Highlights 2018 : Transformation Reloading Table of Contents

Total Page:16

File Type:pdf, Size:1020Kb

Highlights 2018 : Transformation Reloading Table of Contents ROSATOM STATE CORPORATION ENGINEERING DIVISION Highlights 2018 : Transformation Reloading Table of Contents CEO Statement 2 Company’s Background 4 Our Markets 6 International Footprint 8 Milestones 12 Key Performance Results 18 Corporate Governance 20 Science and Innovations 22 Innovative Design Technology: Virtual NPP 26 Sustainable Development 28 Environmental Safety Management 29 Procurement Activity 32 HR Policy 36 ROSATOM STATE CORPORATION CEO STATEMENT ENGINEERING DIVISION CEO Statement Dear colleagues and partners, The year 2018 was a major landmark The engineering business is considered The concept of the Division’s in two areas — implementation by Rosatom State Corporation’s management sustainable development is generated of the projects in the current product portfolio to be the key priority. That is why in 2018 according to the UN Sustainable and transformation aimed at enhancing the management especially focused on Development Goals until 2030 and the efficiency of business operations. enhancement of the internal processes efficiency respective international standards. in order to ensure that the deadlines and In the reporting year, the Division The construction of Akkuyu the costs criteria are met during implementation pursued a consistent policy of social of all projects in the project portfolio. The main responsibility through high standards NPP Unit 1 (Turkey) principles of the transformation are reducing in the area of environmental protection, and Rooppur NPP Unit 2 the number of the Engineering Division’s occupational health and safety (Bangladesh) reached management levels, enhancing the project which is essential for the company’s managers’ functions and responsibilities, sustainable development. the stage of first concrete” optimizing the performance of the design unit. Successful implementation As of December 2018, the Division’s product As to other aspects of its activities, of the projects in the project portfolio portfolio included 31 NPP units. The reporting the Engineering Division is engaged in continuous offers a challenge for both our year witnessed the commissioning of Tianwan process of digitalization, in particular, the use organization and the whole industry. NPP Units 3&4 in the People’s Republic of of the digital model during NPP design I am confident that this challenge will China. Against the background of our growing and construction, which is a prerequisite be met owing to the comprehensive efficient cooperation with the Chinese partners, for ensuring quality and standardization support rendered by Rosatom State General Contract for construction of Tianwan of designs. As part of the digitalization process, Corporation and the Division employees’ NPP Units 7&8 came into effect and Frame the Division operates according to Rosatom State professional competence, dedication Contract for construction of Xudapu NPP Corporation’s digital strategy adopted in 2018. and commitment to results. Units 3&4 was signed. As to the projects implemented within the Russian Federation, the major milestones of the Engineering Division’s operation were commissioning of Rostov NPP Unit 4, power startup of Leningrad NPP-2 Unit 1 — a power plant of generation III+, the first concrete pouring in the foundation slab of the reactor building of Kursk NPP-2 Unit 1 that is the first NPP in Russia, the construction of which applies VVER-TOI — the state-of-the-art national design. In 2018, the Engineering Division’s income reached the point of 202 billion rubles which makes a 15.2% increase compared to 2017. Alexander Lokshin The growth of this value is mostly accounted for by implementation of such projects as President of JSC ASE EC, Rooppur NPP in Bangladesh, Kudankulam NPP First Deputy Director General in India, Belarus NPP. One fifth of Rosatom State Corporation’s total revenue was provided for