Six-Monthly Environmental Compliance Report of Stipulated Conditions of Environmental Clearance (Dec
Total Page:16
File Type:pdf, Size:1020Kb
Project: Commercial Project, Village- Sihi, Sector-84, Tehsil.- Manesar, Gurgaon, Haryana Half-yearly Compliance Report of EC (EC No. –SEIAA/HR/2013/464 Dated 12/07/2013) Conditions SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF STIPULATED CONDITIONS OF ENVIRONMENTAL CLEARANCE (DEC. 2013 to MAY 2014) FOR CONSTRUCTION PROJECT, VILLAGE- SIHI, SECTOR-84 TEHSIL- MANESAR, DISTRCT- GURGAON, HARYANA For Submission to: Ministry of Environment and Forests (MOEF) Submitted by: M/s Mark Buildtech Pvt. Ltd. Regd Office: Flat No. 714, Hemkunt Chamber 89, Nehru Place, New Delhi-110019 MAY 2014 Project: Commercial Project, Village- Sihi, Sector-84, Tehsil.- Manesar, Gurgaon, Haryana Half-yearly Compliance Report of EC (EC No. –SEIAA/HR/2013/464 Dated 12/07/2013) Conditions INDEX Description Page No. Chapter 1 Compliance of Stipulated Conditions of Environmental Clearance Part A Specific Conditions for buildings in operational phase 3 I. Construction Phase 3 II. Operation Phase 7 Part B General Conditions 11 Chapter 2 Details of Environmental Monitoring 2.1 Ambient Air Quality Monitoring 13 2.1.1 Ambient Air Quality Monitoring Stations 13 2.1.2 Ambient Air Quality Monitoring Methodology 13 2.1.3 Ambient Air Quality Monitoring Results 14 2.1.4 Discussion on Ambient Air Quality in the Study Area 15 2.2 Ambient Noise Monitoring 16 2.2.1 Ambient Noise Monitoring Locations 16 2.2.2 Methodology of Noise Monitoring 16 2.2.3 Ambient Noise Monitoring Results 16 2.2.4 Discussion on Ambient Noise Levels in the Study Area 17 2.3 Groundwater Quality Monitoring 18 2.3.1 Groundwater Quality Monitoring Locations 18 2.3.2 Methodology of Groundwater Quality Monitoring 18 2.3.3 Groundwater Quality Monitoring Results 18-19 2.3.4 Discussion on Groundwater Quality in the Study Area 19 2.4 Soil Monitoring 20 2.4.1 Soil Monitoring Locations 20 2.4.2 Methodology of Soil Monitoring 20 2.4.3 Soil Monitoring Results 20-21 2.4.4 Discussion on Soil Characteristics in the Study Area 21 Figures 2.1 Location-wise Variation of Ambient Air Quality 15 2.2 Location-wise Variation of Ambient Noise Levels 17 Annex 1 Test results of ambient air, noise, water and soil monitoring 2 Copy of Environment Clearance (EC) Letter 3 NOC Copy of Aravali Clearance 4 NOC Copy of Forest Clearance 5 Public Notice advertise in local newspaper Project: Commercial Project, Village- Sihi, Sector-84, Tehsil.- Manesar, Gurgaon, Haryana Half-yearly Compliance Report of EC (EC No. –SEIAA/HR/2013/464 Dated 12/07/2013) Conditions PART A:- SPECIFIC CONDITIONS:- CONSTRUCTION PHASE:- S. No. Conditions of Environmental Clearance Status of Compliance 1. “Consent For Establishment” shall be obtained from Haryana state Consent to establishment for the Pollution Control Board under Air and Water Act and a copy shall be project has already been obtained submitted to the SEIAA, Haryana before start of any construction prior to start of the project activity work at site. and submitted to SEIAA. 2. A First aid room as proposed in the project report will be provided First aid room has been provided in both during construction and operational phase of project. 3. Adequate drinking water and sanitary facilities should be provided Adequate drinking water & for construction workers at the site. Provision should be made for sanitary facilities has already been mobile toilets. Open defecation by the laborers is strictly provided for construction workers prohibited. The safe disposal of waste water and solid wastes at the site. The workers are from generated during the construction phase should be ensured. the nearby areas therefore the waste water and solid waste generations are negligible in quantity. Solid waste generated during the construction phase is being disposed off safely. 4. All the top soil excavated during Top soil is being stored for use in Construction activities should be stored for use in horticulture/landscape horticulture/landscape development within project site. development. 5. The project proponent should ensure that the building material Will be complied used in the construction phase should be stored within the project area and disposal of construction waste should not create any adverse effect on the neighboring and should be disposed of after taking necessary precautions for general safety and health aspects of the people .only in the approved sites with the approval of competent authority. 6. Construction spoils including bituminous materials and other Construction spoils being stored in hazardous materials must not be allowed to contamination a dedicated area duly bounded to watercourses and the dump site for such materials must be secured avoid contamination to the so that they should not leak into groundwater and any hazardous environment in proximity. Storage waste generated during construction phase should be disposed off area has been covered by as per applicable rules and norms with necessary approval of insulated lining to prevent Haryana State pollution control Board. contamination from hazardous materials like fuel of DG sets. Waste oil of the generators shall be disposed off through authorized vendors. 