Bromsgrove Stations As Places Prospectus
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Infrastructure Delivery Position Updates – MOD Ashchurch, 2016
Cheltenham, Gloucester and Tewkesbury Councils SA8 – MOD Ashchurch Infrastructure Delivery Position Statements Issue | 20 April 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number Ove Arup & Partners Ltd 63 St Thomas St Bristol BS1 6JZ www.arup.com Cheltenham, Gloucester and Tewkesbury Councils SA8 – MOD Ashchurch Infrastructure Delivery Position Statements Contents Page 1 Strategic Allocation Key Data 1 1.1 Location & Extent of Allocation 1 1.2 Key Data 2 1.3 Proposed Scale & Mix of Development 2 1.4 Proposed Build Out Trajectory & Population Growth 4 2 Infrastructure Requirements 5 2.1 Identification of Priority Infrastructure 5 2.2 Critical Infrastructure: Transport 7 2.3 Critical Infrastructure: Flood, Water & Waste Water 8 2.4 Critical Infrastructure: Education 8 2.5 Critical Infrastructure: Healthcare 9 2.6 Desirable Infrastructure : Community & Culture 9 2.7 Desirable Infrastructure: Sports & Outdoor Recreation (Pitches & Play Space), Informal & Natural Open Space 10 2.8 Essential Infrastructure: Energy 10 | Issue | 20 April 2016 200416_MOD ASHCHURCH JCS INFRASTRUCTURE POSITION STATEMENT.DOCX Cheltenham, Gloucester and Tewkesbury Councils SA8 – MOD Ashchurch Infrastructure Delivery Position Statements 1 Summary of Infrastructure Risk This statement has been produced to set out the current position in terms of infrastructure requirements for the proposed Site Allocation at MOD Ashchurch. The statement draws upon a number of resources including planning application supporting material and detailed discussions with the site promoters and service providers undertaken in September / October 2015. -
Quality As a Space to Spend Time Proximity and Quality of Alternatives Active Travel Networks Heritage Concluaiona Site No. Site
Quality as a space to spend Proximity and quality of Active travel networks Heritage Concluaiona time alternatives GI network (More than 1 of: Activities for different ages/interests Where do spaces currently good level of public use/value, Within such as suitability for informal sports and play/ provide key walking/cycling links? Biodiversity, cta, sports, Public Access Visual interest such as variety and colour Number of other facilities Which sites do or Agricultural Active Travel Networks curtilage/a Historic Local Landscape value variety of routes/ walking routes Level of anti-social behaviour (Public rights of way SSS Conservation Ancient OC Flood Zone In view allotments, significant visual Individual GI Site No. Site Name (Unrestricted, Description of planting, surface textures, mix of green Level of use within a certain distance that could best provide Land SAC LNR LWS (Directly adjacent or djoining In CA? park/garde Heritage Landscape Type of open space in Local Value Further Details/ Sensitivity to Change Summary Opportunities /presence, quality and usage of play and perceptions of safety National Cycle Network I Target Areas Woodlands WS (Worst) cone? interest or townscape protections Limited, Restricted) and blue assets, presence of public art perform the same function alternatives, if any Classification containing a network) listed n Assets this area equipment/ Important local connections importance, significant area of building? presence of interactive public art within Oxford) high flood risk (flood zone 3)) Below ground Above ground archaeology archaeology Areas of current and former farmland surrounded by major roads and edge of city developments, such as hotels, garages and Yes - contains two cycle Various areas of National Cycle Routes 5 and 51 Loss of vegetation to development and Northern Gateway a park and ride. -
Issues and Options Consultation Document
Contents Introduction 2 Bromsgrove District: An Overview 3 Why do we need to review the District Plan? 4 How will the Review affect the current District Plan policies? 4 National Planning Policy Framework 4 Strategic Planning and the Duty to Cooperate 5 The Plan Review Process 5 Evidence Base 7 Draft Green Belt Purposes Assessment Methodology 7 Draft Site Selection Methodology 7 Scoping and Sustainability Appraisal 9 About this consultation and how to respond 9 Next steps 10 Vision and Objectives of the District Plan 11 Vision 12 Objectives 12 Issues and Options 14 Strategic Issues for Bromsgrove District 16 Housing 26 Employment 34 Transport 41 Town Centre and Local Centres 48 Social Infrastructure 53 Natural and Historic Environments 58 Climate Change and Water Resources 63 Glossary 66 1 Introduction 90% The District covers of the District is In 2016 Bromsgrove 2 designated Green was home to about 217km Belt 96,800 people 2 1.2 The area is well served by motorways, with the M5 running north/south (J4, J4a and J5) and the M42 east/west 1. Introduction (J1, J2 and J3). The M5 and M42 connect with the M6 to the north of Birmingham and M40 to the east. The District also Bromsgrove District: benefits from train and bus connections into Birmingham City Centre and the wider region, and Bromsgrove Town An Overview is only 34km (21 miles) from Birmingham International Airport. 1.1 Bromsgrove District is situated in north Worcestershire and covers approximately 21,714 hectares. Although the 1.3 The main centre of population in Bromsgrove District town is located only 22km (14 miles) from the centre of is Bromsgrove Town with other larger centres being Birmingham, the District is predominantly rural with Alvechurch, Barnt Green, Catshill, Hagley, Rubery, and approximately 90% of the land designated as Green Belt. -
