Residential Development Review

Total Page:16

File Type:pdf, Size:1020Kb

Residential Development Review Residential Development Review A monitor of housing development, land supply and transport infrastructure Melbourne Edition March 2019 Directors’ Highlight Contents This Residential Development Review aims to provide key Recent Dwelling Approvals statics and growth trends in Victoria over the past five years, Planning approvals of dwellings per local 04 government area across metropolitan Melbourne and compares these to recent dwelling approval data, over the second half year of 2018 future population growth, land supply and infrastructure delivery across Greater Melbourne’s central, middle and Dwelling Approval Trends greenfield growth areas. Planning approvals of dwellings across metropolitan 06 Melbourne over the past five years total Melbourne is currently the fastest growing city in Australia, adding approximately 100,000 people per annum on average, with the majority of that growth coming from Growth Area Development Capacity overseas migration. Over the past five years, the majority The status of Precinct Structure Plans and development 08 capacity in Melbourne’s urban growth areas (in the of detached dwelling approvals and growth has been in Urban Growth Zone). the greenfield growth areas in the southeastern, northern and western regions. Growth areas in these regions in the Infrastructure pipeline second half of 2018 were above the five-year average. There An overview of the current transport infrastructure has otherwise been a gradual decline in overall dwelling 10 projects under planning or construction in Melbourne’s metropolitan area approvals for Greater Melbourne, led by a decline in apartment approvals and flattening of detached dwelling and townhouse approvals since the end of 2017, and a sharp decline in apartment approvals in the Central Region in the second half of 2018. After many years of limited investment, Melbourne is experiencing its highest volume of major infrastructure projects under construction. Major projects including Melbourne Metro and Level Crossing Removal, West Gate Tunnel and CityLink Tulla Widening are all under construction and expected to be delivered by 2025, delivering much needed infrastructure improvements across Greater Melbourne. Future projects in planning, such as the Airport Rail Link and Suburban Rail Link are city shaping projects that will have a substantial impact on the efficiency of the city. We trust that this publication is of interest and provides insight into the growth trends across Melbourne and is helpful when considering future development in Victoria. Should further detail be sought, please contact our office and DISCLAIMER we would be happy to discuss. The data from this document has been collated by Mecone from various government sources. While care has been taken in preparing the document, Mecone takes no responsibility for the accuracy of any of the information contained within this document. This document is Ben Hendriks Danny Hahesy for informational purposes only and should not be relied upon for any Manging Director Practice Director (VIC) reason without first independently verifying the data. 2 | MECONE >> Residential Development Review Growth Outlook Melbourne to 2031 From 2015 to 2031, the population of Victoria is projected to housing to cater for the increasing population together grow by 1.8 million, from 5.9 million to 7.7 million, at a rate of 1.7% with increasing need for one and two person housing types, per annum. Most of this growth is to occur within the Greater retirement living and aged accommodation. Melbourne Capital City Area, which is projected to reach a Victoria is expected to add approximately 850,000 additional population of 5.1 million by 2021, growing to 6 million by 2031. dwellings to Greater Melbourne and approximately 210,000 The key drivers of this population growth are primarily from net additional dwellings to regional Victoria to 2031 to accommodate migration and natural increase. Net overseas migration accounts an additional 1.8 million people. The rate of growth is for between 52% and 60% of annual population growth over the approximately 100,000 people per annum on average. This projection period. Net interstate migration makes a relatively makes Melbourne the fastest growing cities in Australia. small contribution to Victoria’s population change but has added Past and projected dwelling approvals data confirms