List of Proposed ArchSD Projects 2015-16 for the Refurbishment of Government Buildings Rough Indication Item Project Description of Cost No. (RIC)

005/15 Hammer Hill Road Swimming Pool - Refurbishment of indoor swimming pool 1M-5M

012/15 Hotung Secondary School - Refurbishment of patio and classroom blocks 1M-5M

013/15 Cheung Chau Chest Clinic - Refurbishment of ventilation system 1M-5M

014/15 East Polyclinic - Refurbishment of East Kowloon chest clinic 5M-10M

018/15 Recreation Ground - Refurbishment of toilets and changing rooms 1M-5M

020/15 Tai Po Hau Market Complex - Refurbishment of public toilets 1M-5M

Tsun Yip Street Cooked Food Market - Refurbishment of ventilation system and 021/15 5M-10M roof garden

022/15 Plover Cove Public Toilet and Kiosk (PB870) - Refurbishment of toilet 1M-5M

023/15 Bride's Pool Public Toilet (PB998) - Refurbishment of toilet 1M-5M

024/15 Peak Tower Public Toilet - Refurbishment of toilet 1M-5M

025/15 Cheung Chau Self Help Care Village Public Toilet - Refurbishment of toilet 1M-5M

026/15 Wing Hing Toilet - Refurbishment of toilet 5M-10M

027/15 Sai Kung Tui Min Hoi Public Toilet (SK-208) - Refurbishment of toilet 1M-5M

028/15 Sai Kung Ho Chung Public Toilet (SK-203) - Refurbishment of toilet 1M-5M

029/15 Portland Street Public Toilet - Refurbishment of toilet 1M-5M

Note: The list of projects are subject to change in the course of the year. Updated as at : 08 MAY 2015 List of Proposed ArchSD Projects 2015-16 for the Refurbishment of Government Buildings

030/15 Government Central Pier No.1 - Refurbishment of male and female toilets at 2/F 1M-5M

032/15 Yuen Long Police Station - Refurbishment of report room 5M-10M

036/15 Queen Elizabeth Stadium - Refurbishment of fire services system 5M-10M

037/15 Fu Heng Neighborhood Community Centre - Refurbishment of fire services system 1M-5M

038/15 Tai Wo Neighborhood Community Centre - Refurbishment of fire services system 1M-5M

Wan Tau Tong Neighborhood Community Centre - Refurbishment of fire services 039/15 1M-5M system

044/15 Tai Po Complex - Refurbishment of fire services system 5M-10M

Hong Kong International Airport - Refurbishment of Air Traffic Control Tower 047/15 25M-30M (South Tower)

048/15 International Airport - Refurbishment of Airport Meteorological Office 10M-15M

049/15 Police Sports and Recreation Club - Refurbishment of kitchen of restaurant on 1/F 1M-5M

Shatin Police Divisional Headquarters and Station - Refurbishment of fire services 050/15 1M-5M system

Tong Fuk Correctional Institution - Refurbishment of Block K including fire 055/15 1M-5M services system

Sheung Shui Government Secondary School - Refurbishment of office, toilets, 078/15 5M-10M classroom and playground

Tuen Mun Government Secondary School - Refurbishment of staff common room, 079/15 1M-5M staff room, Student Activity Room and playground

Tuen Mun Government Primary School - Refurbishment of computer room and 080/15 1M-5M corridors

081/15 Police College - Refurbishment of Calderwood House 5M-10M

Note: The list of projects are subject to change in the course of the year. Updated as at : 08 MAY 2015 List of Proposed ArchSD Projects 2015-16 for the Refurbishment of Government Buildings Police College - Refurbishment of fixtures and internal redecoration in NTB 082/15 1M-5M Auditorium

Shau Kei Wan Government Primary School - Refurbishment of computer room and 083/15 5M-10M hall

084/15 Queens’ College - Refurbishment of hall 5M-10M

Belilios Public School - Refurbishment of classrooms and staff room on G/F and 085/15 5M-10M 1/F

Hennessy Road Government Primary School - Refurbishment to teacher staff room 086/15 1M-5M and principal room

087/15 Farm Road Government Primary School - Refurbishment of external walls 1M-5M

