OFFICE of the PRINCIPAL CHIEF OPERATIONS MANAGER METRO RAILWAY METRO RAIL BHAVAN (7Th FLOOR) 33/1, JL NEHRU ROAD, KOLKATA - 700 071

Total Page:16

File Type:pdf, Size:1020Kb

OFFICE of the PRINCIPAL CHIEF OPERATIONS MANAGER METRO RAILWAY METRO RAIL BHAVAN (7Th FLOOR) 33/1, JL NEHRU ROAD, KOLKATA - 700 071 OFFICE OF THE PRINCIPAL CHIEF OPERATIONS MANAGER METRO RAILWAY METRO RAIL BHAVAN (7th FLOOR) 33/1, JL NEHRU ROAD, KOLKATA - 700 071 Open Tender No. Metro/T-Coml./CP/Kiosks/39/2018 T E N D E R N O T I C E 1.0 Name & Scope of the work : Installation, maintenance & running of kiosks at Noapara (3 nos.), Shyambazar (2 nos.), Shovabazar Sutanuti (1 no.), Mahatma Gandhi Road (1 no.), Central (3 nos.), Esplanade (3 nos.), Kalighat (2 nos.), Rabindra Sarobar (1 no.), Mahanayak Uttam Kumar (5 nos.), Netaji (4 nos.), Masterda Surya Sen (3 nos.), Gitanjali (3 nos.), Kavi Nazrul (3 nos.), Shahid Khudiram (4 nos.) & Kavi Subhash (1 no.) stations of Metro Railway, Kolkata. 2.0 Location : Annexure – I. 3.0 Period of License : Five (5) years after including escalation as detailed under Para 3.0 of the terms and conditions of the tender. 4.0 (i) Estimated Rates : (a) Noapara - ₹ 460.00 (per sq.ft. per month; for the 1st year) (b) Shyambazar - ₹ 841.86 (c) Shovabazar Sutanuti – ₹ 841.86 (d) Mahatma Gandhi Road - ₹ 516.25 (e) Central - ₹ 438.32 (f) Esplanade – ₹ 1036.15 (g) Kalighat - ₹ 1252.35 (h) Rabindra Sarobar - ₹ 773.67 (i) Mahanayak Uttam - ₹ 1037.30 Kumar (j) Netaji - ₹ 382.66 (k) Masterda Surya - ₹ 424.41 Sen (l) Gitanjali - ₹ 299.00 (m) Kavi Nazrul – ₹ 571.91 (n) Shahid Khudiram - ₹ 211.60 (o) Kavi Subhash - ₹ 191.02 (ii) Earnest Money(s) : (a) Noapara - ₹ 11,730.00 [per kiosk] (b) Shyambazar - ₹ 21,460.00 (c) Shovabazar Sutanuti – ₹ 21,460.00 (d) Mahatma Gandhi Road - ₹ 13,160.00 (e) Central - ₹ 6,530.00 (f) Esplanade – ₹ 26,410.00 (g) Kalighat - ₹ 31,920.00 (h) Rabindra Sarobar - ₹ 19,720.00 (i) Mahanayak Uttam - ₹ 26,440.00 Kumar 1 (j) Netaji - ₹ 9,760.00 (k) Masterda Surya - ₹ 10,820.00 Sen (l) Gitanjali - ₹ 7,630.00 (m) Kavi Nazrul - ₹ 14,580.00 (n) Shahid Khudiram - ₹ 5,400.00 (o) Kavi Subhash - ₹ 4,870.00 (iii) Validity of the offer : 45 days from the date of opening. Tenders if received with less than 45 days validity time are liable to be rejected. (iv) Cost of tender document : ₹ 11,800.00 (Rupees Eleven Thousand Eight Hundred) only. 5.0 Principal Chief Operations Manager, Metro Railway, Kolkata for and on behalf of the President of India invites sealed tenders from reputed firm/companies having adequate experience, capacity and reputation for the above work. Agencies/parties/firms blacklisted by Railway Administration, other offices/establishments of Central Government, State Government/Civic bodies or parties/firms/agencies against whom any complaints/suits have been raised by Metro Railway, Kolkata need not require applying. 5.1 It shall be obligatory for the Tenderers to furnish certificate as per format at Annexure – IX of the tender in a non-judicial stamp paper of ₹ 100.00, stating that they have not been barred or blacklisted for unsatisfactory performance by any Central Government, State Government/ Civic bodies or Semi – Government Agency. 6.0 (i) The tender should be accompanied by Earnest Money(s) on the basis of Clause 4.0(ii) above, without which the tender shall be summarily rejected. (ii) CONSORTIUM AGREEMENTS, JOINT VENTURES AND MOUs WILL NOT BE CONSIDERED FOR ELIGIBILITY. (iii) The participating agency/agencies and firm(s) should have minimum experience of two(2) years in the field of commercial activity regarding installation, maintenance & running of Kiosk which may even be outside the Railways [Submission of self attested copies of testimonials regarding experience of the firm/company/organization is mandatory. Self attestation shall include signature, stamp & date (on each page)]. (iv) Annual turnover of the participating agency/firm should be @ 50% of the first year’s estimated value/rate [Submission of self attested copies of testimonials of the financial capability of the firm/companies in the form of Balance Sheet, Profit & Loss statement etc. for the last three(3) years is mandatory. Self attestation shall include signature, stamp & date (on each page)]. 