Operations Management by the Engineering Division. of Rosatom State Corporation 2 3 ROSATOM STATE CORPORATION COMPANY’S BACKGROUND ENGINEERING DIVISION Rosatom State Corporation Engineering Division operates using half-century experience of the nuclear industry Company’s in Russia and state-of-the-art technologies” Rosatom State Corporation Background Engineering Division JSC ASE EC — managing company 1 (Nizhny Novgorod) Vision Mission JSC ASE We seek to build a competitive We manage construction (Nizhny Novgorod) business that is successful of complex engineering facilities 2 in implementation of construction based on the vast experience projects and complex in implementing nuclear projects. engineering facilities construction We create shareholder value JSC “Atomenergoproekt” management projects and aims and ensure implementation (Moscow) to maximize the shareholder of their objectives on the Russian 3 value of the Engineering Division. and global markets. JSC ATOMPROEKT 4 (St. Petersburg) Safety Responsibility for the result Efficiency The Division’s One team values Respect One step ahead 4 5 ROSATOM STATE CORPORATION COMPANY’S BACKGROUND ENGINEERING DIVISION Our Markets Our Markets Design of high-power NPPs Construction of high-power NPPs with Pressurized Multi-D-based digital technologies Water Reactors on the terms of EPC, EPC(M) for management of complex engineering facilities VVER-1000 VVER-1200 VVER-TOI Safety generation III Safety generation III+ Safety generation III+ Production type: full-scale 1,000 MW 1,200 MW 1,255 MW Electric power Electric power Electric power 3,000 MW 3,212 MW 3,300 MW Thermal capacity Thermal capacity Thermal capacity Kudankulam NPP (India) Novovoronezh NPP-2 (Russia) Kursk NPP-2 Leningrad NPP-2 (Russia) Rooppur NPP (Bangladesh) Tianwan NPP (China) Xudapu NPP (China) Akkuyu NPP (Turkey) El-Dabaa NPP (Egypt) Hanhikivi-1 NPP (Finland) Paks II NPP (Hungary) Belarus NPP (Belarus) 6 7 ROSATOM STATE CORPORATION INTERNATIONAL FOOTPRINT ENGINEERING DIVISION International Bangladesh Footprint Belarus Bulgaria Hungary Germany Egypt Core projects (NPP design and construction) India China Branch offices Russia Slovakia Turkey Representative offices Ukraine Finland Subsidiaries 8 9 ROSATOM STATE CORPORATION INTERNATIONAL FOOTPRINT ENGINEERING DIVISION The European Utility Organization has recognized the advanced Russian VVER-TOI NPP design as meeting the European Utility Requirements” 30% 80% OF THE GLOBAL NPP OF THE ENGINEERING CONSTRUCTION MARKET DIVISION’S REVENUE IS PROVIDED BY FOREIGN PROJECTS JSC ASE EC and JSC ASE are the first nuclear companies that have been granted a certificate to prove that their information security management systems comply with ISO/IEC 27001:2013 international standard requirements. The scope of certifications covers the information security management system when organizing electronic workflow of design documentation with foreign partners” 10 11 ROSATOM STATE CORPORATION MILESTONES ENGINEERING DIVISION Milestones LENINGRAD NPP-2 KURSK NPP-2 (Russia) (Russia) 09.03.2018 28.04.2018 Power start-up Start of the foundation slab of Power Unit 1. concreting in the reactor building at Power Unit 1. 15.04.2019 Concreting of the foundation plate of the innovation Unit 2 VVER TOI reactor building has started at the Kursk NPP-2 construction site. JANUARY MARCH APRIL SEPTEMBER APRIL MAY JULY 2018 2018 2019 2019 ROSTOV NPP NOVOVORONEZH (Russia) NPP-2 (Russia) 19.01.2018 01.05.2019 Power start-up of Power Unit 4. The power start-up of Novovoronezh NPP-2 Power Unit has taken place. 28.09.2018 The innovation Gen III+ Power Unit with VVER-1200 reactor Commissioning was synchronized with the grid of Power Unit 4. and achieved the 240 MW level. 31.07.2019 Novovoronezh NPP-2 Power Unit 2 has achieved the 100% power level. 