World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document The World Bank Report No: ISR6835 Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION PROGRAM Project Stage: Implementation Seq.No: 6 Status: ARCHIVED Archive Date: 23-Nov-2011 (P107612) Public Disclosure Authorized Country: Moldova Approval FY: 2008 Product Line:IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Public Disclosure Copy Board Approval Date 13-May-2008 Original Closing Date 30-Jun-2013 Planned Mid Term Review Date 13-Jun-2011 Last Archived ISR Date 23-Nov-2011 Effectiveness Date 19-Dec-2008 Revised Closing Date 30-Jun-2013 Actual Mid Term Review Date 06-Sep-2011 Project Development Objectives Project Development Objective (from Project Appraisal Document) The project development objective are (i) to improve the coverage, quality, efficiency, and sustainability of water and sanitationse rvices in selected urban and rural communities; and (ii) enhance the capacity of the Ministry for Construction and TerritorialDevelo pment (MCTD) to prepare and supervise the implementation of investment program and to provide technical assistance to theoperating A pa Canals. Has the Project Development Objective been changed since Board Approval of the Project? Public Disclosure Authorized Yes No Component(s) Component Name Component Cost Rehabilitatrion of WSS and WW in towns 8.00 Rehabilitation of Rural WS 4.00 Capacity Building & Project Management 1.00 Energy Efficiency Improvement 1.00 Overall Ratings Previous Rating Current Rating Public Disclosure Authorized Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Public Disclosure Copy Implementation Status Overview As raised earlier by the Mid-term Review of the Project in 2011 and as a results of the latest implementation support mission in April 2012, on May 4, 2012 the Bank received from the Government a formal request for the Project restructuring with proposed formulation of the revised Project Development Objectives (PDO), Results Framework, and the Project Page 1 of 7 Public Disclosure Authorized The World Bank Report No: ISR6835 components. The Project implementation is in the critical phase. To date 55% of the loan amount has been disbursed. Four works contracts are completed (Balti, Cahul, Ungheni and Floresti) and seven others are ongoing (Causeni, Orhei and Ungheni under Part 1, and Sarata Noua, Valeni, Bestemac and Colibasi under Part 2). One civil works contract is in the bidding stage and one other is in the signature stage. Five of the eight planned activities for procurement of goods have already been completed, and eleven out of the thirteen planned consultancy contracts are either completed or at an advanced stage. Implementation schedule remains critical for the Project's Part 2 (Rural water component). Locations Country First Administrative Division Location Planned Actual Moldova Raionul Ungheni Ungheni Moldova Raionul Soroca Soroca Public Disclosure Copy Moldova Raionul Orhei Orhei Moldova Not Entered Republic of Moldova Moldova Raionul Causeni Causeni Moldova Raionul Floresti Floresti Moldova Raionul Cahul Cahul Moldova Municipul Balti Balti Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Piped household water connections that are Number Value benefiting from rehabilitation works undertaken Date 10-Sep-2011 by the project Comments this indicator was added as The target will be defined core indicator, the baseline will be defined and the information will be monitored Number of people in rural areas provided with Number Value 0.00 access to Improved Water Sources under the Date project Comments 2 works under construction target to be defined New piped household