives to act as drivers of ideas for redeveloping the Seafront. We have determined what general land uses can and cannot be brought into the Seafront area – now we need to transform the general land uses into specific proposals.

To help guide the development of specific proposals, we have modified the Vision and supporting objectives slightly from those in the Masterplan. To ensure consistency and transparency, they still closely reflect the same aims as their Masterplan counterparts, but are worded so as to appreciate the Seafront locality.

26 FLEETWOOD, SEAFRONT MASTERPLAN 4. The Seafront Vision

FLEETWOOD, SEAFRONT MASTERPLAN 27 4. The Seafront Vision

4.2 Fleetwood Seafront Vision the Marine Hall can increase the level of support Seafront Objectives from the local and wider community. Furthermore, ‘To create a sustainable and detailed independent analysis has indicated that the 1. Ensure the Seafront’s heritage and distinctive seafront with a mix of cost of replacing the Marine Hall with a new facility environment be protected and enhanced; facilities, good quality of life, and is anticipated to be prohibitive for Wyre Borough Council, and therefore any such proposals would 2. Develop physical and economic proposals connectivity, built around enhancing instantly fail the first test of the vision – sustainability. that assist in the rejuvenation of the Seafront; the key assets of the Marine Hall and the open setting.’ The objectives that underpin the Seafront Vision are, 3. Maximise the future vibrancy and as with the Vision itself, reflections of the objectives of sustainability of uses on the Seafront; The prime elements of the Masterplan Vision the Fleetwood Masterplan. The Masterplan objectives – the need for sustainability, distinctiveness, concerned with ensuring stakeholders support the 4. Improve linkages between the choice, quality, and accessibility, all remain in Vision; the highlighting of key development areas; and Seafront’s key areas. this Vision. The change is that the key assets that the value of public owned assets are maximised; for the area are more specific – the Marine Hall, have been excluded here as they have effectively All proposals – put forward now and indeed in the is recognised as a key asset, as is the generally been delivered by the actual production of this future – need to support as many of these objectives green and relatively undeveloped nature of the Seafront Development Framework. The remaining four as possible, and any proposal that actively conflicts whole Seafront area. It was the Marine Hall and objectives act as the test of all proposals put forward in with an objective must have a thorough justification for the ‘openness’ of the Seafront which gained the the Seafront area, in the same way that the Masterplan doing so, alongside a clear outline of measures taken most positive comments during the Masterplan’s objectives have been used to determine the types of to reduce conflicts. preparation, and whilst the Hall did also receive general land use that would best suit the Seafront. criticism, this was primarily around its external appearance and internal functionality rather than its general presence and/or type of use. It is felt that with well targeted interventions

28 FLEETWOOD, SEAFRONT MASTERPLAN FLEETWOOD, SEAFRONT MASTERPLAN 29 5. Zoning of the Seafront

The land use assessment recommends that in reshaping the Seafront felt that a ‘zoning’ of the the Masterplan’s objectives), particularly where the uses such as leisure, recreation, civic facilities area was the most practical approach to assist in the zone is seen as being a weak link in the current offer. and some limited retail use are best suited to the developing of proposals. By recognising different zones Elsewhere it may involve very little intervention, as Seafront. Educational uses could be introduced an approach can be developed wherein the existing the facilities onsite are viewed as being a key part of but would need to clearly prove their broader local character and distinctiveness of smaller areas the wider offer and consequently not really in need value to the area. Green spaces are also viewed can be recognised and protected, and proposals can of change. Finally a summary of how the proposed as highly important, though generally where be brought forward on a step-by-step basis. This future uses sit in terms of the strategic context of the possible they should act as areas of recreational is important as for both practical onsite issues (e.g. Seafront Vision is provided – i.e. which of the objectives potential and not simply be a dormant use building works), and financial constraints (limited public underpinning the Vision do the proposals actively seek between more vibrant uses. However, whilst funding is available and the private sector is fragile to meet. The naming of the zones is based on potential the land use assessment ensures strategic fit of given the current recession conditions), it is evident future uses and is purely indicative at this time. proposals with the Fleetwood Masterplan it is vital that the enhancement of Fleetwood Seafront will not that the intricacies of the area are understood – be a short process. It will be an ongoing series of i.e. which uses go where, and how uses overlap interventions, each seeking to build upon earlier work or adjoin most effectively to create the best and assist in delivering the Vision. destination possible. Much of the layout of the area is naturally determined by existing features The following section outlines the fifteen zones the such as the Boating Lake, Model Yachting Lake, Seafront team believe the area naturally divides Marine Hall, Mount, and Leisure Centre, and into, and summarises what current uses exist within proposals involve enhancing these facilities or each zone. Then a description of proposed future altering areas around them. Taking account of uses, which it is felt would most benefit not only the the existing features, and the need to ensure that zone in question, but the development of a vibrant the Seafront includes a diverse range of facilities Seafront and in turn a more successful Fleetwood is commensurate with such a large and important provided. In some instances this may involve relatively area, the urban designers and architects involved radical change (always within the parameters set by

30 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront

Seafront Zones

FLEETWOOD, SEAFRONT MASTERPLAN 31 5. Zoning of the Seafront - Zone 1

Zone 1: Wyre Wing Picnic Area general public use, as well as providing landscaped car parking with a more efficient layout to increase capacity Current Uses: without significantly increasing size. Enhancements A rectangular site bounded by Princes Way to to other zones along the Seafront will in time increase the south (which becomes the Esplanade further usage of the entire area and this zone has the potential along the Seafront), the sea wall to the north, to act as starting point for many of those activities, Fleetwood Golf Course to the west and the particularly the proposal to develop a sculptural “bird Model Boating Lake to the east. At present it is hide” at nearby Rossall Point. The provision of suitable predominantly undeveloped grassland, accessed additional facilities such as more picnic benches and a by an uneven gravel track on the western robust children’s play area will be sought. perimeter and vehicular access from Princes Way on the opposite side of the site. A small At present only two clear pathways to the Promenade rectangular paddling pool lies adjacent to the exist and these lack signage or clarity – both pathways Model Boating Lake. An irregular and unpaved should be upgraded and a clear indication of what car park with a potential capacity of around 50 facilities exist elsewhere will need to be provided. In vehicles around one fifth of the entire zone, and general the aim is not to change the character of the provides bays for drivers to pull up near grassed zone, simply to make it a stronger gateway to the rest picnic areas. The zone is well used by dog- of the Seafront. walkers throughout the year, and by picnickers and those seeking informal recreation spaces Strategic Fit: during periods of better weather. • Ensure the Seafront’s heritage and environment be protected and enhanced Future Uses: • Maximise the future vibrancy and sustainability of The intention is that this zone remains uses on the Seafront; predominantly used for picnicking and other • Improve linkages between the Seafront’s key areas.

32 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 2

Zone 2: Model Boating Lake Future Uses: The Model Boating Lake is a superb asset to Current Uses: Fleetwood’s Seafront and there are no proposals The Model Boating Lake, a stretch of water to alter its current role. Improvements to approximately 250 metres long and 60 metres wide, landscaping and signage around the Lake, as part dominates this zone. This is the largest model boating of the wider overall of the Seafront, would help lake in . There is a small paved car park, with make the area more coherent to visitors and more a capacity for approximately 25 cars accessed from visually appealing. Laidley’s Walk (which become the Esplanade further along the Seafront). The Fleetwood Model Yacht and Strategic Fit: • Ensure the Seafront’s heritage and Power Boat Club was formed in 1929, and the lake environment be protected and enhanced; was opened in 1932. The Club now has approximately • Maximise the future vibrancy and 120 members and hosts numerous radio-controlled sustainability of uses on the Seafront. and scale boating events of regional, national and international importance. A clubhouse exists in the southeastern corner of the zone, and a bus stop sits midway along the zone’s southern perimeter. To the west of the Lake a bridge forms the boundary of the zone and provides direct access to the Outer Promenade – the sea wall having ended before this zone begins. Around the Lake is a grassed boundary of varying quality, which to the northern edge has become very sandy. The zone is very open, giving good views out to sea but also making it prone to severe winds.

FLEETWOOD, SEAFRONT MASTERPLAN 33 5. Zoning of the Seafront - Zone 3

Zone 3: Marine Lake recreational tourism has become more apparent. In areas where the sea retreats a considerable Current Uses: distance from the shore, or is seen as being too Fleetwood Marine Lake hosts facilities for open/choppy, Marine Lakes are ideal facilities for Boatwork & Seamanship courses for the hosting watersports, which remain one the fastest Fleetwood Nautical College, as well as the base growing participation sports in the UK. Sailing, rowing, for the Outdoor Adventure Group (OAG), which windsurfing, canoeing and pedaloes all represent provides assistance to youth leaders and young good uses, with recognition also given to the need to people on adventurous activities, primarily protect the sensitive natural habitats that develop in on kayaks and canoes. The Marine Lake has and around Marine Lakes. faced a number of challenges in recent years, including a severe boathouse fire in 2001, Strategic Fit: and increasing concerns over falling water • Ensure the Seafront’s heritage and environment be levels due to lakebed leakage. However the protected and enhanced; Council has continually sought to meet these • Develop physical and economic proposals that challenges and the Lake remains a vital part of assist in the rejuvenation of the Seafront; the Seafront’s offer. • Maximise the future vibrancy and sustainability of uses on the Seafront. Future Uses: The Marine Lake is, like the Model Boating Lake, a fine landmark and valuable asset for Fleetwood. Many marine lakes such as ’s and West Kirby’s have undergone a significant renaissance in recent years, as their economic value as drivers of leisure and

34 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 4

Zone 4: Adventure Sports Clubhouse purpose venue focusing on outdoor adventure sports, specifically those that require or benefit from Current Uses: This zone is presently occupied by a triangular the presence of water (sea & lakes), , and paved car park with a capacity of approximately 130 spaces. seafront climactic conditions. The new facility – The only public vehicular access route is direct from the given the working title Adventure Sports Clubhouse Esplanade on a small link road which acts as the division – could act as centre of operations for Council and between the Marine Lake to the west and the Pitch and privately run enterprises, and potentially include Putt Course (18 holes) to the east. The car park is bounded an educational dimension, café restaurant facilities by scrubland and grassed verges. An unpaved track leads and ancillary retail provision. It should seek to build eastwards from the car park, parallel with the Promenade, and on existing success stories, such as the growing reputation of Fleetwood as a hub for kiting and eventually terminating in the car park for the smaller Pitch and watersports (potentially superseding the role of the Putt Course. A number of pedestrian desire lines have been current Marine Lake boathouse), supporting the informally created from the car park to neighbouring points of existing pitch and putt facility, as well as acting as a interest, including the Promenade and the Marine Lake. base for promoting new activities, such as the hiring of bicycles, and supporting other proposals as they Future Uses: This flat and central site offers huge emerge – e.g. BMX and skateboarding. potential for developing a key tourist facility that can act as a counterbalance to the developments proposed at Strategic Fit: and around Marine Hall, and provide an attraction to • Develop physical and economic proposals encourage movement through the Seafront area. Any that assist in the rejuvenation of the Seafront; loss in car parking can be addressed increasing efficiency • Maximise the future vibrancy and of existing space, and extensions to parking capacity sustainability of uses on the Seafront; in other less visible and critical areas. At present initial • Improve linkages between the proposals are focusing on the potential to create a multi- Seafront’s key areas.

FLEETWOOD, SEAFRONT MASTERPLAN 35 5. Zoning of the Seafront - Zone 5

Zone 5: Wheels Park The provision of recreation and entertainment facilities for young people has been a long Current Uses: standing issue in the central Fleetwood area, with As with the neighbouring zone 6, this area is it being raised as a priority during the Masterplan presently occupied by a pitch and putt golf consultation. Wheels parks inevitably attract course. This course has eighteen holes, laid criticism during consultation, primarily as the typical out in two east-west lines of nine, parallel with users (and therefore supporters) are not inclined the Esplanade (the southern boundary of the to become involved in the planning process. The zone) and Promenade. To the north the zone is potential for noise, disturbance and anti-social bounded by an unpaved track that links the car behaviour and attracting a problem to an area, parks of the two pitch and putt courses. The area is kept in good condition, and represents where the gathering of young people has not been an attractive – if land-intensive – use of space an issue before is the most common reaction to on the Seafront. the development of a wheels park. This proposal is important in addressing the existing issue of young Future Uses: people meeting and remaining in the area with few The two adjoining pitch and putt courses facilities to occupy and enthuse them as well as are vastly underused. It is proposed that bringing into Fleetwood a new younger visitors (and one be retained and the other is adapted/ perhaps their parents). remodelled to provide another facility of benefit to residents and visitors. At present there is Strategic Fit: no fixed decision on which facility would be • Develop physical and economic proposals that best replaced by a new use – therefore the assist in the rejuvenation of the Seafront; proposals outlined at this time for Zones 5 and • Maximise the future vibrancy and sustainability of 6 should be considered interchangeable. uses on the Seafront.

36 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 6

Zone 6: Pitch and Putt There is also potential for a good quality crazy golf facility. The car park, which currently occupies Current Uses: around one third of the zone’s total area, could Zone 6 is occupied by the smaller (9 holes) of the be slightly extended without causing significant Seafront’s two pitch and putt courses, and a large loss to the area’s character, so as to assist in the paved rectangular car park, with a capacity of development of other zones. approximately 100 spaces. The north-eastern corner of the zone is occupied by Hangtime, a kiting specialist Strategic Fit: offering such activities as kite-surfing, landboarding, • Ensure the Seafront’s heritage and powerkiting, and buggying. A catering kiosk also environment be protected and enhanced; • Maximise the future vibrancy and operates within the same building as Hangtime. The sustainability of uses on the Seafront; zone’s primary access route is Promenade Road, which • Improve linkages between the runs past the Mount, criss-crossing the Esplanade and Seafront’s key areas. terminating at the Promenade. The zone effectively represents the centre of the entire Seafront area, and is easily accessed from the Marine Hall, the beach and is relatively close (though often poorly signposted) to the Mount and onwards into the Town Centre.

Future Uses: Assuming the adjacent pitch and putt course was transformed into a different recreational use, it would be imperative that this facility remain in its present state – there needs to be a pitch and putt offer at the Seafront.

FLEETWOOD, SEAFRONT MASTERPLAN 37 5. Zoning of the Seafront - Zone 7

Zone 7: Discovery Centre to seek to develop a new built facility in this area to complement the Marine Hall and assist in providing a Current Uses: critical mass of attractions on the Seafront to increase This zone encompasses the Marine Hall Formal footfall and expenditure. Development of this site Gardens, including four bowling greens, seven would not reduce views of residents as it is primarily beach huts, and a series of boundary spaces, overlooked by the Mount, and indeed any proposals primarily comprising of dense planting. Access for development would have to be of a scale, style and is primarily intended for pedestrians through architectural quality that respects Marine Hall without a network of paved footpaths extending from attempting to challenge its role as the centrepiece Marine Hall and linking into the adjoining pitch and structure of the Seafront. Given the findings of the land putt course to the west. A ground level access – both physical and visual – to the Promenade and use assessment of the Seafront, guided by the adopted the sea is virtually impossible. However this does Masterplan, it is clear that any new facility would need produce the benefit of reducing the wind factor in to be of a leisure, educational and/or civic focus, with an otherwise very open and flat site. some potential ancillary retailing. Given the wide array of existing and proposed leisure uses already evident in Future Uses: the Seafront, and the role of the Marine Hall as the civic The future use of this area is still under and cultural hub of the area, there is logic in seeking consideration. One proposal is to simply build to provide a facility with an educational focus – though upon the existing green space and seek to its prime role, as with any other Seafront proposal, will improve the appearance and level of interest be to assist in the rejuvenation of the wider area as a of the Formal Gardens, which whilst currently place for local residents and tourists to visit. Preliminary well maintained and reasonably attractive, hold discussions and options testing has suggested that little attraction to most users of the Seafront. an ‘energy centre’ – an interactive facility potentially A second, more transformational proposal is managed by a major energy provider in conjunction

38 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 7

with Wyre Borough Council would be worthy of further consideration. Educational leisure facilities with a focus on critical issues such as climate change, sustainable development, renewable energy, and carbon footprints have proven increasingly successful across the UK – most notably the Eden Project in Cornwall and the National Forest Centre (Conkers) in Leicestershire, but also a wide range of much smaller and less intrusive facilities. The area would also lend itself to the location of a restaurant/café taking advantage of the area’s impressive sea views.

Strategic Fit: • Develop physical and economic proposals that assist in the rejuvenation of the Seafront; • Maximise the future vibrancy and sustainability of uses on the Seafront; • Improve linkages between the Seafront’s key areas.

FLEETWOOD, SEAFRONT MASTERPLAN 39 5. Zoning of the Seafront - Zone 8

Zone 8: Outdoor Events Arena space. This space could serve as a venue for all performing arts as well as sports events, markets, wedding Current Uses: This zone encompasses the grassed ceremonies etc. When not in direct use be a robust and areas in front of and adjacent to the Marine Hall. The well maintained space that adds to the general appearance area fills a square of land bounded by the Esplanade of Marine Hall, and a place people feel comfortable to the south, Marine Hall Formal Gardens to the picnicking, reading, sitting, and generally relaxing. The west, Marine Hall and its colonnades to the north and space would provide “pop up” outlets for services such the Marine Hall car park to the east. Steps provide as water and electricity and have anchor points to enable provide expansion space for events there. Such spaces pedestrian access to the higher Esplanade, and two market stalls, marquees, etc to be erected. The space elsewhere have proven very successful when a series of paved footpaths criss-cross the whole zone providing would work together with the Marine Hall (Zone 9) are criteria are met: easy access to all adjacent uses for pedestrians. i. The space needs to maximise its versatility by being able to host as many activities as possible; Future Uses: There was a widespread concern ii. The space needs to be easily maintainable with raised during the consultation undertaken for the minimal visual impact on adjoining areas; Fleetwood Masterplan that the Marine Hall and its iii. Site maintenance needs to be frequent immediate environs does not make the visual impact and efficient; it has the potential to deliver, and that a considerable iv. Materials used in construction must be resilient to amount of land is under-used because it effectively local weather conditions and potential vandalism; lacks any specific purpose. However few people wanted to see significant built development which Strategic Fit: either obscured Marine Hall or generally changed the • Develop physical and economic proposals that open and peaceful character of the area. Therefore assist in the rejuvenation of the Seafront; the proposal for this zone is to turn an inefficient and • Maximise the future vibrancy and sustainability of unremarkable area of grassed and paved land into uses on the Seafront; a more active and attractive outdoor performance • Improve linkages between the Seafront’s key areas.

40 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 9

Zone 9: Marine Hall - Fleetwood Cultural and Conference Centre

The Marine Hall sits at the heart of Fleetwood’s Seafront, overlooked by the Mount, and backed by spectacular sea views over Morecambe Bay.