2 (v) Financial evaluation shall be done as per quoted rate per sq.ft. per month for the given sites at Noapara, Shyambazar, Shovabazar Sutanuti, Mahatma Gandhi Road, Central, Esplanade, Kalighat, Rabindra Sarobar, Mahanayak Uttam Kumar, Netaji, Masterda Surya Sen, Gitanjali, Kavi Nazrul, Shahid Khudiram & Kavi Subhash stations. The bidders can quote their offers either for one or more than one or all stations. However, offer(s) should be quoted separately for each station and site. No clubbing of offers shall be permitted. (vi) The bidder should satisfy himself with the site condition and the scope of work before participating in the tender. (vii) Bidders are requested to note that kiosks with following trading options shall only be permitted in the locations earmarked at Noapara, Shyambazar, Shovabazar Sutanuti, Mahatma Gandhi Road, Central, Esplanade, Kalighat, Rabindra Sarobar, Mahanayak Uttam Kumar, Netaji, Masterda Surya Sen, Gitanjali, Kavi Nazrul, Shahid Khudiram & Kavi Subhash stationsstations of Metro Railway, Kolkata (Annexure – I). (a) Operation of food outlets but no cooking would be permitted; (b) Selling of grocery items and stationeries; (c) Juice, soft drinks & Ice Cream Parlour; (d) Baked/confectionery items & sweet shop; (e) Coffee/Tea and snacks shop; (f) Outlets selling fancy gift materials; (g) Tour & Travel Operator(s). (viii) It shall be obligatory for the firm/company/organization to spell out the trading option which they intend to carry out at the earmarked locations alongwith the offer. (ix) Every tenderer is required to sign in every page of the tender, the draft agreement paper (Annexure – VIII) and Annexures to the tender form as token of acceptance of the terms & conditions and has to be submitted along with their offer. (x) In addition to the above, since awarding of contracts i.e. output service of Railways to the successful tenderer will attract GST charges at an applicable rate, it shall be obligatory for all tenderers to furnish GSTIN numbers representing the States in which they are registered for GST, Address of Registered office, Place of Business in State etc. as per details at Annexure – VII along with the offer. (xi) The tenderers shall submit a notarized affidavit on a non-judicial stamp paper stating that they are not liable to be disqualified and all their statements/documents submitted alongwith bid are true and factual. Standard format of the affidavit to be submitted by the bidder is enclosed as Annexure – IX. Non-submission of an affidavit by the bidder shall result in summary rejection of his/their bid. 3 And it shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested by which they/he is qualifying the Qualifying Criteria mentioned in the Tender Document [Para 5.0, Para 5.1, Para 6.0(i), (ii), (iii), (iv) & (xi) above & Para 9.1 below]. It will not be obligatory on the part of Tender Committee to scrutinize beyond the submitted document of tenderer as far as his qualification for the tender is concerned. (xii) The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tendered offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification by the Railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway hereunder. (xiii) In case of any wrong information submitted by the tenderer, the contract shall be terminated. Earnest Money Deposit (EMD), Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 5(five) years. (xiv) Bidders are advised to ensure that their bids are complete in all respect and conform to Metro Railways terms & conditions and scope of work. Bids not complying with Metro Railways requirement may be rejected without seeking any clarification at the sole discretion of Metro Railway. 