that as much as 13,000 to Victoria’s growth in recent years. The dwelling approvals in Greater Melbourne have kept up with second highest driver of population change is fertility rates over household formation in recent years, with more approvals the period, accounting for approximately 32% and 40% of annual generated than households formed, with projections for this population growth. trend to continue. While dwelling approvals are higher than Household formation is related to the age structure of the household formation each year, these do not all translate to population, partnering trends, the age at which children leave construction commencements and there can also be a lag of up home and a range of other factors. The older age structure to two years between approval and completion of development. projected for the future contributes to an increased proportion of one and two person households in Victoria. Changes to household formation and aging of the population will create demand for a wider variety of housing types and additional 7,733,259 7,170,957 6,605,653 6,048,767 5,931,007 Population 5,482,776 of Victoria 5,025,182 4,558,692 Population of Greater Melbourne 2,363,103 2,167,322 1,974,175 1,778,405 Total number of households in Greater Melbourne Total number of dwellings approved across metropolitan Melbourne Additional number of households projected per year across metropolitan Melbourne 60,000 Source: ABS Household and Family Projections 40,000 (3236.0), 2011 to 2036 and 2016 to 2041. State 20,000 Government of Victoria, Victoria in Future 2016 0 2014 2015 2017 2018 2019 2020 2022 2023 2024 2025 2027 2028 2029 2030 2016 2021 2026 2031 MECONE >> Residential Development Review | 3 ./012!34256 Recent Dwelling Approvals Planning approvals of dwellings per local government area across metropolitan Melbourne over the second half year of 2018 Source: ABS Building Approvals (8731.0), Dec 2018 Dwelling approvals for the second half of 2018 were highest The remaining municipalities with a relatively high proportion of in Melbourne’s growth areas, with the three highest dwelling dwelling approvals are found in the south-east and north-east in approvals in Wyndham in the south-west, followed by Casey Stonnington, Monash and Manningham. in the south-east and Hume in the north. These coincide with Councils with the highest recent dwelling approvals also the coordinated release of land for affordable housing in these exceeded their five year average over the past six months. locations. These regions account for the largest proportion of detached housing across metropolitan Melbourne followed Stonnington has recently approved the most apartments, being closely by growth area municipalities in Whittlesea and Melton. the only local government area in the Central Region with a 4 | MECONE >> Residential Development Review Recent Dwelling Approvals July-December 2018 Houses Townhouses Apartments 3,000 Half-year average over the past five years 2,500 Central Eastern Northern Southern Western Region Region Region Region Region 2,000 1,500 1,000 500 0 Yarra Knox Casey Hume Melton Monash DarebinBanyule Cardinia Bayside Moreland Glen Eira Kingston Whittlesea Nillumbik FrankstonWyndham Brimbank Port PhillipMelbourne WhitehorseBoroondara Maroondah StonningtonMaribyrnong Yarra Ranges Hobsons Bay Manningham Moonee Valley Greater Dandenong Mornington Peninsula substantial number of apartment approvals. Dwelling approvals Boroondara and Glen Eira, Moonee Valley, Moreland and generally across the rest of the Central Region was less than Hobsons Bay also contributed to a broader range of dwelling 500, with the City of Melbourne approving approximately 3,000 types, with most of these municipalities containing middle dwellings below their five year average. ring suburbs. Monash Council had the most consistent mix of dwelling approvals by type, with a broad range of detached housing, townhouses and apartments. Manningham, Whitehorse, MECONE >> Residential Development Review | 5 Dwelling Approval Trends Planning approvals of dwellings across metropolitan Melbourne over the past five years total Source: ABS Building Approvals (8731.0), 2013/14 - 2018/19 6 | MECONE >> Residential Development Review Five-Year Total Dwelling Approvals January 2014 – December 2018 30,000 25,000 Total 20,000 By Type 15,000 Houses 10,000 Apartments 5,000 Townhouses 0 HY2, 2013 HY1, 2014 HY2, 2014 HY1, 2015 HY2, 2015 HY1, 2016 HY2, 2016 HY1, 2017 HY2, 2017 HY1, 2018 HY2, 