12 13 ROSATOM STATE CORPORATION MILESTONES ENGINEERING DIVISION AKKUYU NPP (Turkey) PAKS II NPP (Hungary) 30.03.2018 20.06.2019 Start of the foundation slab The first civil and erection works concreting in the reactor building started at Paks II NPP. at Power Unit 1. MARCH OCTOBER NOVEMBER FEBRUARY APRIL JUNE 2018 2018 2019 2019 EL-DABAA NPP (Egypt) BELARUS NPP (Belarus) 28.10.2018 26.10.2018 Preparation of the documents Safety systems flushing on the open reactor for obtaining of the license for construction completed at Power Unit 1. of Power Units 1&2. 18.11.2018 Start of assembly works at the reactor at Power Unit 1. Core barrel installed in the reactor pressure vessel. HANHIKIVI-1 NPP (Finland) 19.02.2019 Power supply for auxiliary loads under 09.11.2018 the design layout at Power Unit 1. Highly detailed 3D-model of the NPP was developed. 05.04.2019 The specialists started to implement the Power Unit 1 commissioning programme. 14 15 ROSATOM STATE CORPORATION MILESTONES ENGINEERING DIVISION KUDANKULAM NPP ROOPPUR NPP (India) (Bangladesh) 07.08.2019 08.07.2018 The supplies of the main equipment Start of the foundation slab for Power Unit 3 reactor plant have concreting for the reactor been completed. building at Power Unit 2. 06.08.2019 The works for Power Unit 2 turbine hall foundation plate concreting have been completed at the Rooppur NPP site. FEBRUARY JULY AUGUST DECEMBER MARCH JUNE AUGUST 2018 2018 2019 2019 TIANWAN NPP (China) XUDAPU NPP (China) 15.02.2018 07.03.2019 Putting into commercial operation Signing of Technical Design Contract of Power Unit 3. for Power Units 3&4. 25.08.2018 05.06.2019 Physical start-up of Power Unit 4. Signing of the General Contract for construction of Xudapu Power Units 3&4 of the Russian design with VVER-1200 reactors. 22.12.2018 Putting Power Unit 4 into commercial operation. 07.03.2019 Signing of General Contract for construction of Tianwan NPP Power Units 7&8. 16 17 ROSATOM STATE CORPORATION KEY PERFORMANCE RESULTS ENGINEERING DIVISION Key Performance Results Revenue, bln RUR EBITDA, bln RUR CAPEX, bln RUR Labor Productivity (in terms of proper revenue), mln RUR/pers. 201.9 200 175.2 2018 16.8 152.9 7.7 150 2017 13.9 8 2018 3.85 100 2016 32.4 6 2017 3.73 4 2.7 2016 3.3 2016 2017 2018 1.5 2 The losses incurred over Belene NPP Project were reimbursed upon the Final Award by the Arbitration Court in 2016.
Recommended publications
  • Russia's Nuclear Security Policy
    Innovative approaches to peace and security from the Stanley Foundation POLICYANALYSISBRIEF THE STANLEY FOUNDATION | MAY 2015 Russia’s Nuclear Security Policy: Priorities and Potential Areas for Cooperation The crisis over Ukraine has led to a drastic reduction in regular official Russian-US contacts in most areas, including those where it is in the two countries’ mutual national security interests to work together. Bilateral cooperation on nuclear nonproliferation and nuclear security has been among the affected areas. The United States has suspended contacts with Russia in the framework of the G-8 and in the Russian-US Bilateral Presidential Commission’s Nuclear Energy and Nuclear Security Working Group. Implementation of the September 2013 agreement on Cooperation in Nuclear- and Energy- Related Scientific Research and Development (R&D Agreement), which Anton Khlopkov prioritizes joint efforts on nuclear nonproliferation and nuclear security, has also been put on hold, and exchanges between nuclear scientists of the two Author countries have been frozen. In turn, Russia has decided not to take part in Anton Khlopkov1 is director of the preparations for the 2016 Nuclear Security Summit. Moscow also notified Moscow-based Center for Energy and Washington that most of the joint nuclear security projects in Russia would Security Studies and editor in chief of the not be extended beyond December 31, 2014. journal Nuclear Club. He is a member of the Advisory Board under the Security This trend is a serious cause for concern, given that Russia and the United Council of the Russian Federation and States, which are depositaries of the Treaty on the Non-Proliferation of chairman of the Moscow Nonproliferation Nuclear Weapons (NPT), bear special responsibility for maintaining the Conference.
