The World Bank for OFFICIAL USE ONLY Public Disclosure Authorized Report No: ICR00004798

Total Page:16

File Type:pdf, Size:1020Kb

The World Bank for OFFICIAL USE ONLY Public Disclosure Authorized Report No: ICR00004798 Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: ICR00004798 IMPLEMENTATION COMPLETION AND RESULTS REPORT <Credit Number 5140-KE> ON A CREDIT Public Disclosure Authorized IN THE AMOUNT OF SDR 43.96 MILLION (US$ 92.53 MILLION EQUIVALENT) TO THE Republic of Kenya FOR THE Public Disclosure Authorized KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT June 26, 2019 Transport Global Practice Africa Region Public Disclosure Authorized CURRENCY EQUIVALENTS (Exchange Rate Effective {December 28, 2018}) Currency Unit = KES US$ 1.00 = KES 101.77885 SDR 1.00 = US$ 1.39064 FISCAL YEAR July 1 - June 30 Regional Vice President: Hafez M. H. Ghanem Country Director: Carlos Felipe Jaramillo Senior Global Practice Director: Guangzhe Chen Practice Manager: Benedictus Eijbergen Task Team Leader(s): Josphat O. Sasia ICR Main Contributor: Akiko Kishiue ABBREVIATIONS AND ACRONYMS AF Additional Financing BRT Bus Rapid Transit CBD Central Business District CPS Country Partnership Strategy EASA East African School of Aviation EBK Engineering Board of Kenya EIRR Economic Internal Rate of Return ESIA Environmental and Social Impact Assessments EU European Union FM Financial Management GoK Government of Kenya ICAO International Civil Aviation Organization ICT Information and Communication Technology IDA International Development Association INTP Integrated National Transport Policy ITS Intelligent Transportation System JKIA Jomo Kenyatta International Airport KeNHA Kenya National Highways Authority KRC Kenya Railways Corporation KTSSP Kenya Transport Sector Support Project KURA Kenya Urban Roads Authority M&E Monitoring and Evaluation MoR Ministry of Roads MoT Ministry of Transport MoTIHUD&PW Ministry of Transport, Infrastructure, Housing, Urban Development and Public Works MRTS Mass Rapid Transit System NaMATA Nairobi Metropolitan Area Transport Authority NCA National Construction Authority NCTIP Norther Corridor Transport Improvement Project NMA Nairobi Metropolitan Area NPV Net Present Value NTSA National Transport and Safety Authority NUTRIP National Urban Transport Improvement Project PAD Project Appraisal Document PAP Project Affected Person PDO Project Development Objective PPP Public-Private Partnership RAP Resettlement Action Plan SDoI State Department of Infrastructure SDoT State Department of Transport SDR Special Drawing Rights ToR Terms of Reference TABLE OF CONTENTS DATA SHEET .......................................................................................................................... 1 I. PROJECT CONTEXT AND DEVELOPMENT OBJECTIVES ....................................................... 5 A. CONTEXT AT APPRAISAL .........................................................................................................5 B. SIGNIFICANT CHANGES DURING IMPLEMENTATION ................................................................7 II. OUTCOME .................................................................................................................... 10 A. RELEVANCE OF PDOs ............................................................................................................ 10 B. ACHIEVEMENT OF PDOs (EFFICACY) ...................................................................................... 10 C. EFFICIENCY ........................................................................................................................... 14 D. JUSTIFICATION OF OVERALL OUTCOME RATING- Unsatisfactory ............................................ 15 E. OTHER OUTCOMES AND IMPACTS ......................................................................................... 15 III. KEY FACTORS THAT AFFECTED IMPLEMENTATION AND OUTCOME ................................ 16 A. KEY FACTORS DURING PREPARATION ................................................................................... 16 B. KEY FACTORS DURING IMPLEMENTATION ............................................................................. 17 IV. BANK PERFORMANCE, COMPLIANCE ISSUES, AND RISK TO DEVELOPMENT OUTCOME .. 19 A. QUALITY OF MONITORING AND EVALUATION (M&E) ............................................................ 19 B. ENVIRONMENTAL, SOCIAL, AND FIDUCIARY COMPLIANCE ..................................................... 