World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized procurement planisirrelevantthisstage. at Since thisisanongoing project,thatstartedinApril 2014,submissionaseparate ofsummary Strengthening the National Rural Transport Program theNationalRuralTransport(P132750) Strengthening PROCUREMENT Nepal : Project for Strengthening the National Rural Transport Program PLAN General Information Country: Nepal Bank’s Approval Date of the Original Procurement Plan: 2017-10-18 Revised Plan Date(s): (comma delineated, leave blank if none)2018-10-02 Project ID: P132750 GPN Date: Project Name: Project for Strengthening the National Rural Transport Program Loan / Credit No: IDA / 53360, IDA / H8990 Executing Agency(ies):Department of Local Infrastructure Development and Agricultural Roads WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-KAN-W-NCB-10.04- UG-070-71 / Kanchanpur: Single Stage - One IDA / 53360 Prior Request for Bids Open - National 181,111.90 Signed Rajmarg-Budha- Jhaipura- Envelope Gauji-Bridhasharam Road SNRTP-ARG-W-NCB-1-16- PM-074-75 / Periodic Single Stage - One IDA / 53360 Post Request for Bids Open - National 45,793.00 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Amarai Envelope Jukena Road (8 Km) SNRTP-DHA-W-NCB-6-04- PM-074-75 / Periodic Under Single Stage - One Maintenance of IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Bhimdhunga-Lamidanda- on Galchi (11 Km) SNRTP-GUL-W-NCB-8-08 - PM-074-75 / Periodic Single Stage - One Maintenance of Shantipur- IDA / 53360 Post Request for Bids Open - National 90,548.37 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Harrachaur-Olibang- Sindurghanse Road(12 Km) SNRTP-KAN-W-NCB-10-08- PM-073-74 / Periodic Pending Single Stage - One Maintenance of Bansamiti- IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Pipalladi-Jonpuri-Ranipur on Road ( 10 KM) SNRTP-KAI-W-NCB-9-08-PM- Under 074-75 / Periodic Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Geta- Envelope on Murkatti Road (12.60 KM) SNRTP-NAW-W-NCB-15-14- Pending PM-074-75 / Periodic Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Manjariya- Envelope on Jamuniya Road (9.00 km) SNRTP-KAP-W-NCB-11-10- PM-074-75 / Periodic Single Stage - One Maintenance of Krishnanagar- IDA / 53360 Post Request for Bids Open - National 253,899.85 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Shisirwa -Gugauli -Shivgadi Road (25Km) SNRTP-NAW-W-NCB-15-15- PM-074-75 / Periodic Under Single Stage - One Maintenance of Arunkhola- IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Rakachuli-Mityal Road (11.50 on km) Page 1 SNRTP-PAR-W-NCB-18-09- PM-074-75 / Periodic Under Single Stage - One Maintenance of Ramghadwa- IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Jagarnathpur-Milanchowk on Road (9 Km) SNRTP-PAR-W-NCB-18-13- PM-074-75 / Periodic Maintenance of Mudli -Tulsi barwa-Road (6 Km), Muldi Under tindubiya-sabithawa road(6 Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 km), bedhihari birta Envelope on basantapur road (6 km) padamsadak-bahuwari (6km) and baghi patelchok road (9 km) SNRTP-RAS-W-NCB-20-06- Under PM-074-75 / Periodic Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Sole-Bhimali- Envelope on Hakubesi Road (5 Km) SNRTP-RAS-W-NCB-20-08- PM-074-75 / Periodic Under Single Stage - One Maintenance of Dasmure IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Seti-Devi Ma Vi. Dhuseni on Road (5 Km) SNRTP-RAU-W-NCB-21-14- Under PM-074-75 / Periodic Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Prempur Envelope on Gonahi MHW Road (22Km) SNRTP-RAU-W-NCB-21-15- PM-074-75 / Periodic Single Stage - One Maintenance of Gamhariya IDA / 