water connections that Number Value 0.00 0.00 4200.00 are resulting from the project intervention Date Public Disclosure Copy 31-Dec-2007 30-Jun-2009 30-Jun-2013 Page 2 of 7 The World Bank Report No: ISR6835 Comments this indicator will be redefined target will be redefined as part as part of the project of the project restructuring. restructuring. Number of Apele Moldovei staff proficient in Text Value 0 4 fiduciary aspects of the project. Date 31-Dec-2007 30-Jun-2009 30-Jun-2011 Comments This indicator will be This target will be redefined redefined as part of the as part of the project project restructuring. restructuring. Number of drinking water samples meeting Text Value 84% 100% Moldovan bacteriological standards from Date 31-Dec-2007 10-Sep-2011 30-Jun-2013 participating villages' water supply system. Comments Public Disclosure Copy Not clear how the baseline this indicator will be redefined was taken Number of Rural Water Systems Rehabilitated Text Value 0 50 Date 31-Dec-2007 10-Sep-2011 30-Jun-2013 Comments 2 works under construction the target will be revised to smaller number as part of restructuring The financial working ratio, i.e. the ratio of cash Text Value Balti: 1.05; Cahul 1.08, Balti: .90; Cahul .85, operating costs (without depreciation)/cash Causeni 1.14, Floresti .78, Causeni .90, Floresti .80, operating revenue Orhei .86, Soroca .92, Orhei .90, Soroca .90, Ungheni .93 Ungheni .90 Date 31-Dec-2007 10-Sep-2011 30-Jun-2013 Comments This is a financial covenant, THis will be redefined as part only 2 utilities are under of restructuring compliance The non-revenue water (NRW), i.e. the ratio of Text Value Balti: 58; Cahul 35, Causeni Balti: 52; Cahul 33 Causeni (metered and estimated water production less 55, Floresti 57, Orhei 53, 50, Floresti 50, Orhei 52, metered and estimated water consumption) to Soroca 70, Ungheni 44 Soroca 67, Ungheni 40 (metered and estimated production). (%) Date 31-Dec-2007 30-Jun-2009 30-Jun-2013 Comments This indicator will be redefined as part of restructuring The share of water supply samples meeting Text Value Balti: 98; Cahul 99, Causeni Balti: 98; Cahul 100 Causeni Moldovan quality standards. 92, Floresti 100, Orhei 100, 98, Floresti 100, Orhei 100, Soroca 99, Ungheni 100 Soroca 99, Ungheni 100 Date 31-Dec-2007 14-Sep-2009 30-Jun-2013 Comments This indicator will be Public Disclosure Copy redefined as part of restructuring Page 3 of 7 The World Bank Report No: ISR6835 The number of hours of water service. Text Value Balti: 24; Cahul 19, Causeni Balti: 24; Cahul 20 Causeni 15, Floresti 24, Orhei 24, 20, Floresti 24, Orhei 24, Soroca 24, Ungheni 24 Soroca 24, Ungheni 24 Date 31-Dec-2007 14-Sep-2011 30-Jun-2013 Comments This indicator will be revised as part of restructuring The share of households connected to a piped Text Value Balti: 73; Cahul 76, Causeni Balti: 73; Cahul 77 Causeni sewerage network. 32, Floresti 42, Orhei 58, 35, Floresti 42, Orhei 58, Soroca 48, Ungheni 59 Soroca 49, Ungheni 60 Date 31-Dec-2007 14-Sep-2011 30-Jun-2013 Comments This indicator will be revised Public Disclosure Copy as part of restructuring The share of households connected to a piped Text Value Balti: 83; Cahul 95, Causeni Balti: 85; Cahul 95, Causeni water network. 