2018 By Region 10,000 5,000 Central Eastern Northern Southern Western 0 HY2, 2013 HY1, 2014 HY2, 2014 HY1, 2015 HY2, 2015 HY1, 2016 HY2, 2016 HY1, 2017 HY2, 2017 HY1, 2018 HY2, 2018 Total dwellings approvals increased sharply in the second half of The Central Region is driving a sharp drop in dwelling approvals 2014 before stabalising between 25,000 and 30,000 dwellings in Melbourne’s inner ring which closely follows the drop in total through to the end of 2017. In the second half of 2018 there apartment approvals over the period. was a gradual decline in approvals down to just below 25,000 The Central Region accounts for the majority of apartment dwellings, led by a sharp decline in apartment
Recommended publications
  • Submission Cover Sheets
    Submission Cover Sheet North East Link Project EES IAC 402 Request to be heard?: No, but please email me th Full Name: Phil Turner Organisation: Maroondah City Council Affected property: Attachment 1: Maroondah_Coun Attachment 2: Maroondah_Coun Attachment 3: Comments: To the North East Link Inquiry & Advisory Committee (IAC) Maroondah Council provides the following submission to the IAC, in relation to the EES for the North East Link project. While Council formally supports the objectives of the NEL project, I advise that the support of Maroondah Council has been conditional on appropriate traffic considerations being made with regard to the impact of the project on the Eastlink tunnels, the Ringwood Bypass and by extension the Ringwood Metropolitan Activity Centre. Council previously commissioned a review by O’Brien Traffic that considered the project in the context of the tunnels and impacts on Ringwood, and it was determined that without ancillary works to take traffic pressure off the Eastlink tunnels and the Ringwood Bypass, the project would potentially fail and have a major detrimental impact on the viability of the Ringwood Metropolitan Activity Centre. The O’Brien Traffic report attached to this submission details the basis for those concerns. Council’s concerns were previously forwarded to NELA and Council officers have met with NELA officers on these matters, however, to date Council has not received an appropriate response that addresses these concerns, including within the ESS. In support of this submission, the following documents have also been uploaded: o A submission letter signed by Council’s Mayor Rob Steane documenting the history of Council’s dealings regarding NEL, and outlining Council’s concerns current with the project; o Council Report September 2018; o O’Brien Traffic Review dated 12 September 2017; o Council letter to NELA (26 February 2018) and NELA response (14 March 2018); o Correspondence from Council on Bypass concerns (including technical reports); and o Minutes from MCC / NELA meetings 6 April 2018 and 30 April 2018.
    [Show full text]
  • Road Safety Camera Locations in Victoria
    ROAD SAFETY CAMERA LOCATIONS IN VICTORIA Approved Sites — April 2006 — Road Safety Camera Locations in Victoria – Location of Road Safety Cameras – Red light only wet film cameras (84 sites) • Armadale, Kooyong Road and Malvern Road • Ascot Vale, Maribyrnong Road and Mt Alexander Road • Balwyn, Balwyn Road and Whitehorse Road • Bayswater, Bayswater Road and Mountain Highway • Bendigo, High Street and Don Street • Bendigo, Myrtle Street and High Street • Box Hill, Canterbury Road and Station Street • Box Hill, Station Street and Thames Street • Brighton, Bay Street and St Kilda Street • Brunswick, Melville Road and Albion Street • Brunswick, Nicholson Street and Glenlyon Road • Bulleen, Manningham Road and Thompsons Road • Bundoora, Grimshaw Street and Marcorna Street • Bundoora, Plenty Road and Settlement Road • Burwood, Highbury Road and Huntingdale Road • Burwood, Warrigal Road and Highbury Road • Camberwell, Prospect Hill Road and Burke Road • Camberwell, Toorak Road and Burke Road • Carlton, Elgin Street and Nicholson Street • Caulfield, Balaclava Road and Kooyong Road • Caulfield, Glen Eira Road and Kooyong Road • Chadstone, Warrigal Road and Batesford Road • Chadstone, Warrigal Road and Batesford Road • Cheltenham, Warrigal Road and Centre Dandenong Road • Clayton, Dandenong Road and Clayton Road • Clayton, North Road and Clayton Road • Coburg, Harding Street and Sydney Road • Collingwood, Johnston Street and Hoddle Street • Corio, Princes Highway and Purnell Road • Corio, Princes Highway and Sparks Road • Dandenong, McCrae Street
    [Show full text]