7. The diesel generator sets to be used during construction phase Silent DG sets had been used at should be of ultra-low sulphur diesel type and should confirm to the project site during Environment (Protection) Rules prescribed for air and noise construction stage, which emission standard. maintained noise and emission within the permissible limits. 8. The diesel required for operating DG sets shall be stored in The diesel stored in dug and pits underground tank if required; clearance from chief controller of covered with metal sheet/asbestos explosive shall be taken. sheets. The quantity of diesel stored is less than 2500 liters so approval of chief controller of explosives is not applicable. 9. Ambient noise levels should conform to the residential standards Ambient air & noise monitoring both during day and night. Incremental pollution loads on the had been conducted at the ambient air and noise quality should be closely monitored during boundary of the project site during Project: Commercial Project, Village- Sihi, Sector-84, Tehsil.- Manesar, Gurgaon, Haryana Half-yearly Compliance Report of EC (EC No. –SEIAA/HR/2013/464 Dated 12/07/2013) Conditions construction phase. Adequate measures should be taken to reduce construction phase and the results ambient air and noise level during construction phase, so as to shows that the noise levels were confirm stipulated residential standard. within the prescribed limits. 10. Fly ash should be used as building materials in the construction as Fly ash is being used in per the provision of fly ash notification of September 1999 and construction activities. amendment as on 27th August 2003. 11. Storm water control and its use as per CGWB and BIS standard for The recharge structures for storm various applications. water control as well as rain water harvesting are proposed for recharging of ground water. 12. Water demand during construction phase should be reduced by Premix concrete and curing agent uses of premix concrete, curing agent and other best practices are being used to save water. referred. 13. In view of severe constrains in water supply augmentation in the NOC from CGWA has been applied region and sustainability of water resources, the developers will for the project. submit the NOC from CGWA specifying water extraction quantities and assurance from HUDA/ utility provider indicating source of water supply and quantity of water with details of intended use of water –potable and non-potable. Assurance is required for both construction and operation stages separately. It shall be submitted to the SEIAA/R.O. MoEF, Chandigarh before start of construction. 14. Roof should meet prescribed requirements as per energy Thermal insulation of roofs shall conservation building code by using appropriate thermal insulation be done. material. 15. Opaque wall should meet prescribed requirements as per energy This being non air conditioned conservation building code which is proposed to be mandatory for building thermal insulation all air conditioned spaces while it is inspirational for non-air planned for roof only. conditioned spaces by use of appropriate thermal insulation to fulfill the requirements. 16. The approval of competent authority shall be obtained for The necessary approval has been structural safety of the building due to earthquake, adequacy in taken/ applied for Schematic fire firefighting equipment etc. as per national building code including approval obtained. protection measures for light etc. If any forest land is involved in the proposed site, clearance under Forest conservation act shall be taken from competent authority. 17. Overexploited ground water and impending severe shortage of Dual plumbing has been adopted water supply in the region requires the developers to redraw the for conservation of water. water and energy conservation plan. Developer shall reduce the overall footprint of the proposed development. The Project Proponent shall incorporate water efficiency /saving measures as well as water reuse /recycling within three month & before start of construction to the SEIAA, Haryana and R.O. MoEF, GOI, Chandigarh. 18. The project proponent shall construct 02 no. rainwater harvesting RWH pits will be constructed in pits for recharging the ground water with in project premises. Rain due course of time. water harvesting pits shall be designed to make provision for silting chamber and removal of floating matter before entering harvesting pit maintenance budget and person responsible for maintenance must be provided. Care shall also be taken that contaminated water do not enter any RHW pit. 19. The project proponent shall provide minimum one hydraulic ladder Hydraulic ladder will be installed of sufficient length for escape of people in case of fire. before completion of the project. 20. The project proponent shall submit assurance from the DHBVN for The project will operate only after supply of 2560 KVA of power supply before the start of obtaining connection of DHBVN construction.