Hydro-Québec

PUBLIC CONSULTATION Winter 2018-2019

Strengthening the 315-kV Transmission System in Abitibi-Témiscamingue

Significant economic growth is expected in the Abitibi-Témiscamingue region in the coming years, with an accompanying increase in electricity demand. Hydro-Québec studies show that the capacity of the 315-kV and 120-kV systems in this region must be increased to meet the anticipated development needs.

Hydro-Québec is therefore planning to build a new 315-kV double-circuit line about 150 km long between Lebel substation and a new 315/120 kV substation to be built in the Abitibi-Ouest regional county municipality (MRC). The new substation will be connected on the south side to the existing 120-kV line.

The new facilities will make it possible to: • support development in Abitibi-Témiscamingue • strengthen the region’s 120-kV and 315-kV systems • supply clean, reliable, renewable and sustainable energy.

Environmental and technical studies

Study area Over the course of 2018, Hydro-Québec inventoried a study area of about 895 km2. As a result, we now have a better understanding of the project’s host environment. The study area excluded most urbanization perimeters as well as concentrations of cropland and private land. In addition, the vast majority of existing and planned protected areas were also excluded.

The next step was to develop line routes and examine possible substation sites based on the following criteria:

For the substation and the 315-kV line • As much as possible, avoid the most sensitive components—farmland, wetlands, bodies of water, protected areas, the built environment and vacation areas • Minimize the impact on the landscape

For the substation • Avoid eskers • Give preference to sites behind a visual screen

For the line • Run the line along existing lines whenever possible • Select the shortest route possible to minimize the number of components that could potentially be impacted

Hydro-Québec will continue the inventory over the course of 2019, examining study area geomorphology, hydrography, land use, vegetation, wildlife and archeology, among other things.

The municipality of Authier

2 Proposed substation site Since the beginning of the project, a number of different sites have been considered for the substation. Technical studies have demonstrated, however, that only one site meets the main siting criteria: accessible by road, suitable soil characteristics, and proximity to an existing 120-kV transmission line.

The site selected for the new substation is along highway 111, also called Chemin des Pionniers at this location. It is about 8 km south of the village centre of the municipality of Authier.

Figuery substation, similar to the substation under study

3 Rivière Wawagosic

PROPOSED SUBSTATION SITE AND LINE ROUTES

a Lac ib n Quévillon ig B

e r è i v Lebel-sur- Coigny *# i R  substation Rivière Laflamme 113 Quévillon Lac Turgeon Lebel-sur Quévillon, V NLSQ substation Rivière Octave ## Eeyou Istchee Baie-James, M 1337 1493 *# 3150-3151

R 1335 *# i

Rivière- Ojima, v Abitibi (MRC) i

è Lebel substation

NO r e

1321 Quévillon

H

a substation

r

r

i

c

a

n a Berry, M Lac-Despinassy, NO

Authier-Nord, M Abitibi (MRC) Lac-Chicobi, NO 109 397

Abitibi-Ouest (MRC) Lac 1335 Chicobi

Chazel, M Rivière-Ojima, NO Saint- Lac- Senneterre, V Dominique- Centre A Despinassy, NO Lac-Chicobi, NO Rivière Castagnier du-Rosaire, M Lac Macamic See enlargement: Centre sector Rivière Chicobi West A Lac Lac Josselin Authier, M Despinassy

Rivière Laflamme u 113 Macamic, a  Lac e V r Lac e

Berry, M 1321 Obalski Centre B h Castagnier c

s

a Lac T Parent e Proposed r iè substation site West B iv La Morandière, M R Saint-Félix- de-Dalquier, M Lac Launay, CT Robertson , M 109 3154-3155 See enlargement: West sector Trécesson, CT  a n a ic 101 111 rr  Poularies, M  a Amos, V  Réserve H e indienne ièr de Riv 397 Abitibi-Ouest Taschereau, M  1335 1491-1492 (MRC) Lac Loïs Rouyn-Noranda Amos Produits-Forestiers-Résolu Abitibi (MRC) (MRC) ## , CT (Amos Div.) substation *# , M Amos , M La Vallée-de-l'Or (MRC) substation *# 1301 1335 386 Parc national Figuery  Rouyn-Noranda, V Saint-Blaise Aiguebelle Sainte-Gertrude- substation 0 4 8 km Manneville, M substation 1317 *# 109 Lac 1335(D1) MTM, zone 9, NAD83 (CSRS) Saint-Mathieu- Figuery 7304_bu_cm_006_trace_190222a.mxd d'Harricana, M Document for information purposes only. For any other use, please contact Géomatique at Hydro-Québec Innovation, équipement et services partagés. 315-kV line