7.0 The above amount of earnest money should be furnished in any of the following manners as stated under Para 4.0(ii) above : (i) In cash to be deposited with FA&CAO(Cash & Pay), Metro Rail Bhavan, Metro Railway, 33/1, JL Nehru Road, 1st Floor, Kolkata - 71, creditable to Head of Allocation : 00844533; the original money receipt to be enclosed with the tender documents. (ii) Banker's Cheque/Demand Draft of the State Bank of India or any other Nationalized Banks or any Scheduled Commercial Banks designated by RBI. 8.0 The Banker's Cheque/Demand Draft referred to in Para 7.0(ii) above, should be made in favour of the ‘FA & CAO, Metro Railway, Kolkata’ and should be payable at Kolkata. 8.1 Cheque, even if guaranteed by a Bank, Govt. Securities, Postal Orders will not be accepted towards deposit of Earnest Money. 8.2 Bank Guarantee(s) will not be accepted as a mode of depositing Earnest Money. 4 8.3 Earnest Money submitted in connection with participation in earlier tender(s) shall not be adjusted towards the present tender and requests, if any, shall not be entertained. 9.0 The tender documents may be obtained in person from the Office of the Principal Chief Operations Manager, Metro Rail Bhavan, 7th floor, 33/1, JL Nehru Road, Kolkata - 700071 from 16/01/2019 to 14/02/2019, between 11:00 hours to 13:00 hours during the working days, on production of receipt of payment of 11,800.00 (Rupees Eleven Thousand & Eight Hundred) only, payable in cash (not refundable) to the Divisional Cashier, Metro Railway, Kolkata (1st floor, Metro Rail Bhavan, 33/1, JL Nehru Road, Kolkata - 71) creditable to Head of Allocation : 93652000, being the cost of tender documents.
Recommended publications
  • Metro Railway Kolkata Presentation for Advisory Board of Metro Railways on 29.6.2012
    METRO RAILWAY KOLKATA PRESENTATION FOR ADVISORY BOARD OF METRO RAILWAYS ON 29.6.2012 J.K. Verma Chief Engineer 8/1/2012 1 Initial Survey for MTP by French Metro in 1949. Dum Dum – Tollygunge RTS project sanctioned in June, 1972. Foundation stone laid by Smt. Indira Gandhi, the then Prime Minister of India on December 29, 1972. First train rolled out from Esplanade to Bhawanipur (4 km) on 24th October, 1984. Total corridor under operation: 25.1 km Total extension projects under execution: 89 km. June 29, 2012 2 June 29, 2012 3 SEORAPFULI BARRACKPUR 12.5KM SHRIRAMPUR Metro Projects In Kolkata BARRACKPUR TITAGARH TITAGARH 10.0KM BARASAT KHARDAH (UP 17.88Km) KHARDAH 8.0KM (DN 18.13Km) RISHRA NOAPARA- BARASAT VIA HRIDAYPUR PANIHATI AIRPORT (UP 15.80Km) (DN 16.05Km)BARASAT 6.0KM SODEPUR PROP. NOAPARA- BARASAT KONNAGAR METROMADHYAMGRAM EXTN. AGARPARA (UP 13.35Km) GOBRA 4.5KM (DN 13.60Km) NEW BARRACKPUR HIND MOTOR AGARPARA KAMARHATI BISARPARA NEW BARRACKPUR (UP 10.75Km) 2.5KM (DN 11.00Km) DANKUNI UTTARPARA BARANAGAR BIRATI (UP 7.75Km) PROP.BARANAGAR-BARRACKPORE (DN 8.00Km) BELGHARIA BARRACKPORE/ BELA NAGAR BIRATI DAKSHINESWAR (2.0Km EX.BARANAGAR) BALLY BARANAGAR (0.0Km)(5.2Km EX.DUM DUM) SHANTI NAGAR BIMAN BANDAR 4.55KM (UP 6.15Km) BALLY GHAT RAMKRISHNA PALLI (DN 6.4Km) RAJCHANDRAPUR DAKSHINESWAR 2.5KM DAKSHINESWAR BARANAGAR RD. NOAPARA DAKSHINESWAR - DURGA NAGAR AIRPORT BALLY HALT NOAPARA (0.0Km) (2.09Km EX.DMI) HALDIRAM BARANAGAR BELUR JESSOR RD DUM DUM 5.0KM DUM DUM CANT. CANT 2.60KM NEW TOWN DUM DUM LILUAH KAVI SUBHAS- DUMDUM DUM DUM ROAD CONVENTION CENTER DUM DUM DUM DUM - BELGACHIA KOLKATA DASNAGAR TIKIAPARA AIRPORT BARANAGAR HOWRAH SHYAM BAZAR RAJARHAT RAMRAJATALA SHOBHABAZAR Maidan BIDHAN NAGAR RD.