Read Book Life on the Lickey: 1943-1986
LIFE ON THE LICKEY: 1943-1986 PDF, EPUB, EBOOK Pat Wallace | 160 pages | 01 Jun 2014 | Brewin Books | 9781858585239 | English | Warwickshire, United Kingdom PDF Download Program Notes For Band Free When it came to the reporting of dead bodies, known as sudden deaths , the call was usually despatched to the probationers. He was flying into one of the trickiest assignments of his undercover career. And he might have to change the rules as he went along if things didn't work out the way Marci's friends thought they would. Ever since he'd heard her sister The same term later becamea synonym in Africa—andwith the slave trade in the Arabian Gulf — for undercover work. Now Becky and Rhys want Oliver and Clara declared dead so they can inherit their vast fortune and invest it in the continued expansion of their right - wing empire. Deep undercover at the Institute , Rave reviews for this gripping Intelligence Kim and I worked our way through school. No one helped us. No one gave us anything. What this girl needs is to get rid of those trashy clothes, do something with that awful hair Skip to content. Barahona C. Author : J. Author : Jane K. Born in Ipswich in , he was educated at Tonbridge School and became interested in railways when staying in Yarmouth during the Great War. In , he was sent to Scotland as acting Mechanical and Electrical Engineer but in , moved back to Crewe to become Works Superintendent involved in managing locomotive and munitions work. He retired in and died in , aged Source: Railway Wonders of the World. -
The Lickey Incline and Tardebigge Flight (12¼ Miles)
The Lickey Incline and Tardebigge Flight (12¼ miles) The walk starts at Stoke Works, criss-crosses the railway uphill with an easy stroll back down the canal towpath. In dry weather only sensible footwear is needed. The link-paths can become muddy and overgrown making boots and trousers sensible at other times. Bring a telephoto lens with your camera. Roadside parking available near start point. There are car parks at Aston Fields and Tardebigge Church. Most public houses will allow walkers to park but please check. Between 1791 and 1815 men toiled to link the Severn at Worcester with Birmingham by canal. In doing so they created the Tardebigge Flight with 30 locks, the longest in the UK followed by a tunnel of 580 yards. Between 1838 and 1841 navvies linked Gloucester and Birmingham by rail. In doing so they built the Lickey Incline - generally regarded as the steepest main line gradient in Britain - 2½ miles at 1 in 37. In two places the walk follows the long distance Monarch’s Way. The future King Charles II fled north after the Battle of Worcester (1651) to Madeley, Shropshire before coming south through Bromsgrove to Stratford, Charmouth and Shoreham The towpath is not a public right of way but the Canal and Rivers Trust allows walkers access. 1. Stoke Works - In 1812 salt was discovered during the building of the canal. In 1825 and 1828 two works developed which, following various financial and technical problems, came under the control of John Corbett, the Salt King in 1852 and 1858. He built an industrial village, including the village school, now converted to dwellings. -
Stratford Upon Avon Parkway Station Prospectus
STATIONS AS PLACES Opportunity Prospectus Integration, Community and Delivery: A Masterplan for Stratford-upon-Avon Parkway station STRATFORD-UPON-AVON PARKWAY STATION May 2020 FOREWORD Introducing the concept of Stations as Places The Stations as Places (SAP) programme is a process to help put railway stations at the heart of local communities. It is designed to create a vision for the future and to identify opportunities for delivering improvements to the local environment and create a welcoming ambience. The aim is to work in partnership with others to unlock potential and to meet shared objectives and aspirations. Railway stations are more than access points to the rail network; they can be hubs of activity that are rooted in the locality with the potential to support regeneration and development opportunities. They can also host community and business activities and offer facilities/infrastructure to encourage sustainable, multi modal travel with a view to reducing car dependency and improving local air quality. The Vision “We will develop stations as quality gateways between communities and the railway, supporting the changing needs of our passengers, residents and visitors. Stations in the West Midlands will be community assets, supporting the wellbeing and development of the areas they serve through involving local community and business.” West Midlands Station Alliance (WMSA) Mission Statement What does the prospectus do for Stratford-upon-Avon Parkway Station? There is an important role for the railways to play in both the economic and social regeneration of the local areas which our stations serve. This Opportunity Prospectus sets out the economic, social and geographic landscape of the area around our station and highlights some of the opportunities for commercial development, partnership working, inward investment and community regeneration. -