Infrastructure Project components ## Private 120-kV substation and line Proposed substation site *# Route studied, 120-kV line 58 m 120-kV substation and line 57 m 58 m 57 m *# 315-kV substation and line Route studied, 315-kV line Average height Average Average height Average Average height Average Average height Average Route variant studied (315 kV) 111 Main road Secondary road Study area 31.5 m 38.5 m 31.5 m 38.5 m Railroad Boundaries 31.5 m 38.5 m 31.5 m 38.5 m Right-of-way Right-of-way Right-of-way Right-of-way Regional county municipality (MRC) 70 m 7070 m m 70 m Fichier : 7304_bu_cm_008_315eta_190227a.ai Fichier : 7304_bu_cm_009_315epk_190227a.ai Municipality Fichier : 7304_bu_cm_009_315epk_190227a.ai Fichier : 7304_bu_cm_008_315eta_190227a.ai

Guyed tower for 315-kV line Conventional tower In woodland, the line will be supported Four-legged towers will be used for angle mainly by this type of tower and dead-end towers (e.g., to cross a road) 4 Rivière Wawagosic

a Lac ib n Quévillon ig B

e r è i v Lebel-sur- Coigny *# i R  substation Rivière Laflamme 113 Quévillon Lac Turgeon Lebel-sur Quévillon, V NLSQ substation Rivière Octave ## Eeyou Istchee Baie-James, M 1337 1493 *# 3150-3151

R 1335 *# i

Rivière- Ojima, v Abitibi (MRC) i

è Lebel substation

NO r e

1321 Quévillon

H

a substation

r

r

i

c a

Rivière Wawagosic n

Rivière Wawagosic a Berry, M Lac-Despinassy, NO

Authier-Nord, M Abitibi (MRC) 397 Lac-Chicobi, NO 109 

Abitibi-Ouest (MRC) Lac 1335 Chicobi

Chazel, a Lac Lac a b Rivière-Ojima, NO b i M i n Quévillon Saint- n Quévillon Lac- Senneterre, V ig ig Dominique- B Despinassy, NO Centre A B Rivière Castagnier Lac-Chicobi, NO e e r r du-Rosaire, M è è i i v Lebel-sur- Lac Coigny v i Lebel-sur- Coigny *# i *# R Macamic See enlargement: Centre sector R Rivière Laflamme Rivière Laflamme Quévillon substation substation 113 Quévillon 113 Rivière    Chicobi  Lebel-sur Lac Turgeon Lac Turgeon Lebel-sur West A Quévillon, V NLSQ Quévillon, V NLSQ substation Lacsubstation Rivière Octave Rivière Octave Lac # ## Josselin# 1493 Authier, M Eeyou Istchee Baie-James, M Eeyou Istchee Baie-James, M 1337 Despinassy1493 1337 *# 3150-3151

R *# 3150-3151 *#

R *# 1335

i 1335

v Abitibi (MRC) i Rivière Laflamme

Rivière- Ojima, u

Rivière- Ojima, v Abitibi (MRC)

i 113

a è

Macamic, i Lebel substation

è Lebel substation  e

NO r Lac

r

NO r e 1321

V e Quévillon e

1321 Lac Quévillon H

Berry, M 1321 Obalski

H Centre B h a substation

c

a Castagnier substation

r s

r r

a

i

r Lac

c i

T

c a

a Parent

n e n

Proposed a r a Lac-Despinassy, NO iè substation site Berry, M Berry, M Lac-Despinassy, NO iv Authier-Nord, M West B Abitibi (MRC) Lac-Chicobi, NO 397 Authier-Nord, M Abitibi (MRC) Lac-Chicobi, NO 397  R 109 109 La Morandière, M  Saint-Félix-