    [Show full text]
  • From Gen I to Gen III
    From Gen I to Gen III Gabriel Farkas Slovak University of Technology in Bratislava Ilkovicova 3, 81219 Bratislava [email protected] 14. 9. 2010 1 Evolution of Nuclear Reactors Generation I - demonstration reactors Generation II - working in the present Generation III - under construction 14. 9. 2010 2 Generation IV - R&D 14. 9. 2010 3 Expected development in nuclear technologies Prolongation of lifetieme of existing nuclear reactors Construction of new reactors in frame of Gen. III and IV . Figure 1 Replacement staggered over a 30-year period (2020 - 2050) Rate of construction : 2,000 MW/year 70000 60000 Lifetime 50000 prolongation 40000 Generation IV 30000 Actual reactors 20000 Generation III+ 10000 0 197519801985199019952000200520102015202020252030203520402045205020552060 14. 9. 2010 Average plant life : 48 years 4 Nuclear in Europe (Nuclear ~ 32% of total EU electricity production) SE, 7.3% UK, 7.9% SP, 5.8% BE,4.8% CZ, 2.5% GE, 16.3% FI, 2.4% BU, 1.8% Other 12.4% SK, 1.7% HU, 1.4% LT, 1.1% FR, 45.5% SI, 0.6% NL, RO, 0.5% 0.4% Source PRIS 14. 9. 2010 5 Central & Eastern Europe - Nuclear Landscape Russia Lithuania Ukraine 6 VVER440 Poland 1 RBMK 1300 2 VVER440 8 VVER1000 Min. of Energy 13 VVER1000 NNEGC State owned 11 RBMK 1 BN600 4 Graph Mod BWR Czech Republic Rosenergoatom State 4 VVER440 owned 2 VVER1000 CEZ/ 67% State Romania owned 2 Candu PHW Nuclearelectrica State owned Slovak Republic 4/6 VVER440 Bulgaria ENEL 67% owned 2/4 VVER1000 NEC State owned Hungary Armenia 4 VVER 440 1 VVER440 MVM State owned Armatomenergo, State owned 14.
    [Show full text]
  • Vver.1200 Vver.1000 Vver.Toi (V-320)
    Engineering & Construction Division State Atomic Energy Corporation ROSATOM New VVERs in Russia and Abroad Sergey Svetlov , Dr.Sc. (Tech.) Chief Expert for Design ASE Group (ROSATOM Corporation) 4th MDEP Conference on New Reactor Design Activities , 12.09– 13.09.17, London, UK DEVELOPMENT OF VVER DESIGN Kudankulam Bushehr-2 NPP NV-2 NPP NPP NPP in Jordan Rooppur NPP Akkuy VVER.1000 (AES-92) VVER.1200 VVER.1000 VVER.TOI (V-320) VVER.1000 (AES-91) VVER.1200 Kursk-2 NPP VVER.640 MIR-1200 Hanhikivi NPP, LNPP–2, Bel NPP Paks-II NPP Tianwan NPP Baltic NPP El-Dabaa NPP The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to ASE group and its affiliated companies. ASE disclaims all responsibility for any and all mistakes, quality and completeness of the information. 2 VVER.1200 Design VVER.1200 is an export name of the Russian design of the nuclear power plant known as AES-2006. It is an evolving NPP design developed on the basis of a Russian design VVER.1000. The VVER.1200 design belongs to Generation III+ . It meets all up-to-date Russian, European and international requirements for new NPP. The first units of this design are the unit #1 of Leningrad NPP-2 (LNPP-2) and the unit #1 of Novovoronezh NPP-2 in Russia. The unit #1 of Novovoronezh NPP-2 with the reactor VVER-1200 was put into operation in 2016. It is the first unit of Generation III+ under operation in the World.
