Office of the Executive Engineer, Civil

Total Page:16

File Type:pdf, Size:1020Kb

Office of the Executive Engineer, Civil West Bengal Pollution Control Board, Department of Environment , Government of West Bengal , NOTICE INVITING TENDER 1. Item rate tenders are invited on behalf of the West Bengal Pollution Control Board (WBPCB) from bonafide, interested, experienced and eligible agencies for the work of:- NAME OF WORK: Construction of ultra fast musical fountain with Diode Pumped Solid State (DPSS) laser system, water screen and video projection at Rabindra Sarobar, Kolkata 2. Tender documents consisting of plans, specifications, the schedule of quantities of the various classes of work to be done and the set of terms & conditions of contract to be complied with by the contractor whose tender may be accepted and other necessary documents can be seen in the office of the Member Secretary , West Bengal Pollution Control Board between hours of 11.00 A.M. & 04.00 P.M. from 20/02/2012 to 29/02//2012 everyday except on Holidays. Tender documents, excluding standard form, will be issued from his office, during the hours specified above, on payment of Rs 5000/-(Rupees five thousand) by Demand Draft or pay order to be drawn in favour of ªWest Bengal Pollution Control Boardº payable at Kolkata from any nationalized bank in India as non refundable cost of tender. 3. Bidders may purchase the bid document from the office of Member Secretary,WBPCB on payment of Rs.5,000/-(Rupees five thousand) as non refundable tender cost in the form of Demand Draft/ Pay order/ Bankers cheque, to be drawn in favour of ªWest Bengal Pollution Control Boardº payable at Kolkata from any nationalized bank in India. However the interested bidders may download the same tender document from our website : www.wbpcb.gov.in. and the bidders should enclose such cost of tender document of Rs. 5,000/-(Rupees five thousand) along with the bid. Otherwise bid will be treated as cancelled. 4. Further bidders are requested to deposit Earnest Money Deposit (EMD) of Rs. 20000/-(Rupees twenty thousand) in the form of Demand Draft/ Pay order/ Bankers cheque, to be drawn in favour of ªWest Bengal Pollution Control Boardº payable at Kolkata from any nationalized bank in India at the time of bid submission. 5. Contract shall be signed by the successful bidder within 30 days from the date of letter of award on prescribed format enclosed at annexure-I 6. The time allowed for carrying out the work will be two months from the date of signing the agreement or from the first date of handing over of the site, whichever is later, in accordance with the phasing, if any, indicated in the tender documents. 7. Tenders, which should always be placed in sealed envelope, with the name of work and due date written on the envelopes,, will be addressed to the Member Secretary, West Bengal Pollution Control Board, The tenders shall be dropped at Box supercribed asªTender for Construction of ultra fast musical fountain with DPSS laser system,water screen etcº kept at ground floor of Paribesh Bhavan, upto 4.00 p.m of 01.03.2012 and the same shall be opened in presence of interested agencies on 01.03.2012 at 4.30 p.m . 8. The description of the work is as follows : As per Schedule attached Bidders are advised to inspect and examine the site and its surroundings and satisfy themselves before submitting their tenders as to the nature of the ground and sub-soil (so far as is practicable), the form and nature of the site, the means of access to the site, the accommodation they may requisite and in general shall themselves obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their tender. A tenderer shall be deemed to have full knowledge of the site whether he inspects it or not and no extra charges consequent on any misunderstanding or otherwise shall be allowed. The tenderer shall be responsible for arranging and maintaining at his own cost all materials tools & plants water, electricity access, facilities for workers and all other services required for executing the work unless otherwise specifically provided for all in the contract documents. Submission of a tender by a tenderer implies that he has read this notice and all other contract documents. and has made himself aware of the scope and specification of the work to be done and of conditions 9. The competent authority on behalf West Bengal Pollution Control Board does not bind himself to accept the lowest or any other tender and reserves to himself the authority to reject any or all of the tenders received without the assignment of any reason. All tenders in which any of the prescribed condition is not fulfilled or any condition including that of conditional rebate is put forth by the tenderer shall be summarily rejected. Tender through mail shall not be accepted. 10. Canvassing whether directly or indirectly in connection with tenders is strictly prohibited and the tenders submitted by the contractors who resort canvassing will be liable to rejection. 