76, Floresti 85, Orhei 90, 80, Floresti 90, Orhei 92, Soroca 70, Ungheni 80 Soroca 71, Ungheni 85 Date 31-Dec-2007 14-Sep-2011 30-Jun-2013 Comments This indicator will be revised as part of restructuring Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Improved community water points constructed Number Value 0.00 0.00 57.00 or rehabilitated under the project Date 31-Dec-2007 30-Jun-2009 30-Jun-2013 Comments This indicator most likely target to be redefined part of removed as the approach was as part of the project changed from point sources restructuring. to systems with household connections Number of other water service providers that Number Value 0.00 6.00 50.00 the project is supporting Date 31-Dec-2007 10-Sep-2011 30-Jun-2013 Comments so far 2 contracts signed and target to be redefined to 15 4 others under bidding or less process Number of water utilities that the project is Number Value 0.00 6.00 7.00 supporting Date 31-Dec-2007 10-Sep-2011 30-Jun-2013 Comments Target to be redefined as Soroca was canceled. Public Disclosure Copy Page 4 of 7 The World Bank Report No: ISR6835 Piped household water connections that are Number Value 0.00 1200.00 11150.00 benefiting from rehabilitation works undertaken Date 31-Dec-2007 10-Sep-2011 30-Jun-2013 by the project Comments Estimate from Balti and Target to be defined as part of Floresti restructuring Numbere of villages with signed construction Text Value 0 50 contract Date 31-Dec-2007 10-Sep-2011 20-Jun-2013 Comments The target will be reduced to 15 (or less) The total annual electric energy consumption Text Value Balti: 10216; Cahul 2259, Balti __; Cahul __, Causeni measured in MWh Causeni 600, Floresti 1058, __, Floresti __, Orhei __, Public Disclosure Copy Orhei 1606, Soroca 385, Soroca __, Ungheni Ungheni 1975 Date 31-Dec-2007 10-Sep-2011 30-Jun-2013 Comments This indicator will be Targets will be defined based maintained, but target revised on the results of energy audit currently under preparation The number and level of additional external Text Value Danish Gov: 17.3, SDA: 16.0, Danish Gov: __, SDA: __ financing commitments to the WSS sector Czech Rep: 11.2, ADA: 2.9, Czech Rep: __, ADA: __ (mln. Lei) Kuwait Fund: 13.0, TIKA: Kuwait Fund: __, TIKA:__ 13.2 Date 31-Dec-2007 14-Sep-2011 30-Jun-2013 Comments This indicator will be revised The number of staff-weeks within AM and the Text Value AM: 0, PIU: 4 The project is fully managed AM: 4, PIU 2 PIU respectively, managing different stages of by the PIU project cycle Date 31-Dec-2007 14-Sep-2011 30-Jun-2013 Comments This indicator will be revised.
Recommended publications
  • Local Finance Benchmarking Toolkit: Piloting and Lessons Learned
    fdaşlığ тво East нерс рт Strengthening Institutional Frameworks ідне па tenariat Orientalteneriatul Esti for Local Governance 2015-2017 Par ar ğı P artnership P Pa fdaşlıq во Eastern r T eneriatul Estic Східне пар Local Finance tnership enariat Oriedaşl art r f q t ten fda ar r Par r Benchmarking ıq тво Easter rq t fdaşlıq P fdaşlıq r нерс во Eastern P r T рт т T нерс рт Toolkit: Східне хідне па eneriatul Estic Ş па a art eneriatultnership Estic Ş P teneriatul Estic Східне ar at Oriental Східне паOrientala r P artnership P daşlığı P enariat O artnership tenariat Ofd piloting and stern f art P ar r r q t во Eastern P r q t ст Eastern daşlıq P r fdaşlığı P во Ea r f r т T lessons learned q t тво Ea r нерс Estic iatul Estichip Ş Схід eneriatu t artnership atul Estic Ş нерс l Estic Ş eriatul Estic Par tener daşlığ Східне парт ar r f rtnership P tenariat Oriental тво Eastern P rq t ip ar с eneri ер во Східне парт t не т MOLDOVA ar daşlığı P нерс P r f eneriatul Estic Ş tners Східне парт art tenariat Oriental ar P en P LOCAL FINANCE BENCHMARKING TOOLKIT: PILOTING AND LESSONS LEARNED Східне парт t Par tnership Par Par ENG tnership tenariat Oriental n tn ar ar rtenariat OrientalP ar Eastern f P Pa во r l q Eastern ğ ern The Council of Europe is the continent’s leading human rights The European Union is a unique economic and political partnership http://eap-pcf-eu.coe.int organisation.