20 C. BANK PERFORMANCE ........................................................................................................... 23 D. RISK TO DEVELOPMENT OUTCOME ....................................................................................... 24 V. LESSONS AND RECOMMENDATIONS ............................................................................. 25 ANNEX 1. RESULTS FRAMEWORK AND KEY OUTPUTS ........................................................... 27 ANNEX 2. BANK LENDING AND IMPLEMENTATION SUPPORT/SUPERVISION ......................... 37 ANNEX 3. PROJECT COST BY COMPONENT (IDA, GOK) .......................................................... 38 ANNEX 4. EFFICIENCY ANALYSIS ........................................................................................... 39 ANNEX 5. BORROWER, CO-FINANCIER AND OTHER PARTNER/STAKEHOLDER COMMENTS ... 47 ANNEX 6. SUPPORTING DOCUMENTS (IF ANY) ..................................................................... 51 MAP .................................................................................................................................... 67 The World Bank KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321) DATA SHEET BASIC INFORMATION Product Information Project ID Project Name KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT P126321 PROJECT Country Financing Instrument Kenya Investment Project Financing Original EA Category Revised EA Category Partial Assessment (B) Partial Assessment (B) Organizations Borrower Implementing Agency Kenya National Highways Authority, Kenya Urban Roads Kenya National Treasury Authority, Ministry of Transport, Infrastructure, Housing and Urban Development, Kenya Railways Corporation Project Development Objective (PDO) Original PDO The Project Development Objectives (PDO) are to: (a) improve the efficiency of road transport along the northern corridor; (b) improve the institutional capacity and arrangements in the urban transport sub sector; and (c) promote the private sector participation in the operation, financing and management of transport systems. Page 1 of 67 The World Bank KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321) FINANCING Original Amount (US$) Revised Amount (US$) Actual Disbursed (US$) World Bank Financing 300,000,000 92,531,367 61,868,482 IDA-51400 Total 300,000,000 92,531,367 61,868,482 Non-World Bank Financing 0 0 0 Borrower/Recipient 39 0 0 Total 39 0 0 Total Project Cost 300,000,039 92,531,367 61,868,482 KEY DATES Approval Effectiveness MTR Review Original Closing Actual Closing 02-Aug-2012 24-Dec-2012 31-Dec-2018 31-Dec-2018 RESTRUCTURING AND/OR ADDITIONAL FINANCING Date(s) Amount Disbursed (US$M) Key Revisions 27-Dec-2018 62.01 Change in Components and Cost Cancellation of Financing Change in Financing Plan KEY RATINGS Outcome Bank Performance M&E Quality Unsatisfactory Unsatisfactory Negligible RATINGS OF PROJECT PERFORMANCE IN ISRs Actual No. Date ISR Archived DO Rating IP Rating Disbursements (US$M) 01 30-Mar-2013 Satisfactory Satisfactory 0 Page 2 of 67 The World Bank KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321) 02 22-Oct-2013 Satisfactory Moderately Satisfactory 3.90 03 02-Jun-2014 Satisfactory Moderately Unsatisfactory 8.91 04 23-Jan-2015 Moderately Satisfactory Moderately Unsatisfactory 12.05 05 14-Dec-2015 Moderately Satisfactory Moderately Satisfactory 15.68 06 30-Jun-2016 Moderately Satisfactory Moderately Unsatisfactory 18.33 07 01-Feb-2017 Moderately Satisfactory Moderately Unsatisfactory 34.58 08 18-May-2017 Moderately Satisfactory Moderately Unsatisfactory 36.87 09 15-Feb-2018 Moderately Satisfactory Moderately Satisfactory 44.84 10 07-Sep-2018 Moderately Satisfactory Moderately Unsatisfactory 54.64 SECTORS AND THEMES Sectors Major Sector/Sector (%) Transportation 100 Urban Transport 79 Public Administration - Transportation 21 Themes Major Theme/ Theme (Level 2)/ Theme (Level 3) (%) Economic Policy 1 Trade 1 Trade Facilitation 1 Private Sector Development 25 Jobs 15 Job Creation 15 Public Private Partnerships 10 Page 3 of 67 The World Bank KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321) Public Sector Management 1 Public Administration 1 Administrative and Civil Service Reform 0 Municipal Institution Building 1 Human Development and Gender 6 Disease Control 6 HIV/AIDS 6 Urban and Rural Development 76 Urban Development 61 Urban Infrastructure and Service Delivery 61 Rural Development 15 Rural Infrastructure and service delivery 15 ADM STAFF Role At Approval At ICR Regional Vice President: Makhtar Diop Hafez M. H. Ghanem Country