Abitibi-Ouest (MRC) Abitibi-Ouest (MRC) Lac 1335 Lac Lac de-Dalquier, M 1335 Chicobi ChicobiLaunay, CT Robertson Rochebaucourt, M 109 3154-3155 See enlargement: West sector Trécesson, CT  a n a ic 101 111 rr Chazel, Chazel, Poularies, M  a Amos, V Rivière-Ojima, NO M Rivière-Ojima, NO Réserve H M Saint- e Lac- Senneterre, V Saint- indienne ièr Lac- Senneterre, V de Pikogan Dominique-Riv Centre A Despinassy,397 NO Despinassy, NO Abitibi-Ouest Taschereau, M Dominique- Centre A Rivière Castagnier  1335 Lac-Chicobi, NO Lac-Chicobi, NO Rivière Castagnier du-Rosaire,1491-1492 M du-Rosaire, M (MRC) Lac Loïs Lac Lac Macamic Macamic See enlargement: Centre sector See enlargement: Centre sector Rouyn-Noranda Rivière Amos Rivière Chicobi Produits-Forestiers-Résolu Chicobi Abitibi (MRC) (MRC) ## Landrienne, CT West A West A (Amos Div.) substation *# Champneuf, M Barraute, M Lac La Vallée-de-l'Or (MRC) Lac Amos Lac Lac substation *# 1301 1335 Josselin Josselin Authier, M Authier, M 386 Despinassy Despinassy Parc national Figuery  Rouyn-Noranda, V Saint-Blaise Aiguebelle Sainte-Gertrude- substation 0 4 8 km

Rivière Laflamme u Rivière Laflamme Manneville, M substation u 113 Macamic, 1317 113 a

a 

Macamic, Lac  e e

*# r

Lac 1335(D1) V 109 r MTM, zone 9, NAD83 (CSRS) V Lac Lac e  e Berry, M Lac1321 Obalski h

Berry, M 1321 Obalski Centre B Centre B h 7304_bu_cm_006_trace_190222a.mxd Saint-Mathieu- Figuery Castagnier c c Castagnier s

s d'Harricana, M a Lac a Lac T T Parent Document for information purposes only. For any other use, please contact Géomatique at Hydro-Québec Innovation, équipement et services partagés. Parent e e r Proposed r Proposed iè iè substation site iv substation site West B iv West B R La Morandière, M La Morandière, M R Saint-Félix- Saint-Félix- Lac de-Dalquier, M de-Dalquier, M Lac Launay, CT Launay, CT Robertson Robertson Rochebaucourt, M Rochebaucourt, M Infrastructure Project components 109 109 3154-3155 3154-3155 See enlargement: Trécesson,West sector CT  Trécesson, CT  a See enlargement: West sector  a n n a # a c # Proposed substation site 101 ic ri 101  Poularies, M 111 111 rr r Private 120-kV substation and line  Poularies, M    a Amos, V a Amos, V  Réserve H Réserve H e indienne re *# Route studied, 120-kV line indienne ièr viè 120-kV substation and line de Pikogan iv de Pikogan Ri 397 397 Taschereau, M Abitibi-Ouest Taschereau, M R  1335 Abitibi-Ouest 1335 Route studied, 315-kV line (MRC) 1491-1492 1491-1492 *# 315-kV substation and line (MRC) Lac Loïs Lac Loïs Main road Route variant studied (315 kV) Rouyn-Noranda Rouyn-Noranda Amos Produits-Forestiers-Résolu Amos 111 Produits-Forestiers-Résolu # Abitibi (MRC) Abitibi (MRC) (MRC) (MRC) ## (AmosLandrienne, Div.) substation CT # Landrienne, CT Study area (Amos Div.) substation *# *# Champneuf, M Champneuf, M Secondary road Amos Barraute, M Barraute, M La Vallée-de-l'Or (MRC) La Vallée-de-l'Or (MRC) Amos 1301 1335 substation *# 1301 substation1335 *# Railroad Boundaries 386 386 Parc national Parc national Figuery  Figuery Rouyn-Noranda, V Rouyn-Noranda, V Aiguebelle Sainte-Gertrude- substationSaint-Blaise Saint-Blaise Aiguebelle Sainte-Gertrude- substation 0 4 8 km Regional0 county municipality 4 8 km (MRC) Manneville, M Manneville, M substation substation 1317 1317 *# 109 *# 1335(D1) MunicipalityMTM, zone 9, NAD83 (CSRS) 109 Lac  Lac1335(D1) MTM, zone 9, NAD83 (CSRS)  7304_bu_cm_006_trace_190222a.mxd Saint-Mathieu- Figuery Saint-Mathieu- Figuery 7304_bu_cm_006_trace_190222a.mxd d'Harricana, M d'Harricana, M Document for information purposes only. For any other use, please contactDocument Géomatique for information at Hydro-Québec purposes Innovation, only. For any équipement other use, et please services contact partagés. Géomatique at Hydro-Québec Innovation, équipement et services partagés. 120-kV lines