The Hall was opened in 1935 and has been the premier entertainment venue for the Wyre area ever since. Whilst not Listed, The building’s art deco style gives it a unique and distinctive appearance. Shows and events that take place here are diverse, with top international performers and independent local groups alike using the facilities. The Marine Hall contains a hall capable of seating approximately 600, unique in the area, a bar, a kitchen, a meeting room, and other ancillary office and preparation space. It is well managed and well used, but is limited in its potential due to its internal layout. The building’s modifications over a number of years disqualify it from being ‘Listed’, and concerns remain over the long term costs of maintaining the facility given that it has a annual deficit, although this is decreasing. This deficit is borne by Wyre Borough Council.

FLEETWOOD, SEAFRONT MASTERPLAN 41 5. Zoning of the Seafront - Zone 9

Future Uses: Existing Marine Hall It is the intention of these Seafront development proposals to enhance Marine Hall’s role as the centrepiece of Fleetwood’s Seafront. After deliberation over the future of the facility through the Masterplan and subsequent studies and through public consultation it has been agreed that the Hall will remain in terms of its current location and basic functions, but that enhancements are required. The principal concerns are that the Hall has an inefficient internal layout; a poor entrance; lacks a range of room sizes; is largely inactive during the daytime; and perhaps most frustratingly, lacks significant views of the sea that it adjoins. The Seafront Masterplan’s proposals are phased (i.e. will work in their own right on a stage by stage basis, each phase will add new dimensions to the hall, with maximum benefits being delivered when all stages are eventually completed), based on both financial reality and the need to ensure the character of the Seafront is not irreparably damaged through excessive change.

42 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 9

Stage 1 The summary of the proposals is as follows:

• As a first stage upgrade the main entrance and increase the utility of the building by enclosing the Portico on the south side of the building to give better circulation to all parts of the Hall. Within the foyer a visitor/education/ interpretation centre would be developed to complement the new café facility.

FLEETWOOD, SEAFRONT MASTERPLAN 43 5. Zoning of the Seafront - Zone 9

• Increase the footfall and usage of the building Stage 2 during daytime hours by providing a cafe facility with access from the Promenade and views over Morecambe Bay. • Complete a glazed addition onto the seaward side of the Hall to provide a gallery and space for conferences, meetings, seminars, education, etc

44 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 9

Stage 3 • Develop the colonnades on the western side of the Hall for further conference space or for retail/leisure units

Strategic Fit: • Ensure the Seafront’s heritage and environment be protected and enhanced; • Develop physical and economic proposals that assist in the rejuvenation of the Seafront; • Maximise the future vibrancy and sustainability of uses on the Seafront; • Improve linkages between the Seafront’s key areas.

FLEETWOOD, SEAFRONT MASTERPLAN 45 5. Zoning of the Seafront - Zone 10

Zone 10: Leisure Hub the range of facilities is well above average, and consequently it is considered vital for the Seafront’s Current Uses: The zone is dominated by the regeneration proposals that if the Leisure Centre is to Fleetwood Leisure Centre, a large modern building remain it will continue to receive public investment. The built in 1974, and the adjoining indoor swimming external appearance of the buildings is extremely poor pool. The site of now redundant outdoor pool and undoubtedly reduces the overall lure of Fleetwood is visible to the south of the indoor facility. The Seafront as a credible tourist destination. Whilst it maybe the parking and pedestrian access areas, alongside remainder of the site is predominantly a large paved unrealistic to propose any significant rebuilding or re- quality landscaping would reduce the negative impact of car park, informally divided into three distinct areas cladding of public leisure facilities given the inevitable the facility’s appearance. The site of the former outdoor (also serving the Marine Hall), each capable of pressures on Council resources, some rationalising of pool represents an unattractive and inefficient use of a holding approximately 50 cars. The zone is bound high profile site that could potentially be used to increase by the Promenade to the north, Esplanade to the parking capacity and include some element of greenery south, Marine Hall to the west, and bowling greens that is notably lacking from this zone at present. If in the to the east. The principal vehicular access is from longer term if the Council should consider closing these the Esplanade and is shared with Marine Hall. facilities then we would suggest that this area be used As well as the swimming pool, the Leisure Centre either for leisure , health and fitness, hotel or education offers new gym facilities, indoor football, aerobics, use. Given the zone’s proximity to the historic Mount badminton, netball, basketball, and a family and the Marine Hall it is imperative that any replacement friendly ‘village’ changing facility. buildings are of a scale, style and architectural quality that respect these important buildings. Future Uses: The Leisure Centre is a vital facility for the future of the Seafront as it attracts visitors Strategic Fit: from both the immediate urban area and from • Maximise the future vibrancy and sustainability of further across Wyre, primarily due to the presence uses on the Seafront; of the swimming pool. With recent upgrades • Improve linkages between the Seafront’s key areas.

46 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 11

Zone 11: Bowling Greens and Children’s Play Area This zone is also occupied by two flat grassed general along the Esplanade without realising how purpose recreational areas, a crazy golf course, and a to reach the lower playing fields. This lack of Current Uses: This relatively small but strategically small children’s playground. The area has recently been visibility undermines an important zone that it placed zone comprises of a well maintained bowling successful in obtaining public investment in upgrading is proposed remains fundamentally focused on greens, bounded by paved footpaths that allow the quality of the planting and pathways and installing providing informal family-oriented space suitable convenient access between the leisure hub to the a new kick about area and a new attractive children’s for ad hoc ball games, picnicking and general west and the gardens and children’s play area to the play area. Bounded to the south by the Esplanade, the relaxing. The introduction of a more dramatic east. The greens are partially sheltered from the sea by zone ‘s principal pedestrian entrance is adjacent to the play area for children, especially if the new facility the presence of a number of beach huts, and can be site of the former Pier, and this wide footpath traverses had the necessary height to be viewed from accessed directed from the Esplanade to the south. the entire zone providing easy access to the adjoining Euston Park, could become a major draw for the bowling greens and on to Marine Hall. Seafront, and instrumental in creating linkages between the Town Centre and the Seafront. Future Uses: Discussions with stakeholders Any development would need to be strictly for suggest that whilst the current number of bowling recreational and leisure purposes, so as to not greens across the Seafront is too high for levels of change the character of the area or impact usage there remains a keen number of users, and negatively on views of Marine Hall and other furthermore in the interests of diversity of attractions landmarks beyond this zone. it is vital that some bowling greens remain active. Therefore it is proposed that one of the greens be Strategic Fit: retained and protected in Zone 11. The zone is • Ensure the Seafront’s heritage and relatively understated and quite easily missed for an environment be protected and enhanced; area that should be at the hub of the Seafront offer. • Maximise the future vibrancy and To some degree this is a consequence of topography sustainability of uses on the Seafront; and access – many people will walk from Euston • Improve linkages between the Park/North Albert Street towards the Marine Hall Seafront’s key areas.

FLEETWOOD, SEAFRONT MASTERPLAN 47 5. Zoning of the Seafront

Zone 11 - Precedent Images Zone 12 - Precedent Images

48 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 12

Zone 12: The Pier owner (a multiple leaseholder) had submitted plans for ii. The need to appreciate in future design terms the conversion of the Pier to residential apartments. that this site is (and must remain) the visual Current Uses: opened in 1910, and However in the light of the 2008 fire, he is now gateway for the Seafront from Euston Park despite a series of incidents, including a major fire in proposing a hotel use of the site. The Pier site is highly and the prime vehicular and pedestrian links 1953 and numerous changes of use, primarily due to visible and is the gateway zone to the main part of from the Town Centre; economic factors, remained open until 2005. After a Fleetwood Seafront. Whilst the loss of the most recent further entertainment venture failed the Pier remained built structure cannot be considered detrimental to the The future uses of the Pier zone that would appear closed until a major fire in September 2008 destroyed area’s character given its poor appearance, the current to be most conducive to the development of the most of the built structure. Subsequent demolition work site still remains an acute problem for Fleetwood, Seafront would be hotel, retailing (including the for public safety reasons has effectively led to a flat seriously undermining the Town’s credibility as an provision of restaurants/cafes) or leisure uses, as and empty site, only notable for the remains concrete attractive tourist resort. these would act as the visual attractors necessary floorplate of the Pier’s main built structure. The current to entice people from the Town Centre towards the Future Uses: Proposals for this zone must reflect the fact Seafront and vice versa. that it is in private ownership unlike the majority of the Seafront. No development of the Pier site can be permitted Strategic Fit: that is detrimental to the objectives of the Seafront area on • Develop physical and economic proposals the grounds that it will undermine the broader regeneration that assist in the rejuvenation of the Seafront; of Fleetwood Town Centre. Whilst the owner and the • Maximise the future vibrancy and planning authorities will determine the future uses of sustainability of uses on the Seafront; the site, it is vital that the following points are taken into • Improve linkages between the consideration at this zone as a priority: Seafront’s key areas.

i. The urgent need to change the current appearance of the site, as a minimum transforming it from a negative to a neutral factor in the area;

FLEETWOOD, SEAFRONT MASTERPLAN 49 5. Zoning of the Seafront - Zone 13

Zone 13: The Lighthouse Quarter To thoroughly appreciate the value of this area, it is locomotive was capable of traversing Cumbria so rail vital to understand the story of the development of links to were impossible to develop. The Current Uses: Fleetwood. Fleetwood is a historic planned town, North Euston Hotel, so named as it was adjacent to Zone 13 represents the transition between conceived in the early nineteenth century and named the terminus of the rail line from London Euston was two areas designated as ‘Focus Areas’ in after its founder, Sir Peter Hesketh-Fleetwood. The opened in 1841, and is an imposing Grade II-listed the Fleetwood Masterplan developed by eminent architect Decimus Burton was commissioned sandstone three-storey crescent shaped building Wyre BC, NWDA and English Heritage in to design and supervise the construction of the new designed to reflect the curvature of the coastline, 2007. These Focus Areas, namely the retail town, which at its inception was intended to have two retaining many of its original external architectural focused central core of Lord Street, and the purposes: a holiday resort and a seaport to link the features. The two lighthouses, known as the Upper and tourism and recreation focused Seafront, have north and south of the UK as at that time no steam Lower, are also Grade II listed. The Upper Lighthouse, been recognised as areas able to stimulate situated on Pharos Place, is replica of Pharos regeneration of the town centre. Whilst the Lighthouse in Alexandria, and led to the central ward of two areas do not directly adjoin, at the north Fleetwood also bearing the name Pharos. The Lower eastern tip of Fleetwood town centre they are Lighthouse stands on the Seafront opposite the North separated only be a small distance by an area Euston Hotel and is ten metres above high water level, of remarkable historic value, anchored by the making it visible for almost fifteen miles. landmark North Euston Hotel and Fleetwood’s two lighthouses. Given the area’s architectural For the purposes of this study the zone’s boundaries and heritage value it was not viewed by follow those of the Pharos Conservation Area outlined in the Masterplan as an area of development Fleetwood’s adopted Conservation Area Appraisal, which opportunity, but it is clear that it does hold a was undertaken in 2007 and used to inform the Fleetwood different but equally important role in linking Masterplan. This area stretches from the Old Pier site the key regeneration areas by maximising the following the coastline round the entrance to the Estuary accessibility and attractiveness of the assets up to the junction of Queen’s Terrace and Victoria Street, already present. and is bounded to the inland side by North Albert Street

50 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 13

and the rear of the North Euston Hotel. Consequently the iconic North Euston Hotel and two lighthouses, as well as the , Euston Gardens, Pharos Tram Station, and Queen’s Terrace, a series of residences built by Hesketh-Fleetwood in 1844 for the town’s most prominent inhabitants, which remains one of the most prominent buildings in the town today. Euston Gardens is a small triangular walled greenspace directly in front of the North Euston Hotel. It is bounded by North Albert Street to the west, Bold Street to the south, and the Esplanade to its longest side. The Park offers superb views to the sea, both to the north and the east, to the Ferry Station to the south, and the Hotel to the west. Whilst not geographically an obvious part of the Seafront, with North Albert Street’s natural progression into Lord Street and the commercial heart of Fleetwood, Euston Park effectively serves as the gateway to the entire Seafront area – it is the sight of the Park that is most likely to encourage pedestrians and vehicles to continue out of the commercial heart towards the Seafront before they are able to see everything else the area has to offer. At present the Park is reasonably attractive with seating and grassed areas protected by two-three foot hedge and a similarly high stone wall. The Park suffers a slight sense of isolation, being surrounded by large and often reasonably busy roads.

FLEETWOOD, SEAFRONT MASTERPLAN 51 5. Zoning of the Seafront - Zone 13

Future Uses: The Lighthouse Quarter represents Perhaps the area most suitable for initial intervention interest; and that the analysis done at the design stage the heart of historic Fleetwood, an area that is Euston Gardens. The relatively bland content of the will be primarily focused on enhancing the town for predates the Seafront and indeed much of the Gardens could be subjected to a design competition the public’s benefit; there may be potential to seek development elsewhere in the town at the docks and wherein expert landscapers devise schemes to make Townscape Heritage Initiative (THI) funding in the future, in the residential neighbourhoods. As noted in the the area more vibrant and of greater interest, without and it will be imperative that further work done in this Fleetwood Masterplan one of the major weaknesses threatening the elegant and understated quality of zone explores this opportunity further. in Fleetwood is the lack of connectivity between key this corner of Fleetwood. Potentially some resurfacing areas. It is very easy to arrive by car or tram and of the surrounding road network to make it more Strategic Fit: have no knowledge of the presence of the Seafront pedestrian-friendly could reduce the sense of isolation • Ensure the Seafront’s heritage and environment be or of Lord Street’s retail offer depending on which and encourage more of the Gardens as a recreational protected and enhanced; route people arrive by. To some degree this can be space. The design contest would be flexible in the • Develop physical and economic proposals that addressed by signage, however there needs to be area of focus and allow for recommendations on how assist in the rejuvenation of the Seafront; a subtler, more visually attractive and sustainable the wider ‘Lighthouse Quarter’ could become more • Improve linkages between the Seafront’s key areas. approach taken to connecting the key areas by the coherent and permeable. The potential for the Gardens improved management of important spaces, the to be a gateway to the Wyre Way coastal trail will also eradication of visual and physical barriers, and the be explored, indeed in due course consideration should enhancement of existing features, so as to provide a be given to the potential for the Way to traverse the seamless link between Lord Street and the Seafront. Lighthouse Quarter and formally link Lord Street to the The historic core of the town within zone 13 is the Promenade should be made. ideal location for this, given its multi-functional nature, strategic location between two Focus Areas and the Given that: the Pharos ward has proven socio- existing assets it offers. The unusual and enticing economic weaknesses; the Quarter sits within a features of the Lighthouses in particular should be Conservation Area; includes a number of buildings more prominent in the marketing and branding of notable for their heritage value and owned by a variety Fleetwood as a tourist destination. of organisations rather than a single dominant private

52 FLEETWOOD, SEAFRONT MASTERPLAN 5. Zoning of the Seafront - Zone 14

Zone 14: Mount Gardens Future Uses: The Mount is possibly the most unique and fascinating feature in Fleetwood. Current Uses: The Mount and the Pavilion forms a key Unlike the other Seafront great assets, such as element of the town planning of Fleetwood undertaken the Marine Lake and Hall, there is no realistic by noted architect Decimus Burton in 1835. The equivalent in other seaside resorts. The gardens, existing hill (mount) became the focal point of the street whilst offering excellent views do not represent layout in the Town and remains so to the present day. The Mount is an irregularly shaped area of greenspace, much of an attraction. Themeing the gardens, e.g. The extension of the Town northwards through the bounded to the north by the Esplanade, to the west as a coastal garden, could attract visitors with reclamation of land from the sea has actually added to by Promenade Road, and to all other sides by Mount an interest in horticulture. However earmarking the prestige of the Mount with its wide ranging views of Road. It rises steeply to a pinnacle topped by the viable uses for the Pavilion building remains the coastline and the Cumbria mountains. Pavilion building first built in 1836 and rebuilt in its current effectively difficult as the investment required in decagonal form in 1902. A clocktower was added in the provision of services and internal works would 1919. The building, whilst in sound structural condition, negate any value in using the building as premises presently lies empty, suffering under-use due to its unusual for a business. However the intrinsic attraction shape, relatively small floorplate, lack of basic services of the building makes it valuable to Fleetwood’s and isolation from the main hubs of footfall in the Town. heritage and Seafront and perhaps the Pavilion The majority of the Mount is given over to grassed areas, could be used as an Interpretative Centre for with some trees and shrubbery on the leeward side, and a either the gardens or on the development of network of paved pathways for pedestrians to explore the Fleetwood and the role of Decimus Burton. site. Behind the Pavilion is a children’s playground and the small Mary Hope Garden, which includes some seating Strategic Fit: and attractive flowerbeds. Two small cottages sit at the • Ensure the Seafront’s heritage and rear (southern) entrance to the Mount, protected by a environment be protected and enhanced; cobbled wall and wrought iron gate, originally designed as • Improve linkages between the hunting lodges for Sir Peter Hesketh-Fleetwood. Seafront’s key areas.

FLEETWOOD, SEAFRONT MASTERPLAN 53 5. Zoning of the Seafront

The Promenade in contrast to the Esplanade, which has benefitted from attractive paving and artworks in recent years. Current Uses: To some extent this is the fault of other facilities – and This zone represents the Promenade stretching proposals such as the remodelling of Marine Hall from where it adjoins Fleetwood Golf Club up and the development of an Adventure Clubhouse where it effectively terminates as a traditional will clearly assist in animating the Promenade. promenade between the Old Pier site and the Further work is required though to maximise the Children’s Play Area (zone 11), and is the heart potential of the entire Seafront. Interventions such of Fleetwood Seafront – a wide paved pathway as quality paving, information boards and signage, separating the sea from the land. Unrivalled views artwork, benches, better lighting to enhance security, and the openness of the area make it a popular and stronger links into the key zones such as the walk and a natural way of moving from one part picnicking facilities (zone 1), Adventure Clubhouse of the Seafront to another, especially given the (zone 4), Marine Hall (zone 9), and Children’s Play general lack of permeability elsewhere. Area (zone 12) would undoubtedly increase usage of the Promenade and enable it to fulfil its natural role of Future Uses: being the Seafront’s prime arterial route. A promenade should be the pride of every seaside town, showcasing exactly why seaside Strategic Fit: towns are invariably popular tourist destinations. • Ensure the Seafront’s heritage and environment be However whilst Fleetwood’s Promenade has protected and enhanced; advantages – such as its width – it is generally • Develop physical and economic proposals that a disappointment, being unimaginatively paved, assist in the rejuvenation of the Seafront; lacking lighting, signage and street furniture, • Maximise the future vibrancy and sustainability of and generally feeling very disconnected from uses on the Seafront; the facilities on the Seafront it borders. This is • Improve linkages between the Seafront’s key areas.