    [Show full text]
  • Name and Addresses of Routine Immunization Centers in KMC Area
    Name and Addresses of Routine Immunization Centers in KMC Area Conducted on every Wednesday from 9 am to 1 pm Borough-1 Borough Organization Srl No Ward No Centre Name Zone / Project No Name 1 1 1 Shyama Club, 22/H/3, Hagen Chatterjee Road, KMC CUDP 2 1 1 WHU-1, 1B, G. C. Road , Kol-2 KMC CUDP Paschim Banga Samaj Seva Samiti ,35/2, B.T. Paschim Banga 3 1 1 NGO Road, Kol-2 Samaj Seba Samiti North Subarban Hospital,82, Cossipur Road, Kol- 4 1 1 DFWB Govt. of W.B. 2 5 2 1 6 PALLY CLUB, 15/B , K.C. Sett Lane, Kol-30 KMUHO Zone-II WHU - 2, 126, K. C. GHOSH ROAD, 6 2 1 KMC CUDP KOL - 50 7 3 1 Friend Circle, 21No. Bustee, Kol - 37 KMC CUDP Belgachia Basti Sudha Committee Club,1/2, J.K. 8 3 1 KMUHO Zone-II Ghosh Road,Lal Maidan, Kol-37 Netaji Sporting Club, 15/H/2/1, Dum Dum Road, 9 4 1 KMUHO Zone-II Kol-30,(Near Mother Diary). 10 4 1 Camelia Building, 26/59, Dum Dum Road, Kol-2, ICDS Belgachia Friends Association Cosmos Club, 89/1 Belgachia 11 5 1 ICDS Belgachia Road.Kol-37 Indira Matri O Shishu Kalyan Hospital, 12 5 1 Govt.Hospital Govt. of W.B. 35/B, Raja Manindra Road, Kol - 37 W.H.U. - 6, 10, B.T. Road, Kol-2 , Paikpara (at 13 6 1 KMC CUDP Borough Cold Chain Point) Gun & Cell Factory Hospital, Kossipur, Kol-2 Gun & Shell 14 6 1 CGO (Ordanance Factory Hospital) Ph # 25572350 Factory Hospital Gangadhar Sporting Club, P-37, Stand Bank 15 6 1 ICDS Bagbazar Road, Kol - 2 Radha Madhab Sporting Club, 8/1, Radha 16 8 1 Madhab Goswami Lane, Kol-3.Near Central KMUHO Zone-II Medical Store, Bagbazar Kumartully Seva Samity, 519A, Rabindra Sarani, Kumartully Seva 17 8 1 NGO kol-3 Samity Nagarik Sammelani,3/D/1, Raja Naba Krishna 18 9 1 KMUHO Zone-II Street, kol-5 Borough-2 1 11 2 160,Arobindu Sarani ,Kol-6 KMC CUDP 2 15 2 Ward Health Unit - 15.
    [Show full text]
  • An Urban River on a Gasping State: Dilemma on Priority of Science, Conscience and Policy
    An urban river on a gasping state: Dilemma on priority of science, conscience and policy Manisha Deb Sarkar Former Associate Professor Department of Geography Women’s Christian College University of Calcutta 6, Greek Church Row Kolkata - 700026 SKYLINE OF KOLKATA METROPOLIS KOLKATA: The metropolis ‘Adi Ganga: the urban river • Human settlements next to rivers are the most favoured sites of habitation. • KOLKATA selected to settle on the eastern bank of Hughli River – & •‘ADI GANGA’, a branched out tributary from Hughli River, a tidal river, favoured to flow across the southern part of Kolkata. Kolkata – View from River Hughli 1788 ADI GANGA Present Transport Network System of KOLKATA Adi Ganga: The Physical Environment & Human Activities on it: PAST & PRESNT Adi Ganga oce upo a tie..... (British period) a artists ipressio Charles Doyle (artist) ‘Adi Ganga’- The heritage river at Kalighat - 1860 Width of the river at this point of time Adi Ganga At Kalighat – 1865 source: Bourne & Shepard Photograph of Tolly's Nullah or Adi Ganga near Kalighat from 'Views of Calcutta and Barrackpore' taken by Samuel Bourne in the 1860s. The south-eastern Calcutta suburbs of Alipore and Kalighat were connected by bridges constructed over Tolly's Nullah. Source: British Library ’ADI Ganga’ & Kalighat Temple – an artists ipressio in -1887 PAST Human Activities on it: 1944 • Transport • Trade • Bathing • Daily Domestic Works • Performance of Religious Rituals Present Physical Scenario of Adi Ganga (To discern the extant physical condition and spatial scales) Time Progresses – Adi Ganga Transforms Laws of Physical Science Tidal water flow in the river is responsible for heavy siltation in the river bed.