53360 Post Request for Bids Open - National 61,964.29 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Birta(BHW) Ragnapur Road (12Km) SNRTP-RAU-W-NCB-21-16- PM-074-75 / Periodic Under Maintenance of Sukdevchowk Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Khesaraiya Shivnagar Road Envelope on (9Km) and nahar bridge 30m, Rautahat SNRTP-SAR-W-NCB-25-08- PM-074-75 / Periodic Maintenance of Baghchaur- Single Stage - One Kotmaula-Patihalna Rural IDA / 53360 Post Request for Bids Open - National 79,114.86 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Road( Phulparasi-Simara- India Border Road) Maintenance (8 Km) SNRTP-SAR-W-NCB-25-11- PM-074-75 / Periodic Maintenance of Raniganj Single Stage - One IDA / H8990 Post Request for Bids Open - National 153,128.41 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Parwanipur Road (10 Km) Envelope Parsa Riterchor (13 km) Sarlahi SNRTP-SIR-W-NCB-26-16- PM-074-75 / Periodic Under Single Stage - One Maintenance of Mirchaiya IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Kalyanpur Siraha Road (23 on km): Page 2 SNRTP-TAN-W-NCB-29-15- PM-074-75 / Periodic Under Maintenance of Bhagwati Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Rangapath (Chhirken-Maiwal- Envelope on Nabrung-Tanahunsur- Barbhanjyang ) (13 Km) SNRTP-UDA-W-NCB-30-14- PM-074-75 / Periodic Single Stage - One Maintenance of Basaha IDA / 53360 Post Request for Bids Open - National 207,377.59 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Chaudani Ranitar Road (24 Km) SNRTP-BHOJ-W-NCB-31-08- PM-074-75 / Periodic Under Maintenance of Taksar- Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Gumba -Dalgaun- Okhare - Envelope on Dodhalekhani Rd II Pkg (15 Km) SNRTP-BHOJ-W-NCB-31-09- PM-074-75 / Periodic Under Maintenance of Tiwari- Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Bhanjyang-Chyangre-Bastim Envelope on Thulogaon Duma Sano Duma Road Rd II Pkg (16 Km) SNRTP-SANK-W-NCB-32-01- PM-074-75 / Periodic Single Stage - One Maintenance of Khadbari- IDA / 53360 Post Request for Bids Open - National 195,019.99 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Ramche-Lebrang-Dake- Bharabise Rd (16 Km) SNRTP-TER-W-NCB-33-02- Pending PM-074-75 / Periodic Single Stage - One IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Serma-jaljale- Envelope on Isibu Sadak Rd (19 Km) SNRTP-SIND-W-NCB-34-03- PM-074-75 / Periodic Pending Single Stage - One Maintenance of Dauchet- IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Keureni-Banskharka-Jatatn- on Baruwa Rd (19 Km) SNRTP-GOR-W-NCB-35-04- PM-074-75 / Periodic Under Single Stage - One Maintenance of Abuwa -B IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope irdi-Pauwatar-Kalamata- on Airport Road (8 Km) SNRTP-UDA-W-NCB-30-15- PM-074-75 / Periodic Under Single Stage - One Maintenance of Murkuchi IDA / 53360 Post Request for Bids Open - National 0.00 Implementati 2017-11-26 2017-12-01 2017-12-31 2018-01-30 2018-02-21 2019-02-21 Envelope Puwarebhanjyang Bhutar on Road 23 Km SNRTP-BAR-W-NCB-3-07- PM-074-75 / Periodic Maintenance of Bridge along Single Stage - One Kalaiya-Ganjbhabanipur IDA / H8990 Post Request for Bids Open - National 90,724.43 Signed 2017-11-27 2017-12-02 2018-01-01 2018-01-31 2018-02-22 2018-08-21 Envelope (Bridge Maintenance) and Kholbi Maduwa Road
Recommended publications
  • Status and Human Impact Assessment of Jagdishpur Reservoir - a Ramsar Site, Nepal