11. The competent authority on behalf West Bengal Pollution Control Board reserves the right of accepting the whole or any part of the tender and the tenderer shall be bound to perform the same at the rate quoted. 12. The contractor shall not be permitted to tender for works in WBPCB if his near relative is posted as an officer in any capacity between the grades of Chief Engineer and Junior Environmental Engineer (both inclusive). He shall also intimate the names of persons who are working with him in any capacity or are subsequently employed by him and who are near relatives to any Group A officer in the WBPCB. Any breach of this condition by the contractor would render him liable to be removed from the approved list of contractors of this department. 13. The tender for the works shall remain valid for a period of sixty days from the date of opening of tenders. If any tenderer withdraws his tender before the said period or makes any modification in the terms and conditions of the tender which are not acceptable, WBPCB shall without prejudice to any other right or remedy be at liberty to forfeit the said earnest money as aforesaid. This notice inviting tender shall form a part of the contract document. For & on behalf of West Bengal Pollution Control Board 4 West Bengal Pollution Control Board (WBPCB) ªParibesh Bhavanº 10A, Block-LA,Sector-III, Bidhannagar,Kolkata-700098 ITEM RATE TENDER & CONTRACT FOR WORKS NAME OF WORK: Construction of ultra fast musical fountain with DPSS laser system,water screen and video projection at Rabindra Sarobar, Kolkata (i) To be submitted by 4.00 P.M. on 01.03.2012 To be opened in presence of tenderers who may be present at 4.30 P.M. hours on 01.03.2012 in the office of the Member Secretary,WBPCB Issued to :__________________________________________________________________ (Tenderer) Signature of office issuing the documents _____________________ Designation______________________________________________ Date of issue: ____________________________________________ T E N D E R I/We have read and examined the notice inviting tender, schedule, A,B,C,D,E & F Specifications applicable, Drawings & Designs, General Rules and Directions, Conditions, Contract Clauses of contract, Special condition Schedule of Rate & other documents and Rules referred to in the conditions of contract and all other contents in the tender document for the work. I/We hereby tender for the execution of the work specified within the time specified in schedule `F' viz schedule of quantities and in accordance in all respects with the specifications designs drawing and instructions We agree to keep the tender open for sixty (60) days from the due date of submission thereof and not to make any modification in its terms and conditions. A sum of Rs.20,000/-(Rupees twenty thousand) as EMD is hereby forwarded If I/We fail to commence the work specified I/We agree that the said WBPCB shall without prejudice to any other right or remedy be at liberty to forfeit the said earnest money absolutely otherwise the said earnest money shall be adjusted by Board towards security deposit which will be 5% of the order value to execute all the works referred to in the tender documents upon the terms and conditions contained or referred to therein. I/We hereby declare that I/We Shall treat the tender documents drawings and other records connected with the work as secret/confidential documents and shall not communicate information/derived there from to any person other than a person to whom I/We am/are 5 authorized to communicate the same or use the information in any manner prejudicial to the safety of the state. I/We agree that should I/We fail to commence the work specified in the above memorandum an amount equal to the amount of the earnest money mentioned in the form of invitation of tender shall be absolutely forfeited to the WBPCB and the same may at the option of the competent authority on behalf of the WBPCB be recovered without prejudice to any other right remedy available in law out of the deposit in so far as the same may extend in terms of the said bond and in the event of deficiency out of any other money due to me/us under this contract of otherwise. Dated¼¼¼¼¼.. Signature of Contractor Postal Address Mobile no. Witness: Address Occupation: 6 PROFORMA OF SCHEDULES (Operative Schedules to be supplied separately to each intending tenderer) SCHEDULE `A' Schedule of quantities ():- Attached SCHEDULE `B' --NILÐ( AS SPECIFIED IN ADDITIONAL TERMS AND CONDITIONS) Schedule of materials to be issued to the contractor:- S.No Description of Quantity Rate in figures and words at Place of issue item which the material will be charged to the contractor 1 2 3 4 5 - - - - - SCHEDULE `C' --NIL-- Tools and plants to be hired to the contractor:- S.No Description Hire charges per day Place of issue 1 2 3 4 NIL SCHEDULE `D' Nil SECHEDULE `E' Nil 7 8 SCHEDULE `F' Reference to General Conditions of Attached contract.: Name of work:- : Construction of ultra fast musical fountain with DPSS laser system,water screen and video projection at Rabindra Sarobar,Kolkata (i) Earnest Money: Rs.
