Panama-Canal-Daily-Information

Total Page:16

File Type:pdf, Size:1020Kb

Panama-Canal-Daily-Information Good Day, A. Panama Canal Authority Notices& Advisories to Shipping Latest Advisory: A-56-2016 Requirements for Panamax Vessels when Transiting the Neopanamax Locks Latest Advisory: A-55-2016 Maximum Allowable Draft for Vessels Transiting the Neopanamax Locks Latest Advisory: A-54-2016 Suspension of Water Conservation Measures Latest Advisory: A-53-2016 Changes in Booking Date due to Availability of Additional Slots for Neopanamax Vessels Latest Advisory: A-52-2016 Monthly Canal Operations Summary SEPTEMBER – 2016 Latest Advisory: A-51-2016 Increase in Number of Booking Slots for Neopanamax Vessels Latest Advisory: A-50-2016 Pilot Portable Units for Newpanamax Vessels Latest Advisory: A-48-2016 Panama Canal Locks Lane Outage and the Transit Reservation System Latest Advisory: A-47-2016 Monthly Canal Operations Summary AUGUST 2016 – Latest Advisory: A-46-2016 Information on Escort Tug Requirements for Neopanamax Latest Advisory: A-45-2016 Change in the Effective Date for Booking of Neopanamax Passenger Vessels Latest Advisory: A-44-2016 Panama Canal Locks Lane Outage and the Transit Reservation System Latest Advisory: A-42-2016 Monthly Canal Operations Summary JULY 2016 – Latest Advisory: A-41-2016 Maximum Draft Update Neopanamax Locks Latest Advisory: A-40-2016 New buoys placed at the Atlantic Entrance to the Panama Canal Latest Advisory: A-36-2016 Modification to Minimum Visibility Requirements Latest Advisory: A-35-2016 Tariffs for Tug and Linehandler Services for Neopanamax Locks B. Present Waiting times for non-booked vessels Northbound Southbound Supers (91' in beam & over) 3 days 3 days Regulars (less than 91' beam) 3 days 3 days Please remember that the PCA offers the booking / auction system as an alternative to avoid delays and / or reserve a slot on a desire date, just please bear in mind that spaces are limited and in high demand which makes them difficult to obtain a slot if the customers are not regular Canal users. C. Transit Information For October 27TH, 2016 Northbound Southbound Arrivals 21 11 Transits 15 18 Vessel due 28 27 Vessels booked 6 14 For October 26TH, 2016 Northbound Southbound Arrivals 13 21 Transits 16 18 Vessel due 28 27 Vessels booked 10 7 Canal normal daily capacity is 38-42 transits. a) The amount of ships Arriving and Remaining for transit will vary as ETA of vessels should change. b) Please find attached booking slots available per day list for your appraisal. c) Canal Operations Summary for previous month. D. Locks maintenance schedule SCHEDULE OF LOCK MAINTENANCE OUTAGES Dates Days/Hrs Miraflores Pedro Gatun Estimated Status Miguel Capacity 18 November 2016 12 Hours East Lane** 28-30 Tentative 25 November 2016 8 Hours East Lane** 30-32 Tentative 2 December 2016 8 Hours East Lane** 30-32 Tentative 21 January 2017 12 Hours West Lane* 28-30 Tentative 28 January 2017 12 Hours West Lane* 28-30 Tentative 21 April 2017 8 Hours West Lane** 30-32 Tentative 9-8 May 2017 10 Days East Lane* 22-24 Tentative *The normal transit capacity of the Panama Canal is 34-36 vessels per day, depending on vessel mix and other factors. This capacity is reduced during locks maintenance work, as indicated in the above table. Consequently, vessels may experience delays in transiting. Normally, during these periods, the Panama Canal Transit Reservation System slots are fully utilized. Whenever a set of locks requires a major outage of one of its two lanes for dry chamber inspection, miter gate repairs, tow track work or other major maintenance/improvement projects, advantage may be taken to perform simultaneous single lane outages at other locks. **In order to perform required maintenance on the northeast entrance. E. Panama Canal Auction System Auction Date Transit Date Auction Bid Vessel Name Customer Code NO BID NO BID NO BID NO BID NO BID NO BID NO BID NO BID NO BID F. Weather Please click for updated Panama weather forecast http://www.weather-forecast.com/locations/Panama/forecasts/latest.
