2009 Budget Published: March 31, 2009

Total Page:16

File Type:pdf, Size:1020Kb

2009 Budget Published: March 31, 2009 2009 Budget Published: March 31, 2009 Governor Pat Quinn Chairman John Mitola Acting Executive Director Mike King Pat Quinn, Governor Ex-Officio-Member John Mitola, Chairman Term expires May 1, 2011 Board of Directors Top row from left: Thomas Canham, Steven Harris, James M. Roolf, David R. Andalcio Bottom row from left: Carl O. Towns, Chairman John Mitola, George Pradel, Betty-Ann Moore, James J. Banks Not pictured: Governor Pat Quinn, Ex-officio; Secretary Gary Hannig, IDOT, Ex-officio The Government Finance Officers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to the Illinois State Toll Highway Authority for the Annual Budget beginning January 01, 2008. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, as an operations guide, as a financial plan, and as a communications device. Table of Contents Page Executive Letter...........................................................................................................................................................................7 Executive Summary...................................................................................................................................................................11 Tollway Organization and Background ..................................................................................................................................21 Revenue Sources and Underlying Assumptions....................................................................................................................29 Fund Structure ...........................................................................................................................................................................33 Budget Summaries.....................................................................................................................................................................41 Strategic Plan..............................................................................................................................................................................51 Departmental Budgets and Narratives....................................................................................................................................75 Administration ...................................................................................................................................................................78 Business Systems................................................................................................................................................................83 Communications................................................................................................................................................................88 Engineering.........................................................................................................................................................................92 Executive Office ............................................................................................................................................................. 100 Finance............................................................................................................................................................................. 103 Information Technology................................................................................................................................................ 108 Office of Inspector General.......................................................................................................................................... 113 Legal.................................................................................................................................................................................. 118 Procurement.................................................................................................................................................................... 121 State Police....................................................................................................................................................................... 126 Toll Operations............................................................................................................................................................... 130 Capital Program ...................................................................................................................................................................... 135 Debt Management.................................................................................................................................................................. 161 Budget Process and Documents........................................................................................................................................... 167 Financial Policies and Practices ............................................................................................................................................ 175 Demographics ......................................................................................................................................................................... 181 Appendix ................................................................................................................................................................................ 187 Annual Toll Revenue Certificate—Independent Traffic Engineer.......................................................................... 188 Renewal & Replacement Deposit Requirement from Consulting Engineer .......................................................... 194 Certificate of Authorized Officer ................................................................................................................................. 196 Acronyms......................................................................................................................................................................... 197 Glossary............................................................................................................................................................................ 199 Fiscal Year 2009 Budget Table of Exhibits Exhibit No. and Title ..................................................................................................................................... Page 1. Tollway Board of Directors..............................................................................................................................................22 2. System Map ........................................................................................................................................................................27 3. Overview of Flow of Funds.............................................................................................................................................35 4. Revenues/Expenditures and Changes in Fund Balances.......................................................................................38-39 5. 