Recommended publications
  • SUPREME COURT of INDIA Page 1 of 2 CASE NO.: Appeal (Civil) 3593-05 of 2003 PETITIONER: Union of India RESP
    http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 1 of 2 CASE NO.: Appeal (civil) 3593-05 of 2003 PETITIONER: Union of India RESPONDENT: Howrah Ganatantrik Nagarik Samity & Ors. DATE OF JUDGMENT: 17/04/2003 BENCH: N.Santosh Hegde & B.P.Singh. JUDGMENT: J U D G M E N T (Arising out of SLP Nos.17203-17205 of 1999) SANTOSH HEGDE,J. (With SLP No.9827/2002) Leave granted. SLPNo.9827/2002 is de-linked from C.A.Nos...of 2003 @ SLPNos. 17203-205/99. Heard learned counsel. Union of India through Eastern Railway, Calcutta is challenging an order made by Calcutta High Court dated 18.6.1999 in Writ Petition Nos. 12902/97 and 1322/98 pending in the file of the High Court of Judicature at Calcutta. A Division Bench of the said High Court while considering the above noted writ petitions filed before it for seeking eviction of illegal squatters in the railway property, as also areas besides Rabindra Sarobar, directed the State of West Bengal and Railway administration as an interim measure, to provide sanitary facilities to the said squatters. Accordingly following directions were issued:- (1) Cost for the project shall be borne in equal proportion by the State of West Bengal and the Union of India, through railway administration. (2) The State Government authorities, authorities of the railway administration as also the Calcutta Municipal Corporation shall see to it that no further infiltration takes place. (3) After the aforementioned project is completed by the State Government Calcutta Municipal Corporation would see the proper sanitation is maintained.
    [Show full text]
  • IN the HIGH COURT at CALCUTTA CONSTITUTIONAL WRIT JURISDICTION APPELLATE SIDE (Through Video Conference)
    04-05 05.11.2020 Ct. No.16 pg. IN THE HIGH COURT AT CALCUTTA CONSTITUTIONAL WRIT JURISDICTION APPELLATE SIDE (Through Video Conference) WPA 9184 of 2020 Ms. Anasua Bhattacharya Vs. State of West Bengal & Ors. with WPA 9209 of 2020 Ajay Kumar De Vs. Government of West Bengal & Ors. Mr. Rachit Lakhmani Mr. Indrajeet Dey Mr. Kushal Das Mr. Ranodip Dutta … For the petitioner in WPA 9184 of 2020 Mr. Bikash Ranjan Bhattacharjee Mr. Sabyasachi Chatterjee Mr. Pintu Kumar Kar Ms. Ankani Biswas @ Ankan Biswas Mr. Akashdeep Mukherjee Mr. Sandipan Das … For the petitioner in WPA 9209 of 2020 Mr. Kishore Datta, Ld. AG Mr. Abhrotosh Majumdar, Ld. AAG Mr. T.M. Siddiqui Mr. Sayan Sinha … For the State Mr. N.C. Bihani Ms. P. Banerjee Bihani … For the respondent no.4 Mr. Joy Saha Mr. Yash Vardhan Deora Ms. Easha Manchanda … For the intervenor These two matters, filed in public interest, pertain to the upcoming celebrations. In the second of the matters, 2 prayers have been made pertaining to Kali Puja right upto Christmas. There is an application by an unregistered body that can be loosely called the local firecrackers’ association. It is a body of persons engaged in the manufacture of or trading in firecrackers. The State has issued verbal advisories pertaining to firecrackers during the Kali Puja and Diwali celebrations. Certain guidelines have been framed regarding Kali Puja pandals. An appeal appears to have been made on behalf of the State for all kinds of firecrackers not to be used this year in view of the pandemic and the virus that attacks the respiratory system.