Recommended publications
  • Procedures for Securing a Handline Transitof the Panama Canal
    AUTORIDAD DEL CANAL DE PANAMÁ 4352‐I (NTOT‐A) Rev. 1‐1‐2020 PROCEDURES FOR SECURING A HANDLINE TRANSITOF THE PANAMA CANAL Small craft are vessels up to 38.1 meters (125 feet) in length overall, which normally transits the Canal as handlines, and do not use locomotives in the locks. Handlines under 20 meters (65 feet) in length overall will normally transit the Canal with a transit advisor; while handlines of 20 meters (65 feet) or more will normally require a pilot. The following are guidelines for yacht and other handlines interested in transiting the Panama Canal: 1. GUIDELINES FOR TRANSITING HANDLINES UNDER 125 FEET a. Before Arrival: All information required for transiting the Panama Canal must be submitted utilizing the Maritime Service Portal, at least 96 hours prior to arrival at Panama Canal waters. Since many small craft do not have a computer on board, the Admeasurement Office (Atlantic and Pacific), is available for assistance to collect all the information necessary to be introduced so it can be assigned an estimated time of arrival to the small craft, which allows to be inspected and subsequently be able to perform the transit. For more details, please read in our web‐ page http://www.pancanal.com/eng/ maritime/advisories/index.html all the advisories relating to the Maritime Service Portal. b. Arrival: Upon arrival at the Balboa Anchorage or Cristobal Breakwater, the vessel must contact the appropriate Signal Station announcing its arrival and requesting anchoring instructions. The Signal Station will direct the vessel to the anchorage and give any operational restrictions that may be in effect.
    [Show full text]
  • Case Study Title
    PANAMA – THE MANAGEMENT OF THE PANAMA CANAL WATERSHED (PCW), CASE #5 This case study is about the Panama Canal Watershed, its development in legal, technical and social terms, the problems encountered, and how an Integrated Water Resources Management approach could help it to be managed in a more sustainable way. ABSTRACT Description The Panama Canal Watershed (PCW) was developed when the Panama Canal was constructed (1904-1914). The PCW unites the basins of the Chagres and Grande Rivers into a single hydraulic system. The Chagres and Grande Rivers drain into the Atlantic and the Pacific Oceans, respectively. Damming the Chagres River provides water to operate the canal locks. By the mid 1930’s, an additional lake had been created in the upper basin of the Chagres River to increase the water storage capacity of the system. In 1999, the formal limits of the PCW were established by law and segments of the Indio, Caño Sucio and Coclé del Norte River Basins were added. All these rivers drain separately into the Atlantic Ocean to the north-west of the PCW. Under the Panama Canal Treaty (1977) the Republic of Panama was obliged to provide sufficient water for the operation of the Canal and for cities in the area. This led to the creation of several national parks, the promotion of sustainable development activities, and the implementation of base-line studies, all with support from USAID (United States Agency for International Development). A Panama Canal Authority (PCA) was created by Constitutional reform in 1994 which granted legal obligations and rights to manage the PCW.