Director: Johannes C.M. Zutt Carlos Felipe Jaramillo Senior Global Practice Director: Jamal Saghir Guangzhe Chen Practice Manager: Supee Teravaninthorn Benedictus Eijbergen Task Team Leader(s): Josphat O. Sasia Josphat O. Sasia ICR Contributing Author: Akiko Kishiue Page 4 of 67 The World Bank KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321) I. PROJECT CONTEXT AND DEVELOPMENT OBJECTIVES A. CONTEXT AT APPRAISAL Country Context 1. At appraisal, Kenya was urbanizing rapidly and experiencing relatively strong economic growth, which reached 5.7 percent in 2010, mainly attributed to productive activities in urban areas1 For instance, while Kenya’s overall population grew from 31.5 million
Recommended publications
  • Critical Success Factors for Timely Completion of World Bank Projects in Kenya
    Strathmore University SU+ @ Strathmore University Library Electronic Theses and Dissertations 2020 Critical success factors for timely completion of World Bank projects in Kenya Kefa S. Odhiambo Strathmore Business School (SBS) Strathmore University Follow this and additional works at https://su-plus.strathmore.edu/handle/11071/10180 Recommended Citation Odhiambo, K. S. (2020). Critical success factors for timely completion of World Bank projects in Kenya [Thesis, Strathmore University]. https://su- plus.strathmore.edu/handle/11071/10180 This Thesis - Open Access is brought to you for free and open access by DSpace @Strathmore University. It has been accepted for inclusion in Electronic Theses and Dissertations by an authorized administrator of DSpace @Strathmore University. For more information, please contact [email protected] CRITICAL SUCCESS FACTORS FOR TIMELY COMPLETION OF WORLD BANK PROJECTS IN KENYA KEFA SEDA ODHIAMBO MBA/110514/2018 A DISSERTATION SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF BUSINESS ADMINISTRATION STRATHMORE BUSINESS SCHOOL STRATHMORE UNIVERSITY NAIROBI, KENYA JUNE, 2020 DECLARATION I declare that this work has not been previously submitted and approved for the award of a degree by this or any other University. To the best of my knowledge and belief, this dissertation contains no material previously published or written by another person except where due reference is made in the thesis itself. Kefa Seda Odhiambo Signature: ………………………………… Date: ……15th June, 2020…… APPROVAL This dissertation undertaken by Kefa Seda Odhiambo has been submitted with my approval as the University supervisor. Dr. Elizabeth Muthuma Signature: … ………… Date: ……17th June 2020 …… i DEDICATION I dedicate my dissertation work to my family Norma, Cindy, Crystal, Barbra, and Tamara whose unyielding support, love and encouragement have enriched my soul and motivated me to pursue and finish this dissertation.
    [Show full text]
  • Feasibility Study, Preliminary and Final Designs, Environmental and Social Impact Assessment and Preparation of Tender Documents for the Proposed Londiani Dam Water Project
    Feasibility Study, Preliminary and Final Designs, Environmental and Social Impact Assessment and Preparation of Tender Documents for the Proposed Londiani Dam Water Project Table of Contents LIST OF TABLES .................................................................................................................................................................... V LIST OF FIGURES .................................................................................................................................................................. VI ACRONYMS ........................................................................................................................................................................... VII NON-TECHNICAL SUMMARY ............................................................................................................................................... IX CHAPTER 1: INTRODUCTION ........................................................................................................................................ 1 1.1 BACKGROUND ............................................................................................................................................................ 1 1.2 PROJECT JUSTIFICATION ............................................................................................................................................. 2 1.3 THE PROJECT ...........................................................................................................................................................