54 FLEETWOOD, SEAFRONT MASTERPLAN FLEETWOOD, SEAFRONT MASTERPLAN 55

Appendix 1 Strategic Assessment SEAFRONT APPRAISAL ‐ STRATEGIC ASSESSMENT

STAGE 1: STRATEGIC ASSESSMENT What land uses meet the objectives of the Regeneration Framework?

RF Objective OB1 OB2 OB3 OB4 OB5 OB6 OB7 Recommendation Ensure the Town’s cultural Ensure as far as possible Develop a range of physical Maximise the future vibrancy Highlight deliverable Improve linkages between Consider a range of What is the estimated overall heritage and unique that the Council, other and economic proposals and sustainability of uses on development and Fleetwood’s key areas innovative ways for utilising value of the land use for environment be protected statutory bodies, that assist in the the Seafront redevelopment opportunities the Council’s property Fleetwood's Seafront in and enhanced businesses, residents and rejuvenation of the Town portfolio terms of both the area's other stakeholders in development and its role in Fleetwood support the rejuvenating the Town? Land Use Vision Residential The Seafront has never been a The Fleetwood Masterplan Whilst residential use and good Whilst residential development A recent appraisal of the viability The quality of linkages to and There has long been a Of all uses suggested for the residential area so the unique consultation clearly indicated design can assist in providing an can provide economic benefits, of residential development on the from existing residential presumption that residential Seafront in this assessment, environment will be changed by concerns about the development enhanced offer in the Town that passive security and increase the Seafront suggested it is not communities differs significantly development provides the highest residential has been subject to bringing residential development of the Seafront for residential use. must be balanced against the scale of local footfall and presently deliverable. dependent on the nature of the value use for landowners ‐ the greatest scrutiny. Generally it into the area. objectives of the Masterplan / community events, appropriate building stock and the quality of however recent economic does not appear to be a viable Delivery Framework. alternative uses can also achieve the design. Developing linkages conditions, combined with the option and will not form a part of the desired outcomes. will assist in enhancing the fragility of the Fleetwood market, any emerging proposals. permeability of the Seafront. negate this presumption.

Leisure / Recreation The Seafront is primarily focused There is widespread support The principal attraction of visiting Leisure and recreational land Many coastal masterplans and Recreational uses tend to provide Leisure is a divisive land use, with Where economically feasible and on tourism and recreation for bothemerging from the Masterplan the seaside is based around uses tend to be the single most frameworks have overly high a specific concentration of facilities often split between physically acceptable, the locals and visitors. Further and other work for leisure uses on recreational pursuits. Allied with welcoming and broadly open expectations of the lesiure linkages, often being land public and private provision. The development of lesiure and sympathetic development for the Seafront. Strategic proposals more well developed leisure group of uses of all. With good sector's ability to deliver intensive uses ‐ this is already in need to ensure general recreational facilities on the leisure purposes links perfectly for the Borough's leisure offer offers, the area becomes planning and sensible links they economically viable projects, evidence at the Seafront. accessibility and affordability to Seafront has to be viewed as into the Seafront's strategic role. may impact on the provision on increasingly attractive to locals can help define an area's especially in areas undergoing the public in Fleetwood will have extremely desirable. facilities in due course. and visitors. Therefore the character and provide the catalyst regeneration. Such limitations to be weighed against the need to provision of a range of leisure and to support retail and civic extend to the provision of a hotel appreciate the burden such receational uses on the Seafront facilities. on the Seafront. Therefore a facilities can put on the Wyre are vital to Fleetwood. balance needs to be found taxpayer, making leisure and between being aspirational and recreational uses a limited option being realistic. for the Seafront.

Offices The Seafront has never been a Office development is unlikely to Office development on the fringe Office development can provide Office development is unlikely to Office development tends to be The Council's portfolio would be Whilst not the deeply unattractive hub for offices other than those gain much public support and in of Fleetwood Town Centre is footfall and security. However the be economically or politically well integrated into local better served by concentrating neighbour that industrial land use ancillary to other uses. Office commercial terms the setting may strategically desirable, but the overall nature of offices ‐ acceptable on the Seafront given transport nodes and adjoining office use on other sites across represents, there are no clear development will not enhance the be attractive but accessibility and unique nature and catalytic value generally very limited interaction the site's importance for other retail and leisure offers ‐ the Borough. benefits in allowing office area's unique environment. development costs will undermine of the Seafront reduces the with neighbouring uses ‐ would uses and the number of preferred strategically however the value of development on Fleetwood interest. likelihood that office development not support the area's prime role locations for employment office development on the Seafront. here would lead to wider urban as a leisure and civic hub, elsewhere. Seafront for the Town Centre is regeneration. possibly acting as a specific less apparent. deterrent.

Industrial The Seafront's unique offer makes It is highly unlilkely any Current industrial development Industrial uses would be poor Industrial development will A land use so diverse from The Council's portfolio would not Industrial uses on the Seafront industrial use highly stakeholder would support proposals exist around Fleetwood neighbours for existing users and require sites with the necessary adjoining uses would act as a be best served by a low value use would actively undermine the unacceptable. industrial uses on the Seafront. and there is no clear benefit in would significantly reduce local planning designations and barrier restricting internal being permitted on one of the regeneration of Fleetwood and using Town Centre or waterside vibrancy, reducing the Seafront's strategic transport links. linkages. Borough's most important sites. damage the area's unique sites for such uses. ability to act as a wider a catalyst character. 58 FLEETWOOD, SEAFRONT MASTERPLAN for regeneration.

Retail Retailing can provide tourist Successful retailers are amongst The Seafront could act as a Retail is oriented towards general The current economic climate, Retail survives by being visible Sustainable retail businesses can Limited ancillary retail attractors, footfall and the most locally progressive unique selling point for retailers custom ‐ i.e. users may not and Fleetwood's longstanding and accessible, and the guidance provide value for key sites, development, if responsive to the employment opportunities. businesspeople, with a as a location ‐ however there has specifically have intended to use fragility for retail business means of retailers should inform the stimulate tourism and spin‐off local character and the need to However unsympathetic or too heightened sense of the local to be an awareness that any retail these facilities. The provision of there has to be an above average proposed linkages. benefits, and increase local not directly compete with the much retail can permanently customer base ‐ using their skills developed here is not directly facilities open to all is highly vital element of risk on relying on entreprenuership and Town Centre, would be beneficial undermine the Seafront's as part of the wider Seafront team competing with the Town Centre. for the Seafront. retail ventures to catalyse employment opportunities. to the Seafront, increasing character. is highly recommended. Seafront redevelopment. vibrancy and potentially economic sustainability.

Greenspace The Seafront (and Mount) has Greenspace, if well maintained, Greenspace can sometimes be The quality and range of potential Greenspace is relatively easy to Greenspace with clear linkages Greenspace uses tend to provide Where there may be a loss of always benefitted from a retains a huge degree of public viewed as a relatively uses of greenspace make it a deliver ‐ it is the benefits it can be considered effectively little capital or revenue receipt existing greenspace if other uses signficant degree of greenspace popularity. Built development can uneconomical use of sites ‐ difficult land use to categorise. provides that are more likely to be recreational space as it is and do not significantly assist the offer benefits, there should be an for landscaping purposes. The easily be viewed as negative. however in urban areas where Greenspace that has no subject to scrutiny. Greenspace is encouraging active usage ‐ and in Council's need to reduce attempt to develop other areas 'openness' factor it creates is However some stakeholders space is less common, and in significant recreational benefit effectively environmental areas many instances this will be a expenditure. Greenspace does for greenspace so as to protect vital and should be at the very recognise that maintaince costs areas where tourism is an may add to the overall character without a specific recreation suitable aim for the Seafront meet many of the Council's the overall offer. Seafront least maintained, unless of greenspace require other economic driver ‐ it has a much of the Seafront, but would be the function, and in some instances it green spaces. In other instances targets to ensure a good living greenspace should generally seek proposals actively increase its avenues of development to be higher value which needs to be underuse of an important asset in is important to have areas that no specific attempt may be made environment for its residents to offer a recreational dimension value ‐ e.g. through the provision explored. Therefore the provision, recognised when contrasting tackling Fleetwood's economic serve no greater purpose than to encourage human usage (e.g. however. and not simply be an under‐used of a greater recreational and future use of, greenspace can proposals emerge. and social problems. bounding other uses and the grassed areas of the Mount) ‐ element between other uses. dimension. occasionally become a increasing the aesthetic quality of however simultaneously there Provision of greenspace must disproportionally high profile the wider area. should be no barriers to prevent never be pursued for simplicity if issue to the detriment of other residents and visitors utilising greater regeneration benefits can proposals. these spaces should they desire. be indisputably achieved through allowing other forms of development in the first instance.

Education Aside from small research and The provision of education Education could potentially offer Until further details are known Further consideration of the Educational facilities can often The development of one or more Of all land uses considered in this training facilities the Seafront has facilities at the Seafront has yet a significant contribution to the educationally focused proposals locating of educational facilities seem closed off to neighbouring education facilities in and around assessment the strengths and never been an education hub. The to be tested with the general physical and economic are hard to quantify. Generally at the Seafront is clearly worth uses ‐ and even more so in the the Seafront offers potential weaknesses of educational uses increased footfall and potential public. From the policymaker and redevelopment of Fleetwood as a education provides footfall, undertaking as deliverability of perception of users. Good design mechanisms for realising the on the Seafront are hardest to spend, as well as the social economic perspective there is an whole, and possibly the Seafront. turnover and a high degree of proposals is usually high in the can mitigate these negative value of some of the Council's quantify. It is likely there will be benefits may suit the area's initial degree of support caveated Centres of learning have vibrancy, but it can often create a education sector, as the very impacts, but it remains a property portfolio and as such significant numbers of each, so character, if the proposal(s) has by a need to do further analysis of numerous spin‐off benefits and relatively self‐contained and existance of proposals is potential concern. requires further investigation. only a thorough evaluation of merit. proposals. have long been a staple of unapproachable community to generally based on detailed proposals will provide a definitive regenerative schemes elsewhere. outsiders. examination of need, catchment answer. and funding.

Civic and Cultural The Seafront has long been a The provision of civic facilties Whilst the Seafront needs to act Facilities that are primarily Many civic facilities, particularly Civic facilities tend to act as the The provision of civic facilities Where economically feasible and Facilities centre for community activities based around a rejuvenated as a destination and host some focused on community and visitor in smaller urban areas or those hub ‐ along with good retail and can be relatively costly for local physically acceptable, the and the enhancement and Marine Hall has long been civic facilities, coastal town use are fundamental to the that are relatively isolated such lesiure ‐ and also can provide a authorities. Much has already development of civic facilities on provision of further facilities recognised as the most strongly centres can sometimes suffer if character of the Seafront, and as Fleetwood (therefore having a sense of constancy lacking in been done to reduce expenditure the Seafront has to be viewed as should be encouraged. supported option for the Seafront the coast usurps the centre as the Fleetwood's appeal as a wider reduced potential catchment) commercial ventures. Linkages at at the Seafront, but it is inevitable extremely desirable. following the work of the Town natural focus of the town's destination will be heavily struggle to make civic facilities the Seafront are relatively weak future proposals will be Centre Masterplan. citizens. A balance will need to be influenced by the vibrancy and economically viable. Whilst it is at present, but the potential is undermined if they are seen as found to ensure that the atractiveness of this area ‐ the duty of the public sector to extremely high. excessively expensive. By looking regeneration of the Seafront is therefore it is indisputably clear provide a range of services and at the Seafront as a broader entity not achieved simply through that civic facilities contribute attempt to stimulate socio‐ with a range of uses, less‐ displacement of Town Centre towards achieving this objective. economic progress in the Town, it profitable uses such as civic facilities. is also apparent that a Seafront facilities can be offset by strategy that relies on civic uses allowing higher value uses. The in its entirety will not be key is ensuring this balance does deliverable, and certainly not not result in proposals sustainable. detrimental to the unique character of the area.

Key Use assists in the delivery of the Objective Use has an overall neutral effect on the Objective Use fails to meet the Objective SEAFRONT APPRAISAL ‐ STRATEGIC ASSESSMENT

STAGE 1: STRATEGIC ASSESSMENT What land uses meet the objectives of the Regeneration Framework?

RF Objective OB1 OB2 OB3 OB4 OB5 OB6 OB7 Recommendation Ensure the Town’s cultural Ensure as far as possible Develop a range of physical Maximise the future vibrancy Highlight deliverable Improve linkages between Consider a range of What is the estimated overall heritage and unique that the Council, other and economic proposals and sustainability of uses on development and Fleetwood’s key areas innovative ways for utilising value of the land use for environment be protected statutory bodies, that assist in the the Seafront redevelopment opportunities the Council’s property Fleetwood's Seafront in and enhanced businesses, residents and rejuvenation of the Town portfolio terms of both the area's other stakeholders in development and its role in Fleetwood support the rejuvenating the Town? Land Use Vision Residential The Seafront has never been a The Fleetwood Masterplan Whilst residential use and good Whilst residential development A recent appraisal of the viability The quality of linkages to and There has long been a Of all uses suggested for the residential area so the unique consultation clearly indicated design can assist in providing an can provide economic benefits, of residential development on the from existing residential presumption that residential Seafront in this assessment, environment will be changed by concerns about the development enhanced offer in the Town that passive security and increase the Seafront suggested it is not communities differs significantly development provides the highest residential has been subject to bringing residential development of the Seafront for residential use. must be balanced against the scale of local footfall and presently deliverable. dependent on the nature of the value use for landowners ‐ the greatest scrutiny. Generally it into the area. objectives of the Masterplan / community events, appropriate building stock and the quality of however recent economic does not appear to be a viable Delivery Framework. alternative uses can also achieve the design. Developing linkages conditions, combined with the option and will not form a part of the desired outcomes. will assist in enhancing the fragility of the Fleetwood market, any emerging proposals. permeability of the Seafront. negate this presumption.

Leisure / Recreation The Seafront is primarily focused There is widespread support The principal attraction of visiting Leisure and recreational land Many coastal masterplans and Recreational uses tend to provide Leisure is a divisive land use, with Where economically feasible and on tourism and recreation for bothemerging from the Masterplan the seaside is based around uses tend to be the single most frameworks have overly high a specific concentration of facilities often split between physically acceptable, the locals and visitors. Further and other work for leisure uses on recreational pursuits. Allied with welcoming and broadly open expectations of the lesiure linkages, often being land public and private provision. The development of lesiure and sympathetic development for the Seafront. Strategic proposals more well developed leisure group of uses of all. With good sector's ability to deliver intensive uses ‐ this is already in need to ensure general recreational facilities on the leisure purposes links perfectly for the Borough's leisure offer offers, the area becomes planning and sensible links they economically viable projects, evidence at the Seafront. accessibility and affordability to Seafront has to be viewed as into the Seafront's strategic role. may impact on the provision on increasingly attractive to locals can help define an area's especially in areas undergoing the public in Fleetwood will have extremely desirable. facilities in due course. and visitors. Therefore the character and provide the catalyst regeneration. Such limitations to be weighed against the need to provision of a range of leisure and to support retail and civic extend to the provision of a hotel appreciate the burden such receational uses on the Seafront facilities. on the Seafront. Therefore a facilities can put on the Wyre are vital to Fleetwood. balance needs to be found taxpayer, making leisure and between being aspirational and recreational uses a limited option being realistic. for the Seafront.

Offices The Seafront has never been a Office development is unlikely to Office development on the fringe Office development can provide Office development is unlikely to Office development tends to be The Council's portfolio would be Whilst not the deeply unattractive hub for offices other than those gain much public support and in of Fleetwood Town Centre is footfall and security. However the be economically or politically well integrated into local better served by concentrating neighbour that industrial land use ancillary to other uses. Office commercial terms the setting may strategically desirable, but the overall nature of offices ‐ acceptable on the Seafront given transport nodes and adjoining office use on other sites across represents, there are no clear development will not enhance the be attractive but accessibility and unique nature and catalytic value generally very limited interaction the site's importance for other retail and leisure offers ‐ the Borough. benefits in allowing office SEAFRONT APPRAISAL ‐ STRATEGICarea's unique environment. ASSESSMENT development costs will undermine of the Seafront reduces the with neighbouring uses ‐ would uses and the number of preferred strategically however the value of development on Fleetwood interest. likelihood that office development not support the area's prime role locations for employment office development on the Seafront. STAGE 1: STRATEGIC ASSESSMENT here would lead to wider urban as a leisure and civic hub, elsewhere. Seafront for the Town Centre is regeneration. possibly acting as a specific less apparent. What land uses meet the objectives of the Regeneration Framework? deterrent.

RF Objective OB1 OB2 OB3 OB4 OB5 OB6 OB7 Recommendation Industrial TheEnsure Seafront's the Town’s unique offercultural makes ItEnsure is highly as unlilkely far as anypossible CurrentDevelop industrial a range development of physical IndustrialMaximise uses the would future be vibrancy poor IndustrialHighlight development deliverable will AImprove land use linkagesso diverse between from TheConsider Council's a rangeportfolio of would not IndustrialWhat is theuses estimated on the Seafront overall industrialheritage useand highly unique stakeholderthat the Council, would support other proposalsand economic exist around proposals Fleetwood neighboursand sustainability for existing of users uses and on requiredevelopment sites with and the necessary adjoiningFleetwood’s uses wouldkey areas act as a beinnovative best served ways by a forlow utilisingvalue use wouldvalue activelyof the landundermine use for the unacceptable.environment be protected industrialstatutory uses bodies, on the Seafront. andthat there assist is noin clearthe benefit in wouldthe Seafront significantly reduce local planningredevelopment designations opportunities and barrier restricting internal beingthe Council’s permitted propertyon one of the regenerationFleetwood's of Seafront Fleetwood in and and enhanced businesses, residents and usingrejuvenation Town Centre of the or waterside Town vibrancy, reducing the Seafront's strategic transport links. linkages. Borough'sportfolio most important sites. damageterms of the both area's the unique area's sites for such uses. ability to act as a wider a catalyst character. other stakeholders in development and its role in for regeneration. Fleetwood support the rejuvenating the Town? Land Use Vision Residential The Seafront has never been a The Fleetwood Masterplan Whilst residential use and good Whilst residential development A recent appraisal of the viability The quality of linkages to and There has long been a Of all uses suggested for the Retail Retailingresidential can area provide so the tourist unique consultationSuccessful retailers clearly areindicated amongst Thedesign Seafront can assist could in actproviding as a an Retailcan provide is oriented economic towards benefits, general Theof residential current economic development climate, on the Retailfrom existing survives residential by being visible Sustainablepresumption retail that businessesresidential can LimitedSeafront ancillary in this assessment, retail environmentattractors, footfall will be and changed by concernsthe most locallyabout theprogressive development uniqueenhanced selling offer point in the for Town retailers that custompassive ‐ securityi.e. users and may increase not the andSeafront Fleetwood's suggested longstanding it is not andcommunities accessible, differs and the significantly guidance providedevelopment value providesfor key sites, the highest development,residential has if been responsive subject to to the employmentbringing residential opportunities. development ofbusinesspeople, the Seafront for with residential a use. asmust a location be balanced ‐ however against there the has specificallyscale of local have footfall intended and to use fragilitypresently for deliverable. retail business means ofdependent retailers shouldon the natureinform ofthe the stimulatevalue use tourismfor landowners and spin ‐ ‐off localthe greatest character scrutiny. and the Generally need to it Howeverinto the area. unsympathetic or too heightened sense of the local toobjectives be an awareness of the Masterplan that any retail/ thesecommunity facilities. events, The appropriateprovision of there has to be an above average proposedbuilding stock linkages. and the quality of howeverbenefits, andrecent increase economic local notdoes directly not appear compete to be with a viable the much retail can permanently customer base ‐ using their skills developedDelivery Framework. here is not directly facilitiesalternative open uses to can all isalso highly achieve vital element of risk on relying on the design. Developing linkages conditions,entreprenuership combined and with the optionTown Centre, and will would not form be beneficial a part of undermine the Seafront's as part of the wider Seafront team competing with the Town Centre. forthe thedesired Seafront. outcomes. retail ventures to catalyse will assist in enhancing the fragilityemployment of the opportunities. Fleetwood market, anyto the emerging Seafront, proposals. increasing character. is highly recommended. Seafront redevelopment. permeability of the Seafront. negate this presumption. vibrancy and potentially economic sustainability.

