The Official Newsletter of Gurujal Society
Total Page:16
File Type:pdf, Size:1020Kb
GuruJal NOVEMBER 2020 Gurujal Society, Mini Secretariat, Rajiv Chowk,Gurugram [email protected] | +91-124-2331003 | www.gurujal.org Follow GuruJal on Facebook Twitter Instagram YouTube 1 Table of Contents PROJECT UPDATES: SUPPORT A POND ........................................................................................................... 3 PROJECT UPDATES: BIODIVERSITY MANAGEMENT ................................................................................... 9 PROJECT UPDATES: WATERPROOFING ........................................................................................................ 12 PROJECT UPDATES: CONNECT THE DROPS ................................................................................................. 13 PUBLICATIONS .................................................................................................................................................... 20 ANNEXURE-I ......................................................................................................................................................... 21 2 PROJECT UPDATES: SUPPORT A POND Sr. No. Jurisdiction Pond Site Ongoing Activities Status WWTP has been commissioned 1 Khentawas and completed. Landscaping work WIP is in process WWTP construction is currently 2 Tajnagar WIP underway Dewatering and Water Hyacinth 3 Budhera WIP removal is in process 4 Iqbalpur Site has been completed Completed 5 Nawada Site has been completed Completed WWTP Collection Tank and pond 6 Kasan WIP cleaning has taken place 7 Hariahera WWTP has been constructed WIP 8 Harchandrpur Site has been completed Completed 9 Panchayati Raj Dhaula WWTP has been Constructed WIP Institute WWTP construction has to commissioned 10 Bilaspur WIP Dewatering& desiltinghas competed. Leveling has to started. 11 Palasoli Construction has to be started WIP 12 Bohra Kalan Site has been completed Completed 13 Mojabad Site has been completed Completed 14 Wazirpur RCC, PCC has been completed WIP Construction of wetland has been constructed, tanks has been 15 Dharampur- I WIP constructed and landscaping has to be started 16 Dharampur – II Work order has issued WIP 17 Daulatabad Work Order has issued WIP 18 Dhanwapur I DPR Vetted by GuruJal Completed 19 MCG Dhanwapur II DPR Vetted by GuruJal Completed 20 Godaui Kalan DPR Vetted by GuruJal Completed 3 21 Ghata I DPR Vetted by GuruJal Completed 22 Ghata II DPR Vetted by GuruJal Completed 23 Ghata III DPR Vetted by GuruJal Completed 24 Badshahpur I DPR Vetted by GuruJal Completed 25 Badshahpur II DPR Vetted by GuruJal Completed 26 Badshahpur III DPR Vetted by GuruJal Completed 27 Badshahpur IV DPR Vetted by GuruJal Completed 28 Shubash Nagar DPR Vetted by GuruJal Completed 29 Sihi DPR Vetted by GuruJal Completed 30 Darbaripur I DPR Vetted by GuruJal Completed 31 Darbaripur II DPR Vetted by GuruJal Completed 32 Sarai Alawardi DPR Vetted by GuruJal Completed 33 Tigra DPR Vetted by GuruJal Completed 34 Samaspur DPR Vetted by GuruJal Completed 35 Begampur Khatola DPR Awaited WIP 36 Bandhwari DPR Vetted by GuruJal Completed 37 Nathupur DPR Vetted by GuruJal Completed 38 Chauma DPR Vetted by GuruJal Completed 39 Basai DPR Awaited WIP 40 Jahajgarh DPR Awaited WIP 41 Surat Nagar DPR Awaited WIP 42 Gwal Pahadi DPR Awaited WIP 43 Moti Dungri Johad Pre-studies complete WIP MC Pataudi 44 Ram Johad Pre-studies complete WIP Samshaan Ghat 45 Pre-studies complete WIP MC Johad Farukhnagar Main Haily Mandi 46 Pre-studies complete WIP Johad Baba Mashnath 47 MC Haily Pre-studies complete WIP Johad Mandi 48 Chitar Kund Johad Pre-studies complete WIP 49 MC Sohna 28 Ponds Estimate Completed WIP Table 1: Updates of the projects under ‘Support A Pond 4 Major updates of the month under ‘Support A Pond’ 1. Budhera Pond Site Visit – GuruJal team has visited Budhera pond site with Sarpanch, WWTP Vendor, Dewatering & Desilting Vendor to review the work updates and discuss the issues on the site. Figure 1 –GuruJal team visited the Budhera Site Visit with the venodrs 2. Faridabad Municipal Corporation has provided Project Management for Pond Restoration and Rejuvenation work of 22 ponds in MCF area to GuruJal Society. 3. Interim Drainage Status Report of Gurugram District has been submitted to MCG in which all investigation regarding the drainage has been summarized. 4. Wazirpur site cleaning and leveling for landscaping is completed and WWTP work is in process. Figure 2: WWTP construction at Wazirpur site 5. WWTP construction work completed at Dharampur - I site and wetland construction work is going to start. 