Howard Hanson Dam Update
Seattle District U.S. Army Corps of Engineers
US Army Corps of Engineers
BUILDING STRONG® Howard Hanson Dam
Green River Landslide Debris
Existing Grout Small Depression Drainage Curtain Location Tunnel Spillway
Big Depression Location Sand and Gravel Blanket
Flood Control Eagle Gorge Tower Reservoir
Fish Passage Facility Excavation
BUILDING STRONG® Normal Project Operations
NOV MAR JUN NOV
1206 ft
Potential flood pools of Spring ramp-up for Summer and fall flow short duration augmentation augmentation
1167 ft
1075 ft
Pool elevation in feet above sea level
BUILDING STRONG® Grout Curtain Construction
BUILDING STRONG® Grout Curtain Construction
Landslide Materials Grouting Operations • Boulders • Drill casing • Primary Grout • Secondary Grout • Ancient Silt layer
Bedrock Lower Aquifer
BUILDING STRONG® Drainage Tunnel Improvement Construction
BUILDING STRONG® Green River Valley
. Blue and Purple shading is the FEMA mapped floodplain.
BUILDING STRONG® As of 20FEB09
US Army Corps Of Engineers Green River Levees Seattle District ID Levee Name Eligible 20 1 Tukwila, (Federal & Certified) X
2 Desimone-Briscoe School Working 19 3 Boeing X
4 Lower Russell Working
5 Upper Russell Working 18 6 Kent Shops - Narita X
7 Meyers Golf X 17 8 County Road 8 Working
9 Horseshoe Bend (Federal) X
10 Monk (abandoned) 16
11 Reddington X 15 12 Galli’s X
13 Dykstra X
14 Fenster 13 14 15 Muellen
16 Potter 11 12 17 Neeley
18 Hammakami
19 Turley 10 9 20 Loans
21 Imhoff (Not Shown)
8 1 2 7 6 Eligible 3 4 5 BUILDING STRONGIneligible® Tukwila Temporary Measures . Raise low areas using Hesco systems and supersacks to provide 13,900 cfs capacity. . Add a cut off levee . Add 3’ of freeboard to levee.
BUILDING STRONG® Kent Temporary Measures
. Raise low areas using Supersacks to provide 3,900 cfs containment. . Secondary Containment off of levees . Add 3’ Freeboard to right bank levees
BUILDING STRONG® Kent South
BUILDING STRONG® Kent North
BUILDING STRONG® Auburn Temporary Measures
•Raise low areas on the Dykstra levee to provide 13,900 cfs capacity.
•Secondary Containment using Hesco Systems to extend the Reddington Levee.
BUILDING STRONG® Green River Temporary Measures
Locations Deliveries
Hesco Super Sacks Sandbags
Auburn 10,500 100,000
Kent 21,000 500,000
Renton 11,000 250,000
Tukwila 10,500 9,000 100,000
King County 6,500 100,000
Seattle District 34,000 1,250,000
Totals 27,500 75,000 2,300,000
BUILDING STRONG®