Greenspace The Seafront (and Mount) has Greenspace, if well maintained, Greenspace can sometimes be The quality and range of potential Greenspace is relatively easy to Greenspace with clear linkages Greenspace uses tend to provide Where there may be a loss of always benefitted from a retains a huge degree of public viewed as a relatively uses of greenspace make it a deliver ‐ it is the benefits it can be considered effectively little capital or revenue receipt existing greenspace if other uses signficant degree of greenspace popularity. Built development can uneconomical use of sites ‐ difficult land use to categorise. provides that are more likely to be recreational space as it is and do not significantly assist the offer benefits, there should be an for landscaping purposes. The easily be viewed as negative. however in urban areas where Greenspace that has no subject to scrutiny. Greenspace is encouraging active usage ‐ and in Council's need to reduce attempt to develop other areas 'openness' factor it creates is However some stakeholders space is less common, and in significant recreational benefit effectively environmental areas many instances this will be a expenditure. Greenspace does for greenspace so as to protect vital and should be at the very recognise that maintaince costs areas where tourism is an may add to the overall character without a specific recreation suitable aim for the Seafront meet many of the Council's the overall offer. Seafront least maintained, unless of greenspace require other economic driver ‐ it has a much of the Seafront, but would be the function, and in some instances it green spaces. In other instances targets to ensure a good living greenspace should generally seek proposals actively increase its avenues of development to be higher value which needs to be underuse of an important asset in is important to have areas that no specific attempt may be made environment for its residents to offer a recreational dimension value ‐ e.g. through the provision explored. Therefore the provision, recognised when contrasting tackling Fleetwood's economic serve no greater purpose than to encourage human usage (e.g. however. and not simply be an under‐used Leisure / Recreation Theof a Seafrontgreater recreational is primarily focused Thereand future is widespread use of, greenspace support can Theproposals principal emerge. attraction of visiting Leisureand social and problems. recreational land Manybounding coastal other masterplans uses and and Recreationalthe grassed areas uses oftend the to Mount) provide ‐ Leisure is a divisive land use, with Whereelement economically between other feasible uses. and ondimension. tourism and recreation for bothemergingoccasionally from become the Masterplan a the seaside is based around uses tend to be the single most frameworksincreasing the have aesthetic overly qualityhigh of ahowever specific simultaneouslyconcentration of there facilities often split between physicallyProvision ofacceptable, greenspace the must locals and visitors. Further anddisproportionally other work for high leisure profile uses on recreational pursuits. Allied with welcoming and broadly open expectationsthe wider area. of the lesiure linkages,should be often no barriers being land to prevent public and private provision. The developmentnever be pursued of lesiure for simplicity and if sympathetic development for theissue Seafront. to the detriment Strategic ofproposals other more well developed leisure group of uses of all. With good sector's ability to deliver intensiveresidents usesand ‐ visitorsthis is utilisingalready in need to ensure general recreationalgreater regeneration facilities benefitson the can leisure purposes links perfectly forproposals. the Borough's leisure offer offers, the area becomes planning and sensible links they economically viable projects, evidencethese spaces at the should Seafront. they desire. accessibility and affordability to beSeafront indisputably has to beachieved viewed through as into the Seafront's strategic role. may impact on the provision on increasingly attractive to locals can help define an area's especially in areas undergoing the public in Fleetwood will have allowingextremely other desirable. forms of facilities in due course. and visitors. Therefore the character and provide the catalyst regeneration. Such limitations to be weighed against the need to development in the first instance. provision of a range of leisure and to support retail and civic extend to the provision of a hotel appreciate the burden such receational uses on the Seafront facilities. on the Seafront. Therefore a facilities can put on the Wyre are vital to Fleetwood. balance needs to be found taxpayer, making leisure and between being aspirational and recreational uses a limited option being realistic. for the Seafront.

Education Aside from small research and The provision of education Education could potentially offer Until further details are known Further consideration of the Educational facilities can often The development of one or more Of all land uses considered in this training facilities the Seafront has facilities at the Seafront has yet a significant contribution to the educationally focused proposals locating of educational facilities seem closed off to neighbouring education facilities in and around assessment the strengths and The Seafront has never been a Office development is unlikely to Office development on the fringe Office development can provide Office development is unlikely to Office development tends to be The Council's portfolio would be Whilst not the deeply unattractive Offices never been an education hub. The to be tested with the general physical and economic are hard to quantify. Generally at the Seafront is clearly worth uses ‐ and even more so in the the Seafront offers potential weaknesses of educational uses hub for offices other than those gain much public support and in of Fleetwood Town Centre is footfall and security. However the be economically or politically well integrated into local better served by concentrating neighbour that industrial land use increased footfall and potential public. From the policymaker and redevelopment of Fleetwood as a education provides footfall, undertaking as deliverability of perception of users. Good design mechanisms for realising the on the Seafront are hardest to ancillary to other uses. Office commercial terms the setting may strategically desirable, but the overall nature of offices ‐ acceptable on the Seafront given transport nodes and adjoining office use on other sites across represents, there are no clear spend, as well as the social economic perspective there is an whole, and possibly the Seafront. turnover and a high degree of proposals is usually high in the can mitigate these negative value of some of the Council's quantify. It is likely there will be development will not enhance the be attractive but accessibility and unique nature and catalytic value generally very limited interaction the site's importance for other retail and leisure offers ‐ the Borough. benefits in allowing office benefits may suit the area's initial degree of support caveated Centres of learning have vibrancy, but it can often create a education sector, as the very impacts, but it remains a property portfolio and as such significant numbers of each, so area's unique environment. development costs will undermine of the Seafront reduces the with neighbouring uses ‐ would uses and the number of preferred strategically however the value of development on Fleetwood character, if the proposal(s) has by a need to do further analysis of numerous spin‐off benefits and relatively self‐contained and existance of proposals is potential concern. requires further investigation. only a thorough evaluation of interest. likelihood that office development not support the area's prime role locations for employment office development on the Seafront. merit. proposals. have long been a staple of unapproachable community to generally based on detailed proposals will provide a definitive here would lead to wider urban as a leisure and civic hub, elsewhere. Seafront for the Town Centre is regenerative schemes elsewhere. outsiders. examination of need, catchment answer. regeneration. possibly acting as a specific less apparent. and funding. deterrent.

IndustrialCivic and Cultural The Seafront'sSeafront has unique long beenoffer amakes ItThe is highlyprovision unlilkely of civic any facilties CurrentWhilst the industrial Seafront development needs to act FacilitiesIndustrial that uses are would primarily be poor ManyIndustrial civic development facilities, particularly will CivicA land facilities use so diversetend to fromact as the The Council'sprovision portfolioof civic facilities would not IndustrialWhere economically uses on the feasible Seafront and Facilities industrialcentre for usecommunity highly activities stakeholderbased around would a rejuvenated support proposalsas a destination exist around and host Fleetwood some focusedneighbours on communityfor existing usersand visitor and inrequire smaller sites urban with areas the necessary or those adjoininghub ‐ along uses with would good act retail as aand becan best be relatively served by costly a low for value local use wouldphysically actively acceptable, undermine the the unacceptable.and the enhancement and industrialMarine Hall uses has on long the been Seafront. civicand therefacilities, is no coastal clear benefit town in woulduse are significantly fundamental reduce to the local thatplanning are relatively designations isolated and such lesiurebarrier ‐ restrictingand also can internal provide a beingauthorities. permitted Much on has one already of the regenerationdevelopment ofof Fleetwoodcivic facilities and on provision of further facilities recognised as the most strongly centresusing Town can Centresometimes or waterside suffer if vibrancy,character reducingof the Seafront, the Seafront's and strategicas Fleetwood transport (therefore links. having a senselinkages. of constancy lacking in Borough'sbeen done most to reduce important expenditure sites. damagethe Seafront the area's has to unique be viewed as should be encouraged. supported option for the Seafront thesites coast for such usurps uses. the centre as the abilityFleetwood's to act appealas a wider as a a wider catalyst reduced potential catchment) commercial ventures. Linkages at at the Seafront, but it is inevitable extremelycharacter. desirable. following the work of the Town natural focus of the town's destination will be heavily struggle to make civic facilities the Seafront are relatively weak future proposals will be for regeneration. FLEETWOOD, SEAFRONT MASTERPLAN 59 Centre Masterplan. citizens. A balance will need to be influenced by the vibrancy and economically viable. Whilst it is at present, but the potential is undermined if they are seen as found to ensure that the atractiveness of this area ‐ the duty of the public sector to extremely high. excessively expensive. By looking regeneration of the Seafront is therefore it is indisputably clear provide a range of services and at the Seafront as a broader entity Retail Retailing can provide tourist Successful retailers are amongst Thenot achievedSeafront couldsimply act through as a Retailthat civic is oriented facilities towards contribute general attemptThe current to stimulate economic socio climate,‐ Retail survives by being visible Sustainablewith a range retail of uses, businesses less‐ can Limited ancillary retail attractors, footfall and the most locally progressive uniquedisplacement selling ofpoint Town for Centre retailers customtowards ‐ achievingi.e. users maythis objective. not economicand Fleetwood's progress longstanding in the Town, it and accessible, and the guidance provideprofitable value uses for such key as sites, civic development, if responsive to the employment opportunities. businesspeople, with a facilities.as a location ‐ however there has specifically have intended to use isfragility also apparent for retail that business a Seafront means of retailers should inform the stimulatefacilities can tourism be offset and byspin ‐off local character and the need to However unsympathetic or too heightened sense of the local to be an awareness that any retail these facilities. The provision of strategythere has that to be relies an above on civic average uses proposed linkages. benefits,allowing higherand increase value uses. local The not directly compete with the much retail can permanently customer base ‐ using their skills developed here is not directly facilities open to all is highly vital inelement its entirety of risk will on not relying be on entreprenuershipkey is ensuring this and balance does Town Centre, would be beneficial undermine the Seafront's as part of the wider Seafront team competing with the Town Centre. for the Seafront. deliverable,retail ventures and to certainly catalyse not employmentnot result in proposals opportunities. to the Seafront, increasing character. is highly recommended. sustainable.Seafront redevelopment. detrimental to the unique vibrancy and potentially economic character of the area. sustainability.

Greenspace The Seafront (and Mount) has Greenspace, if well maintained, Greenspace can sometimes be The quality and range of potential Greenspace is relatively easy to Greenspace with clear linkages Greenspace uses tend to provide Where there may be a loss of Key always benefitted from a retains a huge degree of public viewed as a relatively uses of greenspace make it a deliver ‐ it is the benefits it can be considered effectively little capital or revenue receipt existing greenspace if other uses signficant degree of greenspace popularity. Built development can uneconomical use of sites ‐ difficult land use to categorise. provides that are more likely to be recreational space as it is and do not significantly assist the offer benefits, there should be an forUse landscaping assists in purposes. the delivery The ofeasily the beObjective viewed as negative. however in urban areas where Greenspace that has no subject to scrutiny. Greenspace is encouraging active usage ‐ and in Council's need to reduce attempt to develop other areas 'openness'Use has anfactor overall it creates neutral is effectHowever on some the stakeholdersObjective space is less common, and in significant recreational benefit effectively environmental areas many instances this will be a expenditure. Greenspace does for greenspace so as to protect vitalUse and fails should to meet be at thethe very Objective recognise that maintaince costs areas where tourism is an may add to the overall character without a specific recreation suitable aim for the Seafront meet many of the Council's the overall offer. Seafront least maintained, unless of greenspace require other economic driver ‐ it has a much of the Seafront, but would be the function, and in some instances it green spaces. In other instances targets to ensure a good living greenspace should generally seek proposals actively increase its avenues of development to be higher value which needs to be underuse of an important asset in is important to have areas that no specific attempt may be made environment for its residents to offer a recreational dimension value ‐ e.g. through the provision explored. Therefore the provision, recognised when contrasting tackling Fleetwood's economic serve no greater purpose than to encourage human usage (e.g. however. and not simply be an under‐used of a greater recreational and future use of, greenspace can proposals emerge. and social problems. bounding other uses and the grassed areas of the Mount) ‐ element between other uses. dimension. occasionally become a increasing the aesthetic quality of however simultaneously there Provision of greenspace must disproportionally high profile the wider area. should be no barriers to prevent never be pursued for simplicity if issue to the detriment of other residents and visitors utilising greater regeneration benefits can proposals. these spaces should they desire. be indisputably achieved through allowing other forms of development in the first instance.

Education Aside from small research and The provision of education Education could potentially offer Until further details are known Further consideration of the Educational facilities can often The development of one or more Of all land uses considered in this training facilities the Seafront has facilities at the Seafront has yet a significant contribution to the educationally focused proposals locating of educational facilities seem closed off to neighbouring education facilities in and around assessment the strengths and never been an education hub. The to be tested with the general physical and economic are hard to quantify. Generally at the Seafront is clearly worth uses ‐ and even more so in the the Seafront offers potential weaknesses of educational uses increased footfall and potential public. From the policymaker and redevelopment of Fleetwood as a education provides footfall, undertaking as deliverability of perception of users. Good design mechanisms for realising the on the Seafront are hardest to spend, as well as the social economic perspective there is an whole, and possibly the Seafront. turnover and a high degree of proposals is usually high in the can mitigate these negative value of some of the Council's quantify. It is likely there will be benefits may suit the area's initial degree of support caveated Centres of learning have vibrancy, but it can often create a education sector, as the very impacts, but it remains a property portfolio and as such significant numbers of each, so character, if the proposal(s) has by a need to do further analysis of numerous spin‐off benefits and relatively self‐contained and existance of proposals is potential concern. requires further investigation. only a thorough evaluation of merit. proposals. have long been a staple of unapproachable community to generally based on detailed proposals will provide a definitive regenerative schemes elsewhere. outsiders. examination of need, catchment answer. and funding.

Civic and Cultural The Seafront has long been a The provision of civic facilties Whilst the Seafront needs to act Facilities that are primarily Many civic facilities, particularly Civic facilities tend to act as the The provision of civic facilities Where economically feasible and Facilities centre for community activities based around a rejuvenated as a destination and host some focused on community and visitor in smaller urban areas or those hub ‐ along with good retail and can be relatively costly for local physically acceptable, the and the enhancement and Marine Hall has long been civic facilities, coastal town use are fundamental to the that are relatively isolated such lesiure ‐ and also can provide a authorities. Much has already development of civic facilities on provision of further facilities recognised as the most strongly centres can sometimes suffer if character of the Seafront, and as Fleetwood (therefore having a sense of constancy lacking in been done to reduce expenditure the Seafront has to be viewed as should be encouraged. supported option for the Seafront the coast usurps the centre as the Fleetwood's appeal as a wider reduced potential catchment) commercial ventures. Linkages at at the Seafront, but it is inevitable extremely desirable. following the work of the Town natural focus of the town's destination will be heavily struggle to make civic facilities the Seafront are relatively weak future proposals will be Centre Masterplan. citizens. A balance will need to be influenced by the vibrancy and economically viable. Whilst it is at present, but the potential is undermined if they are seen as found to ensure that the atractiveness of this area ‐ the duty of the public sector to extremely high. excessively expensive. By looking regeneration of the Seafront is therefore it is indisputably clear provide a range of services and at the Seafront as a broader entity not achieved simply through that civic facilities contribute attempt to stimulate socio‐ with a range of uses, less‐ displacement of Town Centre towards achieving this objective. economic progress in the Town, it profitable uses such as civic facilities. is also apparent that a Seafront facilities can be offset by strategy that relies on civic uses allowing higher value uses. The in its entirety will not be key is ensuring this balance does deliverable, and certainly not not result in proposals sustainable. detrimental to the unique character of the area.

Key Use assists in the delivery of the Objective Use has an overall neutral effect on the Objective Use fails to meet the Objective SEAFRONT APPRAISAL ‐ STRATEGIC ASSESSMENT

STAGE 1: STRATEGIC ASSESSMENT What land uses meet the objectives of the Regeneration Framework?

RF Objective OB1 OB2 OB3 OB4 OB5 OB6 OB7 Recommendation Ensure the Town’s cultural Ensure as far as possible Develop a range of physical Maximise the future vibrancy Highlight deliverable Improve linkages between Consider a range of What is the estimated overall heritage and unique that the Council, other and economic proposals and sustainability of uses on development and Fleetwood’s key areas innovative ways for utilising value of the land use for environment be protected statutory bodies, that assist in the the Seafront redevelopment opportunities the Council’s property Fleetwood's Seafront in and enhanced businesses, residents and rejuvenation of the Town portfolio terms of both the area's other stakeholders in development and its role in Fleetwood support the rejuvenating the Town? Land Use Vision Residential The Seafront has never been a The Fleetwood Masterplan Whilst residential use and good Whilst residential development A recent appraisal of the viability The quality of linkages to and There has long been a Of all uses suggested for the residential area so the unique consultation clearly indicated design can assist in providing an can provide economic benefits, of residential development on the from existing residential presumption that residential Seafront in this assessment, environment will be changed by concerns about the development enhanced offer in the Town that passive security and increase the Seafront suggested it is not communities differs significantly development provides the highest residential has been subject to bringing residential development of the Seafront for residential use. must be balanced against the scale of local footfall and presently deliverable. dependent on the nature of the value use for landowners ‐ the greatest scrutiny. Generally it into the area. objectives of the Masterplan / community events, appropriate building stock and the quality of however recent economic does not appear to be a viable Delivery Framework. alternative uses can also achieve the design. Developing linkages conditions, combined with the option and will not form a part of the desired outcomes. will assist in enhancing the fragility of the Fleetwood market, any emerging proposals. permeability of the Seafront. negate this presumption.