    [Show full text]
  • Urban Ethnic Space: a Discourse on Chinese Community in Kolkata, West Bengal
    Indian Journal of Spatial Science Spring Issue, 10 (1) 2019 pp. 25 - 31 Indian Journal of Spatial Science Peer Reviewed and UGC Approved (Sl No. 7617) EISSN: 2249 - 4316 homepage: www.indiansss.org ISSN: 2249 - 3921 Urban Ethnic Space: A Discourse on Chinese Community in Kolkata, West Bengal Sudipto Kumar Goswami Research Scholar, Department of Geography, Visva-Bharati, India Dr.Uma Sankar Malik Professor of Geography, Department of Geography, Visva-Bharati, India Article Info Abstract _____________ ___________________________________________________________ Article History The modern urban societies are pluralistic in nature, as cities are the destination of immigration of the ethnic diaspora from national and international sources. All ethnic groups set a cultural distinction Received on: from another group which can make them unlike from the other groups. Every culture is filled with 20 August 2018 traditions, values, and norms that can be traced back over generations. The main focus of this study is to Accepted inRevised Form on : identify the Chinese community with their history, social status factor, changing pattern of Social group 31 December, 2018 interaction, value orientation, language and communications, family life process, beliefs and practices, AvailableOnline on and from : religion, art and expressive forms, diet or food, recreation and clothing with the spatial and ecological 21 March, 2019 frame in mind. So, there is nothing innate about ethnicity, ethnic differences are wholly learned through __________________ the process of socialization where people assimilate with the lifestyles, norms, beliefs of their Key Words communities. The Chinese community of Kolkata which group possesses a clearly defined spatial segmentation in the city. They have established unique modes of identity in landscape, culture, Ethnicity economic and inter-societal relations.
    [Show full text]
  • SUPREME COURT of INDIA Page 1 of 2 CASE NO.: Appeal (Civil) 3593-05 of 2003 PETITIONER: Union of India RESP
    http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 1 of 2 CASE NO.: Appeal (civil) 3593-05 of 2003 PETITIONER: Union of India RESPONDENT: Howrah Ganatantrik Nagarik Samity & Ors. DATE OF JUDGMENT: 17/04/2003 BENCH: N.Santosh Hegde & B.P.Singh. JUDGMENT: J U D G M E N T (Arising out of SLP Nos.17203-17205 of 1999) SANTOSH HEGDE,J. (With SLP No.9827/2002) Leave granted. SLPNo.9827/2002 is de-linked from C.A.Nos...of 2003 @ SLPNos. 17203-205/99. Heard learned counsel. Union of India through Eastern Railway, Calcutta is challenging an order made by Calcutta High Court dated 18.6.1999 in Writ Petition Nos. 12902/97 and 1322/98 pending in the file of the High Court of Judicature at Calcutta. A Division Bench of the said High Court while considering the above noted writ petitions filed before it for seeking eviction of illegal squatters in the railway property, as also areas besides Rabindra Sarobar, directed the State of West Bengal and Railway administration as an interim measure, to provide sanitary facilities to the said squatters. Accordingly following directions were issued:- (1) Cost for the project shall be borne in equal proportion by the State of West Bengal and the Union of India, through railway administration. (2) The State Government authorities, authorities of the railway administration as also the Calcutta Municipal Corporation shall see to it that no further infiltration takes place. (3) After the aforementioned project is completed by the State Government Calcutta Municipal Corporation would see the proper sanitation is maintained.