    [Show full text]
  • Rosatom, Transnational Nuclear Nightmare
    RULES FOR BUSINESS RIGHTS FOR PEOPLE ASIA DEMANDS BINDING RULES ON BUSINESS October 2018 Syeda Rizwana Hasan from BELA/FoE Bangladesh at IGWG 2nd session 2016 @Victor Barro/FoEI BUILDING A STRONG ‘stop robbing peoples’ land: protest in Sri Lanka @Janaka Withanage/CEJ AND BINDING TREATY VOTING CHART Summary of Asian countries’ positions with respect to the UN Binding Treaty on Transnational Traditionally, international human rights law focuses on the role and responsibilities of states. Corporations and other business enterprises with respect to human rights Human rights abuses arising from the cross-border activities of corporations is the largest gap in international law. In our globalised world, companies operate between different national jurisdic- Voted for UN Presence at UNHRC Engagement with civil tions and often escape accountability. Country Binding treaty IGWG binding mandate society on UN Binding Treaty in 20145,6 treaty sessions until7 Transnational corporations (TNCs) and other companies are often implicated in human rights abuses across Asia. A destructive coal mine in Bangladesh threatens to destroy one of the world’s Not a member largest mangrove ecosystems. Hundreds of people risk being displaced from a mega-sugar plan- AUSTRALIA at the time 2016 2020 NO tation in Sri Lanka. Yet many of these crimes go on unpunished, due to corruption in local legal systems and the fact that many corporations are richer and more powerful than the states that Not a member 2015 / 2016 / seek to regulate them. BANGLAGESH at the time 2017 2017 NO In 2014, a people’s victory was celebrated at the United Nations Human Rights Council: Resolu- Proactive: meetings with tion 26/9 was adopted, establishing a new Intergovernmental Working Group (IGWG)1, which has 2015 / 2016 / foreign ministry, human rights INDONESIA YES 2017 2017 a mandate to elaborate an international legally binding instrument to regulate TNCs and other commission and ambassador.
    [Show full text]
  • A Comparison of Advanced Nuclear Technologies
    A COMPARISON OF ADVANCED NUCLEAR TECHNOLOGIES Andrew C. Kadak, Ph.D MARCH 2017 B | CHAPTER NAME ABOUT THE CENTER ON GLOBAL ENERGY POLICY The Center on Global Energy Policy provides independent, balanced, data-driven analysis to help policymakers navigate the complex world of energy. We approach energy as an economic, security, and environmental concern. And we draw on the resources of a world-class institution, faculty with real-world experience, and a location in the world’s finance and media capital. Visit us at energypolicy.columbia.edu facebook.com/ColumbiaUEnergy twitter.com/ColumbiaUEnergy ABOUT THE SCHOOL OF INTERNATIONAL AND PUBLIC AFFAIRS SIPA’s mission is to empower people to serve the global public interest. Our goal is to foster economic growth, sustainable development, social progress, and democratic governance by educating public policy professionals, producing policy-related research, and conveying the results to the world. Based in New York City, with a student body that is 50 percent international and educational partners in cities around the world, SIPA is the most global of public policy schools. For more information, please visit www.sipa.columbia.edu A COMPARISON OF ADVANCED NUCLEAR TECHNOLOGIES Andrew C. Kadak, Ph.D* MARCH 2017 *Andrew C. Kadak is the former president of Yankee Atomic Electric Company and professor of the practice at the Massachusetts Institute of Technology. He continues to consult on nuclear operations, advanced nuclear power plants, and policy and regulatory matters in the United States. He also serves on senior nuclear safety oversight boards in China. He is a graduate of MIT from the Nuclear Science and Engineering Department.