  • The Triumph Trumpet
    TCCV GENERAL COMMITTEE President - Peter Welten Vice President - Graeme Oxley THETHE Mb 0409 511 002 Mb 0413 135 779 [email protected] [email protected] Secretary & Public Officer Treasurer - Fraser Faithfull TRIUMPHTRIUMPH - Terry Roche (03) 59662461 (03) 9877 0120 Mb 0400960029 [email protected] [email protected] TRUMPETTRUMPET Committee - Chris Burgess Committee - Colin Jenkins (03) 9775 9920 Mb 0412 484 995 Mb 0428 310 355 [email protected] [email protected] Volunteer Positions AOMC Delegates Ian Cameron Tel: (03) 9749 1341 Book , Tool Librarian, & Paul Wallace Tel: 0417 721 013 Club Regalia Officer Club Permit Secretary Syd Gallagher Tel: (03) 9772 6537 Collation Co-ordinator Terry Hickey Tel: (03) 9735 1693 Events Co-ordinator Graeme Oxley Tel: 0413 135 779 Membership Promotion John & Fay Seeley Tel: (03) 9359 2415 Membership Secretary Colin Jenkins Tel: 0412 484 995 Media Liaison Officer Terry Hickey Tel: (03) 9735 1693 August 2012 Webmaster - Col Colson Editor - Peter Truman 0417 394 302 0418 368 093 [email protected] [email protected] Monthly General MeeƟngs are held on the third Wednesday of each month except December. The Magazine of the Venue: Koornang UniƟng Church, 117 Murrumbeena Road, Murrunbeena, Vic. Melways Ref; 69A5 Triumph Car Club of Victoria Inc. on the internet; hƩp://www.tccv.net Triumph Car Club of Victoria Inc. TRIUMPH SPARES P/L Proprietors: AJ & AE Ansell 99 Hannans RD, Mandurang South P.O. Box 185, Bendigo, 3552 Victoria Ph: (03) 54 395 491 Fax: (03) 54 393 691 Mob: 0427 811 184 FULL RANGE OF NEW AND USED PARTS FOR ALL MODELS [email protected] MECHANICAL REPAIRS MEMBERSHIP INFORMATION CURRENT ADVERTISING RATES CITY - $50.00 which automatically includes voting membership for partner and non-voting membership for dependents.
    [Show full text]
  • Road Safety Camera Locations in Victoria
    ROAD SAFETY CAMERA LOCATIONS IN VICTORIA Approved Sites — March 2007 — Road Safety Camera Locations in Victoria – Location of Road Safety Cameras – Red light only wet film cameras (84 sites) • Armadale, Kooyong Road and Malvern Road • Ascot Vale, Maribyrnong Road and Mt Alexander Road • Balwyn, Balwyn Road and Whitehorse Road • Bayswater, Bayswater Road and Mountain Highway • Bendigo, High Street and Don Street • Bendigo, Myrtle Street and High Street • Box Hill, Canterbury Road and Station Street • Box Hill, Station Street and Thames Street • Brighton, Bay Street and Street Kilda Street • Brunswick, Melville Road and Albion Street • Brunswick, Nicholson Street and Glenlyon Road • Bulleen, Manningham Road and Thompsons Road • Bundoora, Grimshaw Street and Marcorna Street • Bundoora, Plenty Road and Settlement Road • Burwood, Highbury Road and Huntingdale Road • Burwood, Warrigal Road and Highbury Road • Camberwell, Prospect Hill Road and Burke Road • Camberwell, Toorak Road and Burke Road • Carlton, Elgin Street and Nicholson Street • Caulfield, Balaclava Road and Kooyong Road • Caulfield, Glen Eira Road and Kooyong Road • Chadstone, Warrigal Road and Batesford Road • Chadstone, Warrigal Road and Batesford Road • Cheltenham, Warrigal Road and Centre Dandenong Road • Clayton, Dandenong Road and Clayton Road • Clayton, North Road and Clayton Road • Coburg, Harding Street and Sydney Road • Collingwood, Johnston Street and Hoddle Street • Corio, Princes Highway and Purnell Road • Corio, Princes Highway and Sparks Road • Dandenong, McCrae
    [Show full text]
  • Traffic and Transport April 2019
    Traffic and transport Fact sheet April 2019 An Environment Effects Statement (EES) has been released for the North East Link project and is now open for public submissions. The EES includes information on how the project could affect the environment during construction and operation, and how adverse impacts would be managed. Traffic and Transport is one of 18 study areas in the EES. See the EES summary report for an overview of traffic and transport impacts and benefits or for more details read Chapter 9 - Traffic and transport and Technical report A - Traffic and transport. North East Link will be a new connection for up to 135,000 vehicles a day, reducing travel times through the north-east drawing trucks away from the arterial road network and reducing ‘rat-runs’. Moving traffic off local roads What’s an EPR? Once North East Link is open, traffic would move away North East Link would be delivered in accordance with a from arterial and local roads and onto the freeway network, set of