    [Show full text]
  • Environmental and Social Impact Assessment (Esia)
    ESIA PROJECT REPORT CONTENTS Chapter Description Page 1 INTRODUCTION 1-1 1.1 General project overview 1-1 1.2 Project Location 1-2 1.3 Objective of the consultancy Services 1-4 1.4 Project Justification 1-4 1.5 Objectives of the ESIA Study 1-5 1.6 ESIA Methodology 1-5 1.6.1 Desk Study 1-5 1.6.2 Field Study 1-5 1.6.3 Data Analysis and Impact Prediction 1-7 1.6.4 Identification of mitigation measures 1-7 1.6.5 Incorporating public views into the ESIA report 1-8 1.7 Structure of the ESIA Project Report 1-9 2 POLICY, LEGAL AND REGULATORY FRAMEWORK 2-1 2.1 General Overview 2-1 2.2 Policy Frameworks 2-1 2.2.1 Environmental Policy 2-1 2.2.2 Land policy 2-4 2.2.3 Kenya’s Vision 2030 2-5 2.2.4 The National Biodiversity Strategy, 2007 2-5 2.2.5 Sustainable Development Goals (SDGs) 2-5 2.3 Legal framework 2-6 2.3.1 The Constitution of Kenya 2-6 2.3.1 Building Code, 1968 (Reprinted 1997) 2-7 2.3.2 The National Museums Act (Cap216) 2-7 2.3.3 The Environment Management and Coordination (Amended) Act, 2015 2-7 2.3.4 The Lands Act, 2012 No. 6 of 2012 2-11 2.3.5 The Water Act 2016 2-11 2.3.6 Inter-Governmental Relations Act 2012 2-12 2.3.7 The Public Health Act (Cap. 242) 2-13 2.3.8 The County Governments Act, 2012 2-13 2.3.9 Urban Areas and Cities Act, 2011 2-14 2.3.10 The Traffic Act, Cap 403 2-14 2.3.11 Physical Planning Act, 1996 2-15 2.3.12 Employment and Labour Relations Court Act.
    [Show full text]
  • TENDER NOTICE the Kenya National Highways Authority
    TENDER NOTICE The Kenya National Highways Authority (KeNHA) is a State Corporation established under the Kenya Roads Act, 2007 with the responsibility for Management, Development, Rehabilitation and Maintenance of National Trunk Roads. The Authority hereby invites bids from eligible bidders for provision of 4th Quarter Financial Year 2020- 2021 Maintenance of various roads to be funded through the Road Maintenance Levy Fund as listed below: - Inspection & Purchase NCA of Tender Registr Engineers’ Documents Eligibil No. Tender No. Tender Description ation Region Estimate and Email ity Requir (Kshs.) & telephone ed Contacts of Regional Directors KeNHA Nairobi Region Boardroom; Ministry of Public KeNHA/R5 Purchase of 1. No. Nairobi 50,000,000.00 Works /156/2021 Falling Weight Offices, Deflectometer P.O Box 200-00507 1 Nairobi. Machakos Road 020- 2632237/ 020- 2642475 Email:rm.nai robi@kenha. co.ke Performance Based KeNHA, Contract for Nyanza KeNHA/R1 2 Maintenance of Kisii - 4,5 or 6 All Nyanza 92,455,760.81 Regional /215/2021 Ogembo –Kilgoris Office, P.O. (B4/B3) Road Box 317 – Performance Based 40100, KeNHA/R1 3 Contract for 4,5 or 6 All Nyanza 123,612,257.37 MoPW /216/2021 Maintenance Nyaramba Building, 1 – Chemosit (B4) Road Busia Road, Kisumu 061- Performance Based 2300098/073 Contract for KeNHA/R1 3283167/070 4 Maintenance of 3,4 or 5 All Nyanza 184,929,606.61 /217/2021 8711137 Masara - Email:rm.ny Kehancha(B1)Road anza@kenha Performance Based .co.ke KeNHA/R1 Contract for 1,2 or 5 All Nyanza 216,911,871.30 /218/2021 Maintenance of
    [Show full text]
  • RSS Final Report
    TRADE MARK EAST AFRICA Study on Establishment of Roadside Stations (RSSs) along the Northern Corridor TMEA/PO/20120301 . July 2014 Final Report – 2nd Volume Grupo TYPSA Balbino Marron 3, Edificio Viapol A/1/4&5 41018 Seville, Spain Tel.: (34) 954 925 325 - Fax: (34) 954 640 359 www.typsa.com TABLE OF CONTENTS 1. LEGAL FRAMEWORK ....................................................................................................... 3 2. RESULTS OF THE SURVEYING FACILITIES ALONG THE NORTHERN CORRIDOR 13 3. APPROVED ROADSIDE STATIONS ............................................................................. 120 4. BASIC INFORMATION FOR THE DIMENSIONING OF PRE-SELECTED ROADSIDE STATIONS ...................................................................................................................... 159 5. RESULTS OF THE RSS MODEL DESIGN .................................................................... 181 ANNEX 1: STAKEHOLDERS CONSULTATION ANNEX 2: GRAPHICS OF RESULTS OF THE FINANCIAL ANALYSIS FOR ALL THE ROADSIDE STATIONS ANNEX 3: ToRs Study on Establishment of Roadside Stations (RSSs) along the Northern Corridor First Interim Report 2 1. LEGAL FRAMEWORK We have focused on two key aspects: the strategic and environmental framework and the border regulations. The main characteristics of these frameworks are as follows. Strategic and environmental legal framework Uganda The Constitution of the Republic of Uganda, 1995 In Uganda all pieces of legislation that govern environmental protection and conservation are derived from statutes
