Mining Surveyors and Registrarso
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Gauging Station Index
Site Details Flow/Volume Height/Elevation NSW River Basins: Gauging Station Details Other No. of Area Data Data Site ID Sitename Cat Commence Ceased Status Owner Lat Long Datum Start Date End Date Start Date End Date Data Gaugings (km2) (Years) (Years) 1102001 Homestead Creek at Fowlers Gap C 7/08/1972 31/05/2003 Closed DWR 19.9 -31.0848 141.6974 GDA94 07/08/1972 16/12/1995 23.4 01/01/1972 01/01/1996 24 Rn 1102002 Frieslich Creek at Frieslich Dam C 21/10/1976 31/05/2003 Closed DWR 8 -31.0660 141.6690 GDA94 19/03/1977 31/05/2003 26.2 01/01/1977 01/01/2004 27 Rn 1102003 Fowlers Creek at Fowlers Gap C 13/05/1980 31/05/2003 Closed DWR 384 -31.0856 141.7131 GDA94 28/02/1992 07/12/1992 0.8 01/05/1980 01/01/1993 12.7 Basin 201: Tweed River Basin 201001 Oxley River at Eungella A 21/05/1947 Open DWR 213 -28.3537 153.2931 GDA94 03/03/1957 08/11/2010 53.7 30/12/1899 08/11/2010 110.9 Rn 388 201002 Rous River at Boat Harbour No.1 C 27/05/1947 31/07/1957 Closed DWR 124 -28.3151 153.3511 GDA94 01/05/1947 01/04/1957 9.9 48 201003 Tweed River at Braeside C 20/08/1951 31/12/1968 Closed DWR 298 -28.3960 153.3369 GDA94 01/08/1951 01/01/1969 17.4 126 201004 Tweed River at Kunghur C 14/05/1954 2/06/1982 Closed DWR 49 -28.4702 153.2547 GDA94 01/08/1954 01/07/1982 27.9 196 201005 Rous River at Boat Harbour No.3 A 3/04/1957 Open DWR 111 -28.3096 153.3360 GDA94 03/04/1957 08/11/2010 53.6 01/01/1957 01/01/2010 53 261 201006 Oxley River at Tyalgum C 5/05/1969 12/08/1982 Closed DWR 153 -28.3526 153.2245 GDA94 01/06/1969 01/09/1982 13.3 108 201007 Hopping Dick Creek -
Upper Goulburn River Catchment Local Management Rules
UPPER GOULBURN RIVER CATCHMENT LOCAL MANAGEMENT RULES 1. Catchment Information 3. Compliance Point The Goulburn River flows into Lake Eildon near the There is a surface water monitoring station located township of Jamieson and encompasses an area of upstream of Jamieson on the Mansfield-Woods Point approximately 750 km2. The mean annual flow at the Road. The site is called the Goulburn River @ Dohertys. bottom of the Upper Goulburn River catchment is approximately 357,000 ML/yr, which flows into the 4. Licences headwaters of Eildon. The Goulburn Broken Regional Licence Allocation in the Upper Goulburn River and River Health Strategy lists the Goulburn River above Tributaries Eildon as a high value asset as it is classed as an Licence Type Number of Volume (ML) ecologically healthy river containing Macquarie Perch, Licences Barred Galaxias, and the Spotted Tree Frog. Irrigation 59 130 Total 59 130 The catchment is bound to the west by the Big River catchment, the east by the Macalister River and the 5. Additional Information north by the Jamieson River catchment. Significant Stream codes and sustainable diversion limit zones are tributaries of the upper Goulburn include the Snake, provided within this document for identification Webber, Gaffneys, Moonlight, Edwards and Pheasant purposes when discussing the catchment diversion Creeks and the Black River. The main townships in the management with Goulburn-Murray Water Officers. catchment include Kevington, Knockwood, and Woods Point. The catchment is predominantly a forested Stream Codes catchment with small pockets of cleared land around Stream codes used in the management of the Upper the townships within the valleys. -
Regional Patterns of Erosion and Sediment and Nutrient Transport in the Goulburn and Broken River Catchments, Victoria