Infrastructure ProjectInfrastructure components Project components ## ## Proposed substation site Private 120-kV substation and line ProposedPrivate substation 120-kV site substation and line 52 m

*# 52 m Route studied, 120-kV line *# 120-kV substation and line Route studied,120-kV 120-kV substation line and line

# height Average Route studied, 315-kV line *# 315-kV substation and line *Route studied,315-kV height Average 315-kV substation line and line Route variantMain roadstudied (315 kV) Route variant studied (315 kV) 111 Main road 111 Study area Secondary road Study areaSecondary road Railroad 61 m Boundaries61 m Railroad Boundaries 61 m Right-of-way 61 m Right-of-way Regional county municipality (MRC) Regional county municipality (MRC) 122 m 122 m Fichier : 7304_bu_cm_010_120b4a_190227a.ai Municipality Municipality Fichier : 7304_bu_cm_010_120b4a_190227a.ai

Guyed towers for 120-kV line The two lines connecting the substation to the 120-kV system will be supported mainly by guyed towers 5                                          

 

  

 

 

   

 

   

  

 

 

 

  

     

          

     

 

 

 

 

 

 

 

 

 

  

        

  

                      

  

 

 

 

 

  

 

 

 

   

 

 

                       

 

 

 

 

 

 

 

 

 

 

 

  

 

 

      

  

 

 

 

 

  

  

 

 

 

     

 

 

 

 

 

                   

 

                     

     

  

  

 

 

 

  

  

      

  

  

 

 

 

  

 

  

    

  

   

     

 

  

 

 

  

      

 

 

     

      

           

  

 

 

 

      

      

      

   

   

  

     

    

 

 

 

 

 

 

         

     

      

    

      

    

 

   

  

 

    

 

  

    

 

 

 

 

 

     

  

  

 

 

 

   

  

    

    

 

  

 

 

 

   

 

 

 

 

 

 

 

  

   

   

 

 

  

  

 

 

 

     

 

  

  

 

 

 

 

 

  

 

      

           

  

  

 

    

 

 

 

 

 

 

 

  

               

 

 

     

               

       

 

      

    

   

 

     

  

  

  

 

 

    

 

 

   

 

  

  

 

           

       

  

 

 

 

    

 

     

    

  

  

 

                            

                             

       

 

     

 

 

 

 

   

   

 

 

 

   

   

  

  

 

  

      

    

        

    

     

           

  

   

 

             

     

     

 

      

  

 

  

     

    

   

 

     

 

 

     

  

 

   

  

 

  

   

     

        

       

          

         

           

    

        

          

  

    

    

  

  

   

   

         

      

 

 

  

   

   

  

 

 

  

  

 

   

    

 

     

      

 

 

  

 

 

 

 

 

 

  

 

 

  

    

  

 

 

 

 

  

 

  

  

  

 

        

 

    

 

    

      

   

  

    

 

 

 

 

      

  

 

   

 

 

 

   

             

        

 

   

 

  

  

 

    

   

       

     

 

 

 

     

   

  

 

 

 

 

  

 

 

  

  

   

   

    

 

  

     

      

 

   

 

  

 

 

 

 

 

  

 

 

 

   

 

  

    

  

  

   

 

   

  

 

 

        

 

 

 

   

      

     

 

 ENLARGEMENT OF ROUTE VARIANTS (Centre sector and west sector)   

   

 

     

R 

 

 Lac-Arlelion

 u 

 

 

 

i        s  Chemin du 

 

 s    Rivière

 

  e

  a         

              u

  

   d 

  u

               Rivière Obalski

     