2009 Budgeted Revenues and Expenditures..................................................................................................................42 6. Sources of Revenue Table................................................................................................................................................43 7. Revenue Projection Pie.....................................................................................................................................................43 8. Allocation of Revenue Table............................................................................................................................................44 9. Projected Allocation of Revenue Pie ..............................................................................................................................44 10. Capital Program Projections Table .................................................................................................................................45 11. Projected Capital Expenditures Pie.................................................................................................................................45 12. 2009 Proposed Budgeted Headcount .............................................................................................................................46 13. 2009 Maintenance & Operational Budget by Category................................................................................................47 14. Major Account Summary..................................................................................................................................................48 15. Budget by Department......................................................................................................................................................49 16. Departmental Allocations (% of total budget) ..............................................................................................................50 17. Overview of Tollway Strategic Plan..........................................................................................................................54-55 18. Performance Metric Historical Trends.....................................................................................................................56-57
Recommended publications
  • CHICAGO PREMIUM OUTLETS 1650 Premium Outlets Boulevard | Aurora, IL 60504
    CHICAGO PREMIUM OUTLETS 1650 Premium Outlets Boulevard | Aurora, IL 60504 SEMI-IMPROVED PADS AVAILABLE FOR SALE OR LEASE A. RICK SCARDINO Principal [email protected] 773.355.3040 All information furnished regarding property for sale, rental or financing is from sources deemed reliable, but no warranty or representation is made to the accuracy thereof and same is submitted to errors, omissions, change of price, rental or other conditions prior to sale, lease or financing or withdrawal without notice. No liability of any kind is to be imposed on the broker herein. 9450 West Bryn Mawr Avenue | Suite 550 | Rosemont, IL 60018 | 773.355.3000 (main) | www.lee-associates.com CHICAGO PREMIUM OUTLETS Semi-Improved Pads Available for Sale or Lease PROPERTY OVERVIEW HIGHLIGHTS: OPPORTUNITY IDENTIFICATION: • 687,000 SF Premium Outlet Center with Over 170 Stores • Semi-Improved Pads with Interstate 88 Visibility Available Surrounded by Strong Demographics • Pads are Situated at the Southeast Corner of the Property • Opened in May 2004 and was Expanded in August 2015 and Near Large Parking Fields • Chicago Premium Outlets is One of the Top Performing • Ideal for a Hotel, Full Service Restaurant, Retail, or Outlet Centers in the U.S. with 6,000,000 Annual Visitors Entertainment Users • The City of Aurora, with a Population of More Than TRAFFIC COUNTS: 199,000, is the Second Largest City in Illinois • Interstate 88 (Chicago-Kansas City Expressway): 94,000 VPD • Other Local Attractions Include Hollywood Casino, Paramount Theatre, and Two Brothers
    [Show full text]
  • Transportationtransportation
    Transportationtransportation City of Elmhurst Comprehensive Plan TransporTATion Elmhurst’s transportation system consists of an extensive roadway network, including direct access to Interstate High- ways I-290, I-294, and I-88, an extensive commuter rail and bus transit system, as well as a well-connected pedestrian and bike network. This transportation network allows for easy and accessible travel within the City and excellent con- nections to the surrounding metropolitan area. Elmhurst’s interstate highway and commuter rail access are among its strongest assets, making it a very desirable community for living and conducting business. Therefore, maintain- ing a well-functioning and efficient transportation system is critical to sustaining the high quality-of-life in the com- munity. A review of existing conditions, including average daily traffic and transit ridership history, formed the basis for the development of the transportation framework and functional street classification. Through this analysis, pri- Commuter and freight rail tracks ority improvement areas were identified, as well as general improvements or suggestions to manage population and employment growth, relative to a functional and efficient 8. Improve wayfinding signage throughout the city to aid transportation system. This section provides an overview pedestrians, bicyclists and motorists in locating and of the transportation network in Elmhurst and offers some accessing key community facilities. recommendations to sustain and strengthen community mobility. Goal 2: Maintain and determine adequate parking facilities to serve land uses throughout the city. Goals AND OBJECTIVES Objectives: Goal 1: Continue to enhance mobility within the City by 1. Actively monitor, manage and address on-street and effectively managing local traffic issues and anticipating the off-street parking needs within the city to ensure ad- impact of future development on current traffic patterns.
    [Show full text]
  • Bonded Concrete Overlay Performance in Illinois
    143 Bonded Concrete Overlay Performance In Illinois FINAL REPORT PHYSICAL RESEARCH REPORT NO. 143 JUNE 2002 Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA/IL/PRR 143 4. Title and Subtitle 5. Report Date April 2002 BONDED CONCRETE OVERLAY PERFORMANCE IN ILLINOIS 6. Performing Organization Code 8. Performing Organization Report No. 7. Author(s) Thomas J. Winkelman Physical Research No. 143 9. Performing Organization Name and Address 10. Work Unit ( TRAIS) Illinois Department of Transportation Bureau of Materials and Physical Research 11. Contract or Grant No. 126 East Ash Street Springfield, Illinois 62704-4766 IHR – R07 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Illinois Department of Transportation Final Report Bureau of Materials and Physical Research July, 1995 – December, 2001 126 East Ash Street Springfield, Illinois 62704-4766 14. Sponsoring Agency Code 15. Supplementary Notes 16. Abstract Two bonded concrete overlay rehabilitation projects were constructed in Illinois during the 1990’s. The first project was constructed in 1994 and 1995 on Interstate 80, east of Moline. The second project was constructed in 1996 on Interstate 88 near Erie. The existing pavements for both the Interstate 80 and Interstate 88 projects were 8-inch thick continuously reinforced concrete pavements. The Interstate 80 rehabilitation was designed as a 4-inch thick plain concrete overlay. This project includes six experimental sections using various percentages of microsilica added to the standard mix design. In addition, microsilica grout was used as a bonding agent between the original pavement and the new bonded concrete overlay in some sections.