Regional Patterns of Erosion and Sediment and Nutrient Transport in the Goulburn and Broken River Catchments, Victoria R.C. DeRose, I.P.Prosser, L.J. Wilkinson, A.O. Hughes and W.J. Young CSIRO Land and Water, Canberra Technical Report 11/03, March 2003 CSIRO LAND and WATER Regional Patterns of Erosion and Sediment and Nutrient Transport in the Goulburn and Broken River Catchments, Victoria R.C. DeRose, I.P. Prosser, L.J. Wilkinson, A.O. Hughes and W.J. Young CSIRO Land and Water, Canberra Technical Report 11/03, March 2003 Copyright ©2003 CSIRO Land and Water To the extent permitted by law, all rights are reserved and no part of this publication covered by copyright may be reproduced or copied in any form or by any means except with the written permission of CSIRO Land and Water. Important Disclaimer To the extent permitted by law, CSIRO Land and Water (including its employees and consultants) excludes all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses and any other compensation, arising directly or indirectly from using this publication (in part or in whole) and any information or material contained in it. ISSN 1446-6163 Table of Contents Acknowledgments..................................................................................................................................................... 3 Abstract........................................................................................................................................................................ -
Environmental Audit of the Goulburn River – Lake Eildon to the Murray River
ENVIRONMENTAL AUDIT ENVIRONMENTAL AUDIT OF THE GOULBURN RIVER – LAKE EILDON TO THE MURRAY RIVER ENVIRONMENTAL AUDIT OF THE GOULBURN RIVER – LAKE EILDON TO THE MURRAY RIVER EPA Victoria 40 City Road, Southbank Victoria 3006 AUSTRALIA September 2005 Publication 1010 ISBN 0 7306 7647 1 © Copyright EPA Victoria 2005 This publication is copyright. No part of it may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968. ENVIRONMENTAL AUDIT OF THE GOULBURN RIVER – LAKE EILDON TO THE MURRAY RIVER Environmental audit of the Goulburn River Lake Eildon to the Murray River I, John Nolan, of Nolan-ITU Pty Ltd, an environmental auditor appointed pursuant to the Environment Act 1970 (‘the Act’), having: i. been requested by the Environment Protection Authority Victoria on behalf of the Minister for Environment and Water to undertake an environmental audit of the Goulburn River— Lake Eildon to the Murray River—with the primary objective of obtaining the information and understanding required to guide the management of the Goulburn River towards providing a healthier river system. This included improvements towards meeting the needs of the environment and water users, thereby reducing the likelihood of further fish kill events in the future ii. had regard to, among other things, the: • Environment Protection Act 1970 (the Act) • Water Act 1989 • Catchment and Land Protection Act 1994 • Flora and Fauna Guarantee Act 1998 • Fisheries Act 1995 • Heritage River Act 1992 • Safe Drinking Water Act 2003 • Emergency Management Act 1986 • Agricultural and Veterinary Chemicals (Control of Use) Act 1992 • Environment Protection and Biodiversity Conservation Act 1999 • State Environment Protection Policy (Water of Victoria) 2003 and the following relevant documents • Victorian River Health Strategy • Goulburn Broken Regional Catchment Strategy • Draft Goulburn Broken Regional River Health Strategy • Murray-Darling Basin Commission’s (MDBC) Native Fish Strategy • Goulburn Eildon Fisheries Management Plan iii. -
Rivers and Streams Special Investigation Final Recommendations
LAND CONSERVATION COUNCIL RIVERS AND STREAMS SPECIAL INVESTIGATION FINAL RECOMMENDATIONS June 1991 This text is a facsimile of the former Land Conservation Council’s Rivers and Streams Special Investigation Final Recommendations. It has been edited to incorporate Government decisions on the recommendations made by Order in Council dated 7 July 1992, and subsequent formal amendments. Added text is shown underlined; deleted text is shown struck through. Annotations [in brackets] explain the origins of the changes. MEMBERS OF THE LAND CONSERVATION COUNCIL D.H.F. Scott, B.A. (Chairman) R.W. Campbell, B.Vet.Sc., M.B.A.; Director - Natural Resource Systems, Department of Conservation and Environment (Deputy Chairman) D.M. Calder, M.Sc., Ph.D., M.I.Biol. W.A. Chamley, B.Sc., D.Phil.; Director - Fisheries Management, Department of Conservation and Environment S.M. Ferguson, M.B.E. M.D.A. Gregson, E.D., M.A.F., Aus.I.M.M.; General Manager - Minerals, Department of Manufacturing and Industry Development A.E.K. Hingston, B.Behav.Sc., M.Env.Stud., Cert.Hort. P. Jerome, B.A., Dip.T.R.P., M.A.; Director - Regional Planning, Department of Planning and Housing M.N. Kinsella, B.Ag.Sc., M.Sci., F.A.I.A.S.; Manager - Quarantine and Inspection Services, Department of Agriculture K.J. Langford, B.Eng.