Kwun Tong Government Primary School - Refurbishment of external walls and 088/15 1M-5M basketball court

Shek Wu Hui Jockey Club Clinic - Refurbishment of ventilation system in chest 099/15 1M-5M clinic

Fanling Health Centre - Refurbishment of ventilation system in radio-diagnostic 100/15 5M-10M and imaging centre

101/15 Yan Oi Polyclinic - Refurbishment of ventilation system in chest clinic 5M-10M

Yuen Long Jockey Club Clinic - Refurbishment of chest clinic area and x-ray 102/15 5M-10M vehicle parking area

104/15 Hong Kong Heritage Museum - Refurbishment of thematic galleries 3 and 4 5M-10M

Fanling Swimming Pool - Refurbishment of main entrance and roof of spectator 107/15 1M-5M stand

108/15 Tuen Mun Swimming Pool - Refurbishment of external area and toilets 1M-5M

109/15 Chai Wan Swimming Pool - Refurbishment of training pool 5M-10M

110/15 Hin Tin Swimming Pool - Refurbishment of water play equipment 1M-5M

Note: The list of projects are subject to change in the course of the year. Updated as at : 08 MAY 2015 List of Proposed ArchSD Projects 2015-16 for the Refurbishment of Government Buildings Jordan Valley Swimming Pool - Refurbishment of office, changing rooms and 111/15 1M-5M bathrooms

North Kwai Chung Jockey Club Swimming Pool - Refurbishment of circulation 112/15 5M-10M pipeworks and pool deck tiles

115/15 Tai Po Sports Centre - Refurbishment of external paving 1M-5M

Lung Sum Avenue Sports Centre - Refurbishment of external wall, Squash rooms, 116/15 1M-5M sitting benches and arbours

117/15 Luen Wo Hui Sports Centre - Refurbishment of dance rooms, office and toilets 1M-5M

118/15 Wu Shan Tennis Court - Refurbishment of tennis courts and spectator stand 1M-5M

Tang Shiu Kin Sports Ground Tennis Court - Refurbishment of tennis courts and 119/15 1M-5M changing rooms

120/15 Causeway Bay Sports Ground - Refurbishment of water irrigation system 1M-5M

121/15 - Refurbishment of Stadium Restaurant 1M-5M

122/15 Ngau Tau Kok Road Sports Centre - Refurbishment of roofing system 1M-5M

123/15 Sham Shui Po Sports Ground - Refurbishment of changing room and public toilet 1M-5M

124/15 Complex - Refurbishment of Indoor Games Room 1M-5M

132/15 Yau Ma Tei Community Centre Rest Garden - Refurbishment of rest garden 1M-5M

Tai Po Waterfront Park - Refurbishment of garden furniture, viewing terrace and 137/15 15M-20M arbours

138/15 Tai Po Old Market Playground. - Refurbishment of playground 1M-5M

139/15 Tuen Mun Promenade - Refurbishment of external paving area 5M-10M

Note: The list of projects are subject to change in the course of the year. Updated as at : 08 MAY 2015 List of Proposed ArchSD Projects 2015-16 for the Refurbishment of Government Buildings

140/15 Tsing Tin Playground - Refurbishment of soccer pitch and spectator stand 1M-5M

141/15 Tsing Sin Playground - Refurbishment of tennis court, roller skate court and garden 1M-5M

142/15 Tuen Mun Hung Cheung Road Sitting-out Area - Refurbishment of sitting-out area 1M-5M

143/15 Butterfly Beach Park - Refurbishment of changing rooms and pavilion 1M-5M

144/15 Yuen Long Town Park - Refurbishment of park 5M-10M

145/15 Pui To Road (South) Rest Garden - Refurbishment of rest garden and public toilet 5M-10M

146/15 Tin Shui Wai Park - Refurbishment of external areas 5M-10M

147/15 Yuen Long Jockey Club Square - Refurbishment of park 1M-5M

Lamma Island Tai Ping San Chuen Sitting-out Area - Refurbishment of sitting-out 148/15 less than 1M area

149/15 Hong Kong Park - Refurbishment of lighting system 1M-5M

150/15 Cheung Chau Pak Tai Temple Playground - Refurbishment of sitting out area 1M-5M