    [Show full text]
  • Russia's Akademik Lomonosov – the First Modern Floating Nuclear
    Russia’s Akademik Lomonosov – The First Modern Floating Nuclear Power Plant (FNPP) Peter Lobner, 15 May 2021 1. Introduction Designated Project 20870, construction of Akademik Lomonosov started on 15 April 2007, when the keel was laid at the Sevmash shipyard in Severodvinsk, which also is Russia’s premier submarine building shipyard. Originally, Akademik Lomonosov was expected to supply power to the Sevmash shipyard itself and the town of Severodvinsk, in Northwest Russia. Cutaway drawing showing the general arrangement of the Akademik Lomonosov. Source: Rosatom In August 2008, the hull of Akademik Lomonosov was transferred to the Baltic Shipyard in St. Petersburg, where a second “keel laying” was held in May 2009. Plans for deploying the FNPP were reconsidered, leading to the final selection of Pevek, a remote Arctic coastal city in Russia’s Far East. The FNPP was launched on 30 June 2010 and outfitting continued with the vessel secured dockside at the Baltic Shipyard. Two un-fueled OKBM Afrikantov KLT-40S modular pressurized water reactors (PWRs) were installed in October 2013. 1 After work on the vessel and reactor systems was completed in April 2018, Akademik Lomonosov was towed 4,000 km (2,485 miles) around Norway to Murmansk, where the reactors were fuelled and tested at Rosatomflot facilities, which also support their nuclear- powered icebreaker fleet. In June 2019, the Russian nuclear regulatory agency Rostekhnadzor issued a 10-year license to Rosenergoatom to operate Akademik Lomonosov until 2029. After successfully completing testing, Akademik Lomonosov departed Murmansk on 23 August 2019 and was towed 4,770 km (2,964 miles) along the Northern Sea Route, arriving at its final destination on 9 September 2019 at a new protected pier at Pevek, which is about 980 km (609 miles) west of the Bering Strait.
    [Show full text]
  • Future EQ Perspectives for Russian Global New-Build Projects
    Future EQ Perspectives for Russian Global New-Build Projects Natalia Amosova Principal Consultant Lean Six Sigma Black Belt [email protected] +41 79 458 77 13 Prepared for 2020 Curtiss-Wright EQ Technical Meeting November 2020 November, 2020 Curtiss-Wright EQ Technical Meeting 2020 - [email protected] 1 The Water-Water Energy Reactor “VVER” Development and generations + Total number of 106 VVER‘s build since 1960 + Three generations in operation: + VVER-440 + VVER-1000 + VVER-1200 (AES-2006) + Generation III+ under construction: + VVER-1300 (TOI) + New designs developed for future projects: + MIR-1200 + VVER-1500 + VVER-1700 + VVER-600 November, 2020 Curtiss-Wright EQ Technical Meeting 2020 - [email protected] 2 Rosatom Group + Russian government owned corporation, responsible for all nuclear applications + Consists of over 350 specialized companies throughout the whole fuel cycle, of which relevant for us: + Rosatom Overseas (RAOS) - vendor for VVER outside of Russia + AtomEnergoProm (AEP) - designer of the plant + AtomStroyExport (ASE) – main contractor for the international NPP construction + Titan-2 - main contractor for the international NPP construction + AtomEnergoMash (AEM) – Main equipment manufacturer + World leader in todays‘ newbuild portfolio + 28 VVERs under construction (international and domestic) + Total new-build portfolio >130 B. USD November, 2020 Curtiss-Wright EQ Technical Meeting 2020 - [email protected] 3 The Overseas New-Build Projects Overview Rosatom Overseas (RAOS) Plant name Country Unit number
    [Show full text]
  • Nuclear Power Industry
    JSC ATOMENERGOMASH RESULTS OF 20161 1 The brochure data are valid as of April 26, 2017. JSC ATOMENERGOMASH RESULTS OF 2016 The pilot fast neutron reactor After a long interruption, JSC Atomenergomash with primary sodium CEFR the nuclear industry equipment reinforces the key 3,668 developed under the order manufacture was resumed at business areas – nuclear from Chinese Nuclear Power “Atommash” plant. In particular, power industry, gas and Corporation. The developer the activities were commenced petrochemical industry, of the reactor plant was for the manufacture of the main shipbuilding and general 10 YEARS OF PROGRESS OJSC Afrikantov OKBM, the equipment of the reactor island industry. steam generator developer of the Power units 1 and 2 of was OJSC OKB GIDROPRESS. Belarusian NPP. THE HISTORY OF JSC ATOMENERGOMASH, THE mechanical ENGINEERING DIVISION OF ROSATOM STATE CORPORATION (THE «DIVISION») STARTED FROM TWO 2,947 OJSC Atomenergomash The complete cycle of steam COMPANIES. TODAY THE DIVISION IS ONE OF THE LEADING mechanical ENGINEERING COMPANIES IN RUSSIA. IT COMPRISES OVER 20 LEADING ENGINEERING manufactured a core catcher generators manufacture was at the Atommash plant in mastered – from semi-products JSC TsKBM completed the BUREAUS, MAJOR MACHINE BUILDERS, RESEARCH INSTITUTIONS. THE DIVISION IS INVOLVED IN THE KEY PROJECTS IMPLEMENTED BY ROSATOM, WIDENS unprecedentedly short time (PJSC Energomashspetsstal) to test of the new MCP design – and supplied it to the Baltic body manufacture (OJSC PZM), single-shaft configuration 2,414 Labor productivity per employee, thousand rubles THE COMPETENCES AND ACTIVELY MASTERS NEW MARKETS AND TECHNOLOGIES. 2,397 NPP. assembly of in-vessel components with water cooling of motor and shipment to client and bearing assemblies that (OJSC ZiO-Podolsk).