    Status and Human Impact Assessment of Jagdishpur Reservoir - A Ramsar Site, Nepal A Dissertation Submitted for the Partial Fulfillment of Master of Science (M. Sc.) Degree in Environmental Science Submitted by Mangleswori Dhonju Exam Roll No. 467 T.U. Registration No. 5-2-408-117-2003 Submitted to Central Department of Environmental Science Tribhuvan University Kirtipur, Kathmandu, Nepal August 2010 ACKNOWLEDGEMENT I take great pride in expressing heart-felt gratitude to my respected supervisor, Associate Prof. Soviet Man Pradhan, Patan Campus, Tribhuvan University for providing innumerable instructions during entire period of this study. I am very grateful to my co- supervisor Mr. Deep Narayan Shah, Aquatic Ecologist, Hindu Kush Himalayan Benthological Society (HKH BENSO) for providing all the required technical support (site selection and study design), giving suggestions, encouragement and motivating guidance during whole study periods. I would like to thank Assoc. Prof. Kedar Prashad Rijal (Ph. D.), Head of Department, Central Department of Environmental Science (CDES), Tribhuvan University for providing necessary guidance, supplying essential field materials & equipment and giving laboratory facilities for completing this dissertation. I am very thankful to Prof. Dr. Umakant Ray Yadav, Former Head of Department of CDES for his encouraging suggestion. I must thank Hindu Kush Himalayan Benthological Society (HKH BENSO) for granting me to conduct this study under the Nepal Academy of Science and Technology (NAST). I am very thankful to Mrs. Ram Devi Tachamo Shah, Aquatic Ecologist of HKH BENSO for help in identifying macroinvertebrates, all data analysis using different statistical analysis and providing valuable encouragement & suggestions. Special thank goes to Prof. Jaya Krishna Shrestha, Central Department of Chemistry, Tribhuvan University, Kirtipur for giving valuable suggestion during analysis of physico- chemical parameters and Mr.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Natural Resource, Market Demand and Target Group Analysis of Siraha District-Development Management Institute
    Published by: Micro-Enterprise Development Programme Ministry of Industry United Nations Development Programme June 2013 Copyright © 2013 Micro-Enterprise Development Programme (MEDEP)/UNDP All rights are reserved. No part of this edited volume may be reproduced by any means, nor transmitted, nor translated into a machine language without the written permission of the publisher. ISBN: 978-99946-916-6-1 Printed in Nepal at : Office Support Service Centre Chhapakhana P. Ltd. Teku, Kathmandu Tel.: 4240571 Email.: [email protected] Natural Resource, Market Demand and Target Group Analysis of Siraha District1 Abstract MEDEP was piloted in 1998. It expanded to 36 districts by 2010 in its third phase (2008-13). The development objective of the programme was to contribute to reduce poverty among low-income families in rural areas, and to ensure the institutional development and capacity building of local service delivery organizations to work as catalysts in the development of rural micro-enterprise sector. In order to reach its target group, MEDEP conducts natural resource, market demand and target group surveys in the new programme districts. As Siraha was added as a new programme district in the third phase, this study was conducted to furnish these information. On the basis of the major findings, this study concluded that Siraha district has a high potential of developing micro- enterprises to create employment and income-generating opportunities for the MEDEP's target groups. For implementation effectiveness and better results, MEDEP should concentrate its programme on 32 new VDCs clustered around six market centres. Entrepreneurs should be supported in marketing skill development, market survey and marketing.