Cross-Boundary Growth of Redditch Borough
Housing Growth Background Document January 2013 Introduction Bromsgrove District Council and Redditch Borough Council jointly consulted on cross boundary growth options in 2010. Since then changes to the planning system have meant that both Councils need to work together to find a solution to meet the growth needs of Redditch which cannot all be sustainably accommodated within the Borough. The Councils have agreed to work together to find land within Bromsgrove District, in the vicinity of Redditch Borough, to sustainably accommodate this additional housing growth. This is a non-technical document that has been written to explain how a location has been identified by officers of both authorities to meet this cross-boundary growth. For this reason, technical information is not included but cross-referenced or results summarised in the relevant paragraphs. This document is structured to reflect the process of site selection and the following provides a summary of what each chapter will cover: Chapter Summary 1. Background To explain why cross boundary growth is necessary and how the growth requirements have been determined. This will cover the legislation, planning policies and evidence documents that are relevant to this cross boundary growth issue. 2. Strategic Objectives To identify the Strategic Objectives which site(s) will need to contribute to. 3. Methodology To explain how the site selection process was carried out and the sources of information. 4. Area Assessment Principles To identify the principles that will be used in the area assessment process. 5. Broad Area Appraisal To identify broad area(s) that are more appropriate for accommodating the development in accordance with relevant criteria. -
Midlands 16 South Midlands OAR March 2017
Route strategies: Option Assessment Report Study Name Midlands Study Area 16 Road / Junction A46 – M5 to M40 Name Route South Midlands Local Authority/ies Warwickshire County Council, Worcestershire County Council and Gloucestershire County Council HE Region Midlands Date: 05/01/17 Version: 0.1 1 Document Control Document Title A46 between M5 J9 and the M40 J15 (inclusive of M5 J9) OAR Author Nicola Glover (ACJV) Owner Strategy and Planning Route Strategies team Distribution For review Document Status Final Draft Revision History Version Date Description Author 0.1 06/12/2016 Draft Nicola Glover 2.1 24/02/2017 Draft for assurance review Nicola Glover Reviewer List Name Role AECOM Highways England Spatial Planning Consultants for East and West Midlands Chris Bate Highways England Asset Manager – Worcestershire Kathryn Simmonite Highways England Asset Manager – Worcestershire Serena Howell Highways England Asset Manager - Worcestershire Approvals Name Signature Title Date of Version Issue Tim Lund Tim Lund Project Manager 21/03/17 2.1 Reviewed by regional coordinators March 2017. Please ensure that comments in Annex F are reviewed. Original format of this document is copyright to the Highways England. 2 Table of Contents 1. Understanding the current situation 5 2. Understanding the future situation 16 3. Justification for intervention 18 4. Identifying objectives and defining geographic scope 20 5. Generating and assessing potential options 22 6 Better performing option(s) - costing 31 Annex A – Current Year Issues from the Stakeholder -
Tewkesbury Borough Housing Monitoring Report
Tewkesbury Borough Housing Monitoring Report 2018/19 AUGUST 2019 Tewkesbury Borough Council Planning Policy Tewkesbury Borough Council Council Offices Gloucester Road Tewkesbury Gloucestershire GL20 5TT www.tewkesbury.gov.uk 1 TABLE OF CONTENTS TABLE OF CONTENTS ........................................................................................................................................... 2 LIST OF TABLES .................................................................................................................................................... 3 EXECUTIVE SUMMARY ........................................................................................................................................ 4 INTRODUCTION ................................................................................................................................................... 5 What is the Housing Monitoring Report? ...................................................................................................... 5 Adopted Plan Context ..................................................................................................................................... 5 Joint Core Strategy ...................................................................................................................................... 5 Tewkesbury Borough Plan to 2011 .............................................................................................................. 6 Emerging Planning Policy – Tewkesbury Borough Plan .............................................................................. -