    [Show full text]
  • Freight Rate Determinants Along the Northern Corridor Road 
    UNIVERSITY OF NAIROBI DEPARTMENT OF CIVIL & CONSTRUCTION ENGINEERING FREIGHT RATE DETERMINANTS ALONG THE NORTHERN CORRIDOR ROAD'1 BY OYIER SAMWEL ZEPHANIAH (F56/ 9045/2005) y co + C/° A A Research Thesis submitted to the Department of Civil and Construction Engineering in Partial fulfilment of the Requirements for the Degree of Master of Science in Civil Engineering August, 2009 University of NAIROBI Library I1II1H1|1I 0404705 6 Q rrufht Reus •Determinants alonff the .\orthern ( omdor road ‘MSc. 1 firm, iffy pyter S.Z. Declaration This thesis is my original work and to the best of my knowledge has not been submitted in part or whole for a degree in any other university for any award Signed .....................................Date........................... Oyier Samwel Zephaniah (F56/ 9045/2005) This research thesis is submitted in partial fulfilment of the requirements for the award of Master of Science in Civil Engineering at the University of Nairobi. Supervisor’s Declaration This thesis has been submitted with my approval as supervisor. Signed Department of Civil & Construction Engineering, University of Nairobi n freight ‘Kates Determinants a fort# the Northern Corridor road MSc- Thesis, fly ( ^yterS.Z. Dedication to My father, mother and late grand father V 111 */ reitffit KfltesDetormmanis along the Vanhorn ( orrutor road :KS(. 7 hosts, (By Oytor S.Z. Acknowledgements I would like to extend my sincere thanks to my supervisor Prof Oyuko O. Mbeche, the team leader of the Northern Corridor Monitoring and Evaluation project, for initiating my interest in this research topic and monitoring its progress keenly. Special thanks go to Eng. Tom Opiyo the former team leader of the Northern Corridor Monitoring and Evaluation project for his invaluable guidance throughout the process of developing and writing of this thesis.
    [Show full text]
  • Integrated Strategic Urban Development Plans KERICHO 2017-2037
    Mapping and the Preparation of Integrated Strategic Urban Development Plans [ISUDP] for Kericho Town Integrated Strategic Urban Development Plans KERICHO 2017-2037 Contract No. MLHUD/KMP/COMP2/ISUD-05/2012/13 Consultancy Services for Mapping and the Preparation of Integrated Strategic Urban Development Plans in Selected Municipalities in Kenya Cluster V: Kakamega, Kericho, Turbo, Cheramei and Soy ii Mapping and the Preparation of Integrated Strategic Urban Development Plans [ISUDP] for Kericho Town iii Mapping and the Preparation of Integrated Strategic Urban Development Plans [ISUDP] for Kericho Town Table of Content EXECUTIVE SUMMARY ....................................................................................................................................1 1 INTRODUCTION ........................................................................................................................................4 1.1 BACKGROUND ................................................................................................................................................. 4 1.2 PURPOSE OF ISUD PLAN .............................................................................................................................. 4 1.3 OBJECTIVES...................................................................................................................................................... 5 1.4 SCOPE OF WORK ...........................................................................................................................................