    [Show full text]
  • Displacemect of People from Terai District
    KAPILBASTU DISTRICT: REPORTED DISPLACEMENT - as of 5 November, 2007 82°30'0"E 82°37'30"E 82°45'0"E 82°52'30"E 83°0'0"E 83°7'30"E Maidan Juluke Siddhara Arghakhanchi Bela Thada Simalapani Gangapraspur Gadhawa Gobardiya D a n g 27°45'0"N Map Locator 050 100 200 300 Dubiya Kilometers 204 IDPs (32 families) at Ghumchir, 27°45'0"N Shivagadhi BagargangaVDC Saljhundi Malwar Shivapur Motipur Koilabas Mahendrakot Barakulpur Banganga Gugauli 992+ IDPs at Shankarpur, Shivagadhi VDC 400 IDPs (80 families) at Chunna, Barakulpur VDC Gajehada Budhi Kopawa Rudrapur Jayanagar Chanai Hariharpur Birpur Kapilbastu Hathausa 27°37'30"N Nigalihawa Thunhiya Patna 27°37'30"N Rajpur Khurhuriya Manpur Patthardaihiya Bishunpur Lalpur Mahuwa Jahadi Jawabhari Balaramwapur Dhankauli Tilaurakot Patariya Udayapur Fulika Sadi Administrative Boundaries Ganeshpur Rupandehi Baraipur Ramnagar Maharajganj Bhalubari District Bahadurganj KapilbastuN.P.Infrustructure Damage by VDC Bhagwanpur VidhyaNagar (based on DSP data as of 26 Oct. 2007) $+ Dharmpaniya Nandanagar VDC 140 Sauraha Taulihawa Pakadi Major Roads Ajigara 120 Sisawa120 Dohani Shipanagar Dumara Highway Sirsihawa Kajarhawa Baskhaur Purusottampur 96 Kushhawa 100 Feeder Road KrishnaNagar Milmi Labani Singhkhor Gotihawa Gauri Basantapur Masina 27°30'0"N District Road 80 Haranampur74 71 n n 27°30'0"N o 64 Abhirawa o i Harduona i t t Other Road c 60 c Bithuwa e e r Parsohiya r i i Somdiha Baluhawa District HQ D Bedauli Titirkhi $+ D 37 t t 40 n n Bijuwa Most affected VDCs based on Killings/household destroyed e e m m 18 e Pipra e 20 Rangapur15 Hathihawa v v 12 Municipalities o o 7 2 3 M M 2 Water bodies 0 The majority of displaced in India have reportedly Barakulpur Birpur Bishunpur Ganeshpur Khurhuriya KrishnaNagar Motipur Patthardaihiya IDP Concentrations Sum of House destroyed Sum of House partial damage / looted Sum of huts burned returned to Nepal, however organisations estimate 400+ Sum of Shops destroyed Sum of Hotels Sum of Petrol pumps remain with host families / relatives.
    [Show full text]
  • Distribution of Arsenic Biosand Filters in Rural Nepal
    DISTRIBUTION OF ARSENIC BIOSAND FILTERS IN RURAL NEPAL SLOAN SCHOOL OF MANAGEMENT APRIL 2004 THE G-LAB TEAM Basak Yildizbayrak, MBA 2004 Nikos Moschos, MBA 2004 Tamer Tamar, MBA 2004 Yann Le Tallec, Ph.D 2006 Acknowledgment: We would like to thank the Bergstrom Family Foundation for its support of this project. TABLE OF CONTENTS A. INTRODUCTION............................................................................................3 1. The Water Problem in Nepal and Arsenic Contamination............................................. 3 2. Project Scope.................................................................................................................. 3 3. Methodology ..................................................................................................................4 4. Important MIT contacts/lead people for various work streams ..................................... 4 B. EXECUTIVE SUMMARY................................................................................5 1. Short-Term Recommendations...................................................................................... 5 2. Long-Term Recommendations for Sustainable Filter Distribution ............................... 5 C. THE WORLD BANK PROJECT .....................................................................7 D. PRODUCT DESIGN AND UNIT COSTS.......................................................8 1. Existing Filters ............................................................................................................... 9 2. Alternative
    [Show full text]
  • Kapilvastu District
    Ministry of Agriculture Food and Agriculture and Cooperatives (MOAC) Organization of the United Nations District Disaster Risk Management Plan (DDRMP) Kapilvastu District April 2011 Priority Framework for Action Climate Change Adaptation and Disaster Risk Management in Agriculture Publisher: Government of Nepal Ministry of Agriculture and Cooperatives Kathmandu, Nepal Copyright: April 2011 Ministry of Agriculture and Cooperatives Government of Nepal Prepared under the FAO Technical Assistance to the Government of Nepal (TCP/NEP/3201 (D) and UNJP/NEP/OO5/UNJ) Table of Content Acronyms and Abbreviations Preface Executive Summary Page 1. Introduction ....................................................................................................... 1 1.1. Rationale for District Disaster Risk Management Plans .......................................... 1 1.2. Objectives of the Kapilvastu DDRMP ................................................................. 1 1.3. Methodology .................................................................................................... 4 1.3.1. Framework for DDRMP Preparation ......................................................... 4 1.3.2. Building the picture–Assessing the disaster context in Kapilvastu ................. 4 1.3.3. Data collection methods .......................................................................... 6 1.3.4. Tools Used for Primary Information Collection .......................................... 6 1.3.5. Participatory Hazard Assessment .............................................................