    [Show full text]
  • Annual Report 2011-12
    Nature Mates-Nature Club 4/10A Bijoygarh, Kolkata-700032 Annual Report 2011-12 Regular Works 1. Maintenance of Banabitan Butterfly Garden We are maintaining this garden since 2010. During this financial year approximately 2500 numbers of butterflies were released. 15 new life cycles were documented. Other Works 2. We have assisted Centre for Contemporary Communication to do the Status Survey of Parks of Kolkata. The Report were prepared and submitted to CCC. 3. We have been assigned to assist the Wildlife Division II, Department of Forest, Government of West Bengal, to do the documentation of Butterfly fauna at Gorumara National Park. The work has been started during September 2011. 4. Many wildlife were rescued from in and around Kolkata and were given to the DRC Saltlake. 5. We have cleaned and restored the Santragachhi Jheel during September – November 2011. It was a huge success. Media covered our work with a lot of praise. 6. We are assigned by Creative Hortifirms Pvt Ltd to prepare a Biodiversity Status Report of their property at Panchla, named “Country Roads”. The work has started during July 2011. 7. We are assigned by GGL Hotel and Resort Company Ltd., Amubuja Reality to prepare a Biodiversity Status Report of their property at Raichak on Ganges. The work has started during August 2011. Nature Mates-Nature Club 4/10A Bijoygarh, Kolkata-700032 Annual Report 2012-13 Regular Works 1. Maintenance of Banabitan Butterfly Garden We are maintaining this garden since 2010. During this financial year approximately 3500 numbers of butterflies was released. 10 new life cycles were documented.
    [Show full text]
  • Kolkata Stretcar Track
    to BANDEL JN. and DANKUNI JN. to NAIHATI JN. to BARASAT JN. Kolkata 22./23.10.2004 M DUM DUM Streetcar track map: driving is on the left r in operation / with own right-of-way the second track from the right tracks seeming to be operable e is used to make the turns of the regular passenger trains track trunks which are not operable v other routes in 1996 according to Tasker i other suspended routes according to CTC map TALA 11 [13] R actual / former route number according to CTC ULTADANGA ROAD Suburban trains and ‘Circular Railway’ according to Narayanan: Galif [12] i BELGATCHIA in operation under construction l Street [13] 1 2 11 PATIPUKUR A.P.C. Rd[ 20 ] M Note: The route along the Hugly River can’t be confirmed by my own g 12 Belgatchia observations. Bagbazar SHYAM BAZAR R.G. Kar Rd u BAG BAZAR M M metro railway pb pedestrian bridge 1 2 [4] 11 H Shyambazar BIDHAN NAGAR ROAD pb TIKIAPARA [8] 5 SOVA SOVA BAZAR – M BAZAR 6 AHIRITOLA Bidhan Nagar to PANSKURA JN. Aurobinda Sarani 17 housing block [4] 20 20 [12] [13] [ 12 ] 17 loop Esplanade [10] Rabindra Setu Nimtala enlargement (Howrah Bridge) pb [4] 1 [8] GIRISH 2 Howrah [10] M PARK 5 BURRA 6 15 Bidhan Sarani Rabindra Sarani 11 BAZAR 11 12 20 [21] [26] V.I.P. Rd 15 HOWRAH 11 12 M.G. 30Rd MAHATMA Maniktala Main Rd RAILWAY GANDHI 20 30 Acharya Profullya Chandra Rd STATION M ROAD M.G. Rd 20 Howrah [16] 17 17 Northbound routes are [12] [13] [16] M turning counterclockwise, Bridge 15 Mahatma Gandhi Rd 20 20 southbound routes are [4] 11 12 15 17 [ 12 ] 17 ESPLANADE 12 20 turning clockwise.