151/15 Tung Chung Man Tung Road Park - Refurbishment of artificial turf of soccer pitch 20M-25M

152/15 Yee Shing Lane Sitting Out Area - Refurbishment of sitting-out area 1M-5M

Lei Yue Mun Park and Holiday Village - Refurbishment of coffee corner and 153/15 5M-10M restaurant

154/15 Chai Wan Park - Refurbishment of football pitch no. 1 1M-5M

155/15 Quarry Bay Park - Refurbishment of toilet and changing room block in Phase II 1M-5M

Note: The list of projects are subject to change in the course of the year. Updated as at : 08 MAY 2015 List of Proposed ArchSD Projects 2015-16 for the Refurbishment of Government Buildings

156/15 Hong Kong Park - Refurbishment of U3 and L2 studios of Visual Arts Centre less than 1M

157/15 Hong Kong Park - Refurbishment of eastern pump room and fountain less than 1M

158/15 Big Wave Beach Picnic Area - Refurbishment of picnic area 5M-10M

159/15 Park - Refurbishment of artificial turf of mini soccer pitch 15M-20M

Wai Yip Street / Sheung Yee Road Sitting-out Area - Refurbishment of sitting-out 160/15 1M-5M area

Kai Cheung Road and Lam Hing Street Sitting-out Area - Refurbishment of sitting- 161/15 1M-5M out area

162/15 Po Kong Village Road Park - Refurbishment of athletic track 1M-5M

163/15 Morse Park ( park no. 3) - Refurbishment of football pitches 1M-5M

164/15 Choi Hung Road Playground - Refurbishment of playground and tennis courts 1M-5M

165/15 Yuet Wah Street Playground - Refurbishment of playground 1M-5M

166/15 Park - Refurbishment of artificial turf of soccer pitch no. 2 25M-30M

167/15 King's Park Recreation Ground - Refurbishment of basketball court 1M-5M

168/15 Rest Garden - Refurbishment of rest garden 1M-5M

169/15 Cornwall Street Playground - Refurbishment of playground 1M-5M

170/15 Rutland Street Garden - Refurbishment of garden 1M-5M

171/15 Sham Shui Po Park - Refurbishment of park 10M-15M

Note: The list of projects are subject to change in the course of the year. Updated as at : 08 MAY 2015 List of Proposed ArchSD Projects 2015-16 for the Refurbishment of Government Buildings

172/15 Tsuen Wan Sha Tsui Road Playground - Refurbishment of playground 5M-10M

173/15 Tsuen Wan Tsuen Wan Park - Refurbishment of park 5M-10M

178/15 Shek Wu Hui Municipal Services Building - Refurbishment of fire services system 5M-10M

179/15 Luen Wo Hui Municipal Services Building - Refurbishment of fire services system 5M-10M

Ap Lei Chau Municipal Services Building - Refurbishment of public areas on 1/F, 180/15 5M-10M 2/F and 4/F

181/15 Pei Ho Street Complex - Refurbishment of public toilet at 2/F 1M-5M

196/15 Hong Kong Cemetery - Replacement of pedestrian pavements 1M-5M

North District Community Centre and Town Hall - Refurbishment of fire services 197/15 1M-5M system

Shenzhen Bay Control Point - Refurbishment of external wall and resurfacing of 198/15 5M-10M cargo examination platform at Customs and Excise Department outbound office

Macau Ferry Terminal - Refurbishment of electrical cable trucking at pier deck of 199/15 1M-5M outer pier

North Point Government Offices - Refurbishment of auditorium and classrooms on 200/15 10M-15M 3 and 4/F of Civil Service Training and Development Institute

Lockhart Road Municipal Services Building - Refurbishment of lighting system at 201/15 less than 1M Market Area

202/15 50 Magazine Gap Road, Wanchai - Refurbishment of quarters 1M-5M

203/15 City Hall High Block - Refurbishment of external façade 1M-5M

204/15 North Point Government Offices - Refurbishment of lift lobby on 17/F 1M-5M

Cheung Sha Wan Government Offices - Refurbishment of toilets on 4/F to 18/F 205/15 1M-5M