    [Show full text]
  • World Bank Document
    Project name: Project for Strenghtening National Rural Transport Program New Activities Loan: IDA-5336 & H8990 Modified Activities Procurement Plan Version: 2016-2 Canceled Activities Status: Approved Activities without Modification Date of Last Change of Status: 04/11/2015 Public Disclosure Authorized Category Works: Activities ShowHide Total days of End of No Objection Publication / No Objection to Contract (between Bid Contract Description Reference # Province/State Documents Invitation Bid Opening Evaluation of Bids Evaluation Report Signature Date Opening and (Completed) P.P. - Executing Agency: 2016-2-DOLIDAR - Method: NCB (National Competitive 5.Construction of Sandhikhark-Dharapani- SNRTP-22-NCB-O-SNRTP-ARG-W-NCB-1.05- Lumbini Zone N/A 01/02/14 03/03/14 18/03/14 N/A 10/05/14 68 11/05/15 Maidan Rd. (08 Km) UG-070-71 DTO Arghakhanchi Contract under execution Post Review N/A 15/03/14 14/04/14 15/05/14 N/A 11/07/14 88 Public Disclosure Authorized 6. Construction of Sandhikhark-Nuwakot- SNRTP-23-NCB-O-SNRTP-ARG-W-NCB-1.06- Lumbini Zone N/A 01/02/14 03/03/14 18/03/14 N/A 10/05/14 68 11/05/15 Asurkot-Pyuthan Rd. (07 Km): UG-070-71 DTO Arghakhanchi Contract under execution Post Review N/A 15/03/14 15/04/14 14/05/14 N/A 15/07/14 91 3. Construction of Mandredhunga – SNRTP-80-NCB-O-SNRTP-NUW-W-NCB-16.03-Bagmati Zone N/A 17/01/14 16/02/14 03/03/14 N/A 02/05/14 75 10/12/15 Khargabhanjyang-Gorsyang –Dangsing Road UG-070-71 (12.00 km) DTO Nuwakot Contract under execution Post Review N/A 04/03/14 06/04/14 14/05/14 N/A 30/05/14 54 1.
