Chapter 10 TEMPLE ELECTRICAL CODE
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Mechanical Trades Certification Program
Mechanical Trades Certification Program Electrical | Plumbing | Heating and Air Gas Fitting | Sheet Metal | Pipefitting 1411 Gervais Street | PO Box 12109 Columbia, SC 29211-2109 Phone: 803.933.1209 | Fax: 803.933.1299 [email protected] www.masc.sc August 2020 Mechanical Trades Certification Program Since 1965, the Municipal Association of South Carolina has provided an examination and certification program for master and journeyman tradesmen in the electrical, plumbing, heating and air, sheet metal, pipefitting and gas fitting fields. The ertification may be used as an indication of skill level in South Carolina cities that require trades certification before issuing licenses and permits. This certification should not be confused with the South Carolina Contractors Licensing Board licenses. PSI (800.733.9267) administers the examinations for the S.C. Department of Labor, Licensing and Regulation. The Board requires licensing by examination or waiver for contractors bidding on a commercial job in excess of $5,000. It will waive its examination requirements for holders of the aster electrician and master plumber certifications if the candidate passed examination after December 1990. For candidates who pass the A mechanical examination after September 7, 2013, the Board will also waive its requirements for packaged equipment and air conditioning systems exams. certifications also should not be confused with the S.C. Residentia Contractors License. The Commission will waive its examination requirements for electrical and plumbing licenses if a tradesman already holds an Association master certification card in the appropriate trade. A tradesman interested in either of the above licenses should contact the appropriate agency listed below. -
UAW Ford Agreements Cvr 1Up.Indd 2 11/15/16 7:07 AM SKILLED TRADES AGREEMENTS and LETTERS of UNDERSTANDING
SKILLED TRADES AGREEMENTS AND LETTERS OF UNDERSTANDING between UAW® and the FORD MOTOR COMPANY Agreements Dated November 5, 2015 133 MICHIGAN (Effective November 23, 2015) ♲ printed on recycled paper PRINTED IN U.S.A. 64353-UAW Ford Skilled Trades Cvr 1up.indd 1 10/26/16 8:24 AM National Ford Department Staff 2015 Negotiations Jimmy Settles Vice President and Director UAW Ford, Aerospace, Chaplaincy and Insurance Greg Drudi Roy Escandon Angelique Peterson- Don Godfrey Jeffrey Faber Mayberry Brett Fox Ford Motor Company and the UAW recognize Darryl Nolen Gregory Poet Kenneth Gafa their respective responsibilities under federal Bob Tiseo Reggie Ransom and state laws relating to fair employment Phil Argento Michael Gammella Lorenzo Robinson practices. Tracy Ausen Raenell Glenn Michael Robison Carol Bagdady R. Brian Goff Nick Rutovic The Company and the Union recognize the Matthew Barnett Ruth Golden Angelo Sacino Monica Bass moral principles involved in the area of civil Jane Granger Les Shaw David Berry rights and have reaffirmed in their Collective Andre Green Michael Shoemaker Carlo Bishop Bargaining Agreement their commitment not Joe Gucciardo Casandra Shortridge Shawn Campbell to discriminate because of race, religion, color, Dan Huddleston Larry Shrader Jerry Carson age, sex, sexual orientation, union activity, Michael Joseph Garry Sommerville Alfonzo Cash Thomas Kanitz national origin, or against any employee with Jeffrey Terry Tiffany Coger Brandon Keatts disabilities. Kevin Tolbert Gerard Coiffard Michael Kerr Vaughan Tolliver Sean -
2020 National Electrical Code® Style Manual
2020 NATIONAL ELECTRICAL CODE® STYLE MANUAL 1 FOREWORD August 2020 The National Electrical Code® is used nationally and internationally as the basis for safeguarding persons, buildings, and their contents from hazards arising from the use of electricity. It is vitally important that the text be as explicit as possible, and that maximum consistency be achieved in the language used in the text. The Code contains those provisions considered necessary for safety and thus is widely used as a basis for legal enforcement in the installation of electrical conductors and equipment in buildings and certain other premises (as detailed in the Code itself); this places a major responsibility on those involved in the preparation of document text to use forms of expression that promote uniform interpretation. The National Electrical Code Correlating Committee has recognized these responsibilities and has issued this manual. Preparation and Date of Adoption. This manual was originally prepared by the Editorial Task Group of the National Electrical Code Committee and adopted by the National Electrical Code Correlating Committee on May 13, 1969. It was amended September 22, 1975, October 11, 1984, October 12, 1989, and May 9, 1994. In January 1999, the Correlating Committee Task Group on the Usability of the NEC rewrote the manual. It was adopted by the National Electrical Code Correlating Committee on March 19, 1999 and by the Standards Council on April 15, 1999. It was amended March 1, 2001, January 15, 2003, and August 9, 2011, August 2015, and December 2020. 2 TABLE OF CONTENTS Foreword ........................................................................................................ 2 Chapter 1 General 4 1.1 Purpose ............................................................................................ -