    [Show full text]
  • Republic of Kenya $
    SCA%NNEE-IILE COPY_ 4 Box Na 4i > t w E | ~~~~~~~~~~~~~~~CAT,wLog Public Disclosure Authorized AlalIphPnamer O ^ or #) Ln/Cr GRITF oCESW Co/Rg Adi REPUBLIC OF KENYA $ b MINISTRY OF ROADS, PUBLIC WrORKS & HOUSING 4 Public Disclosure Authorized ROADS DEPARTMIENT REHABILITATION AND MAINTENANCE OF MAU SUMMIT- e KISUMU ROAD (Bi,Al) Public Disclosure Authorized 4 $ THE ENVIRONMENTAL IMPACT ASSESSMENT STUDY REP(ORT (EIASR)i FEBRUARY 2004 Public Disclosure Authorized I,r_______ __ _____!___ CHIEF ENGINEER (ROADS) THE PERMANENT SECRETARY MINISTRY OF ROADS, PUBUC MIN ISTRY OF ROAIDS, PUBLIC 4 WORKS & HOUSING WOI LKS & HOUSING P.O. BOX 30260 P.O BOX 30260 4 NAIROBI NA ROBI 4 AAgT.AAT A rAA&A as TABLE OF CONTE NTS PAG I:. ABBREVIATIONS ..............uuu........u..m........ u.EE.E I"rI! EXECUTIVE SUMMARY ....... m.uumum..mm..Su....u....uuu................. lbL I INTRODUCTION ............................ L III BASELINE INFORMATION l.. IV ANTiCIPATED IMPACrS ........................... ; . V MmGATION MEASURES. .2 VI ENVIRONMENTAL MANAGEMENT PLAN (EMP) ............................ -; VII CONCLUSION AND RECOMMENDATIONS ........... .3..........3 CHAPTER l ... .....E......EuEuSI.I......WEuE.........6uEMMu ... nEE :1.. 1.0 INTRODUCTION . .. 1.1 BACKGROUND ........................................ !14.... 1.3.2 Justification of the Project................... .........5 CHAPTER 2 ........ .............u.............. ...... 2.0 DESCRIPTION OF THE PROJECT ............................ ........ I 2.1 LOCATION AND EXTENT .................................... 'I 2.2 GENERAL LAYOUT .............. IS..... CHAPTER 3 ..... ... ..... ..... W........ .....W.WuWE.u..E...W..E........E 3.0 BASELINE INFORMATION .. 7 3.1 GENERAL .......................... 7 3.2 NATURAL ENVIRONMENT.. 7 3.2.1 Climate ........................... .7 3.2.2 Topography and Geology .7 3.2.4 Bio-diversity ................ 3.2.4.1 Flora ........ .... 3.2.4.2 Fauna .
    [Show full text]
  • Factors Influencing Cost of Road Construction Projects Within Selected Urban Areas in Kenya
    FACTORS INFLUENCING COST OF ROAD CONSTRUCTION PROJECTS WITHIN SELECTED URBAN AREAS IN KENYA OYOLLA CARREN AOKO A RESEARCH REPORT SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR AWARD OF THE DEGREE OF MASTERS OF ARTS IN PROJECT PLANNING AND MANAGEMENT OF THE UNIVERSITY OF NAIROBI 2019 DECLARATION This research project report is my original work and has not been presented by anybody else for the award of a degree in any other university. Signature ____________________________ Date __________________________ Oyolla Carren Aoko L50/70100/2013 This research project report has been submitted for examination with my approval as the University Supervisor. Signature _______________________ Date __________________________ Prof. Raphael Nyonje Associate Professor, School of Open & Distance Learning, The University Of Nairobi ii DEDICATION A special feeling of gratitude to my loving mother, Benter whose words of encouragement and push for tenacity ring in my ears; to my husband Dickson whose constant support, dedication and love enlightened me; to my son Deon and daughter Leona whose innocent energy was and still is a source of inspiration; to my sisters (Lorna & Monica) for being my best cheerleaders; to all of my friends and family who stood beside me with great commitment; I dedicate this research, hoping that I made you proud. iii ACKNOWLEDGEMENT I am indebted to many outstanding individuals who played a crucial role in enabling me to complete this course. Special thank you to my supervisor Prof. Raphael Nyonje for his personal commitment, competent academic guidance, invaluable constructive criticism, and availability towards the success of this research proposal. I would like to thank my lecturers in the department of extra mural and continuing education at Kisumu campus, Prof.