    [Show full text]
  • Saath-Saath Project
    Saath-Saath Project Saath-Saath Project THIRD ANNUAL REPORT August 2013 – July 2014 September 2014 0 Submitted by Saath-Saath Project Gopal Bhawan, Anamika Galli Baluwatar – 4, Kathmandu Nepal T: +977-1-4437173 F: +977-1-4417475 E: [email protected] FHI 360 Nepal USAID Cooperative Agreement # AID-367-A-11-00005 USAID/Nepal Country Assistance Objective Intermediate Result 1 & 4 1 Table of Contents List of Acronyms .................................................................................................................................................i Executive Summary ............................................................................................................................................ 1 I. Introduction ........................................................................................................................................... 4 II. Program Management ........................................................................................................................... 6 III. Technical Program Elements (Program by Outputs) .............................................................................. 6 Outcome 1: Decreased HIV prevalence among selected MARPs ...................................................................... 6 Outcome 2: Increased use of Family Planning (FP) services among MARPs ................................................... 9 Outcome 3: Increased GON capacity to plan, commission and use SI ............................................................ 14 Outcome
    [Show full text]
  • Extensive Bamboo Production-To-Consumption Systems in Eastern Nepal: a Case Study
    Extensive Bamboo Production-to-Consumption Systems in Eastern Nepal: a Case Study INBAR Working Paper No. 17 Madhav B. Karki International Development Research Centre (IDRC), New Delhi, India Gopal R. Sherchan Forest Research and Survey Centre, Kathmandu, Nepal Jay Bahadur S. Karki Tribhuvan University Institute of Forestry, Pokhara, Nepal International Network for Bamboo and Rattan (INBAR) Forest Research and Survey Centre, Nepal Tribhuvan University, Institute of Forestry, Nepal International Network for Bamboo and Rattan 1998 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage and retrieval system, without permission in writing from the publisher. The presentation of material in this publication and in maps which appear herein does not imply the expression of any opinion on the part of INBAR. concerning the legal status of any country, or the delineation of frontiers or boundaries. ISBN U-86247-34-3 Designed and Printed by: Artstock, New Delhi, INDIA CONTENTS FOREWORD INTRODUCTION Overview Resource Distribution Bamboo as an Economic Crop Production and Consumption Major Uses of Bamboo Constraints and Potential of the Bamboo Sector CASE STUDY FRAMEWORK AND METHODS Theoretical Considerations 7 Framework 8 Objectives 8 Study Area 9 Data Collection 15 Research Methods 16 CASE STUDY FINDINGS 17 General Findings 17 Development Options 27 Policy and Institutional Issues 30 IMPLICATIONS OF THE STUDY 31 Major highlights 31 Implications of the Findings 31 Consequences and Outcome Analyses 33 RECOMMENDATIONS 35 Major Recommendations 35 An Indicative List of Investment Projects 36 REFERENCES 38 FURTHER READING 39 ANNEXE 40 1 FOREWORD Nepal - with its rugged terrain, under-developed infrastructure, burgeoning popu- lation, poor communication links, limited human resource base, low literacy, deteriorating forests, etc.
    [Show full text]
  • Terai Flood | August 2017
    NEPAL Terai Flood | August 2017 A REPORT ON THE FOOD SECURITY IMPACT OF THE 2017 FLOOD IN THE TERAI Comprehensive report based on the results of ad hoc District Food Security Network (DFSN) meetings in 15 districts (23-29 August and 9-17 September 2017) Background Heavy monsoon rainfall during 10-13 August 2017 triggered severe flash floods and land- Figure 1: Water level of Ruikhola river at Bankatta. Source: DHM slides in 35 out of 75 districts in Nepal (see Figures 1 and 2). An Initial Rapid Assessment (IRA) conducted in 28 districts revealed that floods and landslides claimed 141 lives, injured 117 persons, displaced 460,900 people, and left 24 missing. Damage to houses, infrastruc- tures, and productive resources was severe; roughly 65,000 houses were completely de- stroyed and 120,100 houses were partially damaged (Nepal Red Cross Society, IRA Compi- lation Report, 20 August 2017). The southern Terai plains were critically affected by the floods and experienced severe hu- manitarian implications in terms of damage to houses, displacement, food security, health and sanitation, access to basic services, and losses in agricultural production. The Ministry of Agricultural Development (MoAD) has estimated 57 million USD in losses of major crops in 30 districts, of which approximately 56.7 million USD in losses occurred in Terai districts. A quick nutrition assessment conducted by the Nutrition Cluster reported high levels of undernutrition (wasting) in the flood-affected Terai districts. NeKSAP undertook a 72-hour assessment of the flood using satellite images, the IRA, sec- ondary data, and field information. The results indicated that Saptari, Rautahat, Mahottari, Bardiya and Banke were the most flood-affected districts, followed by Sarlahi, Siraha, Parsa and Dhanusha (Nepal Terai Flood Update Version 2.0).