Environmental Performance Requirements – or EPRs. reducing volumes and congestion on local roads. These set out the minimum environmental objectives and While we expect large decreases in traffic volumes along key outcomes the project must achieve across its design, arterial roads and the Yarra River crossings, we also predict construction and operation phases – irrespective of the increases along the Greensborough Bypass (east of the M80 final design selected for the project. Ring Road), Watsonia Road and some arterial roads south of The EPRs include requirements to the Eastern Freeway. • Comply with regulations and guidelines set by These increases would occur mostly outside of the peak government and statutory authorities periods, with no material increase in congestion or delays anticipated in the peak periods.
    [Show full text]
  • Attachment IV Stakeholder Consultation Report CONSULTATION REPORT IV - STAKEHOLDER Header
    Environment Effects Statement Attachment IV Stakeholder consultation report CONSULTATION REPORT IV - STAKEHOLDER Header Table of Contents Executive summary ................................................................................................................................................ 1 1 Introduction ....................................................................................................................................................... 3 1.1 About this report ............................................................................................................................................................ 3 1.2 Project planning and approvals ................................................................................................................................. 3 1.3 Scoping requirements .................................................................................................................................................. 4 1.4 Technical Reference Group ........................................................................................................................................ 4 2 About North East Link .................................................................................................................................... 6 2.1 Project overview ............................................................................................................................................................. 6 2.2 Project benefits ..............................................................................................................................................................
    [Show full text]
  • Upcoming Day/Night Works for North East Link
    Works Notification 22 July 2021 Upcoming day/night works for North East Link Site investigations at Eastern Freeway and Chandler Highway, Kew Works are continuing to relocate services to make way for What this means for you the North East Link. We're investigating the location of several utilities that may need to be relocated underneath the During works you may notice: Eastern Freeway. • Crews working on the Eastern Freeway, Chandler Highway What we're doing and the freeway reserve Electrical service relocation works • Reduced speed limits on Chandler Highway Works will involve: • Crews and large equipment entering site from the Yarra Boulevard and Chandler Highway intersection near Guide • Using scanners and radars to locate services Dogs Victoria • Soil sampling using a drilling rig to take ground samples • Directional light towers during night works. Light towers will • Excavating and non-destructive digging (NDD) to carefully be positioned to shine away from oncoming traffic expose underground services and verify their location • Incremental lane closures and reduced speed limits on the • Using high pressure water and a vacuum truck to dig holes, Eastern Freeway at night as well as a concrete saw to cut into the pavement. • A freeway ramp closure from Chandler Highway heading When and where we'll be working eastbound for two nights. A detour will be in place directing traffic from Chandler Highway to the Bulleen Road Eastern From Tuesday 27 July, day works will take place near the Freeway ramp. Eastern Freeway and Chandler Highway intersection for one week in the road reserve. Night works are also required to • Lane closures on the Chandler Highway Eastern Freeway minimise traffic impacts as we work on the Eastern Freeway ramp heading westbound and Chandler Highway.