Leisure / Recreation The Seafront is primarily focused There is widespread support The principal attraction of visiting Leisure and recreational land Many coastal masterplans and Recreational uses tend to provide Leisure is a divisive land use, with Where economically feasible and on tourism and recreation for bothemerging from the Masterplan the seaside is based around uses tend to be the single most frameworks have overly high a specific concentration of facilities often split between physically acceptable, the locals and visitors. Further and other work for leisure uses on recreational pursuits. Allied with welcoming and broadly open expectations of the lesiure linkages, often being land public and private provision. The development of lesiure and sympathetic development for the Seafront. Strategic proposals more well developed leisure group of uses of all. With good sector's ability to deliver intensive uses ‐ this is already in need to ensure general recreational facilities on the leisure purposes links perfectly for the Borough's leisure offer offers, the area becomes planning and sensible links they economically viable projects, evidence at the Seafront. accessibility and affordability to Seafront has to be viewed as into the Seafront's strategic role. may impact on the provision on increasingly attractive to locals can help define an area's especially in areas undergoing the public in Fleetwood will have extremely desirable. facilities in due course. and visitors. Therefore the character and provide the catalyst regeneration. Such limitations to be weighed against the need to provision of a range of leisure and to support retail and civic extend to the provision of a hotel appreciate the burden such receational uses on the Seafront facilities. on the Seafront. Therefore a facilities can put on the Wyre are vital to Fleetwood. balance needs to be found taxpayer, making leisure and between being aspirational and recreational uses a limited option being realistic. for the Seafront.

Offices The Seafront has never been a Office development is unlikely to Office development on the fringe Office development can provide Office development is unlikely to Office development tends to be The Council's portfolio would be Whilst not the deeply unattractive hub for offices other than those gain much public support and in of Fleetwood Town Centre is footfall and security. However the be economically or politically well integrated into local better served by concentrating neighbour that industrial land use ancillary to other uses. Office commercial terms the setting may strategically desirable, but the overall nature of offices ‐ acceptable on the Seafront given transport nodes and adjoining office use on other sites across represents, there are no clear development will not enhance the be attractive but accessibility and unique nature and catalytic value generally very limited interaction the site's importance for other retail and leisure offers ‐ the Borough. benefits in allowing office area's unique environment. development costs will undermine of the Seafront reduces the with neighbouring uses ‐ would uses and the number of preferred strategically however the value of development on Fleetwood interest. likelihood that office development not support the area's prime role locations for employment office development on the Seafront. here would lead to wider urban as a leisure and civic hub, elsewhere. Seafront for the Town Centre is regeneration. possibly acting as a specific less apparent. deterrent.

Industrial The Seafront's unique offer makes It is highly unlilkely any Current industrial development Industrial uses would be poor Industrial development will A land use so diverse from The Council's portfolio would not Industrial uses on the Seafront industrial use highly stakeholder would support proposals exist around Fleetwood neighbours for existing users and require sites with the necessary adjoining uses would act as a be best served by a low value use would actively undermine the unacceptable. industrial uses on the Seafront. and there is no clear benefit in would significantly reduce local planning designations and barrier restricting internal being permitted on one of the regeneration of Fleetwood and using Town Centre or waterside vibrancy, reducing the Seafront's strategic transport links. linkages. Borough's most important sites. damage the area's unique sites for such uses. ability to act as a wider a catalyst character. for regeneration.

Retail Retailing can provide tourist Successful retailers are amongst The Seafront could act as a Retail is oriented towards general The current economic climate, Retail survives by being visible Sustainable retail businesses can Limited ancillary retail attractors, footfall and the most locally progressive unique selling point for retailers custom ‐ i.e. users may not and Fleetwood's longstanding and accessible, and the guidance provide value for key sites, development, if responsive to the employment opportunities. businesspeople, with a as a location ‐ however there has specifically have intended to use fragility for retail business means of retailers should inform the stimulate tourism and spin‐off local character and the need to However unsympathetic or too heightened sense of the local to be an awareness that any retail these facilities. The provision of there has to be an above average proposed linkages. benefits, and increase local not directly compete with the much retail can permanently customer base ‐ using their skills developed here is not directly facilities open to all is highly vital element of risk on relying on entreprenuership and Town Centre, would be beneficial undermine the Seafront's as part of the wider Seafront team competing with the Town Centre. for the Seafront. retail ventures to catalyse employment opportunities. to the Seafront, increasing character. is highly recommended. Seafront redevelopment. vibrancy and potentially economic sustainability.

Greenspace The Seafront (and Mount) has Greenspace, if well maintained, Greenspace can sometimes be The quality and range of potential Greenspace is relatively easy to Greenspace with clear linkages Greenspace uses tend to provide Where there may be a loss of always benefitted from a retains a huge degree of public viewed as a relatively uses of greenspace make it a deliver ‐ it is the benefits it can be considered effectively little capital or revenue receipt existing greenspace if other uses signficant degree of greenspace popularity. Built development can uneconomical use of sites ‐ difficult land use to categorise. provides that are more likely to be recreational space as it is and do not significantly assist the offer benefits, there should be an for landscaping purposes. The easily be viewed as negative. however in urban areas where Greenspace that has no subject to scrutiny. Greenspace is encouraging active usage ‐ and in Council's need to reduce attempt to develop other areas 'openness' factor it creates is However some stakeholders space is less common, and in significant recreational benefit effectively environmental areas many instances this will be a expenditure. Greenspace does for greenspace so as to protect vital and should be at the very recognise that maintaince costs areas where tourism is an may add to the overall character without a specific recreation suitable aim for the Seafront meet many of the Council's the overall offer. Seafront least maintained, unless of greenspace require other economic driver ‐ it has a much of the Seafront, but would be the function, and in some instances it green spaces. In other instances targets to ensure a good living greenspace should generally seek proposals actively increase its avenues of development to be higher value which needs to be underuse of an important asset in is important to have areas that no specific attempt may be made environment for its residents to offer a recreational dimension value ‐ e.g. through the provision explored. Therefore the provision, recognised when contrasting tackling Fleetwood's economic serve no greater purpose than to encourage human usage (e.g. however. and not simply be an under‐used of a greater recreational and future use of, greenspace can proposals emerge. and social problems. bounding other uses and the grassed areas of the Mount) ‐ element between other uses. dimension. occasionally become a increasing the aesthetic quality of however simultaneously there Provision of greenspace must disproportionally high profile the wider area. should be no barriers to prevent never be pursued for simplicity if issue to the detriment of other residents and visitors utilising greater regeneration benefits can proposals. these spaces should they desire. be indisputably achieved through allowing other forms of development in the first instance.

Education Aside from small research and The provision of education Education could potentially offer Until further details are known Further consideration of the Educational facilities can often The development of one or more Of all land uses considered in this training facilities the Seafront has facilities at the Seafront has yet a significant contribution to the educationally focused proposals locating of educational facilities seem closed off to neighbouring education facilities in and around assessment the strengths and never been an education hub. The to be tested with the general physical and economic are hard to quantify. Generally at the Seafront is clearly worth uses ‐ and even more so in the the Seafront offers potential weaknesses of educational uses increased footfall and potential public. From the policymaker and redevelopment of Fleetwood as a education provides footfall, undertaking as deliverability of perception of users. Good design mechanisms for realising the on the Seafront are hardest to spend, as well as the social economic perspective there is an whole, and possibly the Seafront. turnover and a high degree of proposals is usually high in the can mitigate these negative value of some of the Council's quantify. It is likely there will be SEAFRONT APPRAISAL ‐ STRATEGICbenefits may suit ASSESSMENT the area's initial degree of support caveated Centres of learning have vibrancy, but it can often create a education sector, as the very impacts, but it remains a property portfolio and as such significant numbers of each, so character, if the proposal(s) has by a need to do further analysis of numerous spin‐off benefits and relatively self‐contained and existance of proposals is potential concern. requires further investigation. only a thorough evaluation of merit. proposals. have long been a staple of unapproachable community to generally based on detailed proposals will provide a definitive STAGE 1: STRATEGIC ASSESSMENT regenerative schemes elsewhere. outsiders. examination of need, catchment answer. What land uses meet the objectives of the Regeneration Framework? and funding.

RF Objective OB1 OB2 OB3 OB4 OB5 OB6 OB7 Recommendation Civic and Cultural TheEnsure Seafront the hasTown’s long beencultural a TheEnsure provision as far of ascivic possible facilties WhilstDevelop the aSeafront range ofneeds physical to act FacilitiesMaximise that the are future primarily vibrancy ManyHighlight civic facilities,deliverable particularly CivicImprove facilities linkages tend to between act as the TheConsider provision a rangeof civic of facilities WhereWhat iseconomically the estimated feasible overall and Facilities centreheritage for andcommunity unique activities basedthat the around Council, a rejuvenated other asand a destination economic and proposals host some focusedand sustainability on community of and uses visitor on indevelopment smaller urban and areas or those hubFleetwood’s ‐ along with key good areas retail and caninnovative be relatively ways costly for forutilising local physicallyvalue of theacceptable, land use the for andenvironment the enhancement be protected and Marinestatutory Hall bodies, has long been civicthat facilities,assist in coastal the town usethe areSeafront fundamental to the thatredevelopment are relatively isolatedopportunities such lesiure ‐ and also can provide a authorities.the Council’s Much property has already developmentFleetwood's of Seafront civic facilities in on provisionand enhanced of further facilities recognisedbusinesses, as the residents most strongly and centresrejuvenation can sometimes of the Town suffer if character of the Seafront, and as Fleetwood (therefore having a sense of constancy lacking in beenportfolio done to reduce expenditure theterms Seafront of both has theto be area's viewed as should be encouraged. supported option for the Seafront the coast usurps the centre as the Fleetwood's appeal as a wider reduced potential catchment) commercial ventures. Linkages at at the Seafront, but it is inevitable extremely desirable. other stakeholders in development and its role in following the work of the Town natural focus of the town's destination will be heavily struggle to make civic facilities the Seafront are relatively weak future proposals will be Fleetwood support the rejuvenating the Town? Centre Masterplan. citizens. A balance will need to be influenced by the vibrancy and economically viable. Whilst it is at present, but the potential is undermined if they are seen as Land Use Vision found to ensure that the atractiveness of this area ‐ the duty of the public sector to extremely high. excessively expensive. By looking Residential The Seafront has never been a The Fleetwood Masterplan Whilstregeneration residential of the use Seafront and good is Whilsttherefore residential it is indisputably development clear provideA recent a appraisal range of ofservices the viability and The quality of linkages to and atThere the hasSeafront long beenas a broader a entity Of all uses suggested for the residential area so the unique consultation clearly indicated designnot achieved can assist simply in providing through an canthat provide civic facilities economic contribute benefits, attemptof residential to stimulate development socio‐ on the from existing residential withpresumption a range ofthat uses, residential less‐ Seafront in this assessment, environment will be changed by concerns about the development displacementenhanced offer of in Town the TownCentre that towardspassive security achieving and this increase objective. the economicSeafront suggested progress init isthe not Town, it communities differs significantly profitabledevelopment uses provides such as thecivic highest residential has been subject to bringing residential development of the Seafront for residential use. facilities.must be balanced against the scale of local footfall and ispresently also apparent deliverable. that a Seafront dependent on the nature of the facilitiesvalue use can for be landowners offset by ‐ the greatest scrutiny. Generally it into the area. objectives of the Masterplan / community events, appropriate strategy that relies on civic uses building stock and the quality of howeverallowing higherrecent valueeconomic uses. The does not appear to be a viable Delivery Framework. alternative uses can also achieve in its entirety will not be the design. Developing linkages conditions,key is ensuring combined this balance with the does option and will not form a part of the desired outcomes. deliverable, and certainly not will assist in enhancing the fragilitynot result of inthe proposals Fleetwood market, any emerging proposals. sustainable. permeability of the Seafront. negatedetrimental this presumption. to the unique character of the area.

Key Use assists in the delivery of the Objective Use has an overall neutral effect on the Objective Use fails to meet the Objective

Leisure / Recreation The Seafront is primarily focused There is widespread support The principal attraction of visiting Leisure and recreational land Many coastal masterplans and Recreational uses tend to provide Leisure is a divisive land use, with Where economically feasible and on tourism and recreation for bothemerging from the Masterplan the seaside is based around uses tend to be the single most frameworks have overly high a specific concentration of facilities often split between physically acceptable, the locals and visitors. Further and other work for leisure uses on recreational pursuits. Allied with welcoming and broadly open expectations of the lesiure linkages, often being land public and private provision. The development of lesiure and sympathetic development for the Seafront. Strategic proposals more well developed leisure group of uses of all. With good sector's ability to deliver intensive uses ‐ this is already in need to ensure general recreational facilities on the leisure purposes links perfectly for the Borough's leisure offer offers, the area becomes planning and sensible links they economically viable projects, evidence at the Seafront. accessibility and affordability to Seafront has to be viewed as into the Seafront's strategic role. may impact on the provision on increasingly attractive to locals can help define an area's especially in areas undergoing the public in Fleetwood will have extremely desirable. facilities in due course. and visitors. Therefore the character and provide the catalyst regeneration. Such limitations to be weighed against the need to provision of a range of leisure and to support retail and civic extend to the provision of a hotel appreciate the burden such receational uses on the Seafront facilities. on the Seafront. Therefore a facilities can put on the Wyre are vital to Fleetwood. balance needs to be found taxpayer, making leisure and between being aspirational and recreational uses a limited option being realistic. for the Seafront.

Offices The Seafront has never been a Office development is unlikely to Office development on the fringe Office development can provide Office development is unlikely to Office development tends to be The Council's portfolio would be Whilst not the deeply unattractive hub for offices other than those gain much public support and in of Fleetwood Town Centre is footfall and security. However the be economically or politically well integrated into local better served by concentrating neighbour that industrial land use ancillary to other uses. Office commercial terms the setting may strategically desirable, but the overall nature of offices ‐ acceptable on the Seafront given transport nodes and adjoining office use on other sites across represents, there are no clear development will not enhance the be attractive but accessibility and unique nature and catalytic value generally very limited interaction the site's importance for other retail and leisure offers ‐ the Borough. benefits in allowing office area's unique environment. development costs will undermine of the Seafront reduces the with neighbouring uses ‐ would uses and the number of preferred strategically however the value of development on Fleetwood interest. likelihood that office development not support the area's prime role locations for employment office development on the Seafront. here would lead to wider urban as a leisure and civic hub, elsewhere. Seafront for the Town Centre is regeneration. possibly acting as a specific less apparent. deterrent.

Industrial The Seafront's unique offer makes It is highly unlilkely any Current industrial development Industrial uses would be poor Industrial development will A land use so diverse from The Council's portfolio would not Industrial uses on the Seafront industrial use highly stakeholder would support proposals exist around Fleetwood neighbours for existing users and require sites with the necessary adjoining uses would act as a be best served by a low value use would actively undermine the unacceptable. industrial uses on the Seafront. and there is no clear benefit in would significantly reduce local planning designations and barrier restricting internal being permitted on one of the regeneration of Fleetwood and using Town Centre or waterside vibrancy, reducing the Seafront's strategic transport links. linkages. Borough's most important sites. damage the area's unique sites for such uses. ability to act as a wider a catalyst character. 60 FLEETWOOD, SEAFRONT MASTERPLAN for regeneration.

Retail Retailing can provide tourist Successful retailers are amongst The Seafront could act as a Retail is oriented towards general The current economic climate, Retail survives by being visible Sustainable retail businesses can Limited ancillary retail attractors, footfall and the most locally progressive unique selling point for retailers custom ‐ i.e. users may not and Fleetwood's longstanding and accessible, and the guidance provide value for key sites, development, if responsive to the employment opportunities. businesspeople, with a as a location ‐ however there has specifically have intended to use fragility for retail business means of retailers should inform the stimulate tourism and spin‐off local character and the need to However unsympathetic or too heightened sense of the local to be an awareness that any retail these facilities. The provision of there has to be an above average proposed linkages. benefits, and increase local not directly compete with the much retail can permanently customer base ‐ using their skills developed here is not directly facilities open to all is highly vital element of risk on relying on entreprenuership and Town Centre, would be beneficial undermine the Seafront's as part of the wider Seafront team competing with the Town Centre. for the Seafront. retail ventures to catalyse employment opportunities. to the Seafront, increasing character. is highly recommended. Seafront redevelopment. vibrancy and potentially economic sustainability.

Greenspace The Seafront (and Mount) has Greenspace, if well maintained, Greenspace can sometimes be The quality and range of potential Greenspace is relatively easy to Greenspace with clear linkages Greenspace uses tend to provide Where there may be a loss of always benefitted from a retains a huge degree of public viewed as a relatively uses of greenspace make it a deliver ‐ it is the benefits it can be considered effectively little capital or revenue receipt existing greenspace if other uses signficant degree of greenspace popularity. Built development can uneconomical use of sites ‐ difficult land use to categorise. provides that are more likely to be recreational space as it is and do not significantly assist the offer benefits, there should be an for landscaping purposes. The easily be viewed as negative. however in urban areas where Greenspace that has no subject to scrutiny. Greenspace is encouraging active usage ‐ and in Council's need to reduce attempt to develop other areas 'openness' factor it creates is However some stakeholders space is less common, and in significant recreational benefit effectively environmental areas many instances this will be a expenditure. Greenspace does for greenspace so as to protect vital and should be at the very recognise that maintaince costs areas where tourism is an may add to the overall character without a specific recreation suitable aim for the Seafront meet many of the Council's the overall offer. Seafront least maintained, unless of greenspace require other economic driver ‐ it has a much of the Seafront, but would be the function, and in some instances it green spaces. In other instances targets to ensure a good living greenspace should generally seek proposals actively increase its avenues of development to be higher value which needs to be underuse of an important asset in is important to have areas that no specific attempt may be made environment for its residents to offer a recreational dimension value ‐ e.g. through the provision explored. Therefore the provision, recognised when contrasting tackling Fleetwood's economic serve no greater purpose than to encourage human usage (e.g. however. and not simply be an under‐used of a greater recreational and future use of, greenspace can proposals emerge. and social problems. bounding other uses and the grassed areas of the Mount) ‐ element between other uses. dimension. occasionally become a increasing the aesthetic quality of however simultaneously there Provision of greenspace must disproportionally high profile the wider area. should be no barriers to prevent never be pursued for simplicity if issue to the detriment of other residents and visitors utilising greater regeneration benefits can proposals. these spaces should they desire. be indisputably achieved through allowing other forms of development in the first instance.

