2018 Canadian Electrical Code Saskatchewan Interpretations
Total Page:16
File Type:pdf, Size:1020Kb
120 Based on the 2018 Canadian Electrical Code Effective: January 1, 2019 V4.2 (this page left intentionally blank) ELECTRICAL INSPECTIONS Preface and Scope The Canadian Electrical Code, Part l, Twenty-Fourth Edition, as interpreted by these requirements, issued under Section 5 of The Electrical Inspection Act, 1993, shall govern the workmanship and all other matters pertaining to electrical equipment and the installation of electrical equipment in or upon any land, buildings, structures, and premises. All previously issued bulletins are superseded by these interpretations. This document contains supplementary information to clarify the requirements of the 24th edition of the Canadian Electrical Code (CEC), and by their inclusion herein is adopted as requirements under Section 5 of The Electrical Inspection Act, 1993. Report of Accident The Electrical Inspection Act, 1993 c.E-6.3 s.27 requires: “Where an accident involving an electrical installation or electrical equipment occurs and results in a death or injury of a person or in a fire or an explosion, the contractor or the contractor’s agent or the owner of the electrical equipment or the owner’s agent shall immediately notify the Chief Electrical Inspector, stating the precise location of the accident, its general nature and results”. Investigation of Accident The Electrical Inspection Act, 1993 c.E-6.3 s.28 requires: The accident site is to be preserved, “no part of any electrical plant or electrical equipment involved is to be removed or its position altered by any person”, “until the written permission of an Inspector has been obtained”. 2018 Saskatchewan Interpretations Page 1 ELECTRICAL INSPECTIONS Table of Contents PREFACE AND SCOPE ................................................................................................................................................... 1 Report of Accident ............................................................................................................................................................ 1 Investigation of Accident .................................................................................................................................................. 1 Website information ......................................................................................................................................................... 8 Bond notice administration fees ....................................................................................................................................... 8 Unreported work penalty – Electrical Inspection Regulation ........................................................................................... 8 Energization stickers ......................................................................................................................................................... 9 Electrical Inspections Registered Electrical Contractor Program ..................................................................................... 9 Journeyman License (see The Electrical Licensing Act E-7.2) ........................................................................................ 9 Employer’s License (see The Electrical Licensing Act E-7.2) ......................................................................................... 9 SECTION 2 - GENERAL RULES .................................................................................................................................. 10 2-004 - Permit ................................................................................................................................................................. 10 2-004 - Permits for low voltage and extra low voltage installations ..................................................................... 11 2-004 - Permits for signs and outline lighting ......................................................................................................... 11 2-012 - Inspection request required ................................................................................................................................ 12 2-014 - Plans and specifications ..................................................................................................................................... 12 Renewable Energy Information Check Sheet ........................................................................................................ 15 2-022 - Renovations of existing installations .................................................................................................................. 17 2-024 - Use of approved equipment ............................................................................................................................... 18 2-024 - Use of approved equipment - exceptions ........................................................................................................... 27 Liquid-filled Transformers ...................................................................................................................................... 27 HV Downhole ESP’s (Electrical Submersible Pumps) .......................................................................................... 29 2-030 - Deviation or postponement ................................................................................................................................ 30 2-100 - Marking of equipment ........................................................................................................................................ 30 2-106 - Rebuilt equipment .............................................................................................................................................. 30 2-200 - Protection of equipment ..................................................................................................................................... 31 2-300 - General requirements for maintenance and operation ........................................................................................ 32 2-326 - Electrical equipment near combustible gas equipment (see also 6-408) ............................................................ 32 2-400 - Enclosures, type, designation, and use (see Appendix B) .................................................................................. 32 SECTION 4 - CONDUCTORS ........................................................................................................................................ 33 4-004(22) - Service conductors for common residential services ................................................................................... 33 4-004, 4-006 & 8-104 - Application of new changes to conductor sizing ...................................................................... 33 D8 Tables with 75° calculations ............................................................................................................................... 34 D9 Tables with 75° calculations ............................................................................................................................... 35 D10 Tables with 75° calculations ............................................................................................................................. 36 D11 Tables with 75° calculations ............................................................................................................................. 37 4-006 - Temperature limitations (see Appendix B) ........................................................................................................ 38 4-008 - Induced voltages and currents in metal armour or sheaths of single conductor cables (see Appendix B) ......... 39 4-022 - Installation of identified conductors (see Appendix B) ...................................................................................... 40 4-032(3) - Identification of insulated conductors ........................................................................................................... 40 SECTION 6 - SERVICES AND SERVICE EQUIPMENT .......................................................................................... 41 6-104 - Number of consumer’s services permitted in or on a building........................................................................... 41 6-112 - Support for the attachment of overhead supply or consumer’s service conductors or cables (see Appendix B)41 6-112(3) ...................................................................................................................................................................... 41 6-112(5) ...................................................................................................................................................................... 41 6-200(1) - Service equipment - single breaker service equipment.................................................................................. 41 6-200(2) - Service equipment – dual-lug meter sockets (see 6-104) .............................................................................. 41 6-206 – Consumer’s service equipment location ............................................................................................................ 42 6-208 - Consumer’s service conductors location - under house trailer/mobile homes ................................................... 43 6-212 - Wiring space in enclosures ................................................................................................................................