Electrical Inspection Checklist for One-Family Homes Based on the 2020 National Electrical Code® (NEC®)
Electrical Inspection Checklist for One-Family Homes Based on the 2020 National Electrical Code® (NEC®) NOTE: The Board of Electricity adopted the 2020 National Electrical Code (NEC) with an effective date of Nov. 17, 2020. Accordingly, the Department of Labor and Industry began enforcing the 2020 NEC on Nov.17, 2020. Electrical work authorized by permits issued on or after this date must comply with the 2020 NEC. Electrical license examinations are based on the requirements of the 2020 NEC beginning Jan. 1, 2021. However, due to concerns regarding the availability of 2-pole GFCI circuit breakers, the department delayed enforcement of the requirements for 250-volt GFCI receptacles and outlet requirements found in NEC 210.8(A) and 210.8(F). On April 5, 2021, DLI will begin enforcing the 250-volt GFCI receptacle and outlet requirements found in NEC 210.8(A) and 210.8(F). Industry circuit breaker manufacturers have confirmed that supply-chain challenges will be resolved in March 2021. Electrical work authorized by permits issued on or after April 5, 2021, must comply with the 2020 NEC. 001 An owner (i.e. homeowner) who files a Request for Electrical Inspection form (i.e. permit) with the Department of Labor and Industry or other electrical inspection authority is signing an affidavit and declaring they own and occupy the residence and they will personally perform all of the electrical work, including the planning and laying out of the electrical work. 002 The term “owner” is defined in law as a natural person who physically performs electrical work on premises the person owns and actually occupies as a residence or owns and will occupy as a residence upon completion of construction. -
Unit 41: Electrical Installation Design in Building Services Engineering
Unit 41: Electrical Installation Design in Building Services Engineering Unit code: F/600/0416 QCF Level 3: BTEC Nationals Credit value: 10 Guided learning hours: 60 Aim and purpose The aim of this unit is to give learners a knowledge of the principles and processes, and skills, used in the design of electrical services for buildings. Learners will also develop knowledge and skills in data distribution, security and fire protection system requirements. Unit introduction Building services engineers need to develop an understanding of industry standards and how they relate to the principles and processes used to design the electrical services used in buildings. This unit considers the application of components, materials, equipment and installation methods to the production of design specifications for lighting, power, data distribution, security and fire protection systems within buildings. This unit focuses on linking electrical and lighting principles with practical applications. The unit should, therefore, be undertaken when learners have either achieved an understanding of the associated electrical science, materials and analytical methods or have begun to study them. Learning outcomes On completion of this unit a learner should: 1 Know how to design electrical lighting and power requirements for buildings 2 Be able to design electrical lighting and power installations for specific applications 3 Know how to establish the data distribution, security and fire protection system requirements 4 Be able to design data distribution, security -
90 INTRODUCTION to the National Electrical Code
ARTICLE INTRODUCTION TO THE 90 NATIONAL ELECTRICAL CODE Introduction to Article 90—Introduction to the National Electrical Code Many NEC violations and misunderstandings wouldn’t occur if people doing the work simply understood Article 90. For exam- ple, many people see Code requirements as performance standards. In fact, the NEC requirements are bare minimums for safety. This is exactly the stance electrical inspectors, insurance companies, and courts take when making a decision regard- ing electrical design or installation. Article 90 opens by saying the NEC isn’t intended as a design specification or instruction manual. The National Electrical Code has one purpose only, and that’s the “practical safeguarding of persons and property from hazards arising from the use of electricity.” The necessity of carefully studying the NEC rules can’t be overemphasized, and the role of textbooks such as this one is to help in that undertaking. Understanding where to find the rules in theCode that apply to the installation is invaluable. Rules in several different articles often apply to even a simple installation. Article 90 then describes the scope and arrangement of the NEC. The balance of this article provides the reader with informa- tion essential to understanding the Code rules. Typically, electrical work requires you to understand the first four chapters of theNEC which apply generally, plus have a working knowledge of the Chapter 9 tables. That understanding begins with Article 90. Chapters 5, 6, and 7 make up a large portion of the Code, but they apply to special occupancies, special equipment, or other special conditions. -