Education Aside from small research and The provision of education Education could potentially offer Until further details are known Further consideration of the Educational facilities can often The development of one or more Of all land uses considered in this training facilities the Seafront has facilities at the Seafront has yet a significant contribution to the educationally focused proposals locating of educational facilities seem closed off to neighbouring education facilities in and around assessment the strengths and never been an education hub. The to be tested with the general physical and economic are hard to quantify. Generally at the Seafront is clearly worth uses ‐ and even more so in the the Seafront offers potential weaknesses of educational uses increased footfall and potential public. From the policymaker and redevelopment of Fleetwood as a education provides footfall, undertaking as deliverability of perception of users. Good design mechanisms for realising the on the Seafront are hardest to spend, as well as the social economic perspective there is an whole, and possibly the Seafront. turnover and a high degree of proposals is usually high in the can mitigate these negative value of some of the Council's quantify. It is likely there will be benefits may suit the area's initial degree of support caveated Centres of learning have vibrancy, but it can often create a education sector, as the very impacts, but it remains a property portfolio and as such significant numbers of each, so character, if the proposal(s) has by a need to do further analysis of numerous spin‐off benefits and relatively self‐contained and existance of proposals is potential concern. requires further investigation. only a thorough evaluation of merit. proposals. have long been a staple of unapproachable community to generally based on detailed proposals will provide a definitive regenerative schemes elsewhere. outsiders. examination of need, catchment answer. and funding.

Civic and Cultural The Seafront has long been a The provision of civic facilties Whilst the Seafront needs to act Facilities that are primarily Many civic facilities, particularly Civic facilities tend to act as the The provision of civic facilities Where economically feasible and Facilities centre for community activities based around a rejuvenated as a destination and host some focused on community and visitor in smaller urban areas or those hub ‐ along with good retail and can be relatively costly for local physically acceptable, the and the enhancement and Marine Hall has long been civic facilities, coastal town use are fundamental to the that are relatively isolated such lesiure ‐ and also can provide a authorities. Much has already development of civic facilities on provision of further facilities recognised as the most strongly centres can sometimes suffer if character of the Seafront, and as Fleetwood (therefore having a sense of constancy lacking in been done to reduce expenditure the Seafront has to be viewed as should be encouraged. supported option for the Seafront the coast usurps the centre as the Fleetwood's appeal as a wider reduced potential catchment) commercial ventures. Linkages at at the Seafront, but it is inevitable extremely desirable. following the work of the Town natural focus of the town's destination will be heavily struggle to make civic facilities the Seafront are relatively weak future proposals will be Centre Masterplan. citizens. A balance will need to be influenced by the vibrancy and economically viable. Whilst it is at present, but the potential is undermined if they are seen as found to ensure that the atractiveness of this area ‐ the duty of the public sector to extremely high. excessively expensive. By looking regeneration of the Seafront is therefore it is indisputably clear provide a range of services and at the Seafront as a broader entity not achieved simply through that civic facilities contribute attempt to stimulate socio‐ with a range of uses, less‐ displacement of Town Centre towards achieving this objective. economic progress in the Town, it profitable uses such as civic facilities. is also apparent that a Seafront facilities can be offset by strategy that relies on civic uses allowing higher value uses. The in its entirety will not be key is ensuring this balance does deliverable, and certainly not not result in proposals sustainable. detrimental to the unique character of the area.

Key Use assists in the delivery of the Objective Use has an overall neutral effect on the Objective Use fails to meet the Objective Appendix 2 Assessment of Projects SEAFRONT APPRAISAL - STRATEGIC ASSESSMENT

STAGE 2: PROJECT ASSESSMENT How do component projects meet the objectives of the Regeneration Framework?

RF Objective OB1 OB2 OB3 OB4 Recommendation Ensure the Seafront’s Develop physical and Maximise the future Improve linkages What is the estimated overall heritage and economic proposals vibrancy and between the Seafront’s value of the component project for Fleetwood's environment be that assist in the sustainability of uses key areas Seafront in terms of both the protected and rejuvenation of the on the Seafront area's development and its enhanced; Seafront role in rejuvenating the Town? Project 1 Picnic and Children's Play Area Project encourages greater use of There is no significant change to Benefits may be relatively small, The project will not only seek to Whilst not a major project, the an area well suited to providing the present use, but proposals but important. Picnicking and play encourage use of the area it is inclusion of picnicking and play public recreation. aim to encourage greater footfall areas encourage social events and based within, but will also act as a facilities helps define the which should benefit the wider represent low cost uses open to gateway to exploring the Wyre Seafront's general character as a Seafront. all members of the community. Trail. place for recreation and relaxation.

2 Adventure Sports Clubhouse The Clubhouse will require Assuming that businesses The potential diversity of uses at The Clubhouse will most likely The project is potentially the most significant levels of new operated from the Clubhouse are the Clubhouse is vast, and if well- operate as a destination in its own catalytic of all proposed. An development which must respect economically viable, the increased managed, maintained and right. Linkages to surrounding opportunity exists to provide an the Seafront's character. choice of events and facilities at marketed, could attract users to related facilities will be important, iconic building that attracts Sympathetically done it has the the Seafront will represent a step- the Seafront who previously and though visits that combine interest and visitors from a potential to enhance the change for the area that could would not consider visiting the use of this facility with others such regional and even national environment as seen at the and should complete its area, as well as providing greater as Marine Hall or the Mount may hinterland. Marine Hall. rejuvenation. choice to existing users. be relatively infrequent, it will be important to cross-sell and raise awareness of the wider offer.

3 Wheels Park Wheels Parks can cause concerns There is an apparent need for Assuming the strategic fit of uses The Park should link with some The Wheels Park, along with the over their fit with adjoining uses such a facility in the sub-region, is well managed the Wheels Park neighbouring uses in an economic Clubhouse, offer the opportunity and measures to mitigate impact and it has the potential to provide will encourage use of the Seafront and administrative sense, though to modernise the Seafront's offer will need to be explored. However a boost to the area's image by younger people and potentially it will not necessarily be the most and provide developments that the natural terrain of the site does amongst a key demographic that draw regular use from those permeable area in strategic terms. will gain reognition and interest lend itself to a track based use. is presently poorly served by training or competing at amateur from a wider area that in turn will existing facilities. and professional levels. be to the advantage of less high profile elements of the Seafront 62 FLEETWOOD, SEAFRONT MASTERPLAN redevelopment.

4 Discovery Centre The built form of a centre focused As noted in OB1 an innovative The appraisal of the Seafront's The project may increase footfall As yet one of the most undefined on energy has the potential to facility can actually increase the potential land uses suggested that and if well designed should projects as further feasibility work innovate and actively enhance the physical diversity of the Seafront some form of educational use enhance permeability, but has no is required. However it is clear Seafront's environment. in a positive manner. A genuinely could assist more dominant uses sigificant benefits with regard to that such facilities have proven successful facility would also in providing a sustainable linking key areas in its own right. effective elsewhere and it offers a attract new users raising lcoalised economy. unique use unlikely to be awareness of the wider Town and replicated elsewhere in the sub- Seafront offer. region.

5 Seafront Restaurant New built development needs to A successful private enterprise The Seafront requires greater The project may increase footfall Whilst this project would be run be sympathetic to the area's could stimulate potential further diversity of uses to encourage and if well designed should as a private concern the character. retail growth and create a small more visitors and increased usage enhance permeability, but has no legitimacy of branding the amount of new employment. The at different times of the day - sigificant benefits with regard to Seafront as a tourist and visitor additional footfall and activity will proposals such as a restaurant linking key areas in its own right. attraction is exponentially also increase security and reduce meet these requirements and enhanced by the presence of negative perceptions of the provide additionality for the offer places to eat and drink, especially Seafront aiding adjoining uses. of other uses in the area. in the presently moribund local evening economy.

6 Marine Hall Events Area The events area will involve the This project aims to tackle an area The potential for an ongoing By acting as a visual focal point, This project represents a possible loss of historic greenspace but will that is failing to reach its programme of events that and by ensuring signage and 'early-win' - a highly visible provide new community-oriented potential. Fleetwood, and in maximises use (and therefore desire lines exist between this transformation of an area that facilities. particular the Seafront, needs a income) of the area is clearly area and the rest of the Seafront, presently under performs. natural civic hub, that can be apparent. this project can act as hub for used for a variety of purposes. encouraging exploration of other Developing it in the heart of the areas. Seafront clearly offers the best chance of stimulating wider rejuvenation of the area.

7 Marine Hall , Cultural and The Marine Hall is the most iconic The proposal is to address the The Marine Hall is well used at The project will significantly This project forms the core structure on the Seafront and acts entry and viewing points of the present, particularly in the increase footfall both throughout element of all Seafront proposals, Conference Centre as the centrepiece for the entire Hall, and potentially develop evenings, but remains quiet and the day and evening and in social, economic and physical area. The proposals in Project 7 extensions to the main building, under-used during most days. This throughout the year. terms. Without addressing the seek to protect its most distinctive whilst protecting the historic project will increase the types and slow decline of the Marine Hall features whilst addressing its dome and Art Deco design of the frequency of uses, which will in Fleetwood's Seafront cannot ever weaknesses, such as the lack of structure. turn provide greater visibility of be truly rejuvenated. sea views, poor layout, and the Seafront's wider offer to a inability to finance its own larger audience. upkeep. SEAFRONT APPRAISAL - STRATEGIC ASSESSMENT

STAGE 2: PROJECT ASSESSMENT How do component projects meet the objectives of the Regeneration Framework?

RF Objective OB1 OB2 OB3 OB4 Recommendation Ensure the Seafront’s Develop physical and Maximise the future Improve linkages What is the estimated overall heritage and economic proposals vibrancy and between the Seafront’s value of the component project for Fleetwood's environment be that assist in the sustainability of uses key areas Seafront in terms of both the protected and rejuvenation of the on the Seafront area's development and its enhanced; Seafront role in rejuvenating the Town? Project 1 Picnic and Children's Play Area Project encourages greater use of There is no significant change to Benefits may be relatively small, The project will not only seek to Whilst not a major project, the an area well suited to providing the present use, but proposals but important. Picnicking and play encourage use of the area it is inclusion of picnicking and play public recreation. aim to encourage greater footfall areas encourage social events and based within, but will also act as a facilities helps define the which should benefit the wider represent low cost uses open to gateway to exploring the Wyre Seafront's general character as a Seafront. all members of the community. Trail. place for recreation and relaxation.

2 Adventure Sports Clubhouse The Clubhouse will require Assuming that businesses The potential diversity of uses at The Clubhouse will most likely The project is potentially the most significant levels of new operated from the Clubhouse are the Clubhouse is vast, and if well- operate as a destination in its own catalytic of all proposed. An development which must respect economically viable, the increased managed, maintained and right. Linkages to surrounding opportunity exists to provide an the Seafront's character. choice of events and facilities at marketed, could attract users to related facilities will be important, iconic building that attracts Sympathetically done it has the the Seafront will represent a step- the Seafront who previously and though visits that combine interest and visitors from a potential to enhance the change for the area that could would not consider visiting the use of this facility with others such regional and even national environment as seen at the and should complete its area, as well as providing greater as Marine Hall or the Mount may hinterland. SEAFRONT APPRAISAL - STRATEGICMarine ASSESSMEN Hall. T rejuvenation. choice to existing users. be relatively infrequent, it will be important to cross-sell and raise STAGE 2: PROJECT ASSESSMENT awareness of the wider offer. How do component projects meet the objectives of the Regeneration Framework?

RF Objective OB1 OB2 OB3 OB4 Recommendation 3 Wheels Park WheelsEnsure Parks the can Seafront’s cause concerns ThereDevelop is an apparent physical need and for AssumingMaximise the strategicthe future fit of uses TheImprove Park should linkages link with some TheWhat Wheels is the Park, estimated along with overall the over their fit with adjoining uses such a facility in the sub-region, is well managed the Wheels Park neighbouring uses in an economic Clubhouse, offer the opportunity heritage and economic proposals vibrancy and between the Seafront’s value of the component and measures to mitigate impact and it has the potential to provide will encourage use of the Seafront and administrative sense, though toproject modernise for Fleetwood's the Seafront's offer willenvironment need to be explored. be However athat boost assist to the area's in the image bysustainability younger people and of potentially uses itkey will notareas necessarily be the most andSeafront provide in developments terms of both that the theprotected natural terrain and of the site does amongstrejuvenation a key demographic of the that drawon the regular Seafront use from those permeable area in strategic terms. willarea's gain development reognition and andinterest its lendenhanced; itself to a track based use. isSeafront presently poorly served by training or competing at amateur fromrole ina wider rejuvenating area that inthe turn will existing facilities. and professional levels. beTown? to the advantage of less high Project profile elements of the Seafront redevelopment. 1 Picnic and Children's Play Area Project encourages greater use of There is no significant change to Benefits may be relatively small, The project will not only seek to Whilst not a major project, the an area well suited to providing the present use, but proposals but important. Picnicking and play encourage use of the area it is inclusion of picnicking and play public recreation. aim to encourage greater footfall areas encourage social events and based within, but will also act as a facilities helps define the 4 Discovery Centre The built form of a centre focused whichAs noted should in OB1 benefit an innovative the wider representThe appraisal low of cost the uses Seafront's open to gatewayThe project to exploringmay increase the Wyrefootfall Seafront'sAs yet one generalof the most character undefined as a on energy has the potential to Seafront.facility can actually increase the allpotential members land of uses the community.suggested that Trail.and if well designed should placeprojects for as recreation further feasibility and work innovate and actively enhance the physical diversity of the Seafront some form of educational use enhance permeability, but has no relaxation.is required. However it is clear Seafront's environment. in a positive manner. A genuinely could assist more dominant uses sigificant benefits with regard to that such facilities have proven successful facility would also in providing a sustainable linking key areas in its own right. effective elsewhere and it offers a attract new users raising lcoalised economy. unique use unlikely to be 2 Adventure Sports Clubhouse The Clubhouse will require awarenessAssuming that of the businesses wider Town and The potential diversity of uses at The Clubhouse will most likely replicatedThe project elsewhere is potentially in the the sub- most significant levels of new Seafrontoperated offer. from the Clubhouse are the Clubhouse is vast, and if well- operate as a destination in its own region.catalytic of all proposed. An development which must respect economically viable, the increased managed, maintained and right. Linkages to surrounding opportunity exists to provide an the Seafront's character. choice of events and facilities at marketed, could attract users to related facilities will be important, iconic building that attracts Sympathetically done it has the the Seafront will represent a step- the Seafront who previously and though visits that combine interest and visitors from a 5 Seafront Restaurant potentialNew built to development enhance the needs to changeA successful for the private area thatenterprise could wouldThe Seafront not consider requires visiting greater the useThe ofproject this facility may increase with others footfall such regionalWhilst this and project even nationalwould be run environmentbe sympathetic as toseen the at area's the andcould should stimulate complete potential its further area,diversity as well of uses as providing to encourage greater asand Marine if well Halldesigned or the should Mount may hinterland.as a private concern the Marinecharacter. Hall. rejuvenation.retail growth and create a small choicemore visitors to existing and users.increased usage beenhance relatively permeability, infrequent, but it willhas beno legitimacy of branding the amount of new employment. The at different times of the day - importantsigificant benefits to cross-sell with andregard raise to Seafront as a tourist and visitor additional footfall and activity will proposals such as a restaurant awarenesslinking key areasof the in wider its own offer. right. attraction is exponentially also increase security and reduce meet these requirements and enhanced by the presence of negative perceptions of the provide additionality for the offer places to eat and drink, especially Seafront aiding adjoining uses. of other uses in the area. in the presently moribund local evening economy. 3 Wheels Park Wheels Parks can cause concerns There is an apparent need for Assuming the strategic fit of uses The Park should link with some The Wheels Park, along with the over their fit with adjoining uses such a facility in the sub-region, is well managed the Wheels Park neighbouring uses in an economic Clubhouse, offer the opportunity 6 Marine Hall Events Area andThe eventsmeasures area to will mitigate involve impact the andThis itproject has the aims potential to tackle to providean area willThe encouragepotential for use an of ongoing the Seafront andBy acting administrative as a visual sense, focal point,though toThis modernise project represents the Seafront's a possible offer willloss needof historic to be greenspaceexplored. However but will athat boost is failing to the to area's reach image its byprogramme younger people of events and that potentially itand will by not ensuring necessarily signage be theand most and'early-win' provide - adevelopments highly visible that theprovide natural new terrain community-oriented of the site does amongstpotential. a Fleetwood, key demographic and in that drawmaximises regular use use (and from therefore those permeabledesire lines areaexist in between strategic this terms. willtransformation gain reognition of an and area interest that lendfacilities. itself to a track based use. isparticular presently the poorly Seafront, served needs by a trainingincome) orof competingthe area is atclearly amateur area and the rest of the Seafront, frompresently a wider under area performs. that in turn will existingnatural civicfacilities. hub, that can be andapparent. professional levels. this project can act as hub for be to the advantage of less high used for a variety of purposes. encouraging exploration of other profile elements of the Seafront Developing it in the heart of the areas. FLEETWOOD, SEAFRONTredevelopment. MASTERPLAN 63 Seafront clearly offers the best chance of stimulating wider rejuvenation of the area. 4 Discovery Centre The built form of a centre focused As noted in OB1 an innovative The appraisal of the Seafront's The project may increase footfall As yet one of the most undefined on energy has the potential to facility can actually increase the potential land uses suggested that and if well designed should projects as further feasibility work innovate and actively enhance the physical diversity of the Seafront some form of educational use enhance permeability, but has no is required. However it is clear 7 Marine Hall , Cultural and Seafront'sThe Marine environment. Hall is the most iconic inThe a positiveproposal manner. is to address A genuinely the couldThe Marine assist moreHall is dominant well used usesat sigificantThe project benefits will significantly with regard to thatThis projectsuch facilities forms havethe core proven structure on the Seafront and acts successfulentry and viewingfacility would points also of the inpresent, providing particularly a sustainable in the linkingincrease key footfall areas bothin its throughoutown right. effectiveelement ofelsewhere all Seafront and proposals, it offers a Conference Centre as the centrepiece for the entire attractHall, and new potentially users raising develop lcoalisedevenings, economy. but remains quiet and the day and evening and uniquein social, use economic unlikely andto be physical area. The proposals in Project 7 awarenessextensions ofto the widermain building, Town and under-used during most days. This throughout the year. replicatedterms. Without elsewhere addressing in the the sub- seek to protect its most distinctive Seafrontwhilst protecting offer. the historic project will increase the types and region.slow decline of the Marine Hall features whilst addressing its dome and Art Deco design of the frequency of uses, which will in Fleetwood's Seafront cannot ever weaknesses, such as the lack of structure. turn provide greater visibility of be truly rejuvenated. sea views, poor layout, and the Seafront's wider offer to a 5 Seafront Restaurant inabilityNew built to development finance its own needs to A successful private enterprise largerThe Seafront audience. requires greater The project may increase footfall Whilst this project would be run upkeep.be sympathetic to the area's could stimulate potential further diversity of uses to encourage and if well designed should as a private concern the character. retail growth and create a small more visitors and increased usage enhance permeability, but has no legitimacy of branding the amount of new employment. The at different times of the day - sigificant benefits with regard to Seafront as a tourist and visitor additional footfall and activity will proposals such as a restaurant linking key areas in its own right. attraction is exponentially also increase security and reduce meet these requirements and enhanced by the presence of negative perceptions of the provide additionality for the offer places to eat and drink, especially Seafront aiding adjoining uses. of other uses in the area. in the presently moribund local evening economy.