    [Show full text]
  • PROYECTO DE PANAMA COLON CONTAINER PORT: an Estimation of the Environmental Impacts
    ENVI 451 FINAL REPORT PROYECTO DE PANAMA COLON CONTAINER PORT: An estimation of the environmental impacts By Laura Peña Silva and Sandrine Royer Days in the Field: 5; Days working in Panama city: 5 Presented to Nilson Ariel Espino and Stanley Heckadon McGill University Peña Silva & Royer April 24th, 2018 EXECUTIVE SUMMARY 4 English version 4 Spanish version 5 ACKNOWLEDGMENTS 7 INTRODUCTION 8 Environmental Impact Assessments 8 Urban Development of the city Colón - Goals and Challenges 11 METHODS 13 Interviews 13 Visual Material 14 Analysis of the EIA 14 Limits of methodology 15 RESULTS 16 Results from objective 1: Panama Colon Container Port Description 16 About the Company 16 Description of the Project in Panama 17 Port Dimensions 18 Results of objective 2: Environmental Elements of the Sectors 19 Corals 20 Mangroves 21 Seagrasses 22 Results for objective 3: Content of the EIA 23 Introduction 23 EIA content 24 DISCUSSION 27 Environmental impacts of the port 27 Socio-economic impacts 30 CONCLUSION 33 Recommendations 34 REFERENCES 36 APPENDIX I 39 APPENDIX II 40 APPENDIX III 41 APPENDIX VI 42 2 Peña Silva & Royer APPENDIX V 43 APPENDIX VI 44 APPENDIX VII 44 APPENDIX VIII 47 APPENDIX IX 48 APPENDIX X 49 APPENDIX XI 50 APPENDIX XII 50 3 Peña Silva & Royer EXECUTIVE SUMMARY English version Project of Panama Colon Container Port: An estimation of the environmental impacts By Laura Peña Silva and Sandrine Royer Laboratorio Marino Punta Galeta Smithsonian Tropical Research Institute Unit 0948 APO AA 34002 In a country where the service sector accounts for more than 75%, the development of the port facilities is highly relevant.
    [Show full text]
  • Panamax - Wikipedia 4/20/20, 1018 AM
    Panamax - Wikipedia 4/20/20, 1018 AM Panamax Panamax and New Panamax (or Neopanamax) are terms for the size limits for ships travelling through the Panama Canal. General characteristics The limits and requirements are published by the Panama Canal Panamax Authority (ACP) in a publication titled "Vessel Requirements".[1] Tonnage: 52,500 DWT These requirements also describe topics like exceptional dry Length: 289.56 m (950 ft) seasonal limits, propulsion, communications, and detailed ship design. Beam: 32.31 m (106 ft) Height: 57.91 m (190 ft) The allowable size is limited by the width and length of the available lock chambers, by the depth of water in the canal, and Draft: 12.04 m (39.5 ft) by the height of the Bridge of the Americas since that bridge's Capacity: 5,000 TEU construction. These dimensions give clear parameters for ships Notes: Opened 1914 destined to traverse the Panama Canal and have influenced the design of cargo ships, naval vessels, and passenger ships. General characteristics New Panamax specifications have been in effect since the opening of Panamax the canal in 1914. In 2009 the ACP published the New Panamax Tonnage: 120,000 DWT specification[2] which came into effect when the canal's third set of locks, larger than the original two, opened on 26 June 2016. Length: 366 m (1,201 ft) Ships that do not fall within the Panamax-sizes are called post- Beam: 51.25 m (168 ft) Panamax or super-Panamax. Height: 57.91 m (190 ft) The increasing prevalence of vessels of the maximum size is a Draft: 15.2 m (50 ft) problem for the canal, as a Panamax ship is a tight fit that Capacity: 13,000 TEU requires precise control of the vessel in the locks, possibly resulting in longer lock time, and requiring that these ships Notes: Opened 2016 transit in daylight.
    [Show full text]
  • Vessel Requirements
    OP NOTICE TO SHIPPING No. N-1-2017 Vessel Requirements PANAMA CANAL AUTHORITY (ACP) Operations Department Bldg. 729, Balboa-Ancon Panama, Panama www.pancanal.com UA-208 January 1, 2017 OP NOTICE TO SHIPPING No. N-1-2017 To: Shipping Agents, Owners and Operators Subject: Vessel Requirements 1. Effective Date and Cancellation This Notice is effective on the date of issue and cancels OP Notice to Shipping No. N- 1-2016. A revised Notice will be issued in January of each year or when otherwise required. This Notice has been thoroughly modified to incorporate vessel requirements for the new Expanded Canal locks. Other changes in this revision include: (1) Items a, b, c, d, e, f, g, h, I and j were incorporated into the Relevant Information for Canal Customers section, on pages 5 to 8. (2) Former Paragraph 3.b was eliminated. (3) Subsection 4.e (Panama Canal Minimum Visibility Requirements) was modified on pages 29 and 30. (4) Subsection 4.p (Use of Automatic Identification System - AIS) was modified on p. 38. (5) Section 11 (Definitive Phase-out of Single Hull Oil Tankers) was modified on p. 55. (6) Section 12 (Admeasurement System for Full Container Vessels) was modified on pages 55 and 56. (7) Former Section 13.d (Calculations of PC/UMS for Vessels not Designed to Carry Containers on Deck) was eliminated. (8) Section 17 (Cargo Regulated Under Annex II of MARPOL) was modified on p. 65. (9) Section 25 (Sanitary Facilities and Sewage Handling) was modified on p. 71. (10) Section 29 (Maneuvering Fuel) was modified on pages 72 and 73.