    [Show full text]
  • A Platform of Organizations and People Supporting Environment RA 449 Sector IV Salt Lake, Kolkata 700105 Phone No
    A Platform of Organizations and People Supporting Environment RA 449 Sector IV Salt Lake, Kolkata 700105 Phone No: 9831172060 E mail : [email protected] Ref: SM/ R-Sarovar/ 110 Dt. 18 Nov 2020 To The Hon'ble Chief Minister, Government of West Bengal Nabanna Sub: Feared environmental degradation and destruction of biodiversity at Rabindra Sarovar and Subhas Sarobar during ensuing Chhat Festival Respected Madam, At the outset please accept our festive greetings. You may be aware that Sabuj Mancha is the largest platform of organizations and individuals concerned for environment of the state, and has been consistently trying since 2009 to generate an informed and united voice regarding the critical environmental issues in the state, and share inputs and opinions to government for facilitating actions against range of environmental violations. We like to draw your kind attraction that Rabindra Sarovar, one of the most important National Water bodies and few of the rarest major patches of green and water left in the city, is under threat. You yourself raised the issues regarding Rabindra Sarobar in the past. Rabindra Sarovar plays a major role in maintaining ecological equilibrium in the city, particularly in its southern part, and has never been associated with practicing any religious or social rituals. However during last few years, the Sarovar has been severely affected environmentally; often in the name of culture and religion especially during Chhat Puja. We take this opportunity to remind that a committee involving primarily government officials and experts, set up under NGT order, highlighted the threat to Rabindra Sarobar and recommended the ban on such events in Rabindra Sarobar; based on which NGT passed the ‘ban Chhat puja’ order.
    [Show full text]
  • Environmental Impact Assessment Study Report on Rabindra Sarobar Lake Premises, Kolkata
    ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT ON RABINDRA SAROBAR LAKE PREMISES, KOLKATA FINAL REPORT APRIL, 2017 Published by West Bengal Pollution Control Board on 05 June 2018 1 EIA Report of Rabindra Sarovar, Kolkata Acknowledgement The West Bengal Pollution Control Board wishes to thank the Hon’ble NGT (EZ) for constituting a five member committee consisting of eminent scientists and engineers to study and submit a report on the probable impact of the activities in the Rabindra Sarovar stadium during the nights, connected with ISL matches, on “physical environment”, “biodiversity of the lake environment” and on the survivability scope of the migratory birds and required preventive measures. The West Bengal Pollution control Board extends heartiest thanks to the expert committee members, constituted to undertake Rapid EIA study in the Rabindra Sarovar: Dr. A.K. Sanyal, Chairman, WBBB (Chairman of the Expert Committee), Dr. Ujjal Kumar Mukhopadhyay, Chief Scientist, WBPCB, Dr. Anirban Roy, Research Officer, WBBB , Dr. Rajib Gogoi, Scientist-D, BSI, Kolkata, Dr. Rita Saha, Scientist-D, CPCB, Kolkata Regional Office, Dr. Deepanjan Majumdar, Sr. Scientist, NEERI, Dr. S.I. Kazmi, Scientist, ZSI, Kolkata and Mr. Ashoke Kumar Das, Secretary, KIT, Kolkata (Convenor). The background information and Literature survey provided by West Bengal Biodiversity Board and Botanical Survey of India were intently helpful to prepare this “ EIA Report of Rabindra Sarovar, Kolkata ” . This could not have been possible to prepare and publish this without their great help. We are also thankful to the team from the West Bengal Biodiversity Board for visiting Rabindra Sarobarlake and premises and contributed their effort & energy to prepare general biodiversity documentation, one of the essential source for this report, with their expertise.