    [Show full text]
  • A Report on Food Security Impact of 2017 Flood in Terai
    NEPAL Terai Flood | August 2017 A REPORT ON FOOD SECURITY IMPACT OF 2017 FLOOD IN TERAI Based on the results of ad hoc District Food Security Network (DFSN) meetings in 10 districts (23-29 August 2017) http://www.nepalitimes.com/blogs/thebrief/ Background Heavy monsoon rainfall during 10-13 August 2017 triggered severe flash floods Figure 1: Water level of Babai river at Chepang. Source: DHM and landslides in 32 out of 75 districts in Nepal (see Figures 1 and 2). An Initial Rapid Assessment conducted in 28 districts revealed that floods and landslides claimed 141 lives, injured 117 persons, displaced 460,900 people, and left 24 missing. Damage to houses, infrastructures, and productive resources was severe; roughly 65,000 houses were completely destroyed and 120,100 houses were par- tially damaged (Nepal Red Cross Society, IRA Compilation Report, 20 August 2017). The southern Terai plains were critically affected by the floods and experienced severe humanitarian implications in terms of damage to houses, displacement, food security, health and sanitation, access to basic services, and losses in agricul- tural production. The Ministry of Agricultural Development (MoAD) has estimated 57 million USD in losses of major crops in 30 districts, of which approximately 56.7 million USD in losses occurred in Terai districts. A quick nutrition assessment con- ducted by the Nutrition Cluster and District Public Health Offices reported high levels of undernutrition (wasting) in the flood-affected Terai districts. NeKSAP undertook a 72-hour assessment of the flood using satellite images, the IRA, secondary data, and field information. The results indicated that Saptari, Rau- tahat, Mahottari, Bardiya and Banke were most flood-affected districts, followed by Sarlahi, Siraha, Parsa and Dhanusha (Nepal Terai Flood Update Version 2.0).
    [Show full text]
  • C E N T R a L W E S T E
    Bhijer J u m l a Saldang N E P A L - W E S T E R N R E G I O N Patarasi Chhonhup f Zones, Districts and Village Development Committees, April 2015 Tinje Lo M anthang Kaingaon National boundary Zone boundary Village Development Comm ittee boundary Phoksundo Chhosar Region boundary District boundary Gothichour Charang Date Created: 28 Apr 2015 Contact: [email protected] Data sources: WFP, Survey Department of Nepal, SRTM Website: www.wfp.org 0 10 20 40 Rim i Prepared by: HQ, OSEP GIS The designations employed and the presentation of material in M I D - W E Dho S T E R N the map(s) do not imply the expression of any opinion on the Kilom eters part of WFP concerning the legal or constitutional status of any Map Reference: country, territory, city or sea, or concerning the delimitation of its ± frontiers or boundaries. Sarmi NPL_ADMIN_WesternRegion_A0L Pahada © World Food Programme 2015 Narku Chharka Liku Gham i Tripurakot Kalika K A R N A L I FAR-W ESTERN Lhan Raha MID-W ESTERN BJ a Hj a Er kRo It Surkhang Bhagawatitol Juphal D o l p a M u s t a n g W ESTERN Lawan Suhu Chhusang CENTRAL Gotam kot EASTERN Dunai Majhphal Mukot Kagbeni Sahartara Jhong Phu Nar Syalakhadhi Sisne Marpha Muktinath Jom som Tangkim anang Tukuche Ranm am aikot M a n a n g Baphikot Jang Pipal Pwang R u k u m Kowang Khangsar Ghyaru Mudi Pokhara M y a g d i Bhraka Sam agaun Gurja Ransi Hukam Syalpakha Kunjo Thoche W LeteE S T Manang E R N Chokhawang Kanda Narachyang Sankh Shova Chhekam par Kol Bagarchhap Pisang Kuinem angale Marwang Taksera Prok Dana Bihi Lulang Chim khola
    [Show full text]