    [Show full text]
  • Rosatom Technical Academy” (Rosatom Tech)
    “Rosatom Technical Academy” (Rosatom Tech) Developments of Nuclear Technologies in Russia 3rd of Febuary 2020, STTN-BATAN Evgenii Varseev Assitant to vice-rector for international cooperation, Rosatom Tech © 2019 Rosatom Tech Self Introduction Eugeny Varseev Specialist in International training at Rosatom Tech since 2016 Education 2014-2016 – Master’s degree in “New-generation nuclear power technologies and advanced NFC” at National Research Nuclear University MEPhI, Moscow, Russia 2012-2016 – PhD student, Majoring in Development, operation and decommissioning of nuclear power facilities PhD dissertation title: «Masstransfer in circuits with liquid metal coolants», Institute for Physics and Power Engineering (IPPE), Obninsk, Russia 2006-2012 – Specialist degree (5.5 years) in “Nuclear reactors and power facilities” at Obninsk Institute for Nuclear Power Engineering (IATE NRNU MEPhI), Obninsk, Russia Work experience Since November 2019 – assistant to vice-rector o Rosatom Tech for int. cooperation 2016 - 2019 – Specialist of International Center at Rosatom Tech, Obninsk, Russia 2011 - 2016 – Research engineer at SSC RF - Institute for Physics and Power Engineering named after A.I. Leypunsky, Obninsk, Russia © Rosatom Tech 2 Rosatom in a Nut Shell • More than 260 000 people in 400 nuclear companies and R&D institutions - total number of employees • 80 000 people (30%) are employees under 35 years • 43 years old- average age of employees • More than 3 300 people employees with PhD and Doctor Degrees • 1800 graduates each year are recruited
    [Show full text]
  • Rosatom: Continuous Nuclear Contamination of the Area Around the Mayak Complex
    Greenpeace Justice for Section International People and Planet Case Studies Rosatom: Continuous nuclear contamination of the area around the Mayak complex Russian nuclear corporation Rosatom has been Company activity responsible for a series of nuclear accidents at its Nuclear power and power engineering assets, as well Mayak complex, and victims have been unable to as nuclear power plant (NPP) and facilities of full nuclear secure either justice or remedy in part due to the fuel cycle design and construction.5 Rosatom is also impunity of the state-owned company in Russian responsible for part of the military nuclear activities of courts. Russia, including in Mayak. The company has a range of other businesses, including power generation in its Problem Analysis existing nuclear plants; it has a renewable division with increasing investments in wind; and it has uranium mining The Kyshtym nuclear disaster, caused by the Mayak and nuclear weapon development, amongst others. nuclear complex, was the third worst nuclear disaster in history. Despite this the Mayak nuclear complex, whose Country and location in which core business is reprocessing spent nuclear fuel, remains in the violation occurred operation. Local residents are affected both by the historical contamination and by the emissions from current activities. Ozyorsk, Chelyabinsk Oblast, the Southern Urals region, Today Mayak is run by Rosatom, Russia’s state nuclear Russia corporation. This case illustrates how the Russian state and its flagship company work closely together to continue their Summary of the case operations, despite the negative impacts on both public Rosatom’s Mayak Combine is part of the Russian state health and the environment.