    [Show full text]
  • D I R E C T I O N
    WEST BENGAL POLLUTION CONTROL BOARD (Department of Environment, Government of West Bengal) Paribesh Bhawan,10A, Block – LA, Sector III, Salt Lake Kolkata-700 098, Ph.: (033)335 8212, Fax : (033)335-8073, Web:www.wbpcb.gov.in, Email:[email protected] Memo No. 386 –2L/WPB-B(IX)/2002 Dated: 07/05/2003. D I R E C T I O N WHEREAS the West Bengal Pollution Control Board (hereinafter will be referred to as the ‘WBPCB’) is entrusted with the enforcement of the provisions of the Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act, 1981 and the Environment (Protection) Act, 1986 for the purpose of protection of environment and for the prevention and control of pollution in the State of West Bengal; AND WHEREAS it is observed that due to extensive and indiscriminate use of non-biodegradable plastic carrybags in the under mentioned heritage and tourist spots, huge quantity of garbage containing plastic carrybags accumulates causing environmental pollution due to contamination of water in such areas or in their vicinity; AND WHEREAS for the purpose of protecting the environment in the under mentioned areas, the entry, use, sale and processing of the plastic carrybags should be prohibited; AND THEREFORE in exercise of the power conferred by section 33 and 33A of the Water (Prevention and Control of Pollution) Act 1974 and by section 31 and 31A of Air (Prevention and Control of Pollution) Act 1981, the entry, use, sale of plastic carrybags are prohibited in the following areas with immediate effect: Contd.
    [Show full text]
  • GEOGRAPHY — HONOURS — PRACTICAL Paper : DSE-A-3P (Environmental Issues in Geography) Full Marks : 30 the Figures in the Margin Indicate Full Marks
    ( 1 ) T(6th Sm.)-Geography-H/Pr./(DSE-A-3P)/CBCS 2021 GEOGRAPHY — HONOURS — PRACTICAL Paper : DSE-A-3P (Environmental Issues in Geography) Full Marks : 30 The figures in the margin indicate full marks. Candidates are required to give their answers in their own words as far as practicable. 1. Prepare a questionnaire on the perception of people about the environmental pollution caused by a factory in your locality with both close and open ended questions. 10 2. How do you collect soil sample from the field and estimate proportion of organic carbon in it using a field kit? Describe the methodology. 10 3. Interpret the following changes in air quality. Diagram not necessary. 5 Stations in Kolkata AQI on Prominent AQI on Prominent 5/01/2021 Pollutant 5/05/2020 Pollutant Fort William 223 PM 2.5 45 PM 10 Jadavpur 260 PM 2.5 34 PM 10 Rabindra Bharati 315 PM 2.5 33 PM 10 Rabindra Sarobar 207 PM 2.5 31 PM 10 Victoria Memorial 240 PM 2.5 34 PM 10 Beliaghata 167 PM 10 23 PM 10 Shyambazar 228 PM 2.5 42 PM 10 Tollygunj 112 PM 10 25 PM 10 4. Laboratory notebook. 5 ( 1 ) T(6th Sm.)-Geography-H/Pr./(DSE-A-4P)/CBCS 2021 GEOGRAPHY — HONOURS — PRACTICAL Paper : DSE-A-4P (Resource Geography) Full Marks : 30 The figures in the margin indicate full marks. Candidates are required to give their answers in their own words as far as practicable. Answer All questions. 1. Compute the HDI values for the given states of India and represent with a suitable cartogram.