5 Figure 2 –WWTP construction at Dharampur-I Gram Panchayat Site 6. Landscaping work is on completion at Khetawas site. Figure 4: Grass layer separate around ground 6 Figure 5: Walkway constructed near the pond 7. Kasan settler tank is on completion and landscaping work needs to start. Figure 6: Settler tank at Kasan Site 8. Detailed site update report has submitted to Rites for Budhera pond site. 9. Detailed site update report has submitted to PowerGrid for Dharampur-II, Daultabad pond sites. 10. Chauma detailed project report (DPR) has submitted to MCG. 7 PROJECT UPDATES: BIODIVERSITY MANAGEMENT Status of Biodiversity Parks Biodiversity Sr. Ongoing Park/Urban Village Block Activities Status No. Activities City Forest Reconnaissance Survey, Aanganwadi Meetings, Completed Dependency Survey, Damdama Drone Survey Damdama Floral Survey WIP and Kherla (Sampling) 1 Sohna Pre-Study Biodiversity Reconnaissance Survey, Park Aanganwadi Meetings, Completed Drone Survey Kherla Dependency Survey, Floral Survey Completed (Sampling) Table 1 - Updates of Biodiversity Parks under the intervention ‘Biodiversity Management’ Status of Plantation Drives Sr. No. Rural/Urban Jurisdiction No. of Samplings Planted 1 Urban MCG 63335 Panchayati Raj: Bohra 2 Rural 400 Kalan Panchayati Raj: 3 Rural 350 Iqbalpur Panchayati Raj: 4 Rural 60 Harchandpur Panchayati Raj: 5 Rural 910 Mojabad 84 6 Rural Panchayati Raj: Kasan Panchayati Raj: 7 Rural 210 Khentawas Total 65349 8 Figure 7: Villagers of Khentawas helping in plantation Figure 8: Plantation at Khentawas village Updated Summary of MCG Plantation Drive Sr. No. Zone RWA/NGO Common Area Geo-Tagging 1 Zone 1 12,000 680 34 2 Zone 2 20,068 1060 19 3 Zone 3 4,678 155 20 4 Zone 4 14,064 630 40 5 Forest Nursery 10,000 - - Total 60,810 2525 113 Table 2 - Updates of MCG Plantation Drives 9 Major updates of the month under ‘Biodiversity Management’ 1. Door to Door Dependency Survey of Kherla Village - GuruJal team has conducted door to door survey (100 households) in Kherla village to understand the dependency of the villagers on the Pahad area where Biodiversity Park is to be constructed. Figure 9: Data collection for the survey; villagers collecting woods for their livelihood Figure 10 - Dependency Survey in Kherla Village 10 2. Nursery Development - Nursery Site Identification- GuruJal team visited the site and identified the suitable location for the nursery development with the support of Girdhawar and Sarpanch. Figure 11: Girdhawar and GuruJal team identifying the suitable location for nursery Figure 12: Drone image of nursery site - All administration approvals for the Nursery Development have been completed. 11 PROJECT UPDATES: WATERPROOFING Functionality Check of Rainwater Harvesting Structures Sr No. No. of RWH Structures Jurisdiction Activity 1 MCG 413 Cleaning Completed 2 MC Sohna 75 3 MC Pataudi 6 Checking Completed 4 MC Hailey Mandi 8 5 MC Farrukhnagar 11 6 Panchayati Raj 572 Checking Completed Total 1085 Table 3 - Updates of Rainwater Harvesting Structures Major updates of the month under ‘Waterproofing’ Bore Cleaning using Bokey in 89 sites in MCG jurisdiction. Sr. Total No. of RWHs under Division Total No. of RWHs (Bore) Cleaned No. Progress/Pending 1 Division I 0 0 2 Division II 15 1 3 Division III 12 1 4 Division IV 4 0 5 Division V 15 0 6 Division VI 0 0 7 Division VII 41 0 8 Division VIII 2 0 Total 89 2 Table 4 - Rainwater Harvesting Structures Cleaning in MCG 12 Figure 13 - Borewell Cleaning in Sector-3 and Sector-5 by MCG Workers PROJECT UPDATES: CONNECT THE DROPS Major updates of the month under ‘Connect the Drops’ 1. CII Conference - Ms. Shubhi Kesarwani, Program Manager GuruJal, addressed the GuruJal work on 2nd CII’s conference on the theme: “Building Resilience: Evolving a strategic framework for water secure future” on 3rd November 2020. Figure 14:2nd CII’s Conference | Water Secure Future 13 Figure 15: Snapshot of CII’s Conference 2. Ground Water Recharge Proposal for Tauru Block, Nuh - Meeting was conducted on 10th November 2020, with CEO Zila Parishad, Nuh at GuruJal office regarding pond restoration & rejuvenation work in Tauru Block of Nuh District. Meeting was focused on GuruJal’s previous and current works under various verticals and approach for pond restoration and rejuvenation in Nuh district. 3. MCG Meeting - Meeting was held on 19th November 2020 under the chairmanship of Additional Municipal Commissioner, Gurugram regarding review on pond sites. Detailed discussion on four DPR of Samaspur, Darbaripur I & II, Bandhwari, Badshapur IV pond sites to increase the efficiency and reduce the cost of the project. 4. Municipal Corporation Faridabad Meeting - Capacity Building Workshop - GuruJal has facilitated the capacity building workshop for the Municipal Corporation Faridabad on 19th November 2020. The workshop was attended by the SDOs, Junior Engineer (JE) and clerk. The agenda of the workshop is to train the field member of Faridabad for the pond site surveys which included all