Reconstruction
Total Page:16
File Type:pdf, Size:1020Kb
Periods in the year 2016 of the prospective works for the construction, reconstruction and/or repairs intended to be carried out on the Gas Transmission System which may affect the contractual rights (as provided for by the gas transportation contracts) of System Users Specification of the Gas Gas consumers planned to Seq. Intended cut-off Scheduled dates of the cut- Facility/Object concerned and be cut-off / provided with Notes No periods off Works intended to be carried out temporary gas supplies Reconstruction The linear part Vilnius Area Rudamina will be supplied with gas from iš Vilnius Ivatsevitschi-Vilnius-Riga Gas M&R Station, and Jašiūnai 1 Transmission Pipeline: replacement 24 hours 20 September 2016 Notification to AB ESO and Šalčininkai M&R of a unit of the line block valve No 25 Stations will be supplied with gas from tank-trucks Gas supplies via the branch of the gas transmission Gas Transmission Pipeline to pipeline to Girininkai M&R Girininkai M&R Station: installation of Station will be stopped; an intelligent pig launcher and 2 24 hours 5 October 2016 the branch to Prienai M&R Notification to AB ESO receiver (0-36.0 km) and Station and the branch to replacement of line block valves No Birštonas M&R Station will 3, 4, 5A, 6, 7B, and 9 be supplied with gas from tank-trucks Gas Transmission Pipeline to Kaliningrad: replacement of the line Lekėčiai M&R Station and block valve No 25; branch to Lekėčiai Zapyškis M&R Station will 3 M&R Station: replacement of line 24 hours 3-4 September 2016 Notification to AB ESO be supplied with gas from block valve No 1; branch to Zapyškis tank-trucks M&R Station: replacement of line block valve No 1 Gas Transmission Pipeline branch to Šakiai M&R Station will be 4 Šakiai M&R Station: replacement of 16 hours 14 September 2016 supplied with gas from Notification to AB ESO line block valve No 1 tank-trucks Gas Transmission Pipeline to Kaliningrad: replacement of the The consumers will not be 5 24 hours 15-16 September 2016 block valve No 27, works for the cut off cutting off of the insulating coupling Panevėžys Area Gas Transmission Pipeline branch to Cuff off of Panevėžys Gas 6 Panevėžys M&R Station: replacement 24 hours 2016-08-02 Compressor Station of line block valves No. 20, 7, 7A, 8, Gas Transmission Pipeline branch to Cuff off of Panevėžys M&R 7 Panevėžys M&R Station: replacement 12 hours 2016-09-06 Notification to AB ESO Station of line block valves No 1 and 8 Gas Transmission Pipeline branch to Cuff off of Panevėžys M&R 8 Panevėžys M&R Station: replacement 12 hours 2016-09-08 Notification to AB ESO Station of line block valves No 2 and 9 Gas Transmission Pipeline branch to Cuff off of Panevėžys M&R 9 Panevėžys M&R Station: replacement 8 hours 2016-09-12 Notification to AB ESO Station No 1 of line block valve No 7 Specification of the Gas Gas consumers planned to Seq. Intended cut-off Scheduled dates of the cut- Facility/Object concerned and be cut-off / provided with Notes No periods off Works intended to be carried out temporary gas supplies Gas Transmission Pipeline branch to Panevėžys M&R Station (DN250): Installation of an intelligent pig Palanga M&R Station will launcher and receiver (0-28.2 km), be supplied with LNG, and replacement of inadequate elbows 10 120 hours 22-26 September 2016 Kretinga M&R Station will Notification to AB ESO (4 pcs.), replacement of valves and be supplied with gas from components No. 2 at Kretinga 1 and tank-trucks connection to the Supervisory Control and Data Acquisition System (SCADA) Gas Transmission Pipeline Panevėžys- Šiauliai-Klaipėda: replacement of line Cut off of gas supplies to 11 24 hours 08-18 August 2016 Notification to AB ESO block valves Nr. 7, 8, 9, 10 including Klaipėda M&R Station No 1 relocation to a new place Gas Transmission Pipeline branch to Pasvalys M&R Station will 12 Pasvalys M&R Station: replacement 8 hours 20 September 2016 be supplied with gas from Notification to AB ESO of line block valve No 1-II tank-trucks Panevėžys-Riga Gas Transmission Cut off of gas supplies to The date is being coordinated 13 Pipeline: connection of an intelligent 12 hours 2016-09-11 the Republic of Latvia with Latvijas Gaze pig launcher and receiver Repairs Vilnius Area Repairs of the looping of the gas The date is being coordinated The consumers will not be 14 transmission pipeline to Jonava M&R – 1-6 August 2016 with the Russian Federation cut off Station PK 0 + 00 - PK 221 + 18 and AB Achema Minskas-Vilnius-Vievis Gas The date is being coordinated The consumers will not be 15 Transmission Pipeline: repairs of – 1-7 August 2016 with the Russian Federation cut off Jauniūnai- Vievis branch and AB Achema Repairs of above ground transitions Alytus M&R Station will be 16 of the gas pipeline branch to Alytus 24 hours 27-28 August 2016 Notification to AB ESO supplied with natural gas M&R Station Panevėžys Area Repairs of above ground transitions Plunge M&R Station will be 17 of the gas pipeline branch to Plungė 48 hours 21-30 September 2016 supplied with gas from Notification to AB ESO M&R Station tank-trucks.