    [Show full text]
  • Synopsis Sheets CANAL DE PANAMA UK
    Synopsis sheets Rivers of the World THE PANAMA CANAL Initiatives pour l’Avenir des Grands Fleuves The Panama Canal 80 km long, the Panama Canal links the Pacific and Atlantic Oceans, forming a faster transoceanic route for merchant shipping than by passing via Cape Horn, at the southernmost tip of South America. A strategic hub for the world’s maritime trade, 15,000 ships pass through it every year. In 2016, a huge project of Canal’s enlargement was completed to double its capacity and accommodate the new generation ships, larger and longer, the Post Panamax. Now it has to face new challenges: competing projects are emerging and new shipping routes can be opened that would reduce the supremacy of the Panama Canal. A strategic route The origins Océan Atlantique The first attempt to build the canal dates back to 1880. France entrusted Ferdinand de Lesseps with the responsibility of its design and amassed considerable funds. However, the technical difficulties and above all a major financial scandal revealed in 1889 led to the bankruptcy of the Compagnie Universelle du Canal Inter-océanique du Panamá. The new Panama Canal Company took over but met the same fate, and in 1903 the treaty of Hay- Bunau-Varilla officialised the transfer of the operating and building rights to the canal to the United States. Built under the direction of G.W. Goethals, at the head of the U.S. Army Corps of Engineers, the canal opened in 1914 and was finally handed over to Panama in 1999 by virtue of the Torrijos-Carter Treaty.
    [Show full text]
  • Panama Excursion 2.Indd
    Perspectives on global supply chains Spring 2011 The Panama Canal’s impact on U.S. industrial real estate Game changer Key takeaways The expansion of the Panama Canal is without a doubt a global “game changer.” In a world of rising energy and fuel prices, it is becoming • Higher oil prices driving carrier lines to bring “Post-Panamax” vessels increasingly important for companies to stay competitive by operating into service as quickly as possible upon opening of the expanded canal in 2014 the most cost-effective and effi cient supply chains and driving down transportation costs as much as possible. The expansion of the Panama • Larger ships able to transit the new set of locks mean lower shipping costs per TEU (twenty-foot equivalent units, a standard Canal is predicated on the economies of scale that can be gained through of measurement), thus realizing better economies of scale for both the utilization of larger container ships, thus delivering cost savings to shippers and carriers companies also needing to quickly transport goods and materials to market. • Trade routes are likely to be reset as Asian fi rms gain better access not only to East Coast U.S. markets throughout the Americas but across While the implications of the Panama Canal’s new set of locks and the Atlantic changing dynamics in the maritime industry are already broad, the eventual • Shippers still recall the West Coast lockdown of 2002 and have impact on the industrial real estate landscape in the United States will be committed to a diversifi cation strategy, expanding their options to just as signifi cant.