ASC-GIEC List of Degrees and Careers
ASC-GIEC List of Degrees and Careers College Degree Original Career list APS PVNGS SRP (Career Levels) TEP AAS Electric Electric Utility Lineworker Design Technician TEP – T&D Design Utility Design Design Electrician Lineworker Technology Technician Polyphase Cable Splicer Chandler- Cable splicers Meterman Gilbert Designer Community AAS Electric Lineworker Lineworker Lineworker TEP T&D College Utility Electrician Substations Relay Tech. Technology Substation Electrician Lineman Technician (Lineworker) Relay Technician Troubleman Metering Tech. Meter Technician Polyphase Distribution Meterman Cable Splicer Designer Automobile Automobile Heavy Equip. Ops Mechanic Mechanic Elect./Comm. Metal Fabricator Electrician Machinist Electric Repair Plant Electrician and Test Shop Plant Mechanic Electrician Construction and Automotive Maintenance Mechanic Repairer Design Technician CCL Electric Lineworker Lineworker Lineworker TEP T&D – Lineman Utility Electrician Substations (Lineworker) Technology Polyphase Electrician Relay Technician Meterman Meter Technician Cable Splicer 1 ASC-GIEC List of Degrees and Careers Automobile Mechanic Metal Fabricator Machinist Plant Electrician Plant Mechanic Construction and Maintenance Repairer AAS Engineering Engineering Engineering Technician Technician Technology I & C Relay Technician Technician Communications E&I Technician Technician Boilermaker Control Technician Millwright Electrical Repairman Pipefitter OR Pathway to Eng. Bachelor’s; Elect, -
Construction Electrician Basic
NONRESIDENT TRAINING COURSE January 1998 Construction Electrician Basic NAVEDTRA 14026 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Although the words “he,” “him,” and “his” are used sparingly in this course to enhance communication, they are not intended to be gender driven or to affront or discriminate against anyone. DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. PREFACE By enrolling in this self-study course, you have demonstrated a desire to improve yourself and the Navy. Remember, however, this self-study course is only one part of the total Navy training program. Practical experience, schools, selected reading, and your desire to succeed are also necessary to successfully round out a fully meaningful training program. THE COURSE: This self-study course is organized into subject matter areas, each containing learning objectives to help you determine what you should learn along with text and illustrations to help you understand the information. The subject matter reflects day-to-day requirements and experiences of personnel in the rating or skill area. It also reflects guidance provided by Enlisted Community Managers (ECMs) and other senior personnel, technical references, instructions, etc., and either the occupational or naval standards, which are listed in the Manual of Navy Enlisted Manpower Personnel Classifications and Occupational Standards, NAVPERS 18068. THE QUESTIONS: The questions that appear in this course are designed to help you understand the material in the text. VALUE: In completing this course, you will improve your military and professional knowledge. Importantly, it can also help you study for the Navy-wide advancement in rate examination. -
Electrical Code Amendment
CITY OF GRAPEVINE Chapter 7, Buildings and Construction, Article III, Electrical Code ARTICLE III. ELECTRICAL CODE DIVISION 1. GENERALLY Sec. 7-30. Definitions. For the purposes of this article, hereinafter referred to as the electrical code or this code, the following terms, phrases, words, and their derivatives shall be construed as set out in this section: Approved: Acceptable to the building inspection division and/or the electrical board of appeals of the city. Authorized person: Any person, as defined in section 1-5, registered or licensed under the provisions of this code to do work as permitted under the specific provisions of this code. Buildings, building use: Words relating to buildings and building use, when not otherwise separately defined, shall have meanings which conform to the meanings set out in the zoning ordinance of the city; otherwise, they shall have their usual dictionary meanings. City: The territory within the corporate limits of the city, or the legally constituted governing body thereof, its agents and its officers. Conductor: A wire or cable or other form of metal suitable for carrying electric current or potential. Electrical apprentice: Any person who has been issued a license from the State of Texas as an electrical apprentice as provided for by state law. Electrical construction: All work and materials used in installing, maintaining, or extending a system of electrical wiring and all appurtenances, apparatus or equipment used in connection therewith, inside or outside of or attached to any building, structure, lot or premises. Electrical contractor: Any person who has been issued a license from the State of Texas as an electrical contractor as provided for by state law. -
Industrial MI Wiring Cable
Industrial MI Wiring Cable Installation Manual for Alloy 825 Sheath Cable Wiring Systems Important Safeguards and Warnings WARNING: FIRE AND SHOCK HAZARD. nVent PYROTENAX mineral insulated (MI) industrial wiring cables must be installed in accordance with the requirements of national and local codes and standards, the installation instructions in this manual, and the customer’s specification. Read these important safeguards and carefully follow the installation instructions. • Ensure the cable has been stored properly and is in good condition prior to commencing installation. • Always use safe working practices when installing cables, observing OSHA and other national safety rules. • Store cables indoors in a clean, dry, covered area, if possible. • During the time that the cables are exposed and during cable pulling activities, protect cables from nearby or overhead work to prevent damage to the cable sheath. • Do not pull cables around corners that have sharp edges, such as corners in cable trays, or other obstructions. • Prevent damage to cables by removing any abrasions or sharp edges from surface of support system. • Damage to cables or components can cause sustained electrical arcing or fire. Do not energize cables that have been damaged. Damaged cable or terminations may need to be repaired or replaced. Damaged cable should be repaired by a qualified person. • When installing cables which may be exposed to hydrocarbon flash fires, use only steel or stainless steel in the support system. ii | nVent.com Table of Contents General Information -
Don't Be Confused by Your Fuse
Head Office Neptronic® 400 Lebeau Blvd. HVAC Controls Electric Actuators Actuated Valves Montreal, Quebec, Canada H4N 1R6 Tel.: (514) 333-1433 Humidifiers Electric Heaters Fax: (514) 333-3163 Toll Free: 1-800-361-2308 Don’t be confused by your fuse: MCA and MOP for your humidifier explained Before we start, we need first to understand what MCA and MOP are. The minimum circuit ampacity (MCA) and maximum overcurrent protection (MOP) ratings provide a guide for safely connecting field-wired equipment to the building mains. Understanding these ratings, and their relationship to each other, is critical to properly selecting wire and circuit breaker sizes. What is MCA? Minimum Circuit Ampacity (MCA) is a calculated value that specifies the minimum main power wire size. It is also used to determine the minimum wire size required for a field wired product. This specification is necessary in order to guarantee that the wiring will not overheat under expected operating conditions. The wire size takes into account the normal current draw, aging of components and anticipated faults. More specifically, the MCA is the highest steady-state electrical current that the unit should see when operating correctly. What is MOP? Maximum Over-Current Protection (MOP) is a calculated value that determines the maximum size of the over-current protection device (fuse or breaker). There are different MOP equations depending on your application. The maximum overcurrent protection (MOP) is the maximum circuit breaker size required to properly protect the equipment under anticipated fault conditions. The MOP takes into account startup surges and component aging. Supply wiring must be rated to carry the amps shown as MCA. -
Prevailing Wage Rates CHARLES D
THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates CHARLES D. BAKER As determined by the Director under the provisions of the RONALD L. WALKER, II Governor Secretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H WILLIAM D MCKINNEY KARYN E. POLITO Director Lt. Governor Awarding Authority: Massachusetts College of Art and Design Contract Number: City/Town: BOSTON Description of Work: Patch and paint crackertorium per specifications Job Location: 621 Huntington Ave Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request Number” on all pages of this schedule. • An Awarding Authority must request an updated wage schedule from the Department of Labor Standards (“DLS”) if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L.