6 Marine Hall Events Area The events area will involve the This project aims to tackle an area The potential for an ongoing By acting as a visual focal point, This project represents a possible loss of historic greenspace but will that is failing to reach its programme of events that and by ensuring signage and 'early-win' - a highly visible provide new community-oriented potential. Fleetwood, and in maximises use (and therefore desire lines exist between this transformation of an area that facilities. particular the Seafront, needs a income) of the area is clearly area and the rest of the Seafront, presently under performs. natural civic hub, that can be apparent. this project can act as hub for used for a variety of purposes. encouraging exploration of other Developing it in the heart of the areas. Seafront clearly offers the best chance of stimulating wider rejuvenation of the area.

7 Marine Hall , Cultural and The Marine Hall is the most iconic The proposal is to address the The Marine Hall is well used at The project will significantly This project forms the core structure on the Seafront and acts entry and viewing points of the present, particularly in the increase footfall both throughout element of all Seafront proposals, Conference Centre as the centrepiece for the entire Hall, and potentially develop evenings, but remains quiet and the day and evening and in social, economic and physical area. The proposals in Project 7 extensions to the main building, under-used during most days. This throughout the year. terms. Without addressing the seek to protect its most distinctive whilst protecting the historic project will increase the types and slow decline of the Marine Hall features whilst addressing its dome and Art Deco design of the frequency of uses, which will in Fleetwood's Seafront cannot ever weaknesses, such as the lack of structure. turn provide greater visibility of be truly rejuvenated. sea views, poor layout, and the Seafront's wider offer to a inability to finance its own larger audience. upkeep. SEAFRONT APPRAISAL - STRATEGIC ASSESSMENT

STAGE 2: PROJECT ASSESSMENT How do component projects meet the objectives of the Regeneration Framework?

RF Objective OB1 OB2 OB3 OB4 Recommendation Ensure the Seafront’s Develop physical and Maximise the future Improve linkages What is the estimated overall heritage and economic proposals vibrancy and between the Seafront’s value of the component project for Fleetwood's environment be that assist in the sustainability of uses key areas Seafront in terms of both the protected and rejuvenation of the on the Seafront area's development and its enhanced; Seafront role in rejuvenating the Town? Project 1 Picnic and Children's Play Area Project encourages greater use of There is no significant change to Benefits may be relatively small, The project will not only seek to Whilst not a major project, the an area well suited to providing the present use, but proposals but important. Picnicking and play encourage use of the area it is inclusion of picnicking and play public recreation. aim to encourage greater footfall areas encourage social events and based within, but will also act as a facilities helps define the which should benefit the wider represent low cost uses open to gateway to exploring the Wyre Seafront's general character as a Seafront. all members of the community. Trail. place for recreation and relaxation.

2 Adventure Sports Clubhouse The Clubhouse will require Assuming that businesses The potential diversity of uses at The Clubhouse will most likely The project is potentially the most significant levels of new operated from the Clubhouse are the Clubhouse is vast, and if well- operate as a destination in its own catalytic of all proposed. An development which must respect economically viable, the increased managed, maintained and right. Linkages to surrounding opportunity exists to provide an the Seafront's character. choice of events and facilities at marketed, could attract users to related facilities will be important, iconic building that attracts Sympathetically done it has the the Seafront will represent a step- the Seafront who previously and though visits that combine interest and visitors from a potential to enhance the change for the area that could would not consider visiting the use of this facility with others such regional and even national environment as seen at the and should complete its area, as well as providing greater as Marine Hall or the Mount may hinterland. Marine Hall. rejuvenation. choice to existing users. be relatively infrequent, it will be important to cross-sell and raise awareness of the wider offer.

3 Wheels Park Wheels Parks can cause concerns There is an apparent need for Assuming the strategic fit of uses The Park should link with some The Wheels Park, along with the over their fit with adjoining uses such a facility in the sub-region, is well managed the Wheels Park neighbouring uses in an economic Clubhouse, offer the opportunity and measures to mitigate impact and it has the potential to provide will encourage use of the Seafront and administrative sense, though to modernise the Seafront's offer will need to be explored. However a boost to the area's image by younger people and potentially it will not necessarily be the most and provide developments that the natural terrain of the site does amongst a key demographic that draw regular use from those permeable area in strategic terms. will gain reognition and interest lend itself to a track based use. is presently poorly served by training or competing at amateur from a wider area that in turn will existing facilities. and professional levels. be to the advantage of less high profile elements of the Seafront redevelopment.

4 Discovery Centre The built form of a centre focused As noted in OB1 an innovative The appraisal of the Seafront's The project may increase footfall As yet one of the most undefined on energy has the potential to facility can actually increase the potential land uses suggested that and if well designed should projects as further feasibility work innovate and actively enhance the physical diversity of the Seafront some form of educational use enhance permeability, but has no is required. However it is clear Seafront's environment. in a positive manner. A genuinely could assist more dominant uses sigificant benefits with regard to that such facilities have proven successful facility would also in providing a sustainable linking key areas in its own right. effective elsewhere and it offers a attract new users raising lcoalised economy. unique use unlikely to be awareness of the wider Town and replicated elsewhere in the sub- Seafront offer. region.

5 Seafront Restaurant New built development needs to A successful private enterprise The Seafront requires greater The project may increase footfall Whilst this project would be run be sympathetic to the area's could stimulate potential further diversity of uses to encourage and if well designed should as a private concern the character. retail growth and create a small more visitors and increased usage enhance permeability, but has no legitimacy of branding the amount of new employment. The at different times of the day - sigificant benefits with regard to Seafront as a tourist and visitor SEAFRONT APPRAISAL - STRATEGIC ASSESSMENT additional footfall and activity will proposals such as a restaurant linking key areas in its own right. attraction is exponentially also increase security and reduce meet these requirements and enhanced by the presence of STAGE 2: PROJECT ASSESSMENT negative perceptions of the provide additionality for the offer places to eat and drink, especially Seafront aiding adjoining uses. of other uses in the area. in the presently moribund local How do component projects meet the objectives of the Regeneration Framework? evening economy.

RF Objective OB1 OB2 OB3 OB4 Recommendation 6 Marine Hall Events Area TheEnsure events thearea willSeafront’s involve the ThisDevelop project aimsphysical to tackle and an area TheMaximise potential for the an ongoingfuture ByImprove acting as alinkages visual focal point, ThisWhat project is the represents estimated a possible overall loss of historic greenspace but will that is failing to reach its programme of events that and by ensuring signage and 'early-win' - a highly visible heritage and economic proposals vibrancy and between the Seafront’s value of the component provide new community-oriented potential. Fleetwood, and in maximises use (and therefore desire lines exist between this transformationproject for Fleetwood's of an area that facilities.environment be particularthat assist the Seafront, in the needs a income)sustainability of the area isof clearly uses areakey and areas the rest of the Seafront, presentlySeafront under in terms performs. of both the protected and naturalrejuvenation civic hub, that of canthe be apparent.on the Seafront this project can act as hub for area's development and its enhanced; usedSeafront for a variety of purposes. encouraging exploration of other role in rejuvenating the Developing it in the heart of the areas. Town? Project Seafront clearly offers the best chance of stimulating wider 1 Picnic and Children's Play Area Project encourages greater use of rejuvenationThere is no significant of the area. change to Benefits may be relatively small, The project will not only seek to Whilst not a major project, the an area well suited to providing the present use, but proposals but important. Picnicking and play encourage use of the area it is inclusion of picnicking and play public recreation. aim to encourage greater footfall areas encourage social events and based within, but will also act as a facilities helps define the which should benefit the wider represent low cost uses open to gateway to exploring the Wyre Seafront's general character as a 7 Marine Hall , Cultural and The Marine Hall is the most iconic Seafront.The proposal is to address the allThe members Marine Hall of the is well community. used at Trail.The project will significantly placeThis project for recreation forms the and core structure on the Seafront and acts entry and viewing points of the present, particularly in the increase footfall both throughout relaxation.element of all Seafront proposals, Conference Centre as the centrepiece for the entire Hall, and potentially develop evenings, but remains quiet and the day and evening and in social, economic and physical area. The proposals in Project 7 extensions to the main building, under-used during most days. This throughout the year. terms. Without addressing the seek to protect its most distinctive whilst protecting the historic project will increase the types and slow decline of the Marine Hall 2 Adventure Sports Clubhouse featuresThe Clubhouse whilst willaddressing require its domeAssuming and thatArt Decobusinesses design of the frequencyThe potential of uses, diversity which of willuses in at The Clubhouse will most likely Fleetwood'sThe project is Seafront potentially cannot the mostever weaknesses,significant levels such of as new the lack of structure.operated from the Clubhouse are turnthe Clubhouse provide greater is vast, visibility and if well- of operate as a destination in its own becatalytic truly rejuvenated. of all proposed. An seadevelopment views, poor which layout, must and respect economically viable, the increased themanaged, Seafront's maintained wider offer and to a right. Linkages to surrounding opportunity exists to provide an inabilitythe Seafront's to finance character. its own choice of events and facilities at largermarketed, audience. could attract users to related facilities will be important, iconic building that attracts upkeep.Sympathetically done it has the the Seafront will represent a step- the Seafront who previously and though visits that combine interest and visitors from a potential to enhance the change for the area that could would not consider visiting the use of this facility with others such regional and even national environment as seen at the and should complete its area, as well as providing greater as Marine Hall or the Mount may hinterland. Marine Hall. rejuvenation. choice to existing users. be relatively infrequent, it will be 8 Children's Play Area Project encourages greater use of The potential to develop a Benefits may be relatively small, importantAt present tothis cross-sell area is attractive and raise This project does not in itself offer an area well suited to providing landmark play-related structure but important. Picnicking and play awarenessand well-maintained of the wider but offer. lacking in an opportunity for catalytic public recreation. that has visibility from Euston area's encourage social events visibility, especially from the Town change but it does assist in the Park and the former Pier site has and represent low cost uses open Centre/Euston Park. development of a balanced range been recommended, and if to all members of the community. of uses, balanced in terms of user deliverable could raise the costs, types of user and frequency visibility of the wider area. Such of use. Given the considerable 3 Wheels Park Wheels Parks can cause concerns proposalsThere is an would apparent need need to be for Assuming the strategic fit of uses The Park should link with some distanceThe Wheels between Park, alongthis play with area the over their fit with adjoining uses carefullysuch a facility assessed in the to sub-region, ensure that is well managed the Wheels Park neighbouring uses in an economic andClubhouse, that proposed offer the in opportunityproject 1, and measures to mitigate impact and it has the potential to provide will encourage use of the Seafront and administrative sense, though to modernise the Seafront's offer they enhance rather than damage they can be viewed as will need to be explored. However a boost to the area's image by younger people and potentially it will not necessarily be the most and provide developments that the character of the Seafront. complimentary rather than the natural terrain of the site does amongst a key demographic that draw regular use from those permeable area in strategic terms. will gain reognition and interest competitive. lend itself to a track based use. is presently poorly served by training or competing at amateur from a wider area that in turn will existing facilities. and professional levels. be to the advantage of less high profile elements of the Seafront 64 FLEETWOOD, SEAFRONT MASTERPLAN redevelopment. 9 Euston Park Euston Park is the public realm Whilst the project is focused on Euston Park is a relatively small Euston Park and the surrounding Whilst sat slightly outside the centrepiece of Fleetwood's the redevelopment of the Park and presently quite isolated area. areas represent the most logical prime Seafront area, it is a long historic quarter, surrounded by opposite the iconic North Euston Its redevelopment will raise the pedestrian and vehicular link held view of the Town's The built form of a centre focused As noted in OB1 an innovative The appraisal of the Seafront's The project may increase footfall As yet one of the most undefined 4 Discovery Centre the Listed structures of North Hotel, it is also seeking to image of a historic quarter of between the Seafront and the Masterplan that the on energy has the potential to facility can actually increase the potential land uses suggested that and if well designed should projects as further feasibility work Euston Hotel and the two precipitate a change in the quality Fleetwood but is unlikely to Town Centre and the main redevelopment of the Seafront is innovate and actively enhance the physical diversity of the Seafront some form of educational use enhance permeability, but has no is required. However it is clear Lighthouses. The project is of the public realm in all areas significantly increase the vibrancy gateways into Fleetwood. This site primarily sought to assist in the Seafront's environment. in a positive manner. A genuinely could assist more dominant uses sigificant benefits with regard to that such facilities have proven focused on protecting and between Albert Street and the of the Seafront in its own right - if is effectively the gateway to all broader regeneration of the successful facility would also in providing a sustainable linking key areas in its own right. effective elsewhere and it offers a enhancing this area without Old Pier site. With the right successfully enhanced it can the key areas of the Seafront and entire urban area. Consequently it attract new users raising lcoalised economy. unique use unlikely to be changing its character. interventions this area has the provide an important gateway, should be afforded the level of is of upmost importance that the awareness of the wider Town and replicated elsewhere in the sub- potential to act as a gateway to and potentially an attraction to priority this role signifies. physical links exist so as to allow Seafront offer. region. the Seafront for pedestrians and those interested in architecture, the Seafront's rejuvenation to tram users in the Town Centre. heritage and the shipping impact on the Town Centre. industry. 5 Seafront Restaurant New built development needs to A successful private enterprise The Seafront requires greater The project may increase footfall Whilst this project would be run be sympathetic to the area's could stimulate potential further diversity of uses to encourage and if well designed should as a private concern the character. retail growth and create a small more visitors and increased usage enhance permeability, but has no legitimacy of branding the Set slightly back from the main Noamount significant of new change employment. to the area The Mountat different Gardens times offers of the the day perfect - Setsigificant slightly benefits away from with the regard to TheSeafront importance as a tourist of Mount and visitor 10 Mount Gardens additional footfall and activity will proposals such as a restaurant linking key areas in its own right. attraction is exponentially Seafront but undeniably a vital is proposed besides opportunity to provide formal and Seafront so the Mount cannot be Gardens is based on also increase security and reduce meet these requirements and enhanced by the presence of element in its character, the environmental upgrades and the peaceful recreation space in deemed as a vital link between environmental rather than negative perceptions of the provide additionality for the offer places to eat and drink, especially project will ensure that this seeking of a viable use for the contrast to the more active uses key areas. What it is however is a economic factors. As the Seafront aiding adjoining uses. of other uses in the area. in the presently moribund local unusual and attractive feature of Pavilion building - therefore it is proposed and existing elsewhere vital link between the Seafront centrepiece of Burton's design of evening economy. Fleetwood is protected in the long- unlikely that this project will in the Seafront area. and the residential and retail the Town, and a key link to the term. stimulate the rejuvenation of the areas at the heart of Fleetwood. area's history prior to the Seafront in its own right, but will development of the Seafront, 6 Marine Hall Events Area The events area will involve the assistThis project other projectsaims to tacklein doing an soarea - The potential for an ongoing By acting as a visual focal point, theyThis projectmust be represents protected a for possible future loss of historic greenspace but will i.e.that the is failing detrimental to reach impact its on the programme of events that and by ensuring signage and generations.'early-win' - a highly visible provide new community-oriented viewspotential. and Fleetwood,setting of Marine and in Hall if maximises use (and therefore desire lines exist between this transformation of an area that facilities. theparticular Mount the were Seafront, lost must needs be a income) of the area is clearly area and the rest of the Seafront, presently under performs. considered.natural civic hub, that can be apparent. this project can act as hub for used for a variety of purposes. encouraging exploration of other Developing it in the heart of the areas. Seafront clearly offers the best 11 Promenade The core of the Seafront chanceThe Seafont of stimulating would cease wider to be a Aside from the economic benefits The Promenade is, and will There can be no Seafront without experience is the Promenade and rejuvenationcoherent identity of the without area. the noted in OB2, this project offers remain, the single most important a front, and the health and upgrading the quality of the Promenade, and any failure to the opportunity to improve the link between all the Seafront's key attractiveness of seaside resorts is environment significantly maximise the quality of this key usage of the Promenade by areas. often defined by the quality of its enhances the attraction of the artery would clearly undermine increasing visual quality, and Promenade. Therefore in image 7 Marine Hall , Cultural and wholeThe Marine area. Hall is the most iconic theThe economicproposal is health to address of other the providingThe Marine lighting Hall is to well aid used security. at The project will significantly terms,This project as well forms as in the practical core structure on the Seafront and acts entry and viewing points of the present, particularly in the increase footfall both throughout element of all Seafront proposals, Conference Centre projects. This will hopefully lead to greater terms, the uprgading of the as the centrepiece for the entire Hall, and potentially develop footfallevenings, and but the remains development quiet and of the day and evening and Promenadein social, economic is a project and ofphysical upmost area. The proposals in Project 7 extensions to the main building, theunder-used area as aduring hub of most social days. This throughout the year. importanceterms. Without and addressing value. the seek to protect its most distinctive whilst protecting the historic activities.project will increase the types and slow decline of the Marine Hall features whilst addressing its dome and Art Deco design of the frequency of uses, which will in Fleetwood's Seafront cannot ever weaknesses, such as the lack of structure. turn provide greater visibility of be truly rejuvenated. sea views, poor layout, and the Seafront's wider offer to a inability to finance its own larger audience. Key upkeep. Use assists in the delivery of the Objective Use has an overall neutral effect on the Objective Use fails to meet the Objective 8 Children's Play Area Project encourages greater use of The potential to develop a Benefits may be relatively small, At present this area is attractive This project does not in itself offer an area well suited to providing landmark play-related structure but important. Picnicking and play and well-maintained but lacking in an opportunity for catalytic public recreation. that has visibility from Euston area's encourage social events visibility, especially from the Town change but it does assist in the Park and the former Pier site has and represent low cost uses open Centre/Euston Park. development of a balanced range been recommended, and if to all members of the community. of uses, balanced in terms of user deliverable could raise the costs, types of user and frequency visibility of the wider area. Such of use. Given the considerable proposals would need to be distance between this play area SEAFRONT APPRAISAL - STRATEGIC ASSESSMENT carefully assessed to ensure that and that proposed in project 1, they enhance rather than damage they can be viewed as STAGE 2: PROJECT ASSESSMENT the character of the Seafront. complimentary rather than competitive. How do component projects meet the objectives of the Regeneration Framework?