    [Show full text]
  • 10 Ronald Reagan Expressway
    2004-10 EXECUTIVE ORDER ESTABLISHING INTERSTATE 88 BETWEEN STERLING, ILLINOIS AND THE QUAD CITIES AS THE RONALD REAGAN MEMORIAL HIGHWAY WHEREAS, President Ronald Reagan was a native son of Illinois, born in Tampico, Illinois, on February 6, 1911 in a five-room flat over a bakery, the second son of store clerk John Reagan and seamstress Nelle Reagan; and WHEREAS, the Reagan family moved to Chicago’s South Side, to Monmouth, and back to Tampico before settling in Dixon, Illinois; and WHEREAS, Ronald Reagan was baptized at the Christian Church of Dixon on July 21, 1922; and WHEREAS, Ronald Reagan spent seven summers working as a lifeguard at Dixon’s Lowell Park, and is credited with saving 77 swimmers from drowning in the Rock River during that time; and WHEREAS, Ronald Reagan graduated from Dixon High School, where he participated in drama, basketball, football and track, and was elected student body president; and WHEREAS, Ronald Reagan attended Eureka College in Eureka, Illinois, where he appeared in 14 plays, won letters in football, swimming and track, coached the swim team, and served as study body president during his senior year; and WHEREAS Ronald Reagan graduated from Eureka College in 1932 with a Bachelor of Arts degree in social science and economics; and WHEREAS, Ronald Reagan cast his first vote in a national presidential election in Dixon in 1932; and WHEREAS, the future fortieth president of the United States spent his entire youth in Illinois; and WHEREAS, President Ronald Reagan had a long and varied career, ranging from the movie screens of Hollywood, to the Governor’s mansion in California, and finally to the White House as President of the United States; and WHEREAS, with his death on June 6, 2004, the United States of America and the State of Illinois have lost a charismatic and inspiring leader.
    [Show full text]
  • Storm Data and Unusual Weather Phenomena - April 2013
    Storm Data and Unusual Weather Phenomena - April 2013 Location Date/Time Deaths & Property & Event Type and Details Injuries Crop Dmg ILLINOIS, Northeast (IL-Z013) DU PAGE 04/08/13 08:39 CST 0.50K Strong Wind (MAX 48 kt) 04/08/13 08:39 CST 0 A strong area of low pressure drove winds to 50 mph across northern Illinois. Minor damage occurred at DuPage Airport on a hanger door. WINNEBAGO COUNTY --- 0.9 SE THE LEDGES [42.41, -88.99] 04/09/13 07:30 CST 0 Hail (0.88 in) 04/09/13 07:40 CST 0 Source: CoCoRaHS WINNEBAGO COUNTY --- 1.5 E THE LEDGES [42.42, -88.97] 04/09/13 07:30 CST 0 Hail (0.88 in) 04/09/13 07:40 CST 0 Source: COOP Observer Nickel size hail covered the ground. WINNEBAGO COUNTY --- 1.5 E THE LEDGES [42.42, -88.97] 04/09/13 08:30 CST 0 Hail (0.88 in) 04/09/13 08:40 CST 0 Source: COOP Observer A second thunderstorm moved over the same area dropping hail up to the size of nickels. The ground was still covered in hail from the previous storm about an hour earlier. A few strong thunderstorms developed over northern Illinois dropping nickel size hail. OGLE COUNTY --- 3.0 ESE ROCHELLE [41.90, -89.02], 2.4 ESE ROCHELLE [41.91, -89.02] 04/10/13 05:40 CST 0.15M Thunderstorm Wind (EG 50 kt) 04/10/13 05:40 CST 0 Source: Law Enforcement Over a dozen semi trucks either jackknifed or flipped onto their side at the Interstate 39 and 88 interchange in southeast Ogle County.