B                 r  Centre A   804 û 

 

  

  l  é  Harricana 1321

 

 

  

 

  

 

 

  

  

      

       

  Bé 

 a    u  r

n     a

 e 

Chemin Hamel 

 s

s  315-kV line 

   i  

  

     u

 

     R     Chemin Hamel

  

 

 

 

    

 

   109

            

 1321 

 

 

 

  

 Rivière

 

 

 

   

      

 

 

 

  

 

   315-kV line

 

 

 

 

 

 

  

 

  

  

  

 

   

      

  

 

 

  

    

 Davy 

 

 

      

 

  

 Centre B  

 

             

          

   

      

        

 

Saint-Dominique-du-Rosaire, M 

  

 

 

  

  

  

 

     

    

   

      Lac-Despinassy, NO 

 0 0,7 1,4 km  

 Lac 

   

  

  

 

    

Rue Obalski

    1321 La Morandière, M

 

 

  

 

MTM, zone 9, NAD83 (CSRS) 

 

 

 Principale        

  

 

 

 

    7304_bu_cm_007_agranditrace_190222a.mxd

 

 

  

 

   

  

     

 

 

  

  

 

 

  

 

Document for information purposes only. For any other use, please contact Géomatique at Hydro-Québec Innovation, équipement et services partagés.

  

 au-4e-Rang

 

 

   

  Routedu 3e-

 

  

  

 

 

             

 

 

           Chemin des Sables      

 

  

  

  

   

 

 

 

  

  

  

       

 

 

  West A  

 

 

 

   

   

  

           

 315-kV line 

 

 

 

  

  

   

  

         

  

 

 

 

 

     

      

  

   

 

    

  

  

 

 

 

 

 

 

 315-kV line

 

 

   

  

    

   

 

 

  

   

 

 

 

  

 

 

     

 West B   

  

 

 Lac

 

 

 

   

 

 

      Chemin de  

 

 Profond 

 la Source

   

 

  

  

 

     

      

        

   

     

  

  Rivière-Ojima, NO

  Lac-Chicobi, NO    

    

  

 Taschereau, M

 

 Launay, CT

  C

 

 

 h

     e 

m 

  

 i

n 

 

 

 

 d 

 

 

 e 

 

 

 

  s  

        

 

 

 P

 

 i

 

 o

      

 

 n 

    n

i e

            r        

s     

  

Chemindu Nord  

  

Rivière Bellefeuille    Proposed

 

Abitibi (MRC)

   substation site

Abitibi-Ouest (MRC)

 

     Authier, M

              

 Taschereau, M       

        

    

   

  

       

    

 

 

     

 

   

  

      

   

  

 

 

 

    

   

  

 

 

      

    

 

 Chemin des Anciens 

 

  

  111     

    Chemin de la Plage  

  Lac

 

 

 

 

    

     Taschereau

  

   Crique 

 

   

 Caroline 

  

  

    

 

 

   R     iv 

    i 

 è 

 

 r      e

 

B 

   e 

   l    l laPlage  e   f Cheminde 120-kV lines

  

 e 

 

u    i    

 lle 

 

 

   

 

   Chemin des Pionniers  

 

 

      

  C 

  h

      emin

 P ier

 oir

  

 

 

                 

         

  

     

 

  

 

    

    

   

 

 

 

 

  111

  

 

 

 

 

 0 0,7 1,4 km

  

    

  Lac   

 

 

 

 

 Robertson  

 Cheminde Laferté     

  MTM, zone 9, NAD83 (CSRS) 

 

  1491-1492 

          

          

      

  7304_bu_cm_007_agranditrace_190222a.mxd

  

 

  

 Che  min

     

 du Chalet  

   

   Document for information purposes only. For any other use, please contact Géomatique at Hydro-Québec Innovation, équipement et services partagés.  