(Ag)., Ph.D , General Manager - Rural Water Commission R.D. Malcolmson, M.B.E., B.Sc., F.A.I.M., M.I.P.M.A., M.Inst.P., M.A.I.P. D.S. Saunders, B.Agr.Sc., M.A.I.A.S.; Director - National Parks and Public Land, Department of Conservation and Environment K.J. -
Heritage Rivers Act 1992 No
Version No. 014 Heritage Rivers Act 1992 No. 36 of 1992 Version incorporating amendments as at 7 December 2007 TABLE OF PROVISIONS Section Page 1 Purpose 1 2 Commencement 1 3 Definitions 1 4 Crown to be bound 4 5 Heritage river areas 4 6 Natural catchment areas 4 7 Powers and duties of managing authorities 4 8 Management plans 5 8A Disallowance of management plan or part of a management plan 7 8B Effect of disallowance of management plan or part of a management plan 8 8C Notice of disallowance of management plan or part of a management plan 8 9 Contents of management plans 8 10 Land and water uses which are not permitted in heritage river areas 8 11 Specific land and water uses for particular heritage river areas 9 12 Land and water uses which are not permitted in natural catchment areas 9 13 Specific land and water uses for particular natural catchment areas 10 14 Public land in a heritage river area or natural catchment area is not to be disposed of 11 15 Act to prevail over inconsistent provisions 11 16 Managing authority may act in an emergency 11 17 Power to enter into agreements 12 18 Regulations 12 19–21 Repealed 13 22 Transitional provision 13 23 Further transitional and savings provisions 14 __________________ i Section Page SCHEDULES 15 SCHEDULE 1—Heritage River Areas 15 SCHEDULE 2—Natural Catchment Areas 21 SCHEDULE 3—Restricted Land and Water Uses in Heritage River Areas 25 SCHEDULE 4—Specific Land and Water Uses for Particular Heritage River Areas 27 SCHEDULE 5—Specific Land and Water Uses for Particular Natural Catchment Areas 30 ═══════════════ ENDNOTES 31 1. -
Goulburn River Environmental Water Management Plan
Document history and status Version Date issued Prepared by Reviewed by 1.0 17th April 2015 J. Wood S. Witteveen S. Casanelia M. Judd th J. Roberts 1.0 20 April 2015 J. Wood T. Hillman 2.0 11th June 2015 J. Wood M. Judd 3.0 28th August 2015 J. Wood S. Casanelia Final 8th September 2015 J.Wood S. Witteveen Distribution Version Date Quantity Issued To 1.0 17th April 2015 1 S.Witteveen 1.0 20th April 2015 1 J. Roberts and T. Hillman 2.0 11th June 2015 1 M. Judd 3.0 28th August 2015 1 S. Casanelia and M. Turner Final 1st September 2015 1 S. Witteveen Publication Details Published by: Goulburn Broken Catchment Management Authority, PO Box 1752, Shepparton VIC 3632 ©Goulburn Broken Catchment Management Authority, 2015 Please cite this document as: GB CMA (2015) Goulburn River Environmental Water Management Plan. Goulburn Broken Catchment Management Authority, Shepparton. Disclaimer This publication may be of some assistance to you, but the Goulburn Broken Catchment Management Authority does not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequences which may arise from you relying on information in this publication. For further information, please contact: Goulburn Broken Catchment Management Authority PO Box 1752, Shepparton 3632 Ph (03) 5822 7700 or visit www.gbcma.vic.gov.au i Table of Contents Table of Contents .................................................................................................................................................. -
Planning Standards for Timber Harvesting Operations in Victoria's State Forests 2014