    [Show full text]
  • Rozbudowa Kanału Panamskiego
    Geoinżynieria BUDOWNICTWO INŻYNIERYJNE drogi mosty tunele RRozbudowaozbudowa KKanaanału PPanamskiegoanamskiego Dagmara Dukała Geoinżynieria drogi mosty tunele W Panamie realizowany jest projekt mający na celu dwukrotne zwiększenie przepustowości kanału. Dzięki niemu ten „inżynier- ski cud XIX w.” oraz bardzo ważne ogniwo w handlu międzynarodowym będzie jednym z najnowocześniej- szych kanałów na świecie. Bez inwestycji w ciągu kilku lat stałby się jedynie reliktem przeszłości Kanał Panamski rozciąga się na przestrzeni około 80 km po- kowana, a małe odległości pomiędzy statkami stanowią dla między Oceanem Atlantyckim a Spokojnym. Rocznie przepły- nich zagrożenie. wa nim około 14 tys. jednostek (w 1914 r. - mniej niż 2 tys.), Ze względu na fakt, że obecna szerokość komory śluzy wy- transportujących miliony ton towarów (w 2011 r. 322 mln tzw. nosi 33,53 m, a długość 304,8 m, coraz trudniej jest manewro- „Panama Canal tons”. 1 tona PC=100 ft3=2,8317 m3). Jest to jed- wać największym jednostkom typu Panamax, liczącym 32,3 m na z najbardziej uczęszczanych dróg wodnych świata. Działa 24 szerokości, 294,1 m długości i maksymalnie 12 m zanurzenia godziny na dobę, 365 dni w roku. Zarządza nim The Panama w słodkiej wodzie. Takie kontenerowce ledwie mieszczą się Canal Authority. w kanale, a odległości ich burt od betonowych ścian obiek- Usytuowanie kanału jest bardzo ważne pod względem tu liczone są w zaledwie dziesiątkach centymetrów. Przepły- strategicznym i ekonomicznym. Jest on źródłem ogromnych nięcie jest więc ryzykowną operacją. Zdarza się, że jednostka dochodów Panamy – jednostki płacą za tranzyt średnio oko- uderza stalową burtą w betonową ścianę – wówczas może ło 100 tys. USD. Transport przez kanał stanowi około 5% dojść do uszkodzeń kadłuba.
    [Show full text]
  • Impact of Panama Canal Expansion on the U.S. Intermodal System
    IMPACT OF PANAMA CANAL EXPANSION ON THE U.S. INTERMODAL SYSTEM 1 United States Department of Agriculture Agricultural Marketing Service January 2010 United States Department of Agriculture Marketing and Regulatory Programs Agricultural Marketing Service Transportation and Marketing Programs January 2010 Author: Delmy L. Salin, USDA, Agricultural Marketing Service Acknowledgments The author would like to acknowledge Maria Eugenia Sanchez of the Panama Canal Authority for proving data and pictures, and Kimberly Vachal of the Upper Great Plains Transportation Institute and Agapi Somwaru of the Economic Research Service for reviewing the manuscript. Abstract The Panama Canal expansion is expected to affect global transportation trade routes. The Panama Canal’s main competitors for shipments from Asia to the U.S. East Coast are the U.S. Intermodal System and the Suez Canal. The Panama Canal is an effi cient route, but is reaching its maximum capacity. However, this problem will be resolved by 2014 when the Panama Canal Expansion Project is completed. The Suez Canal route, especially, competes with the Panama Canal in the South and Southeast Asia–U.S. East Coast route due to its shorter navigation time of 21.1 days and its capacity to handle Post-Panamax vessels. The U.S. Intermodal System has the shortest ocean navigation time (Asia to U.S. West Coast) of 12.3 days. Transit time from the West Coast to the East Coast is another 6 days, for a total transit time from Asia to the East Coast of about 18.3 days. However, the reliability of ports and railroads frequently is compromised by labor problems and capacity expansion challenges.