Note: The list of projects are subject to change in the course of the year. Updated as at : 08 MAY 2015 List of Proposed ArchSD Projects 2015-16 for the Refurbishment of Government Buildings

206/15 Shatin Marriage Registry - Refurbishment of external walls 1M-5M

Border District Police Headquarters - Refurbishment of the Beverage and Catering 229/15 1M-5M Unit block

230/15 Man Kam To Operation Base - Refurbishment of the Transport Unit block 1M-5M

Police Dog Unit and Force Search Unit at Sha Ling - Refurbishment of dog kennels 231/15 5M-10M No.5 and 6

Tin Shui Wai Police Station - Refurbishment of 1/F offices and conference room, 232/15 1M-5M 5/F sitting room and 7/F store rooms

233/15 Ma On Shan Police Station - Refurbishment of external walls 1M-5M

234/15 Kwun Tong Police Station - Refurbishment of external walls 1M-5M

Shatin Police Divisional Headquarters and Station - Refurbishment of security 235/15 1M-5M service for car park

239/15 Tai Po East Fire Station - Refurbishment of toilet, changing room and office 1M-5M

Sheung Shui Fire Station - Refurbishment of office, replacement of air- 240/15 1M-5M conditioning and lighting systems, and resurfacing of open car park

Fire Service Department Tseung Kwan O Junior Married Quarters - Refurbishment 241/15 1M-5M of external walls

Hei Ling Chau Correctional Institution (18C) - Re-roofing , refurbishment of fire 243/15 1M-5M services system of industrial store(Out-Centre)

Hei Ling Chau Treatment Centre (18A) - Re-roofing and refurbishment of 244/15 1M-5M dormitories 4, 5 and 10

Hei Ling Chau Treatment Centre (18A) - Re-roofing and refurbishment of offices 245/15 1M-5M of Psychological Unit behind Dormitories 4 - 10

246/15 Stanley Prison - Refurbishment of tennis court 1M-5M

247/15 Shatin Town Hall - Refurbishment of security system less than 1M

Note: The list of projects are subject to change in the course of the year. Updated as at : 08 MAY 2015 List of Proposed ArchSD Projects 2015-16 for the Refurbishment of Government Buildings

251/15 Yuen Long Vehicle Depot - Refurbishment of flooring 1M-5M

Customs and Excise Training School - Refurbishment of external wall and 256/15 1M-5M provision of green roof at Dormitory II

Kwai Chung Kwai Tsing Theatre - Refurbishment of auditorium seats at theatre 258/15 10M-15M and re-roofing

Shatin Public Library - Refurbishment of external wall, re-roofing and provision of 260/15 5M-10M green roof

261/15 Wo Hing Sports Centre - Refurbishment of office, ball court and external wall 5M-10M

Ngan Chi Wan Sports Centre - Refurbishment of sports hall including re-roofing 262/15 1M-5M and provision of green roof

264/15 Hong Kong Park - Refurbishment of children playground including lighting system 1M-5M

267/15 Harbour Building - Refurbishment of lighting system at staircase no. 1 to 3 1M-5M

High Court Building - Refurbishment of air-conditioning system at jury conference 268/15 1M-5M room and retiring rooms

New Territories North Regional Police Headquarters - Refurbishment of changing 271/15 1M-5M room at various floors

Cheung Sha Wan Divisional Police Station - Refurbishment of G/F compound and 272/15 1M-5M provision of green roof at 2/F

Lau Fau Shan Fire Station cum Ambulance Depot - Refurbishment of fire station 274/15 5M-10M and provision of green roof

275/15 Chung Hom Kok Fire Station - Re-roofing and provision of green roof 1M-5M

Ex-Sam Shui Natives Association Tong Yun Kai School - Refurbishment to the external wall, external areas, internal areas, electrical installations, plumbing and 278/15 25M-30M drainage system, fire services installations, lift, MVAC installations, etc., for use of an office

Fire and Ambulance Services Academy (Pat Heung) - Refurbishment and of fire 279/15 25M-30M services upgrading in Block C

APB Centre - Refurbishment of Multi-functional Room, BDRC, Special Duties 280/15 1M-5M Group and 4/F toilets

Note: The list of projects are subject to change in the course of the year. Updated as at : 08 MAY 2015