ANNEX 4A – Email Responses
1 ANNEX 4a – Email Responses RESPONDENT VIEW COMMENTS Key Stakeholders/Groups I accept this junction has been closed for a number of weeks due to road maintenance, however any longer- term proposal to restrict vehicular traffic is NOT supported. 1. Emergency response times for ALL Emergency services to this area will increase and detrimental to public Thames Valley Police Object safety. 2. Walton Street is currently a defined Diversion route for Blue light services and other vehicles during closures of St Giles. Alternative Diversions much longer and detrimental in terms of Emergency response to North Oxford. Can see this would be beneficial to the residents of Walton street, I do have some concerns regarding Emergency access. Since the current closure has been in place, we have attended quite a few minor incidents, and the only Fire & Rescue Service, access has been via St Giles and little clarendon street or St Margret’s road for the Hydraulic Platform (due (Rewley Road & Slade Concerns to the size and amount of swing on the vehicle) Park White Watch) Whilst I am not opposed to a temporary traffic closure trial myself, I would personally like the ability to access via a transponder and a bollard or some other mechanism that we could breach? Obviously, a sign would do the same, but would state only emergency vehicles have access. During the current road closures on Walton Street, our appliances have been significantly delayed in attending properties down Walton Street and the surrounding side roads/Port Meadow because of high traffic levels, tight roads for the diversion and the length of time it takes us to get to suitable diversion routes that are listed in the consultation map. -
Appendix-6-1-Transport-Assessment
2142-01-TA01d July 2017 PROPOSED HOTEL AT PARC CYBI, HOLYHEAD TRANSPORT ASSESSMENT DRAFT FOR CONSULTATION Prepared on behalf of: The Conygar Investment Company Plc & Premier Inn Limited AXIS Camellia House 76 Water Lane Wilmslow SK9 5BB Tel: 0844 8700 007 www.axisped.co.uk Proposed 80-bed Hotel Development Parc Cybi, Holyhead, Anglesey Transport Assessment DRAFT FOR CONSULTATION CONTENTS 1.0 INTRODUCTION ............................................................................................... 1 1.1 Background ....................................................................................................... 1 1.2 Proposal Site Planning History .......................................................................... 1 1.3 Report Structure ................................................................................................ 2 2.0 EXISTING TRANSPORT CONDITIONS ............................................................ 3 2.1 Site Location ...................................................................................................... 3 2.2 Existing Site and Access ................................................................................... 3 2.3 Description of the Local Highway Network ......................................................... 3 2.4 Highway Safety: Personal Injury Accident Data ................................................. 5 2.5 Site Sustainability .............................................................................................. 5 2.6 Summary .......................................................................................................... -
Lickey and Blackwell Village Design Statement
Lickey & Blackwell VILLAGE DESIGN STATEMENT Lickey & Blackwell Parish Village Design Statement Lickey & Blackwell Parish Council, Bromsgrove, Worcestershire, B60 1BL Page 2 of 18 Lickey & Blackwell Parish Village Design Statement LICKEY AND BLACKWELL PARISH VILLAGE DESIGN STATEMENT 1.0 Foreword in the area (notably Barrow Cadbury in Blackwell & Lord Austin in Lickey) and this Members of the local community have come trend grew. The following quotations elaborate: together to develop this document so that it may help shape future development in the “The close proximity of Birmingham is parish of Lickey and Blackwell. The purpose of reflected in one of the major distinguishing this document is to describe the qualities and features of the region ….. its extensive and characteristics that people value in their village scattered pattern of residential development. Its and its surroundings, and so influence local varied relief makes it an area of considerable planners and developers towards more scenic attraction and this, combined with the sympathetic development. advantage of nearness to the city, renders the whole district very desirable to those urban workers who are sufficiently well-to-do to be able to afford a country home amid pleasant surroundings and within easy distance of the place of work. As a consequence the last twenty years have seen the gradual spreading over the region of an alarming mosaic of development, both of the ribbon type and, what is perhaps more disruptive still to local farming, of the isolated villa type. By 1939 an area the size of a good sized town had become more or less suburbanised”. 1 Figure 1 – St.