    [Show full text]
  • Economic and Social Council
    UNITED NATIONS E Economic and Social Working Paper No. WGSO-4/2007/6 Council 8 May 2007 ENGLISH ONLY ECONOMIC COMMISSION FOR EUROPE COMMITTEE ON ENVIRONMENTAL POLICY Ad Hoc Preparatory Working Group of Senior Officials “Environment for Europe” Fourth meeting Geneva, 30 May–1 June 2007 Item 2 (e) of the provisional agenda Provisional agenda for the Sixth Ministerial Conference “Environment for Europe” Capacity-building STRENGTHENING ENVIRONMENTAL GOVERNANCE IN THE EASTERN EUROPE, CAUCASUS AND CENTRAL ASIA THROUGH LOCAL ENVIRONMENTAL ACTION PROGRAMMES 1 Proposed category II document2 Submitted by the Regional Environmental Centers for the Eastern Europe, Caucasus and Central Asia 1 The text in this document is submitted as received from the authors. This is a draft document as of 21 April 2007. 2 Background documents (informational and analytical documents of direct relevance to the Conference agenda) submitted through the WGSO. Table of Contents Executive Summary Part I: Background A) Institutional Needs Addressed B) History of LEAPs in EECCA C) Relevance to Belgrade Conference D) Process for Preparing the Report Part II: Results to Date A) Strengthened Environmental Governance B) Improved Environmental Conditions C) Increased Long-Term Capacity Part III: Description of Activities A) Central Asia B) Moldova C) Russia D) South Caucasus Part IV: Lessons Learned and Future Directions A) Lessons Learned B) Future Directions C) Role of EECCA Regional Environmental Centers Attachment A: R E S O L U T I O N of International Conference “Local Environmental Action Plans: Experience and Achievements of EECCA RECs” Executive Summary Regional Environmental Centers (RECs) in Eastern Europe, Caucasus, and Central Asia (EECCA) have promoted local environmental action programs (LEAPs) the last five years as a means of strengthening environmental governance at the local level.
    [Show full text]
  • “Romanian Waters”, Head of River Basin Management Plans Office, Bucharest, Romania
    NATIONAL ADMNISTRATION “ROMANIAN WATERS” Romania key input to the Second Assessment of Transboundary Rivers, Lakes and Groundwaters under the UNECE Water Convention Prut River Basin CORINA COSMINA BOSCORNEA, PhD National Administration “Romanian Waters ”, Head of River Basin Management Plans Office, Bucharest, Romania Ukraine - Kiev, 28 th April 2010 Second Assessment of Transboundary Rivers, Lakes and Romanian transboundary river basins Information about transboundary river basins: •Somes/Szamos, •Mures/Maros, •Crisuri, Tisza River •Banat, basin •Siret, •Prut, •Dobrogea-Litoral , •Arges-Vedea Danube •Banat River Basin •Buzau-Ialomita District •Jiu Romanian river basins Prut river basins in the Danube river basin district Prut river basin 1. General description of the Prut river basin The total Population Area in area of the Major density in the Shared the Character with an river basin transbound area in the countries country in average elevation in the ary river country km² (%) country (persons/km 2) upland character Romania, (Ukrainian 10,990 Ukraine and 27820 Prut Carpathians) and 55 (39.5%) Moldova lowland (lower reaches) • The Prut river basin is shared by Ukraine, Romania and Moldova Its source is in the Ukrainian Carpathians. Later, the Prut forms the border between Romania and Moldova. • The rivers Lapatnic, Drageste and Racovet are transboundary tributaries in the Prut sub-basin; they cross the Ukrainian- Moldavian border. • The Prut River’s major national tributaries are the rivers Cheremosh and Derelui, (Ukraine), Baseu, Jijia,
    [Show full text]
  • Road Infrastructure Development of Moldova
    Government of The Republic of Moldova Ministry of Economy and Infrastructure Road infrastructure development Chisinau 2017 1 … Road Infrastructure Road network Public roads 10537 km including: National roads 3670 km, including: Asphalt pavement 2973 km Concrete pavement 437 km Macadam 261 km Local roads 6867 km, Asphalt pavement 3064 km Concrete pavement 46 km Macadam 3756 km … 2 Legal framework in road sector • Transport and Logistic Strategy 2013 – 2022 approved by Government Decision nr. 827 from 28.10.2013; • National Strategy for road safety approved by Government Decision nr. 1214 from 27.12.2010; • Road Law nr. 509 from 22.06.1995; • Road fund Law nr. 720 from 02.02.1996 • Road safety Law nr. 131 from 07.06.2007 • Action Plan for implementing of National strategy for road safety approved by Government Decision nr. 972 from 21.12.2011 3 … Road Maintenance in the Republic of Moldova • The IFI’s support the rehabilitation of the road infrastructure EBRD, EIB – National Roads, WB-local roads. • The Government maintain the existing road assets. • The road maintenance is financed from the Road Fund. • The Road Fund is dedicated to maintain almost 3000km of national roads and over 6000 km of local roads • The road fund is part of the state budget . • The main strategic paper – Transport and Logistics Strategy 2013-2022. 4 … Road Infrastructure Road sector funding in 2000-2015, mil. MDL 1400 976 461 765 389 1200 1000 328 800 269 600 1140 1116 1025 1038 377 400 416 788 75 200 16 15 583 200 10 2 259 241 170 185 94 130 150 0 63 63 84 2000