    [Show full text]
  • North East Link (NEL) Traffic and Transport Review Expert Evidence Statement
    North East Link (NEL) Traffic and Transport Review Expert Evidence Statement Prepared by: GTA Consultants (VIC) Pty Ltd for North East Link Project on 15/07/19 Reference: V153791 Issue #: Final North East Link (NEL) Traffic and Transport Review Expert Evidence Statement Client: North East Link Project Instructed by: Clayton Utz Hearing Date: 25/07/19 Report Date: 15/07/19 Reference: V153791 Issue #: Final © GTA Consultants (VIC) Pty Ltd [ABN 34 137 610 381] 2019 The information contained in this document is confidential and intended solely for the use of the client for the purpose for which it has been prepared and no representation is made or is to be implied as being made to any third party. Use or copying of this document in whole or in part Melbourne | Sydney | Brisbane without the written permission of GTA Consultants constitutes an infringement of copyright. The intellectual property contained in this Adelaide | Perth document remains the property of GTA Consultants. CONTENTS Introduction 1 1.1. Introduction 1 1.2. Qualifications and Experience 1 1.3. Relationship to Applicant 1 1.4. GTA Peer Review of the TTIA 1 1.5. Further Work Since Preparation of the GTA Peer Review Report 2 1.6. Expert Evidence Statement Scope & Purpose 3 1.7. References 6 1.8. Consideration of Submissions 6 1.9. Summary of Key Issues, Opinions and Recommendations 6 1.10. Declaration 13 Project Background 14 2.1. Introduction 14 2.2. Project Rationale 14 2.3. Key Transport Issues Sought to be Resolved by NEL 18 2.4. Public Works Order 23 2.5.
    [Show full text]
  • Vicroads Will Con Nue Its Prac Ce of Consul Ng with Communi Es and Service Delivery Partners Whenever Changes Are Proposed to Th
    2/23/2021 Parliament of Victoria Question: 167 QUESTION ON NOTICE — Mr Crisp to ask the Attorney-General — With reference to Statutory Declarations: (1) Why is the operator of a Post Office unable to witness Victorian Statutory Declarations, given that the Commonwealth accepts the authority of a Post Office operator to witness a Statutory Declaration. (2) What is the final jurisdiction when authorising a Statutory Declaration. Answer: I am advised that: (1) The current list of persons authorised to witness statutory declarations under Victorian legislation differs from that under Commonwealth law. My department is currently developing options for modernising the law relating to statutory declarations in Victoria, including witnessing requirements. (2) The Victorian statutory declaration requirements only apply to statutory declarations required or permitted under Victorian law. Operators of post offices in Victoria are still authorised to witness Commonwealth statutory declarations (that is, statutory declarations required or permitted under Commonwealth law). THE HON MARTIN PAKULA MP Attorney General Attachments: No Attachments Answer Published Date: 25/05/2015 Question: 168 QUESTION ON NOTICE — Mr Crisp to ask the Minister for Roads and Road Safety — Will the Minister instruct VicRoads to undertake formal reviews that incorporate rural and remote community consultation in order to protect necessary services centres throughout Victoria. Answer: I am informed that, as at the date the queson was raised: VicRoads delivers its registraon and licensing services across Victoria through a network of 39 service centres and 90 agencies. It also operates two large call centres - one in regional Victoria. These arrangements ensure that VicRoads provides accessible services to all Victorians including those in rural communies.
    [Show full text]
  • Chandler Highway Bridge Duplication
    Council Meeting Agenda 16/11/15 10 Chandler Highway Bridge Duplication Abstract The Victorian Government confirmed the allocation of $110 million in the 2015-2016 Victorian budget for the Chandler Highway Bridge upgrade project. The VicRoads project team has developed four road and bridge alignment options west or east of the existing Chandler Highway Bridge, namely: 1. West alignment - six lanes. 2. East alignment - six lanes. 3. West alignment - four lanes. 4. East alignment - four lanes. VicRoads has publically stated that the west alignment, six lanes option is their preferred option. With all options, the existing Chandler Highway Bridge is to be retained and repurposed as a shared path. From a review of the available documentation and plans, the west alignment options provide a greater benefit to the City of Boroondara than the east alignment options in that: - No land is required in excess of the existing Crown land set aside for road purposes. - The Guide Dogs Victoria facility is not impacted in terms of land required. - Willsmere Chandler Park and associated high value vegetation is not impacted. - The location of the shared path on the east side of Chandler Highway from the Yarra River to Heidelberg Road is considered to be a safer outcome for path users. The traffic impacts of the options presented are currently unknown, but are expected to be very similar for the two proposed alignments. The traffic treatments will be the same, including the signalisation of the Yarra Boulevard/Chandler Highway/Guides Dog Victoria facility and the removal of the existing two stage pedestrian operated signals located to the south of Yarra Boulevard.