    [Show full text]
  • Some Historical Aspects on the Hydraulic Design of the Gatun Spillway in the Panama Canal
    8th IAHR ISHS 2020 Santiago, Chile, May 12th to 15th 2020 DOI: 10.14264/uql.2020.609 Some historical aspects on the hydraulic design of the Gatun Spillway in the Panama Canal A.V. Bal1, F. Re2, M.R. Lapetina2 & N. Badano2 1Panama Canal Authority Balboa, Panama 2Stantec Buenos Aires, Argentina E-mail: [email protected] ABSTRACT The Gatun spillway in the Panama Canal is built on top of the sea-level canal project, which was excavated between 1881 and 1887 by the Universal Company of the Interoceanic Canal, of France. The project was changed in October 1887 to a lock canal project. The design of the Gatun Spillway was developed between 1909 and 1911 by the Isthmian Canal Commission (ICC), an organization which reported directly to the United States Secretary of War, and which had the support of some of the best engineering minds working at the best universities, engineering companies and government institutions of the United States and Europe. A 1:32 scale physical model was used to aid in the spillway design. The spillway was completed in 1913 and the Panama Canal began operating on August 15th, 1914. This paper presents some engineering and historical aspects of the hydraulic design of the Gatun Spillway. The spillway design hydrograph and the methodology used to estimate the number of spillway gates required is contrasted to the current engineering practice. A detailed hydraulic engineering study was performed for the spillway between 2011 and 2013, in order to evaluate its hydraulic performance and to determine its discharge rating curve, using the OpenFoam CFD model and a physical model at a scale of 1:40.
    [Show full text]
  • Report Panama Port Development
    Report Panama Port Development Investment Opportunities in the Maritime Sector 2017 Embassy of the Kingdom of the Netherlands in Panama | Embassy of the Kingdom of the Netherlands in Panama | Embassy of the Kingdom of the Netherlands in Panama | Embassy of th lines navigate their global shipping routes. This has already born fruits as the expansion has led to an impressive increase in the ‘Hub of the Americas’ aggregated volume handled: the expanded Canal has registered an increase in tonnage of 23% in its first year after expansion, Over the past decade, Panama’s strategic location and its while its revenues increased 12.5% during the same period of integration into the world economy have converted the country time. into the fastest growing economy in Latin America and the Caribbean; transforming it into the ‘Hub of the Americas’. The The continuous developments around the Canal present country seeks to continue being competitive by amplifying challenges for which Dutch expertise can provide solutions. services and forming clusters to improve the interconnectivity Within the maritime sector six central developments can be between all sectors. In the government’s five-year plan for 2015- identified: 2019, a total public investment of USD 6.4 billion in transport 1. Peak hours and logistics has been indicated, of which USD 109 million will 2. Automation specifically be invested in maritime infrastructure. 3. Sustainability 4. LNG Market Furthermore, Panama has recently established diplomatic ties 5. Agro-logistics with China, the second biggest user - after the US - of the 6. Maritime Auxiliary Services Panama Canal. As it is expanding its global trade ambitions with its ‘One Belt One Road’ infrastructure-building initiative, The expansion of the Panama Canal has led to the establishment access to the eastern coasts of both Latin America and the US is of new projects in the maritime sector, thus creating business expected to be of growing importance for Beijing.
    [Show full text]
  • Responding to Challenges Following the Panama Canal Expansion Project
    Responding to Challenges following the Panama Canal Expansion Project Liliana Almonte Caitlin Burner Julia Ring Victoria Simpson Sonia Zarate Responding to Challenges following the Panama Canal Expansion Project A Major Qualifying Project Report: Submitted to the faculty of the Department of Civil and Environmental Engineering at Worcester Polytechnic Institute in partial fulfillment of the requirements for the Degree of Bachelor of Science in cooperation with the Autoridad del Canal de Panamá Submitted October 14, 2016 Submitted By: Project Advisors: Liliana Almonte Dr. Aaron Sakulich Caitlin Burner Dr. Tahar El-Korchi Julia Ring Victoria Simpson Sonia Zarate This report represents the work of WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review. For more information about the projects program at WPI, please see http://www.wpi.edu/academics/ugradstudies/project-learning.html Abstract The Panama Canal has shaped the global shipping industry since 1914, but recently expanded its operations to respond to increasing world trade. Projects completed in collaboration with the Autoridad del Canal de Panamá over the course of three months in Panama focused on the treatment of potable water originating in the canal and the maintenance of its aging structures following the expansion. Recommendations were provided to aid in preserving the sustainability of the canal. ii Authorship In order to achieve the collaborative writing goals set forth by the Worcester Polytechnic Institute (WPI) Major Qualifying Project (MQP) guidelines, the team adopted a methodology by which the alternative roles of writer and editor were assumed by each member.
    [Show full text]