    [Show full text]
  • 16‐06‐20 13 5 Seals Garden Lane Cossipore 700002 1 1
    Affected Zone DAYS SINCE Date of reporting of REPORTING Sl No. Address Ward Borough Local area the case 13 5 SEALS GARDEN LANE The premises itself 1 1 1 Cossipore 16‐06‐20 COSSIPORE 700002 14 The affected flat/the 59 Kalicharan Ghosh Rd standalone house 2 kolkata ‐ 700050 West 2 1 Sinthi Bengal India 16‐06‐20 14 The premises itself 21/123 RAJA MANINDRA 3 31 Paikpara ROAD BELGACHIA 700037 16‐06‐20 14 14A BIRPARA LANE The premises itself 4 kolkata ‐ 700030 West 31 Belgachia 16‐06 ‐20 BBlIdiengal India 14 The flat itself A4 6 R D B RD Kolkata ‐ 5 41 Paikpara 700002 West Bengal India 16‐06‐20 14 110/1A COSSIPORE Road The premises itself 6 Kolkata ‐ 700002 West 6 1 Chitpur 16‐06‐20 Bengal India 14 Adjacent common passage of affected hut 14 3 GALIFF STREET 7 7 1 Bagbazar including toilet and BAGHBAZAR 700003 water source of the 16‐06‐20 slum 14 Adjacent common passage of affected hut 14 3 GALIFF STREET 8 7 1 Bagbazar including toilet and BAGHBAZAR 700003 water source of the 16‐06‐20 slum 14 Affected Zone DAYS SINCE Date of reporting of REPORTING Sl No. Address Ward Borough Local area the case 1 RAMKRISHNA LANE The premises itself 9 Kolkata ‐ 700003 West 7 1 Girish Mancha 16‐06‐20 Bengal India 14 The premises itself 4/2/1B KRISHNA RAM BOSE 10 STREET SHYAMPUKUR 10 2 Shyampukur KOLKATA 700004 16‐06‐20 14 T/1D Guru Charan Lane The premises itself 11 Kolkata ‐ 700004 West 10 2 Hatibagan 16‐06‐20 Bengal India 14 Adjacent common 47 1 SHYAMBAZAR STREET passage of affected hut 12 Kolk at a ‐ 700004 W est 10 2 Shyampu kur iilditiltdncluding toilet and
    [Show full text]
  • Status of Physical Environment and Land Use Pattern in Rabindra Sarobar Lake Area of Kolkata Debabrata Mistry1 and Ranjan Basu2
    Inernational Journal of Social Science Volume, 3 Special Issue: 2014: 311-324 © 2014 New Delhi Publishers. All rights reserved DOI Number: Status of Physical Environment and Land use Pattern in Rabindra Sarobar Lake Area of Kolkata Debabrata Mistry1 and Ranjan Basu2 Research Scholar1 and Professor2, Department of Geography, University of Calcutta West Bengal, India Corresponding author. D. Mistry: [email protected] Abstract The Rabindra Sarobar lake ecosystem is playing a key role in maintaining the oxygen balance of the Kolkata metropolis by generating fresh oxygen. The Physical environment is considered as an essential part of a lacustrine system. Degradation of environment largely affects the physical component. If the physical components are spoiled, then the entire system of the lake will get degraded. Water, air, soil, sound level etc. have been taken as the physical components of the study. Due to cultural activities and improper monitoring system practicised by the lake authority, the physico-chemical properties of Rabindra Sarobar Lake are degrading over time. The total land and water area of Rabindra Sarobar is about 192 acres which is being used for sports, recreational and cultural activities. Holistic measures need to be followed for improvement of the ambient air and the water quality of the lake area. Keywords: BOD, COD, lacustrine system, biomass, zooplankton, tree count Introduction Rabindra Sarobar lake is used mostly for rowing and swimming purposes .It was created as a part of recreational complex and was earlier known as ‘Dhakuria Lake’. Today it stands as a green and blue landmark at the heart of southern Kolkata. At present the Kolkata Improvement Trust (K.I.T.) maintains this recreational complex.