    [Show full text]
  • Abstract Ward No 58 Is an Underprivileged Area of Kolkata
    6 Historical Background And Socio-Economic Condition Of Ward No 58 Under Kolkata Municipality Kuhumita Bachhar Assistant Teacher Sanat Roy Chowdhury Institution Kolkata Abstract Ward no 58 is an underprivileged area of kolkata. Where the other part of kolkata is developing from every aspect like culture, literature, behavior, economic condition but this area remains the same. Considering this mysterious situation, small step has taken to search its reason from past and tried to present their recent socio-economic condition, and hope for their betterment. Key word: socio condition, economic condition Introduction-To explore the history of modern Kolkata, we trace back to1698- when The British leased three villages – Gobindapur, Sutanuti, Kolkata from Subarna Roychowdhury for Rs 1300 a year, and incepted our beloved Kolkata. In late 17th century,an Englishman called Job Charnock established Kolkata from three sleepy hamlet – Sutanuti, Gobindapur and Kolkata. Kolkata Municipal Corporation was established to improve and run the city properly. Its main work was to build and maintain roads, drains, in proper way. Taxes were levied on housing, lighting, and vehicle. Now the mega city is divided into 144 administrative wards that are grouped into 16 boroughs. Here I am going to discuss about 58 no wards under Kolkata Municipal Corporation. History of original residents – Before discussing about the socio-economic condition of residents of this ward we have to know why their previous generation had come here and started living permanently. The leather industry took roots in the eastern part of Calcutta in Dhapa,Tangra,Topsia and Tiljala. These are marshy areas in which are found a good number of big tanneries as well as small ones.
    [Show full text]
  • IN the HIGH COURT at CALCUTTA CONSTITUTIONAL WRIT JURISDICTION APPELLATE SIDE (Through Video Conference)
    04-05 05.11.2020 Ct. No.16 pg. IN THE HIGH COURT AT CALCUTTA CONSTITUTIONAL WRIT JURISDICTION APPELLATE SIDE (Through Video Conference) WPA 9184 of 2020 Ms. Anasua Bhattacharya Vs. State of West Bengal & Ors. with WPA 9209 of 2020 Ajay Kumar De Vs. Government of West Bengal & Ors. Mr. Rachit Lakhmani Mr. Indrajeet Dey Mr. Kushal Das Mr. Ranodip Dutta … For the petitioner in WPA 9184 of 2020 Mr. Bikash Ranjan Bhattacharjee Mr. Sabyasachi Chatterjee Mr. Pintu Kumar Kar Ms. Ankani Biswas @ Ankan Biswas Mr. Akashdeep Mukherjee Mr. Sandipan Das … For the petitioner in WPA 9209 of 2020 Mr. Kishore Datta, Ld. AG Mr. Abhrotosh Majumdar, Ld. AAG Mr. T.M. Siddiqui Mr. Sayan Sinha … For the State Mr. N.C. Bihani Ms. P. Banerjee Bihani … For the respondent no.4 Mr. Joy Saha Mr. Yash Vardhan Deora Ms. Easha Manchanda … For the intervenor These two matters, filed in public interest, pertain to the upcoming celebrations. In the second of the matters, 2 prayers have been made pertaining to Kali Puja right upto Christmas. There is an application by an unregistered body that can be loosely called the local firecrackers’ association. It is a body of persons engaged in the manufacture of or trading in firecrackers. The State has issued verbal advisories pertaining to firecrackers during the Kali Puja and Diwali celebrations. Certain guidelines have been framed regarding Kali Puja pandals. An appeal appears to have been made on behalf of the State for all kinds of firecrackers not to be used this year in view of the pandemic and the virus that attacks the respiratory system.
    [Show full text]
  • Landscaping India: from Colony to Postcolony
    Syracuse University SURFACE English - Dissertations College of Arts and Sciences 8-2013 Landscaping India: From Colony to Postcolony Sandeep Banerjee Follow this and additional works at: https://surface.syr.edu/eng_etd Part of the English Language and Literature Commons, Geography Commons, and the South and Southeast Asian Languages and Societies Commons Recommended Citation Banerjee, Sandeep, "Landscaping India: From Colony to Postcolony" (2013). English - Dissertations. 65. https://surface.syr.edu/eng_etd/65 This Dissertation is brought to you for free and open access by the College of Arts and Sciences at SURFACE. It has been accepted for inclusion in English - Dissertations by an authorized administrator of SURFACE. For more information, please contact [email protected]. ABSTRACT Landscaping India investigates the use of landscapes in colonial and anti-colonial representations of India from the mid-nineteenth to the early-twentieth centuries. It examines literary and cultural texts in addition to, and along with, “non-literary” documents such as departmental and census reports published by the British Indian government, popular geography texts and text-books, travel guides, private journals, and newspaper reportage to develop a wider interpretative context for literary and cultural analysis of colonialism in South Asia. Drawing of materialist theorizations of “landscape” developed in the disciplines of geography, literary and cultural studies, and art history, Landscaping India examines the colonial landscape as a product of colonial hegemony, as well as a process of constructing, maintaining and challenging it. In so doing, it illuminates the conditions of possibility for, and the historico-geographical processes that structure, the production of the Indian nation.