    [Show full text]
  • Progress Report for 2009
    Contract number: 2009/219-955 Project Title: Building confidence between Chisinau and Tiraspol Report starting date: 01 January 2010 Report end date: 31 December 2011 Implementing agency: UNDP Moldova Country: Republic of Moldova Support to Confidence Building Measures II – Final Report 2010-2011 – submitted by UNDP Moldova 1 Table of Contents I. SUMMARY ................................................................................................................................................................. 3 II. CONTEXT ................................................................................................................................................................. 4 III. PROJECT BACKGROUND .................................................................................................................................. 5 1. BUSINESS DEVELOPMENT ............................................................................................................................................ 5 2. COMMUNITY DEVELOPMENT ........................................................................................................................................ 6 3. CIVIL SOCIETY DEVELOPMENT ...................................................................................................................................... 7 4. SUPPORT TO CREATION OF DNIESTER EUROREGION AND RESTORATION OF RAILWAY TRAFFIC. ........................................... 7 IV. SUMMARY OF IMPLEMENTATION PROGRESS .........................................................................................
    [Show full text]
  • The Republic of Moldova
    The Republic of Moldova The National Agency for Energy Regulation ANRE Alexandr Pushkin Street, no. 52 / A, MD-2005 Chisinau, Tel: 022 852 901, [email protected],http://www.anre.md ADMINISTRATION COUNCIL DECISION no. _____ March 2, 2021 Chisinau on the provisional certification of the natural gas transmission system operator "Vestmoldtransgaz" LLC, IDNO 1014600024244, legal address: MD-2004, Chisinau municipality, Stefan cel Mare si Sfant Avenue, no.180, off. 515 According to the provisions of art. 36 of the Law no. 108 / 27.05.2016 on natural gas, based on the application no. 9532 of 05.11.2020 on the certification of "Vestmoldtransgaz" LLC according to the "ownership separation" model and the attached documents that are in line with the established requirements, submitted by the nominated transmission system operator, as well as the information provided by the Motivation Note on the certification of TSO „Vestmoldtransgaz” LLC, the Administration Council of the National Agency for Energy Regulation, DECIDES: 1. To provisionally certify the natural gas transmission system operator „Vestmoldtransgaz” LLC, IDNO 1014600024244, holder of the license Series AC no. 001338 issued on 06.01.2016 for the natural gas transmission activity, according to the “ownership separation” model. 2. The Licensing, Monitoring and Control Department shall notify the Energy Community Secretariat within 5 working days of this decision and shall send it the Motivation Note on the provisional certification of TSO "Vestmoldtransgaz" LLC, which was the basis for issuing
    [Show full text]
  • The Jewish Cemetery of Ungheni Before 1917 Ungheni Was Part of the Bessarabia Gubernia of the Russian Empire
    The Jewish Cemetery of Ungheni Before 1917 Ungheni was part of the Bessarabia gubernia of the Russian Empire. Now it is part of the Republic of Moldova. Еврейское Кладбище, Унгены, Молдова Final report, Yefim Kogan, November 25, 2015 First reading – Terry Lasky, second reading – Yefim Kogan The project was started by JewishGen, Bessarabia SIG in 2015. The photographing was organized and financed by Avner Yonai, photographs were done by residents of Moldova Maria Calin – a history teacher and Serj – a local photographer. The cemetery is part of the large town cemetery located on strada Alexandru cel Bun, and not far from the Prut River. View it on the Google map above. 1 997 Jews lived in Ungheni in 1897 from a total population of 1697. 48 Jewish businesses were in Ungheni in 1924 and 1390 Jews lived there in 1930. Town Ungheni within the map of the Republic of Moldova. See the nearby town of Iasi, Romania, also see capital Chisinau (Kishinev) to the East, Balti - to the North. According to the report “Jewish Heritage Sites and Monuments in Moldova”, created by the United States Commission for the Preservation of America’s Heritage Abroad, 2010, the Jewish section of the town cemetery was established in 1958, after the old Jewish cemetery in the town was closed and signs of it were demolished. It contains approximately 100 gravestones. The stones at the new cemetery are all in good condition. The cemetery has no regular caretaker, but the area is occasionally cleaned and cleared by local individuals. Vegetation overgrowth is only a seasonal problem.