RF Objective OB1 OB2 OB3 OB4 Recommendation 9 Euston Park EustonEnsure Park the is the Seafront’s public realm WhilstDevelop the project physical is focused and on EustonMaximise Park is athe relatively future small EustonImprove Park andlinkages the surrounding WhilstWhat issat the slightly estimated outside overallthe centrepiece of Fleetwood's the redevelopment of the Park and presently quite isolated area. areas represent the most logical prime Seafront area, it is a long heritage and economic proposals vibrancy and between the Seafront’s value of the component historic quarter, surrounded by opposite the iconic North Euston Its redevelopment will raise the pedestrian and vehicular link heldproject view for of theFleetwood's Town's theenvironment Listed structures be of North Hotel,that itassist is also seeking in the to imagesustainability of a historic quarter of uses of betweenkey areas the Seafront and the MasterplanSeafront in that terms the of both the Eustonprotected Hotel and and the two precipitaterejuvenation a change of in the quality Fleetwoodon the Seafront but is unlikely to Town Centre and the main redevelopmentarea's development of the Seafront and its is Lighthouses.enhanced; The project is ofSeafront the public realm in all areas significantly increase the vibrancy gateways into Fleetwood. This site primarilyrole in rejuvenating sought to assist the in the focused on protecting and between Albert Street and the of the Seafront in its own right - if is effectively the gateway to all broaderTown? regeneration of the Project enhancing this area without Old Pier site. With the right successfully enhanced it can the key areas of the Seafront and entire urban area. Consequently it changing its character. interventions this area has the provide an important gateway, should be afforded the level of is of upmost importance that the Project encourages greater use of There is no significant change to Benefits may be relatively small, The project will not only seek to Whilst not a major project, the 1 Picnic and Children's Play Area potential to act as a gateway to and potentially an attraction to priority this role signifies. physical links exist so as to allow an area well suited to providing the present use, but proposals but important. Picnicking and play encourage use of the area it is inclusion of picnicking and play the Seafront for pedestrians and those interested in architecture, the Seafront's rejuvenation to public recreation. aim to encourage greater footfall areas encourage social events and based within, but will also act as a facilities helps define the tram users in the Town Centre. heritage and the shipping impact on the Town Centre. which should benefit the wider represent low cost uses open to gateway to exploring the Wyre Seafront's general character as a industry. Seafront. all members of the community. Trail. place for recreation and relaxation.

10 Mount Gardens Set slightly back from the main No significant change to the area Mount Gardens offers the perfect Set slightly away from the The importance of Mount 2 Adventure Sports Clubhouse SeafrontThe Clubhouse but undeniably will require a vital isAssuming proposed that besides businesses opportunityThe potential to diversity provide offormal uses andat SeafrontThe Clubhouse so the willMount most cannot likely be GardensThe project is based is potentially on the most elementsignificant in levelsits character, of new the environmentaloperated from theupgrades Clubhouse and the are peacefulthe Clubhouse recreation is vast, space and inif well- deemedoperate asas aa destinationvital link between in its own environmentalcatalytic of all proposed. rather than An projectdevelopment will ensure which that must this respect seekingeconomically of a viable viable, use the for increased the contrastmanaged, to maintained the more active and uses keyright. areas. Linkages What to it surrounding is however is a economicopportunity factors. exists Asto theprovide an the Seafront's character. choice of events and facilities at marketed, could attract users to related facilities will be important, iconic building that attracts unusual and attractive feature of Pavilion building - therefore it is proposed and existing elsewhere vital link between the Seafront centrepiece of Burton's design of Sympathetically done it has the the Seafront will represent a step- the Seafront who previously and though visits that combine interest and visitors from a Fleetwood is protected in the long- unlikely that this project will in the Seafront area. and the residential and retail the Town, and a key link to the potential to enhance the change for the area that could would not consider visiting the use of this facility with others such regional and even national term. stimulate the rejuvenation of the areas at the heart of Fleetwood. area's history prior to the environment as seen at the and should complete its area, as well as providing greater as Marine Hall or the Mount may hinterland. Seafront in its own right, but will development of the Seafront, Marine Hall. rejuvenation. choice to existing users. be relatively infrequent, it will be assist other projects in doing so - they must be protected for future important to cross-sell and raise i.e. the detrimental impact on the generations. awareness of the wider offer. views and setting of Marine Hall if the Mount were lost must be considered.

3 Wheels Park Wheels Parks can cause concerns There is an apparent need for Assuming the strategic fit of uses The Park should link with some The Wheels Park, along with the 11 Promenade overThe core their of fit the with Seafront adjoining uses suchThe Seafont a facility would in the cease sub-region, to be a isAside well from managed the economic the Wheels benefits Park neighbouringThe Promenade uses is, inand an will economic Clubhouse,There can be offer no Seafrontthe opportunity without andexperience measures is the to mitigatePromenade impact and andcoherent it has identity the potential without to theprovide willnoted encourage in OB2, this use project of the Seafrontoffers andremain, administrative the single most sense, important though toa front, modernise and the the health Seafront's and offer willupgrading need to the be quality explored. of the However aPromenade, boost to the and area's any imagefailure to bythe younger opportunity people to improveand potentially the itlink will between not necessarily all the Seafront's be the most key andattractiveness provide developments of seaside resorts that is theenvironment natural terrain significantly of the site does amongstmaximise a the key quality demographic of this key that drawusage regular of the Promenadeuse from those by permeableareas. area in strategic terms. willoften gain defined reognition by the and quality interest of its lendenhances itself theto a attraction track based of use.the isartery presently would poorly clearly served undermine by trainingincreasing or visualcompeting quality, at amateurand fromPromenade. a wider Therefore area that in turnimage will whole area. existingthe economic facilities. health of other andproviding professional lighting levels. to aid security. beterms, to the as advantagewell as in practical of less high projects. This will hopefully lead to greater profileterms, theelements uprgading of the of Seafront the footfall and the development of FLEETWOOD, SEAFRONTredevelopment.Promenade is MASTERPLANa project of upmost 65 the area as a hub of social importance and value. activities. 4 Discovery Centre The built form of a centre focused As noted in OB1 an innovative The appraisal of the Seafront's The project may increase footfall As yet one of the most undefined on energy has the potential to facility can actually increase the potential land uses suggested that and if well designed should projects as further feasibility work innovate and actively enhance the physical diversity of the Seafront some form of educational use enhance permeability, but has no is required. However it is clear Key Seafront's environment. in a positive manner. A genuinely could assist more dominant uses sigificant benefits with regard to that such facilities have proven successful facility would also in providing a sustainable linking key areas in its own right. effective elsewhere and it offers a Use assists in the delivery ofattract the Objective new users raising lcoalised economy. unique use unlikely to be Use has an overall neutral effectawareness on the of the Objective wider Town and replicated elsewhere in the sub- Seafront offer. region. Use fails to meet the Objective

5 Seafront Restaurant New built development needs to A successful private enterprise The Seafront requires greater The project may increase footfall Whilst this project would be run be sympathetic to the area's could stimulate potential further diversity of uses to encourage and if well designed should as a private concern the character. retail growth and create a small more visitors and increased usage enhance permeability, but has no legitimacy of branding the amount of new employment. The at different times of the day - sigificant benefits with regard to Seafront as a tourist and visitor additional footfall and activity will proposals such as a restaurant linking key areas in its own right. attraction is exponentially also increase security and reduce meet these requirements and enhanced by the presence of negative perceptions of the provide additionality for the offer places to eat and drink, especially Seafront aiding adjoining uses. of other uses in the area. in the presently moribund local evening economy.

6 Marine Hall Events Area The events area will involve the This project aims to tackle an area The potential for an ongoing By acting as a visual focal point, This project represents a possible loss of historic greenspace but will that is failing to reach its programme of events that and by ensuring signage and 'early-win' - a highly visible provide new community-oriented potential. Fleetwood, and in maximises use (and therefore desire lines exist between this transformation of an area that facilities. particular the Seafront, needs a income) of the area is clearly area and the rest of the Seafront, presently under performs. natural civic hub, that can be apparent. this project can act as hub for used for a variety of purposes. encouraging exploration of other Developing it in the heart of the areas. Seafront clearly offers the best chance of stimulating wider rejuvenation of the area.

7 Marine Hall , Cultural and The Marine Hall is the most iconic The proposal is to address the The Marine Hall is well used at The project will significantly This project forms the core structure on the Seafront and acts entry and viewing points of the present, particularly in the increase footfall both throughout element of all Seafront proposals, Conference Centre as the centrepiece for the entire Hall, and potentially develop evenings, but remains quiet and the day and evening and in social, economic and physical area. The proposals in Project 7 extensions to the main building, under-used during most days. This throughout the year. terms. Without addressing the seek to protect its most distinctive whilst protecting the historic project will increase the types and slow decline of the Marine Hall features whilst addressing its dome and Art Deco design of the frequency of uses, which will in Fleetwood's Seafront cannot ever weaknesses, such as the lack of structure. turn provide greater visibility of be truly rejuvenated. sea views, poor layout, and the Seafront's wider offer to a inability to finance its own larger audience. upkeep. 8 Children's Play Area Project encourages greater use of The potential to develop a Benefits may be relatively small, At present this area is attractive This project does not in itself offer an area well suited to providing landmark play-related structure but important. Picnicking and play and well-maintained but lacking in an opportunity for catalytic public recreation. that has visibility from Euston area's encourage social events visibility, especially from the Town change but it does assist in the Park and the former Pier site has and represent low cost uses open Centre/Euston Park. development of a balanced range been recommended, and if to all members of the community. of uses, balanced in terms of user deliverable could raise the costs, types of user and frequency visibility of the wider area. Such of use. Given the considerable proposals would need to be distance between this play area carefully assessed to ensure that and that proposed in project 1, they enhance rather than damage they can be viewed as the character of the Seafront. complimentary rather than competitive.

9 Euston Park Euston Park is the public realm Whilst the project is focused on Euston Park is a relatively small Euston Park and the surrounding Whilst sat slightly outside the centrepiece of Fleetwood's the redevelopment of the Park and presently quite isolated area. areas represent the most logical prime Seafront area, it is a long historic quarter, surrounded by opposite the iconic North Euston Its redevelopment will raise the pedestrian and vehicular link held view of the Town's the Listed structures of North Hotel, it is also seeking to image of a historic quarter of between the Seafront and the Masterplan that the Euston Hotel and the two precipitate a change in the quality Fleetwood but is unlikely to Town Centre and the main redevelopment of the Seafront is Lighthouses. The project is of the public realm in all areas significantly increase the vibrancy gateways into Fleetwood. This site primarily sought to assist in the focused on protecting and between Albert Street and the of the Seafront in its own right - if is effectively the gateway to all broader regeneration of the enhancing this area without Old Pier site. With the right successfully enhanced it can the key areas of the Seafront and entire urban area. Consequently it changing its character. interventions this area has the provide an important gateway, should be afforded the level of is of upmost importance that the potential to act as a gateway to and potentially an attraction to priority this role signifies. physical links exist so as to allow the Seafront for pedestrians and those interested in architecture, the Seafront's rejuvenation to tram users in the Town Centre. heritage and the shipping impact on the Town Centre. industry.

10 Mount Gardens Set slightly back from the main No significant change to the area Mount Gardens offers the perfect Set slightly away from the The importance of Mount Seafront but undeniably a vital is proposed besides opportunity to provide formal and Seafront so the Mount cannot be Gardens is based on element in its character, the environmental upgrades and the peaceful recreation space in deemed as a vital link between environmental rather than project will ensure that this seeking of a viable use for the contrast to the more active uses key areas. What it is however is a economic factors. As the unusual and attractive feature of Pavilion building - therefore it is proposed and existing elsewhere vital link between the Seafront centrepiece of Burton's design of Fleetwood is protected in the long- unlikely that this project will in the Seafront area. and the residential and retail the Town, and a key link to the term. stimulate the rejuvenation of the areas at the heart of Fleetwood. area's history prior to the Seafront in its own right, but will development of the Seafront, SEAFRONT APPRAISAL - STRATEGIC ASSESSMENT assist other projects in doing so - they must be protected for future i.e. the detrimental impact on the generations. views and setting of Marine Hall if STAGE 2: PROJECT ASSESSMENT the Mount were lost must be How do component projects meet the objectives of the Regenerationconsidered. Framework?

RF Objective OB1 OB2 OB3 OB4 Recommendation 11 Promenade TheEnsure core of thethe Seafront Seafront’s TheDevelop Seafont wouldphysical cease toand be a AsideMaximise from the theeconomic future benefits TheImprove Promenade linkages is, and will ThereWhat canis the be noestimated Seafront withoutoverall experience is the Promenade and coherent identity without the noted in OB2, this project offers remain, the single most important a front, and the health and heritage and economic proposals vibrancy and between the Seafront’s value of the component upgrading the quality of the Promenade, and any failure to the opportunity to improve the link between all the Seafront's key attractivenessproject for Fleetwood's of seaside resorts is environment significantly be maximisethat assist the quality in the of this key usagesustainability of the Promenade of uses by areas.key areas oftenSeafront defined in termsby the ofquality both of the its enhancesprotected the attraction and of the arteryrejuvenation would clearly of undermine the increasingon the Seafrontvisual quality, and Promenade.area's development Therefore inand image its wholeenhanced; area. theSeafront economic health of other providing lighting to aid security. terms,role in as rejuvenating well as in practical the projects. This will hopefully lead to greater terms,Town? the uprgading of the Project footfall and the development of Promenade is a project of upmost the area as a hub of social importance and value. Project encourages greater use of There is no significant change to Benefits may be relatively small, The project will not only seek to Whilst not a major project, the 1 Picnic and Children's Play Area activities. an area well suited to providing the present use, but proposals but important. Picnicking and play encourage use of the area it is inclusion of picnicking and play public recreation. aim to encourage greater footfall areas encourage social events and based within, but will also act as a facilities helps define the which should benefit the wider represent low cost uses open to gateway to exploring the Wyre Seafront's general character as a Seafront. all members of the community. Trail. place for recreation and relaxation. Key Use assists in the delivery of the Objective Use has an overall neutral effect on the Objective 2 Adventure Sports Clubhouse The Clubhouse will require Assuming that businesses The potential diversity of uses at The Clubhouse will most likely The project is potentially the most significantUse fails levels to meet of new the Objectiveoperated from the Clubhouse are the Clubhouse is vast, and if well- operate as a destination in its own catalytic of all proposed. An development which must respect economically viable, the increased managed, maintained and right. Linkages to surrounding opportunity exists to provide an the Seafront's character. choice of events and facilities at marketed, could attract users to related facilities will be important, iconic building that attracts Sympathetically done it has the the Seafront will represent a step- the Seafront who previously and though visits that combine interest and visitors from a potential to enhance the change for the area that could would not consider visiting the use of this facility with others such regional and even national environment as seen at the and should complete its area, as well as providing greater as Marine Hall or the Mount may hinterland. Marine Hall. rejuvenation. choice to existing users. be relatively infrequent, it will be important to cross-sell and raise awareness of the wider offer.

3 Wheels Park Wheels Parks can cause concerns There is an apparent need for Assuming the strategic fit of uses The Park should link with some The Wheels Park, along with the over their fit with adjoining uses such a facility in the sub-region, is well managed the Wheels Park neighbouring uses in an economic Clubhouse, offer the opportunity and measures to mitigate impact and it has the potential to provide will encourage use of the Seafront and administrative sense, though to modernise the Seafront's offer will need to be explored. However a boost to the area's image by younger people and potentially it will not necessarily be the most and provide developments that the natural terrain of the site does amongst a key demographic that draw regular use from those permeable area in strategic terms. will gain reognition and interest lend itself to a track based use. is presently poorly served by training or competing at amateur from a wider area that in turn will existing facilities. and professional levels. be to the advantage of less high profile elements of the Seafront 66 FLEETWOOD, SEAFRONT MASTERPLAN redevelopment.

4 Discovery Centre The built form of a centre focused As noted in OB1 an innovative The appraisal of the Seafront's The project may increase footfall As yet one of the most undefined on energy has the potential to facility can actually increase the potential land uses suggested that and if well designed should projects as further feasibility work innovate and actively enhance the physical diversity of the Seafront some form of educational use enhance permeability, but has no is required. However it is clear Seafront's environment. in a positive manner. A genuinely could assist more dominant uses sigificant benefits with regard to that such facilities have proven successful facility would also in providing a sustainable linking key areas in its own right. effective elsewhere and it offers a attract new users raising lcoalised economy. unique use unlikely to be awareness of the wider Town and replicated elsewhere in the sub- Seafront offer. region.

5 Seafront Restaurant New built development needs to A successful private enterprise The Seafront requires greater The project may increase footfall Whilst this project would be run be sympathetic to the area's could stimulate potential further diversity of uses to encourage and if well designed should as a private concern the character. retail growth and create a small more visitors and increased usage enhance permeability, but has no legitimacy of branding the amount of new employment. The at different times of the day - sigificant benefits with regard to Seafront as a tourist and visitor additional footfall and activity will proposals such as a restaurant linking key areas in its own right. attraction is exponentially also increase security and reduce meet these requirements and enhanced by the presence of negative perceptions of the provide additionality for the offer places to eat and drink, especially Seafront aiding adjoining uses. of other uses in the area. in the presently moribund local evening economy.

6 Marine Hall Events Area The events area will involve the This project aims to tackle an area The potential for an ongoing By acting as a visual focal point, This project represents a possible loss of historic greenspace but will that is failing to reach its programme of events that and by ensuring signage and 'early-win' - a highly visible provide new community-oriented potential. Fleetwood, and in maximises use (and therefore desire lines exist between this transformation of an area that facilities. particular the Seafront, needs a income) of the area is clearly area and the rest of the Seafront, presently under performs. natural civic hub, that can be apparent. this project can act as hub for used for a variety of purposes. encouraging exploration of other Developing it in the heart of the areas. Seafront clearly offers the best chance of stimulating wider rejuvenation of the area.

7 Marine Hall , Cultural and The Marine Hall is the most iconic The proposal is to address the The Marine Hall is well used at The project will significantly This project forms the core structure on the Seafront and acts entry and viewing points of the present, particularly in the increase footfall both throughout element of all Seafront proposals, Conference Centre as the centrepiece for the entire Hall, and potentially develop evenings, but remains quiet and the day and evening and in social, economic and physical area. The proposals in Project 7 extensions to the main building, under-used during most days. This throughout the year. terms. Without addressing the seek to protect its most distinctive whilst protecting the historic project will increase the types and slow decline of the Marine Hall features whilst addressing its dome and Art Deco design of the frequency of uses, which will in Fleetwood's Seafront cannot ever weaknesses, such as the lack of structure. turn provide greater visibility of be truly rejuvenated. sea views, poor layout, and the Seafront's wider offer to a inability to finance its own larger audience. upkeep.