    [Show full text]
  • Building Suburban Rail Loop
    FACT SHEET BUILDING SUBURBAN RAIL LOOP The Andrews Labor Government will get on with the Suburban Rail Loop – the biggest transport project in Australian history that will connect our suburbs and our state. Our transport system was built a century ago – designed to get people from their homes to jobs in Melbourne’s CBD. But as we’ve grown, our state has changed. Melbourne’s suburbs have expanded, and jobs and services have decentralised to centres across Melbourne’s middle and outer suburbs. As we continue to grow, demand on the transport network in and out of the CBD will continue to fill our roads and our trains. To keep up with our growing population, create more jobs, help families get where they need to be, and make Melbourne a truly world-class city, our transport system needs overhauling. The Suburban Rail Loop will transform how people move around Melbourne – connecting people directly to jobs, hospitals, universities, and the airport without having to travel in to the CBD. The underground train network will circle Melbourne’s suburbs from Cheltenham to Melbourne Airport, with 12 new underground stations connecting our southern, eastern, and northern suburbs. From the Airport, Labor’s new Melbourne Airport Rail Link will connect it to Sunshine, with the loop completed via a new connection to the Werribee line. It will be the biggest transport project in Australian history, giving Melbourne a modern orbital public transport network the likes of London, New York, and Paris. In just four years, Labor has delivered the big road and rail projects our state needs for today.
    [Show full text]
  • Do Not Overwrite
    1 RECOMMENDATION OF THE EXECUTIVE DIRECTOR AND ASSESSMENT OF CULTURAL HERITAGE SIGNIFICANCE UNDER PART 3, DIVISION 3 OF THE HERITAGE ACT 2017 Name Eastern Freeway – Stage One Location Hoddle Street/Alexandra Parade, Clifton Hill to Bulleen Road, Kew, (City of Yarra, City of Boroondara) Provisional VHR Number PROV VHR H2400 Provisional VHR Category Heritage Place Hermes Number 204090 Heritage Overlay Number No Eastern Freeway - Stage One, August 2019 EXECUTIVE DIRECTOR RECOMMENDATION TO THE HERITAGE COUNCIL: • That the Eastern Freeway - Stage One (Hoddle Street to Bulleen Road) be included as a Heritage Place in the Victorian Heritage Register under the Heritage Act 2017 [Section 37(1)(a)]. • That the Eastern Freeway - Stages Two and Three (Bulleen Road to Springvale Road) not be included as a Heritage Place in the Victorian Heritage Register under the Heritage Act 2017 [Section 37(1)(b)]. STEVEN AVERY Executive Director Recommendation Date: 11 December 2019 Advertising Period: 16 December 2019 – 14 February 2020 This recommendation report has been issued by the Executive Director, Heritage Victoria under s.37 of the Heritage Act 2017. Name: Eastern Freeway - Stage One Hermes Number: 204090 2 NOMINATED EXTENT OF REGISTRATION Two nominations were received for the Eastern Freeway, with different extents. Nomination 1: Date that the nomination was accepted by the Executive Director 2 August 2019 Written extent of nomination The section of the Eastern Freeway from the Hoddle Street Road bridge at Clifton Hill/Collingwood to the Bulleen Road bridge, Balwyn North/Bulleen, constructed between 1972 and 1977, as indicated on the plan below. Nomination extent diagram The extent is the section between the two red lines.
    [Show full text]