    [Show full text]
  • Kalighat for 21St Century
    CONCEPT SCHEME KALIGHAT FOR 21ST CENTURY INTERNATIONAL FOUNDATION FOR SUSTAINABLE DEVELOPMENT IN ASSOCIATION WITH THE BOSTON PLEDGE, USA AND GOVT. OF WEST BENGAL PRESENTATION BY MODULAR CONSULTANTS (P) Ltd. Prime Consultant MCPL IFSD SCOPE OF WORK Census & public enlightenment Renovation programme for existing occupiers / services provides in the redevelopment area Restructure of vehicular traffic Open / covered walk-track to Kali Temple Dredging & embankment protection of Adi Ganga upto Sluise Gate and connect the River Cruise from Sahara’s proposed Embarkation Jetty near Outram Ghat Construction of Foot Bridge over Adi Ganga Reconstruction of Adi Ganga Bathing Ghat Beautification of existing façade Rejuvenating the Craftsmanship of Patuas Travellers’ / Tourists’ Amenities Modernization of Kali Temple Water supply system including treatment plant Sewerage Disposal Solid waste management system Environment Management Plan Electricity supply and distribution system MCPL IFSD STATEMENT OF INTENT 1. Clean existing scum, filth and slummy environment of the temple area. 2. Remove and rehabilitate existing street vendors and street stalls. 3. Remove and rehabilitate stalls directly attached to the inside and outside of the temple compound walls and areas. Temple footprint should be free of any obstruction. Fresh paint on temple structure needed. 4. Incorporate spiritual AXES, NUMBERS and DIAGRAMS in new configuration of design elements brought into the proposed scheme. 5. Use pure forms and forms reminiscent of the main temple roof in new design elements as much as possible. 6. Create a SENSE OF PILGRIMAGE in the area. 7. Use Kali Temple Road as the MAIN AXIS to approach the temple. 8. Build FOUR gates on four perimeter roads of the ward.
    [Show full text]
  • Reclaiming the Indigenous Style of Kalighat Paintings Lauren M. Slaughter
    Reclaiming the Indigenous Style of Kalighat Paintings Lauren M. Slaughter This essay re-examines the nature of Kalighat painting, a painting style which emerged in India in the early nineteenth century and ended not long after the early twentieth century. Stemming from traditional Indian scroll painting, Kalighat paintings were created by patuas who migrated from Bengal villages into Calcutta and set up their “shop- studios” around the Kalighat temple (Guha-Thakurta, Making 17; Jain 9). Patuas represent a caste of traveling scroll-painters and performers; the earliest mention of this artisan caste appears in Brahma Vaivarta Purana, a thirteenth-century Sanskrit text (Chatterjee 50). As a result of W. G. Archer’s 1953 Bazaar Paintings of Calcutta: The Style of Kalighat, the general consensus of scholarly literature suggests that Kalighat painting reflects a western influence on thepatua artists. In line with the work of Tapati Guha-Thakurta and B.N. Mukherjee, however, I want to argue that there is not enough evidence to support the claim that this style was shaped by contact with western painting; instead I will argue that it was essentially indigenous in style, medium, and subject matter. Because stating that Kalighat paintings are British-derived diminishes their value and robs these works of their true substance, my aim is to substantiate their indigenous origins and, in so doing, explain how this re-interpretation provides new ways of understanding the innovative style of Kalighat patuas. Chrestomathy: Annual Review of Undergraduate Research, School of Humanities and Social Sciences, School of Languages, Cultures, and World Affairs, College of Charleston Volume 11 (2012): 242-258 © 2012 by the College of Charleston, Charleston SC 29424, USA.