Planning Standards for timber harvesting operations in Victoria’s State forests 2014 Appendix 5 to the Management Standards and Procedures for timber harvesting operations in Victoria’s State forests 2014 © The State of Victoria Department of Environment and Primary Industries 2014 This work is licensed under a Creative Commons Attribution 3.0 Australia licence. You are free to re-use the work under that licence, on the condition that you credit the State of Victoria as author. The licence does not apply to any images, photographs or branding, including the Victorian Coat of Arms, the Victorian Government logo and the Department of Environment and Primary Industries logo. To view a copy of this licence, visit http://creativecommons.org/licenses/by/3.0/au/deed.en ISBN 978-1-74326-929-9 (online) ISBN 978-1-74146-266-1 (Print) Accessibility If you would like to receive this publication in an alternative format, please telephone the DEPI Customer Service Centre on 136186, email [email protected] or via the National Relay Service on 133 677 www.relayservice.com.au. This document is also available on the internet at www.depi.vic.gov.au Disclaimer This publication may be of assistance to you but the State of Victoria and its employees do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on any information in this publication. Planning Standards for timber harvesting operations in Victoria’s State forests, 2014. -
The Goulburn Explorer
What better way to experience the beauty of the Goulburn River than by cruising along its waters in style. The Goulburn Explorer River Cruiser links Mitchelton and Tahbilk, two of Victoria’s best-loved wineries, and the charming township of Nagambie, providing a memorable experience for food and wine lovers. Available for private events, corporate parties and twilight cruises, this 12m vessel seats up to 49 passengers with two open-plan decks, bathroom and audio-visual equipment. Murray River Strathmerton Cobram Situated at the gateway to the Goulburn Valley approximately 90 minutes Nathalia Monichino WINERY from Melbourne’s CBD, The Goulburn Explorer River Cruiser is one of Yarrawonga Echuca Numurkah CRUISES regional Victoria’s must see and do experiences. Goulburn River Tungamah Tongala Kyabram THE GOULBURN VALLEY Dookie Merrigum Shepparton Girgarre Mooroopna WINE REGION Tallis Tatura ITINERARY Stanhope Toolamba Departs from Nagambie Lakes Leisure Park @ 10:30am Murray River Colbinabbin Rushworth Arrives at Tahbilk Winery @ 11:30am Strathmerton Cobram Murchison Departs from Tahbilk Winery @ 12:00pm Longleat Violet Town Arrives at Mitchelton @ 12:30pm Nathalia Monichino Goulburn Valley HWY NYarrawonga Echuca Numurkah Departs Mitchelton @ 2:30pm Nagambie Goulburn Terrace Goulburn River Euroa David Traeger Disembarks at Nagambie Lakes Leisure Park @ 4:00pm Tahbilk Tungamah Tongala Mitchelton Hume FWY Kyabram Avenel Fowles Dookie Merrigum Shepparton Girgarre Mooroopna PRICE Tallis Tatura Stanhope Seymour Toolamba Adult $40pp Rocky Passes -
Swifts Creek
TA L LA N G A MITTA MITTA - CALLAGHAN CREEK T K TA E C E R E R NARIEL VALLEY - BONDS ROAD SCRUBBY THOWGLA CREEK LMB E C K A N U L L I H MT BOEBUCK - WALKERS RD K T E E R MITTA MITTA - ENEVERS TRACK DARTMOUTH - MOUNT BENAMBRA C Y D K A E H K E EE S R R C G C RIN SP Y MITTA MITTA - THE SUGARLOAF W DARTMOUTH ROAD O N S SCRUBBY CK ROAD - MITTA MITTA NARIEL VALLEY - SIX MILE RIDGE TOM GROGGIN-TOM GROGGIN TK MOUNT MISERY - MITTTA MITTAMITTA MITTA - MAGORRA RANGE K EE DARTMOUTH - WALSH`S ROAD K R E C STON T Y CREEK ESKDALE - BOWMANS E MI R ER D C H A R T T N R E IV C E N R I V M M IT T U A R M R IT A T Y MITTA MITTA - WELCOME SPUR A R R I IV V GRANITE PEAK E E R R M C K E K E A R Y C E C IL R M E T E H K LO G R I D E C R K E E E E K R C Y A SCR B UBBY CREEK K E DARTMOUTH - EUSTACE GAP CREEK E R C O E M O GRANITE PEAK RODDA CREEK K E E GRANITE FLAT - WEST BRANCH R C Y N NARIEL VALLEY - SALTPETRE CREEK O K T IE S W A DARTMOUTH - KINGS SPUR R