    [Show full text]
  • Republic of Kenya Ministry of Lands, Housing and Urban Development Urban Development Department
    REPUBLIC OF KENYA MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT URBAN DEVELOPMENT DEPARTMENT INTEGRATED STRATEGIC URBAN DEVELOPMENT PLAN FOR BUSIA TOWN (2010-2030) Prepared By: Syagga and Associates Limited Kampus Towers, 5th Floor, P.O Box 26060-00504, Nairobi, Kenya, Tel: (+254) 20 312557 Cell: (+254) 722 777598 / 721 233970 Fax: 224010 E-mail: [email protected] Website: www.syagga.com November, 2013 i | P a g e PLAN APPROVAL This Plan has been prepared, publicized and circulated as per the requirements of the Physical Planning Act Cap 286 of the Laws of Kenya. The plan has fulfilled all the statutory requirements and is hereby approved. CERTIFIED Director of Physical Planning Date ----------------------------------------------------------------------------------------------------------------- APPROVED Cabinet Secretary of Lands, Housing and Urban Development Date------------------------------------------------------------------------------------------------------------------ Approved Development Plan N0. -------------------------------------------------------------------------- ii | P a g e PROJECT TEAM MEMBERS This plan was prepared by a team of professionals from Syagga and Associates. The names of the team members are:- Prof. Grephas P. Opata - Project Director Mr. Moses Kola - Project Planner Mr. Maurice Lishenga - Project Surveyor Dr. Grace Cheserek - Sociologist Prof. Paul Syagga - Housing/Informal Settlement Expert Prof. Washington H.A. Olima - Investment/Economic Expert Eng. Dr. Tom Opiyo Odago - Transport Expert Dr. Benjamin
    [Show full text]
  • Republic of Kenya
    REPUBLIC OF KENYA MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING AND URBAN DEVELOPMENT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED RECONSTRUCTION AND REHABILITATION OF THE MAMBOLEO-MIWANI- CHEMELIL-MUHORONI-KIPSITET C674 (FORMERLY C34) ROAD TO BITUMEN STANDARD AND ASSOCIATED SPUR ROADS OCTOBER 2020 KENYA NATIONAL HIGHWAYS AUTHORITY OCTOBER 2020 DECLARATION TITLE: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY REPORT FOR THEPROPOSED RECONSTRUCTION AND REHABILITATION OF THE MAMBOLEO-MIWANI- CHEMELIL-MUHORONI-KIPSITET C674 (FORMERLY C34) ROAD TO BITUMEN STANDARD AND ASSOCIATED SPUR ROADS This ESIA study report has been prepared in accordance with the provisions and requirements of the Environmental Management and Coordination Act (EMCA) Cap 387 and subsidiary regulation -Environmental (Impact Assessment and Audit) Regulations, 2003, NAME NEMA REG. NO SIGN DATE Walter Nyatwang’a Lead Expert-0822 For and on behalf of: Kenya National Highways Authority, Barabara Plaza, Off Airport South Road, along Mazao Road, Opposite KCAA HQs. P.O. Box 49712 - 00100 NAIROBI. ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED RECONSTRUCTION TO BITUMEN STANDARDS OF MAMBOLEO-MIWANI- CHEMELIL-MUHORONI- KIPSITET C674 (FORMERLY C34) ROAD ii | P a g e KENYA NATIONAL HIGHWAYS AUTHORITY OCTOBER 2020 TABLE OF CONTENTS LIST OF PLATES ........................................................................................................................................... vi LIST OF FIGURES ......................................................................................................................................
    [Show full text]
  • THE KENYA GAZETTE Published by Authority of the Republic of Kenya (Registered As a Newspaper at the G.P.O.)
    THE KENYA GAZETTE Published by Authority of the Republic of Kenya (Registered as a Newspaper at the G.P.O.) Vol. CXVIII—No. 50 NAIROBI, 6th May, 2016 Price Sh. 60 CONTENTS GAZETTE NOTICES PAGE PAGE The Central Bank of Kenya Act—Specification of SUPPLEMENT No. 59 and 62 Institution ................................................................................. 1968 National Assembly Bills, 2016 The Civil Aviation Act—Release of Aircraft Accident PAGE Report ....................................................................................... 1968 The Wakf Commissioner Act—Appointment......................... 1968 The Bribery Bill, 2016 ...................................................... 203 The Co-operative Societies Act—Appointment...................... 1968 The Supplementary Appropriation Bill, 2016 ................. 203A The Land Registration Act—Issue of Provisional Certificates, etc ....................................................................... 1968—1980 ---------------- The Land Act—Intention to Acquire Land .............................. 1980–1981 SUPPLEMENT No. 60 and 63 The Companies Act—Members Voluntary Liquidation, etc. ............................................................................................. 1981, 1990 Legislative Supplement The Co-operative Societies Act—Inquiry Order..................... 1981 LEGAL NOTICE NO. PAGE The Civil Aviation Act—Decisions of the Kenya Civil 69—The Kenya Citizen and Foreign Nationals Aviation Authority on Applications for Air Service Management Service (Charges
    [Show full text]