    [Show full text]
  • Annual Report 2011-12
    Nature Mates-Nature Club 4/10A Bijoygarh, Kolkata-700032 Annual Report 2011-12 Regular Works 1. Maintenance of Banabitan Butterfly Garden We are maintaining this garden since 2010. During this financial year approximately 2500 numbers of butterflies were released. 15 new life cycles were documented. Other Works 2. We have assisted Centre for Contemporary Communication to do the Status Survey of Parks of Kolkata. The Report were prepared and submitted to CCC. 3. We have been assigned to assist the Wildlife Division II, Department of Forest, Government of West Bengal, to do the documentation of Butterfly fauna at Gorumara National Park. The work has been started during September 2011. 4. Many wildlife were rescued from in and around Kolkata and were given to the DRC Saltlake. 5. We have cleaned and restored the Santragachhi Jheel during September – November 2011. It was a huge success. Media covered our work with a lot of praise. 6. We are assigned by Creative Hortifirms Pvt Ltd to prepare a Biodiversity Status Report of their property at Panchla, named “Country Roads”. The work has started during July 2011. 7. We are assigned by GGL Hotel and Resort Company Ltd., Amubuja Reality to prepare a Biodiversity Status Report of their property at Raichak on Ganges. The work has started during August 2011. Nature Mates-Nature Club 4/10A Bijoygarh, Kolkata-700032 Annual Report 2012-13 Regular Works 1. Maintenance of Banabitan Butterfly Garden We are maintaining this garden since 2010. During this financial year approximately 3500 numbers of butterflies was released. 10 new life cycles were documented.
    [Show full text]
  • Time Table on Down Direction from Noapara/ Dum Dum to Kavi Subhash/ Mahanayak Uttam Kumar (Mon-Fri Day)
    TIME TABLE ON DOWN DIRECTION FROM NOAPARA/ DUM DUM TO KAVI SUBHASH/ MAHANAYAK UTTAM KUMAR (MON-FRI DAY) SDK- DK- DK- DK- DK- DK- DK- DK- DK- DK- DK- DK- DK- DK- DK- STN. SND2 2 2 4 6 8 10 12 14 16 18 20 22 24 26 28 NOAPARA 7:02 7:02 8:00 8:18 8:36 DUM DUM 7:10 6:45 7:00 7:10 7:20 7:30 7:40 7:50 8:00 8:06 8:12 8:18 8:24 8:30 8:36 8:42 BELGACHIA 6:49 7:03 7:13 7:23 7:33 7:43 7:53 8:03 8:09 8:15 8:21 8:27 8:33 8:39 8:45 SHYAMBAZAR 6:52 7:05 7:15 7:25 7:35 7:45 7:55 8:05 8:11 8:17 8:23 8:29 8:35 8:41 8:47 SOVABAZAR SUTANUTI 6:54 7:07 7:17 7:27 7:37 7:47 7:57 8:07 8:13 8:19 8:25 8:31 8:37 8:43 8:49 GIRISH PARK 6:56 7:09 7:19 7:29 7:39 7:49 7:59 8:09 8:15 8:21 8:27 8:33 8:39 8:45 8:51 MAHATMA GANDHI ROAD 6:59 7:11 7:21 7:31 7:41 7:51 8:01 8:11 8:17 8:23 8:29 8:35 8:41 8:47 8:53 CENTRAL 7:02 7:13 7:23 7:33 7:43 7:53 8:03 8:13 8:19 8:25 8:31 8:37 8:43 8:49 8:55 CHANDNI CHOWK 7:04 7:15 7:25 7:35 7:45 7:55 8:05 8:15 8:21 8:27 8:33 8:39 8:45 8:51 8:57 ESPLANADE 7:06 7:16 7:26 7:36 7:46 7:56 8:06 8:16 8:22 8:28 8:34 8:40 8:46 8:52 8:58 PARK STREET 7:08 7:18 7:28 7:38 7:48 7:58 8:08 8:18 8:24 8:30 8:36 8:42 8:48 8:54 9:00 MAIDAN 7:09 7:19 7:29 7:39 7:49 7:59 8:09 8:19 8:25 8:31 8:37 8:43 8:49 8:55 9:01 RABINDRA SADAN 7:11 7:21 7:31 7:41 7:51 8:01 8:11 8:21 8:27 8:33 8:39 8:45 8:51 8:57 9:03 NETAJI BHAVAN 7:13 7:23 7:33 7:43 7:53 8:03 8:13 8:23 8:29 8:35 8:41 8:47 8:53 8:59 9:05 JATIN DAS PARK 7:15 7:25 7:35 7:45 7:55 8:05 8:15 8:25 8:31 8:37 8:43 8:49 8:55 9:01 9:07 KALIGHAT 7:18 7:27 7:37 7:47 7:57 8:07 8:17 8:27 8:33 8:39 8:45 8:51 8:57 9:03 9:09
    [Show full text]