    [Show full text]
  • State Atomic Energy Corporation Rosatom
    STATE ATOMIC ENERGY CORPORATION ROSATOM. STATE ATOMIC ENERGY CORPORATION ROSATOM. PERFORMANCE IN 2019 PERFORMANCE IN 2019 PERFORMANCE OF STATE ATOMIC ENERGY CORPORATION ROSATOM IN 2019 TABLE OF CONTENTS Report Profile 4 CHAPTER 7. DEVELOPMENT OF THE NORTHERN SEA ROUTE 122 7.1. Escorting Vessels and Handling Cargo Traffic along the Northern Sea Route 127 CHAPTER 1. OUR ACHIEVEMENTS 6 7.2. Construction of New Icebreakers 128 History of the Russian Nuclear Industry 8 7.3. New Products 128 ROSATOM Today 10 7.4. Digitization of Operations 128 Key Results in 2019 14 7.5. Activities of FSUE Hydrographic Enterprise 129 Key Events in 2019 15 7.6. Plans for 2020 and for the Medium Term 130 Address by the Chairman of the Supervisory Board 16 Address by the Director General 17 CHAPTER 8. EFFECTIVE MANAGEMENT OF RESOURCES 132 Address by a Stakeholder Representative 18 8.1. Corporate Governance 135 Financial and Economic Results 20 8.2. Risk Management 141 8.3. Performance of Government Functions 155 CHAPTER 2. STRATEGY FOR A SUSTAINABLE FUTURE 22 8.4. Financial and Investment Management 158 2.1. Business Strategy until 2030 24 8.5. ROSATOM Production System 164 2.2. Sustainable Development Management 28 8.6. Procurement Management 168 2.3. Value Creation and Business Model 34 8.7. Internal Control System 172 8.8. Prevention of Corruption and Other Offences 174 CHAPTER 3. CONTRIBUTION TO GLOBAL DEVELOPMENT 40 3.1. Markets Served by ROSATOM 42 CHAPTER 9. DEVELOPMENT OF HUMAN POTENTIAL 176 3.2. International Cooperation 55 AND INFRASTRUCTURE 3.3. International Business 63 9.1.
    [Show full text]
  • Behavioral Determinants of Russian Nuclear State-Owned Enterprises in Central and Eastern European Region
    International Journal of Energy Economics and Policy ISSN: 2146-4553 available at http: www.econjournals.com International Journal of Energy Economics and Policy, 2015, 5(4), 910-917. Behavioral Determinants of Russian Nuclear State-Owned Enterprises in Central and Eastern European Region Tomas Vlcek1*, Martin Jirusek2 1Department of International Relations and European Studies, Energy Security Program, Faculty of Social Studies, Masaryk University, Jostova 10, 602 00, Brno, Czech Republic, 2Department of International Relations and European Studies, Energy Security Program, Faculty of Social Studies, Masaryk University, Jostova 10, 602 00, Brno, Czech Republic. *Email: [email protected] ABSTRACT Rosatom State Nuclear Corporation play a substantial role in the energy sector of the Central and Eastern European (CEE) region and the behavioral characteristics of the company forms the basis of this article. Rosatom is positioned as the dominant provider of nuclear technology and fuel supplies to the region, in large part stemming from the Soviet legacy in CEE countries. Compounding this challenge, nuclear energy is one of the major sources of power generation in CEE. Given the long-time, near monopoly of Russian nuclear technology/design in the region and plans to expand further the nuclear capacity of select CEE countries, the sector requires careful monitoring from both a technical and security-minded perspective. Keywords: Power Generation, Nuclear Energy, Central and Eastern Europe, Russian Federation, Rosatom State Nuclear Corporation JEL Classifications: H760, Q310, Q380, Q400, Q410, Q480, Q490 1. RESEARCH AIM AND METHODOLOGY The nuclear energy sector has a number of structural differences when compared to crude oil, natural gas or coal; most typically The goal of the research was to identify the behavioral determinants it is not dependent on certain infrastructure and the uninterrupted of these Russian nuclear state-owned enterprises (SOEs), how flow of energy supplies.
    [Show full text]