    [Show full text]
  • To the Chairman West Bengal Pollution Control Board Paribesh Bhawan Block LA-10A, Salt Lake Sector-III Kolkata 700098 13 Novemb
    To The Chairman West Bengal Pollution Control Board Paribesh Bhawan Block LA-10A, Salt Lake Sector-III Kolkata 700098 13 November 2010 Subject: Protection of environment in ‘Subhas Sarobar’, Kolkata Dear Sir This has reference to a meeting on the above subject, arranged by West Bengal Pollution Control Board (WBPCB) and held at Paribesh Bhawan at 4pm on 10 October 2010. In this connection we would like to submit the following for your kind attention and appropriate action: Facts and Submission 1. Subhas Sarobar, a lake situated in Eastern part of Kolkata with its adjoining open public space, is presently under the administrative control of Kolkata Improvement Trust (KIT). Since long it has been referred to as the ‘lung of East Kolkata’. The ‘lung’ today, runs the risk of infection owing to two Government Projects. 2. The Government of West Bengal along with a number of individuals and organizations, concerned, and hence active, with environmental issues, had appealed to the Government of India to declare three lakes in West Bengal as ‘National Lakes’. Of these Rabindra Sarobar, towards the southern part of the City, has already been categorized as a ‘National Lake’ while very soon Subhas Sarobar too is expected to be declared similarly as a ‘National Lake’. That it has not been declared as yet, might be owing to lack of proper initiative on the part of the State Government. 3. Subhas Sarobar, as per the Outline Development Plan (ODP) of Calcutta Metropolitan Corporation (1986) is marked at serial number 144 under the head ‘park and public space’ in Ward No.
    [Show full text]
  • Gems City Brochure
    Beautiful living SITE ADDRESS Bakrahat Road, Thakurpukur, P.O. Rasapunja, Naurbad, Kolkata, West Bengal 700104 DEVELOPER 23A Netaji Subhash Road 4th Floor, Room No 6, Kolkata 700 001 Phone : 033 2230 9909 / 5849 Fax : 033 4005 0136 email : [email protected] ARCHITECT PRAKALPA SPACE KRAFT PVT. LTD. PRAKALPA ARCHITECTS 145, Nanigopal Roy Chowdhury Avenue, (CIT Road) Entally Mezzanine, 2nd, 3rd & 4th floor, Kolkata 700014 Phone: 033 6450 7757, 22650612 Email: [email protected] Web: www.prakalpa.in FACADE CONSULTANT & VISUALISATION MRC PRISM PROJECTS (P) LTD. 2nd floor, Amrita 131/56, HSC Bose Road Kolkata- 700 040 “Life is beautiful at Ph: Email: Website: Gems City” MARKETING AGENT CALL 4040 1010 NK REALTORS PVT LTD [email protected] DN-52, PS Srijan Tech Park, 9th Floor, www.gemscity.in Sec - V, Salt Lake, Kolkata, West Bengal 700091 Beautiful living Disclaimer: This brochure is not a legal offering; it only describes the intent, purpose & concept of Gems City. All the areas, dimensions, layout, elevations, pictures are only indicative and not as per scale. All the details are subject to change, alteration and modification as per the management’s decision. For me, the essence of beautiful living lies in loving life, caring for my loved ones, sharing moments and ensuring a better tomorrow for the next generation. Moments of togetherness with loved ones can make ife truly fulfilling. BEAUTIFUL LIVING It is our responsibility to ensure a healthier environment for the next generation. At Gems City, you will find a sense of beauty & community, all the facilities, amenities & conveniences you ever wanted, right next to your home.
    [Show full text]