 

 

   

   

 

 

 6  

 

  

 

  

  

 

 

 

        

 

   

    

 

  

    

 Montéed'Aiguebelle  

 

 

 

  

   

 

 

    

 

   

 

 

 

 

 

 

 

   

 

   

 

   

    

 

 

 

  

 

   

    

  

   

  

 

   

 

 

 

 

 

 

   

    

 

 

  

       

   

   

   

 

          

 

   

 

  

  

 

 

  

 

  

 

  

 

  

         

  

 

   

  

          

  

  

 

    

 

  

 

 

 

 

 

 

             

      

      

   

 

 

  

 

  

  

   

 

 

   

     

 

 

 

 

    

   

  

 

  

  

 

  

 

  

 

   

  

  

  

 

 

    

 

 

 

 

 

 

 

  

  

  

 

 

  

 

 

  

 

        

 

 

 

 

 

 

 

   

 

 

  

 

    

       

 

  

 

  

 

 

  

 

 

 

 

   

     

 

 

 

  

 

 

 

  

 

     

 

 

  

  

 

       

        

 

  

 

 

 

   

  

  

  

 

 

 

 

 

                                               

 

  

 

 

   

 

   

  

 

 

 

  

     

          

     

 

 

 

 

 

 

 

 

 

  

        

  

                      

  

 

 

 

 

  

 

 

 

   

 

 

                       

 

 

 

 

 

 

 

 

 

 

 

  

 

 

      

  

 

 

 

 

  

  

 

 

 

     

 

 

 

 

 

                   

 

                     

     

  

  

 

 

 

  

  

      

  

  

 

 

 

  

 

  

    

  

   

     

 

  

 

 

  

      

 

 

     

      

           

  

 

 

 

      

      

      

   

   

  

     

    

 

 

 

 

 

 

         

     

      

    

      

    

 

   

  

 

    

 

  

    

 

 

 

 

 

     

  

  

 

 

 

   

  

    

    

 

  

 

 

 

   

 

 

 

 

 

 

 

  

   

   

 

 

  

  

 

 

 

     

 

  

  

 

 

 

 

 

  

 

      

           

  

  

 

    

 

 

 

 

 

 

 

  

               

 

 

     

               

       

 

      

    

   

 

     

  

  

  

 

 

    

 

 

   

 

  

  

 

           

       

  

 

 

 

    

 

     

    

  

  

 

                            

                             

       

 

     

 

 

 

 

   

   

 

 

 

   

   

  

  

 

  

      

    

        

    

     

           

  

   

 

             

     

     

 

      

  

 

  

     

    

   

 

     

 

 

     

  

 

   

  

 

  

   

     

        

       

          

         

           

    

        

          

  

    

    

  

  

   

   

         

      

 

 

  

   

   

  

 

 

  

  

 

   

    

 

     

      

 

 

  

 

 

 

 

 

 

  

 

 

  

    

  

 

 

 

 

  

 

  

  

  

 

        

 

    

 

    

      

   

  

    

 

 

 

 

      

  

 

   

 

 

 

   

             

        

 

   

 

  

  

 

    

   

       

     

 

 

 

     

   

  

 

 

 

 

  

 

 

  

  

   

   

    

 

  

     

      

 

   

 

  

 

 

 

 

 

  

 

 

 

   

 

  

    

  

  

   

 

   

  

 

 

        

 

 

 

   

      

     

 

 

  

   

 

     

R 

 

 Lac-Arlelion

 u 

 

 

 

 i        s  Chemin du 

 

 s    Rivière

 

  e

  a         

              u

  

   d 

  u

               Rivière Obalski

     

B                 r  Centre A   804 û 

 

  

  l  é  Harricana 1321

 

 

  

 

  

 

 

  

  

      

       

  Bé 

 a    u  r

n     a

 e 

Chemin Hamel 

 s

 s  315-kV line 

   i  

  

     u

 

     R     Chemin Hamel

  

 

 

 

    

 

   109

            

 1321 

 

 

 

  

 Rivière

 

 

 

   

      

 

 

 

  

 

   315-kV line

 

 

 

 

 

 

  

 

  

  

  

 

   

      

  

 

 

  

    

 Davy 

 

   

    

 

  

 Centre B  

 

             

          

   

      

        

 

Saint-Dominique-du-Rosaire, M 

  

 

 

  

  

  

 

     

    

   

      Lac-Despinassy, NO 

 0 0,7 1,4 km  

 Lac 

   

  

  

 

    

Rue Obalski

    1321 La Morandière, M

 

 

  

 

MTM, zone 9, NAD83 (CSRS) 

 

 

 Principale        

  

 

 

 

 

    7304_bu_cm_007_agranditrace_190222a.mxd

 

 

  

 

   

  

     

 

 

  

  

 

 

  

 

Document for information purposes only. For any other use, please contact Géomatique at Hydro-Québec Innovation, équipement et services partagés.