    [Show full text]
  • Medium Sized Project Proposal
    0(',806,=('352-(&7352326$/ 5(48(67)25*())81',1* Public Disclosure Authorized FINANCING PLAN (US$) AGENCY’S PROJECT ID: 3 GEF PROJECT/COMPONENT GEFSEC PROJECT ID: COUNTRY: REPUBLIC OF MOLDOVA Project 972,920 PROJECT TITLE: RENEWABLE ENERGY FROM PDF A* 25,000 AGRICULTURAL WASTES (REAW) SUB-TOTAL GEF 997,920 GEF AGENCY: WORLD BANK CO-FINANCING** OTHER EXECUTING AGENCY (IES): CONSOLIDATED IBRD/IDA/IFC AGRICULTURAL PROJECTS MANAGEMENT Government 1,434,950 Bilateral DURATION: 3 YEARS NGOs GEF FOCAL AREA: CLIMATE CHANGE Others 219,388 GEF OPERATIONAL PROGRAM: OP # 6 Sub-Total Co-financing: 1,654,338 Public Disclosure Authorized GEF STRATEGIC PRIORITY: CC 4 Total Project Financing: 2,652,258 ESTIMATED STARTING DATE: MAY 2005 FINANCING FOR ASSOCIATED ACTIVITY MPLEMENTING GENCY EE I A F : $146,000 IF ANY: N/A * PDFA approved on 23.03.2004 ** Details provided in the Financing Section CONTRIBUTION TO KEY INDICATORS OF THE BUSINESS PLAN: The project will contribute to the established target for OP#6 by removing barriers for the use of renewable energy from agricultural wastes in Moldova, and will reduce high implementation costs of such energy technologies due to low-volume of replication. Public Disclosure Authorized RECORD OF ENDORSEMENT ON BEHALF OF THE GOVERNMENT: Constantin Mihalescu, minister of Ministry of Environmental and Natural Date: 16 February 2005 Recourses of Moldova, GEF National Focal Point This proposal has been prepared in accordance with GEF policies and procedures and meets the standards of the GEF Project Review Criteria for a Medium-sized Project. Project Contact Person: Emilia Battaglini, ECA Regional Coordinator Tel.