    [Show full text]
  • Construction Suspended Where Possible for July 4
    State of Illinois JB Pritzker, Governor Illinois Department of Transportation Omer Osman, Acting Secretary FOR IMMEDIATE RELEASE: CONTACT: July 1, 2020 Paul Wappel 217.685.0082 Maria Castaneda 312.447.1919 Construction suspended where possible for July 4 Non-emergency closures called off, but motorists should still expect work zones SPRINGFIELD – The Illinois Department of Transportation announced today that lanes that have been closed for construction will reopen, where possible, for the Fourth of July holiday to minimize travel disruption. Non-emergency closures will be suspended from 3 p.m. July 2 to 11:59 p.m. July 5. The following lane closures will remain in place during the holiday weekend. Work zone speed limits will remain in effect where posted. Please buckle up, put your phone down and drive sober. District 1 City of Chicago: • The following ramps in the Jane Byrne Interchange work zone will remain closed: • o Inbound Kennedy (Interstate 90/94) Expressway exit to inbound Ida B. Wells Drive. o Outbound Dan Ryan Expressway exit to Taylor Street and Roosevelt Road. o Outbound Ida B. Wells Drive entrance from Canal Street. o Outbound Ida B. Wells Drive exit to outbound Dan Ryan. o Outbound Ida B. Wells Drive exit to outbound Kennedy. o Inbound Eisenhower Expressway (Interstate -290) to outbound Kennedy; detour with U-turn posted. o Inbound Eisenhower; lane reductions continue. o Inbound Ida B. Wells Drive; lane reductions continue. • Outbound Kennedy exit at Canfield Road; closed. • Westbound Bryn Mawr Avenue between Harlem and Oriole avenues; lane reductions continue. • Westbound Higgins Avenue between Oriole and Canfield avenues; lane reductions continue.
    [Show full text]
  • 1- Ordinance Re Freestanding Interstate Highway Signs On
    CITY OF WARRENVILLE DU PAGE COUNTY, ILLINOIS ORDINANCE NO. ______3028 ORDINANCE RE FREESTANDING INTERSTATE HIGHWAY SIGNS ON PUBLIC PROPERTY WHEREAS, by virtue of a referendum, the City of Warrenville, DuPage County, Illinois, is a home rule unit and may exercise any power and perform any function pertaining to its government and affairs, including, but not limited to, the power to tax and to incur debt; and WHEREAS, the Mayor and City Council believe, and hereby declare, that it is in the best interests of the City to regulate Interstate highway signs on public property separately from other signs in the City based upon their unique location, characteristics, and potential impacts; and WHEREAS, a public information and input meeting regarding a proposed Interstate Highway Sign on proposed public property was held on October 22, 2015; NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF WARRENVILLE, DU PAGE COUNTY, ILLINOIS, IN THE EXERCISE OF ITS HOME RULE POWERS, AS FOLLOWS: SECTION ONE: The foregoing recitals are hereby incorporated in this Section One as if said recitals were fully set forth herein. SECTION TWO: Section 8-6-3 of Title 8 Chapter 6 of the Warrenville City Code is hereby amended in its entirety to read as follows: 8-6-3: APPLICABILITY: Except for Freestanding Interstate Highway Signs on public property (which are regulated under 1- Chapter 6 of Title 7), from and after the effective date of this Chapter, the use of all signs and portions of signs erected, altered, with respect to height, area, and additions to sign face, and relocated in the City shall be in conformity with the provisions of this Chapter.
    [Show full text]
  • Letter Reso 1..2
    *LRB09621705GRL39304r* SJ0118 LRB096 21705 GRL 39304 r 1 SENATE JOINT RESOLUTION 2 WHEREAS, The Chicago - Kansas City Expressway (C-KC) 3 corridor through Illinois and Missouri forms a unified corridor 4 of commerce between 2 of the major commercial and tourism 5 centers in the Midwest; and 6 WHEREAS, The portion of the Chicago - Kansas City 7 Expressway corridor from Chicago to the Quad Cities, Galesburg, 8 Monmouth, Macomb, and Quincy, constitutes a major artery for 9 travel, commerce, and economic opportunity for a significant 10 portion of the State of Illinois; and 11 WHEREAS, It is appropriate that this highway corridor 12 through Illinois connecting to the corridor in the State of 13 Missouri be uniquely signed as the Chicago - Kansas City 14 Expressway (C-KC) to facilitate the movement of traffic; 15 therefore, be it 16 RESOLVED, BY THE SENATE OF THE NINETY-SIXTH GENERAL 17 ASSEMBLY OF THE STATE OF ILLINOIS, THE HOUSE OF REPRESENTATIVES 18 CONCURRING HEREIN, that we designate Interstate 88, the 19 portions of Interstate 55 and Interstate 80 from Chicago to the 20 Quad Cities, Interstate 74 to Galesburg, U.S. Route 34 to 21 Monmouth, U.S. Route 67 to Macomb, Illinois 336 to Interstate 22 172 at Quincy, Interstate 172 to Interstate 72, and Interstate -2-SJ0118LRB096 21705 GRL 39304 r 1 72 to the crossing of the Mississippi River at Hannibal, 2 Missouri as the Illinois portion of the Chicago - Kansas City 3 Expressway and marked concurrently with the existing route 4 numbers as Illinois Route 110; and be it further 5 RESOLVED, That the Illinois Department of Transportation 6 is requested to erect at every route marker, consistent with 7 State and federal regulations, signs displaying the approved 8 C-KC logo and Illinois Route 110; and be it further 9 RESOLVED, That suitable copies of this resolution be 10 delivered to the Secretary of the Illinois Department of 11 Transportation, the Director of the Missouri Department of 12 Transportation, and the Mayors of Chicago, the Quad-Cities, 13 Galesburg, Monmouth, Macomb, and Quincy..