DARTMOUTH - SHEEVERS SPUR K IV E E R E R C EK T E N K R C A I S S E R E K A W P E E E AP R A C H TR R E P V DI A OL EK L S E R K L C E E Trappers Spur Track BA E Y EN R T C BU H O R E I K G N E IN H D C W Mount Beauty LMB Cooper Creek R A E Y E K K E R E OU R GH C CR IN EEK Tawonga - Ryders Spur TA N U O M GRANITE FLAT - MULHAUSER SPUR DARTMOUTH - TOKE CREEK Mt Beauty Tawonga Gap K E E R C Mount Beauty LMB Kiewa River East R E MT BEAUTY - HOLLANDS HILL N R O RAZORBACK SPUR - MERIMAC SPUR RAZORBACK SPUR - PEGLEG CREEK C R E V I K E R E O R B C MT BEAUTY - SIMMONDS CREEK B I A G R B M CHARLIE A CREEK M K N E -
Fisheries Victoria
Talk Wild Trout 2015 Conference Proceedings 21 November 2015 Mansfield Performing Arts Centre, Mansfield Victoria Partners: Fisheries Victoria Editors: Taylor Hunt, John Douglas and Anthony Forster, Freshwater Fisheries Management, Fisheries Victoria Contact email: [email protected] Preferred way to cite this publication: ‘Hunt, T.L., Douglas, J, & Forster, A (eds) 2015, Talk Wild Trout 2015: Conference Proceedings, Fisheries Victoria, Department of Economic Development Jobs Transport and Resources, Queenscliff.’ Acknowledgements: The Victorian Trout Fisher Reference Group, Victorian Recreational Fishing Grants Working Group, VRFish, Mansfield and District Fly Fishers, Australian Trout Foundation, The Council of Victorian Fly Fishing Clubs, Mansfield Shire Council, Arthur Rylah Institute, University of Melbourne, FlyStream, Philip Weigall, Marc Ainsworth, Vicki Griffin, Jarod Lyon, Mark Turner, Amber Clarke, Andrew Briggs, Dallas D’Silva, Rob Loats, Travis Dowling, Kylie Hall, Ewan McLean, Neil Hyatt, Damien Bridgeman, Paul Petraitis, Hui King Ho, Stephen Lavelle, Corey Green, Duncan Hill and Emma Young. Project Leaders and chapter contributors: Jason Lieschke, Andrew Pickworth, John Mahoney, Justin O’Connor, Canran Liu, John Morrongiello, Diane Crowther, Phil Papas, Mark Turner, Amber Clarke, Brett Ingram, Fletcher Warren-Myers, Kylie Hall and Khageswor Giri.’ Authorised by the Victorian Government Department of Economic Development, Jobs, Transport & Resources (DEDJTR), 1 Spring Street Melbourne Victoria 3000. November 2015 -
Savannah River Basin Management Plan 2001
Savannah River Basin Management Plan 2001 Georgia Department of Natural Resources Environmental Protection Division Georgia River Basin Management Planning Vision, Mission, and Goals What is the VISION for the Georgia RBMP Approach? Clean water to drink, clean water for aquatic life, and clean water for recreation, in adequate amounts to support all these uses in all river basins in the state of Georgia. What is the RBMP MISSION? To develop and implement a river basin planning program to protect, enhance, and restore the waters of the State of Georgia, that will provide for effective monitoring, allocation, use, regulation, and management of water resources. [Established January 1994 by a joint basin advisory committee workgroup.] What are the GOALS to Guide RBMP? 1) To meet or exceed local, state, and federal laws, rules, and regulations. And be consistent with other applicable plans. 2) To identify existing and future water quality issues, emphasizing nonpoint sources of pollution. 3) To propose water quality improvement practices encouraging local involvement to reduce pollution, and monitor and protect water quality. 4) To involve all interested citizens and appropriate organizations in plan development and implementation. 5) To coordinate with other river plans and regional planning. 6) To facilitate local, state, and federal activities to monitor and protect water quality. 7) To identify existing and potential water availability problems and to coordinate development of alternatives. 8) To provide for education of the general public on matters involving the environment and ecological concerns specific to each river basin. 9) To provide for improving aquatic habitat and exploring the feasibility of re-establishing native species of fish.