  

 au-4e-Rang

 

 

   

  Routedu 3e-

 

  

  

 

 

             

 

 

            Chemin des Sables      

 

  

  

  

   

  CENTRE SECTOR

 

 

  

  

 Centre variant A avoids Centre variant B avoids

  

       

 

 

  West A  

 

  • the built environment • the planned Rivière Harricana aquatic reserve

 

   

   

  

           

 315-kV line 

 

 

 • the wide parts of the river, which are difficult • opening a new line corridor apart from the

 

  

  

   

  

         

  

  to cross existing corridor

 

 

 

     

      

  

   

 

    

  

  

 

  It will mean It will mean

 

 

 

 

 315-kV line

 

 

   

  

    

   

  • opening a new corridor over 16.7 km where • opening a new corridor over 11.5 km

 

  

   

 

 

 

  

  

 

     the route cannot run along existing lines • enlarging the existing right-of-way over 9.4 km 

 West B   

  

 

 Lac 

 

 

 

   

 

   

  Chemin de  

 • enlarging the existing right-of-way over 4.1 km • coming close to the built environment 

 

 Profond 

 la Source

   

 

  

  

 

     

    • crossing the planned Rivière Harricana   

        

   

     

  

  Rivière-Ojima, NO

  Lac-Chicobi, NO

  

 aquatic reserve

    

  

 Taschereau, M

 

 Launay, CT

  C

 

 

 h

     e 

m 

  

 i

n 

 

 

 

 d 

 

 

 e 

 

 

 

  s  

        

 

 

 P

 

 i

 

 o

      

 

 n 

    WEST SECTOR n

i e

            r         s     

   Chemindu Nord 

 West variant A avoids West variant B avoids

  

Rivière Bellefeuille    Proposed • coming close to Mont Panoramique • coming close to fishing farms and the municipal

 

Abitibi (MRC)

   substation site water source

Abitibi-Ouest (MRC)

 It will mean  

     Authier, M • opening a new corridor over 16 km It will mean

              

 Taschereau, M        • opening a new corridor over 14.8 km

         LégendeLégende commune commune

    

   

 Légende commune Légende commune  

       

    

 

 

     

 

   

  

      

   

  

 

 

 Protected areas and other Infrastructure Project components   Protected areas and other Infrastructure Project components

    

   

  

 Protected areas and other Infrastructure Project components

 Protected areas and other Infrastructure Project components 

 

    components of interest  components of interest  

    

 Municipal water source ProposedProposed substation substation site site

 Chemin des Anciens  components of interest  Municipal water source components of interest

 

 

 Municipal water source Proposed substation site Municipal water source Proposed substation site   111  Planned aquatic reserve      Planned aquatic reserve 

    Chemin de la Plage  

  Lac Planned aquatic reserve Planned aquatic reserve 

 Route studied, 120-kV line

  120-kV120-kV line line Route studied, 120-kV line

 

 

        Route studied, 120-kV line  Route studied, 120-kV line  Taschereau 120-kV line 120-kV line

  

   Crique FishFish farming farming (600 (600 m) m) 

 

    Fish farming (600 m) Fish farming (600 m)

 Caroline    Route studied, 315-kV line

 Route studied, 315-kV line   

 

  Boundaries  Boundaries

  Route studied, 315-kV line Route studied, 315-kV line

 

   R   Mont Panoramique (3 km) Boundaries Boundaries   Mont Panoramique (3 km) iv 

    i 

 è  Mont Panoramique (3 km) Mont Panoramique (3 km)  

 r      e

  RouteRoute variant variant studied studied (315 (315 kV) kV)

 Regional county municipality (MRC)

B  Regional county municipality (MRC)

   e  Route variant studied (315 kV) Route variant studied (315 kV) 

  Regional county municipality (MRC)  l  Wetland Regional county municipality (MRC) laPlage Wetland   l  e   f Cheminde 120-kV lines

   Wetland Wetland

 e 

  Study area u  Study area   i MunicipalityMunicipality    

 lle 

 Study area Study area

 Municipality

 Esker Municipality

 Esker

   