    [Show full text]
  • The Greater Chicago Region: a Logistics Epicenter
    the greater chicago region By Mike Kirchhoff, CEcD, and Jody Peacock Fully one third of rail and truck traf- fic – and half the nation’s container traffic – pass through the Chicago region. While these statistics are impres- sive, Chicago’s infrastructure is being pushed to its limit. And projections point to more challenges ahead. In 2001 the Chicago Area Transportation Study (the Chicago region’s transporta- tion planning agency) projected 600 more daily trains in the region within 20 years (2,400 trains/year), and pro- jected an increase in Intermodal lifts of more than 250 percent in the same time period. Market impacts such as these are projected to demand more than 7,000 additional acres of land for Intermodal facilities. Choked by con- gestion already, these projections pre- A transload in progress from barge to truck. dict dire consequences for the region’s transportation system. rom the mid-1800’s to the 21st EMERGING CHALLENGES IN LOGISTICS century, Chicago has played a key Mike Kirchhoff, CEcD, Lean manufacturing, Six Sigma, just-in-time role at the heart of the American is Executive Director of commercial transportation sys- manufacturing, and other approaches to modern manufacturing each demand greater reliance on a the Jacksonville f tem. Today, with time-to-market timely, efficient and cost-effective transportation (Illinois) Regional EDC. demands ever more critical, the Chicago network. The increasingly elevated importance of Jody Peacock is region’s historic position as a freight transporta- distribution in the supply chain represents a signif- Communications and tion and distribution nexus is growing ever icant shift in emphasis – a paradigm shift of extraor- dinary proportions.
    [Show full text]
  • Letter Reso 1..2
    *LRB09621705GRL39304r* 09600SJ0118 Enrolled LRB096 21705 GRL 39304 r 1 SENATE JOINT RESOLUTION NO. 118 2 WHEREAS, The Chicago - Kansas City Expressway (C-KC) 3 corridor through Illinois and Missouri forms a unified corridor 4 of commerce between 2 of the major commercial and tourism 5 centers in the Midwest; and 6 WHEREAS, The portion of the Chicago - Kansas City 7 Expressway corridor from Chicago to the Quad Cities, Galesburg, 8 Monmouth, Macomb, and Quincy, constitutes a major artery for 9 travel, commerce, and economic opportunity for a significant 10 portion of the State of Illinois; and 11 WHEREAS, It is appropriate that this highway corridor 12 through Illinois connecting to the corridor in the State of 13 Missouri be uniquely signed as the Chicago - Kansas City 14 Expressway (C-KC) to facilitate the movement of traffic; 15 therefore, be it 16 RESOLVED, BY THE SENATE OF THE NINETY-SIXTH GENERAL 17 ASSEMBLY OF THE STATE OF ILLINOIS, THE HOUSE OF REPRESENTATIVES 18 CONCURRING HEREIN, that we designate Interstate 290 to 19 Interstate 88, Interstate 88 to Interstate 80, the portions of 20 Interstate 80 from Interstate 88 to Interstate 74, Interstate 21 74 to Galesburg, U.S. Route 34 to Monmouth, U.S. Route 67 to 22 Macomb, Illinois 336 to Interstate 172 at Quincy, Interstate -2-09600SJ0118Enrolled LRB096 21705 GRL 39304 r 1 172 to Interstate 72, and Interstate 72 to the crossing of the 2 Mississippi River at Hannibal, Missouri as the Illinois portion 3 of the Chicago - Kansas City Expressway and marked concurrently 4 with the existing
    [Show full text]
  • RL ISTHA Toll Rates 2019 and 2020 08192019.Xlsx
    This notice is pursuant to 605 ILCS 10/11 (c.) The following rate schedule goes into effect on January 1, 2019 at 12:01 AM TOLL RATES BY PLAZA FOR YEAR 2019 Toll Plaza Name Plaza No. Autos Trucks • All Times I-PASS • All Times Cash • Daytime • Overnight 6:00AM to 10:00PM 10:00PM to 6:00AM Small Medium Large Small Medium Large Jane Addams Memorial Tollway, Interstate 90 South Beloit Mainline 1 $0.95 $1.90 $3.20 $4.75 $8.35 $2.10 $3.65 $6.25 East Riverside Boulevard * 2 $0.55 $1.10 $1.95 $2.80 $5.00 $1.25 $2.25 $3.75 Genoa Road EB Exit * 3 $0.55 $1.10 $1.95 $2.80 $5.00 $1.25 $2.25 $3.75 Genoa Road WB Exit * 3 $0.75 $1.50 $2.50 $3.75 $6.65 $1.65 $2.90 $5.00 Illinois 173 * 4 $0.55 $1.10 $1.95 $2.80 $5.00 $1.25 $2.25 $3.75 Irene Road (I-PASS or Pay Online) ^ 5A $0.55 Pay Online^: $1.10 $1.95 $2.80 $5.00 $1.25 $2.25 $3.75 Belvidere Mainline 5 $1.50 $3.00 $5.00 $7.50 $13.35 $3.35 $5.85 $10.00 Illinois 47 (I-90); EB Exit & WB Entrance (I- ^6 $0.45 Pay Online^: $0.90 $1.55 $2.40 $4.15 $1.10 $1.95 $3.20 PASS or Pay Online) Illinois 47 (I-90); EB Entrance & WB Exit (I- ^6 $0.30 Pay Online^: $0.60 $1.00 $1.40 $2.50 $0.70 $1.15 $1.95 PASS or Pay Online) Illinois 23 (I-PASS or Pay Online) ^7A $0.75 Pay Online^: $1.50 $2.50 $3.75 $6.65 $1.65 $2.90 $5.00 [Interchange to open late 2019] Marengo Mainline 7 $1.50 $3.00 $5.00 $7.50 $13.35 $3.35 $5.85 $10.00 Randall Road * 8 $0.55 $1.10 $1.95 $2.80 $5.00 $1.25 $2.25 $3.75 Elgin Mainline 9 $0.75 $1.50 $2.50 $3.75 $6.65 $1.65 $2.90 $5.00 Barrington Rd EB Ent & WB Exit * 10 $0.45 $0.90 $1.55 $2.40 $4.15 $1.10
    [Show full text]
  • Lanes Reopened for Memorial Day Holiday Weekend
    State of Illinois Bruce Rauner, Governor Illinois Department of Transportation Randall S. Blankenhorn, Secretary FOR IMMEDIATE RELEASE: CONTACT: May 24, 2018 Giana Urgo 312.814.4693 Guy Tridgell 312.793.4199 Lanes Reopened for Memorial Day Holiday Weekend IDOT suspends non-emergency roadwork to improve traffic flow SPRINGFIELD — The Illinois Department of Transportation announced today the reopening of lanes where possible for the busy Memorial Day weekend to minimize travel disruption. Non- emergency roadwork will be suspended from 3 p.m. Friday, May 25, through 12:01 a.m. Tuesday, May 29. Work zone speed limits will remain in effect where posted. Please buckle up, put your phone down, avoid distractions and drive sober. Motorists should be alert, as lane closures in the following locations will remain in place during the holiday weekend: District 1 Cook County • Harts Road over North Branch of Chicago River, between Illinois 21 (Milwaukee Avenue) and Touhy Avenue in Niles; closed. • U.S. 6 (159th Street) between Oak and Cicero Avenue in Oak Forest; closed, detour posted. • Northwest Highway at Broadway Street, from east of State Street to east of Hanbury Drive in Des Plaines; lane reductions continue. • Illinois 58 (Golf Road) at Wolf Road (Cumberland Circle) in Des Plaines; lane reductions continue. • Vincennes Road at Halsted Street in Harvey; closed. • JFK Boulevard from Arlington Heights Road to Elk Grove Boulevard in Elk Grove Village; closed, • Elk Grove Boulevard from Arlington Heights Road to Victoria Lane in Elk Grove Village; closed. • Skokie Blvd. (U.S. 41) and Hibbard Road in Wilmette; closed. • Illinois 59 (Sutton Road) from north of West Bartlett Road to south of Illinois 19 (Irving Park Road); lane reductions continue.
    [Show full text]