   

 

   Chemin des Pionniers 

  Esker Esker

 

  

    

 Protected agricultural land (CPTAQ)

  Protected agricultural land (CPTAQ) C 

  h

      emin Protected agricultural land (CPTAQ) Protected agricultural land (CPTAQ)

 P ier

 oir

  

 

  Land use

            Land use      

    Land  use    Land use

  

     

 

  

 

  AgricultureAgriculture

  

    

  Agriculture Agriculture  

 

 

  

 

 BuiltBuilt environment environment

 111  Share your thoughts on the variants with us, either by completing  

 

   Built environment Built environment

 

 0 0,7 1,4 km

  

    

  Lac   

 the attachedVacationVacation area area opinion submission form or by filling in the online form

 

 

 

 

 Robertson  

 Vacation area Cheminde Laferté    Vacation area  

  MTM, zone 9, NAD83 (CSRS) 

 

  1491-1492 

          at www.hydroquebec.com/abitibi-temiscamingue. 

          

      

  7304_bu_cm_007_agranditrace_190222a.mxd

  

 

  

 Che  min

     

 du Chalet  

   

   Document for information purposes only. For any other use, please contact Géomatique at Hydro-Québec Innovation, équipement et services partagés.  

 

 

   

   

 

 7 

 

 

  

 

  

  

 

 

 

        

 

   

    

 

  

    

 Montéed'Aiguebelle  

 

 

 

  

   

 

 

    

 

   

 

 

 

 

 

 

 

   

 

   

 

   

    

 

 

 

  

 

   

    

  

   

  

 

   

 

 

 

 

 

 

   

    

 

 

  

       

   

   

   

 

          

 

   

 

  

  

 

 

  

 

  

 

  

 

  

         

  

 

   

  

          

  

  

 

    

 

  

 

 

 

 

 

 

             

      

      

   

 

 

  

 

  

  

   

 

 

   

     

 

 

 

 

    

   

  

 

  

  

 

  

 

  

 

   

  

  

  

 

 

    

 

 

 

 

 

 

 

  

  

  

 

 

  

 

 

  

 

        

 

 

 

 

 

 

 

   

 

 

  

 

    

       

 

  

 

  

 

 

  

 

 

 

 

   

     

 

 

 

  

 

 

 

  

 

     

 

 

  

  

 

       

        

 

  

 

 

 

   

  

  

  

 

 

 

 

 

      Public consultation Current and upcoming Favorable reception by local communities is one of the consultation activities three essential conditions for Hydro-Québec projects. When The consultation on the line route and the substation developing new projects, Hydro-Québec seeks to balance site is currently in progress. the three pillars of sustainable development: environmental sustainability, economic sustainability and social sustainability. The project team should be ready to meet once more with community members by the end of the spring of Discussions with the host community were considered in 2019 to present the selected line route and substation selecting the proposed substation site and the line route site with the least impact and to explain why these variants presented in this bulletin. These aspects of the choices were made. project could be improved based on meetings with the municipalities, property owners, representatives of the First Nation of Abitibiwinni (Pikogan) and of the Nation Tangible support for Anishnabe of Lac Simon and others concerned. We ask community development that concerned organizations, property owners and residents send us their comments before April 15, 2019. You can use Hydro-Québec sees its projects as an opportunity to the attached form or the online version available on our participate in the development of host communities. website to share your comments, or you can send us an It grants funds to eligible organizations through the email or call us (contact information below). Integrated Enhancement Program. The amount granted is based on the length of the lines and the area of the substations concerned, and it is to be used for initiatives that improve quality of life in the host communities.

For more information INFO-PROJECT line ABITIBI-TÉMISCAMINGUE INDIGENOUS RELATIONS Abitibi-Témiscamingue Diane Guillemette Luc Duquette and Nord-du-Québec: Advisor – Community Relations Advisor – Indigenous Relations 1 8 3 3 3 6 4-5 3 8 4 [email protected] [email protected] NORD-DU-QUÉBEC Sylviane Legault Richard Simard Advisor – Community Relations Advisor – Community Relations [email protected] [email protected]

www.hydroquebec.com/abitibi-temiscamingue

Original text written in French. Ce document est également publié en français. 2019E0668-A

100%