    [Show full text]
  • Cv-Vitalie-Cirhana-01-2018.Pdf
    E UROPEAN CURRICULUM VITAE FORMAT PERSONAL INFORMATION Name Vitalie Cîrhană Address str. Andrei Doga 32/7, ap.120, Chisinau, MD-2024, Republic of Moldova Mobile phone +373 69110076 E-mail [email protected] Nationality Moldavian Date of birth 23 November 1977 SALTO TOY http://trainers.salto-youth.net/CirhanaVitalie/ WORK EXPERIENCE • Dates (from - to) July 2017 – now • Name of employer Erasmus+ Youth Info Centre in Moldova • Type of business or sector Promotion of Erasmus+: Youth in Action program in Republic of Moldova • Occupation or position held Coordinator • Main activities and responsibilities Promotion of Erasmus+: Youth in Action program in Republic of Moldova and it’s opportunities for youth organizaiton • Dates (from - to) February 2014 – now • Name of employer SALTO EECA • Type of business or sector International trainings for EVS volunteers and accredited organizations • Occupation or position held Trainer and facilitator • Main activities and responsibilities Delivering EVS training activities in the Eastern Partnership region (OnArrival Trainings, Mid- Term Meetings, EVS events and EVS Coordinators meetings) • Dates (from - to) December 2000 – now • Name of employer „MilleniuM” Training and Development Institute • Type of business or sector NGO • Occupation or position held Director • Main activities and responsibilities coordinating the implementation process of the Strategic Plan of the organisation implementation of the annual plans of the organisation, developing and promotion programmes and projects • Dates (from
    [Show full text]
  • Serviciul Vamal
    Republica Moldova SERVICIUL VAMAL ORDIN Nr. OSV449/2016 din 05.12.2016 cu privire la modificarea anexei nr.8 la Ordinul Serviciului Vamal nr.346-O din 24.12.2009 „Referitor la aprobarea Normelor tehnice privind imprimarea, utilizarea şi completarea declaraţiei vamale în detaliu” Publicat : 23.12.2016 în MONITORUL OFICIAL Nr. 459-471 art. 2145 Data intrării în vigoare Întru asigurarea executării Hotărîrii Guvernului Republicii Moldova ”Cu privire la aprobarea efectivului-limită și a Regulamentului Serviciului Vamal” nr. 04 din 02.01.2007, alin. (4) art. 9, alin. (2) art. 132 şi alin. (4) art. 175 din Codul vamal al Republicii Moldova, nr. 1149-XIV din 20.07.2000, ORDON: 1. Se modifică anexa nr. 8 la Ordinul Serviciului Vamal „Referitor la aprobarea Normelor tehnice privind imprimarea, utilizarea şi completarea declaraţiei vamale în detaliu.” nr. 346-O din 24.12.2009, care va avea următorul cuprins: Cod birou / Denumire birou / post vamal Localitatea limitrofă post vamal 1000 Nord 1010 COSTEȘTI (PVFI, rutier) STÎNCA 1020 LIPCANI (PVFI, rutier) RĂDĂUȚI PRUT 1030 CRIVA1 (PVFI, rutier) MAMALIGA 1040 CRIVA2 (PVFI, feroviar) MAMALIGA 1050 LARGA1 (PVFI, rutier) KELMENȚI 1060 LARGA2 (PVFI, feroviar) KELMENȚI 1070 BRICENI (PVFI, rutier) ROSOȘANI 1080 GRIMĂNCĂUȚI (PVFS, rutier) VASKIVȚI 1090 OCNIȚA1 (PVFI, feroviar) SOKIREANÎ 1100 OCNIȚA2 (PVFI, rutier) SOKIREANÎ 1110 VOLCINEȚ (PVFI, feroviar) MOGHILIOV-PODOLISK 1120 OTACI (PVFI, rutier) MOGHILIOV-PODOLISK 1130 UNGURI (PVFL, rutier) BRONNIȚA 1140 COSĂUȚI (PVFI, fluvial) IAMPOL 1150 SOROCA(PVFS,
    [Show full text]
  • Seven Years of Successful Cooperation in the Moldovan Water Sector
    SEVEN YEARS OF SUCCESSFUL COOPERATION IN THE MOLDOVAN WATER SECTOR Marco Beros EUROPEAN INVESTMENT BANK Alexandru Cosovan EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT Henno Putnik DELEGATION OF THE EUROPEAN UNION TO MOLDOVA 20TH MEETING OF THE EUWI NATIONAL POLICY DIALOGUE ON WATER POLICY IN MOLDOVA Chisinau, November 7, 2014 7 Nov. 2014 20th EUWI Meeting on Water Policy in Moldova 1 CONTENTS 1. Overview of Activity in Moldova a) EIB Activity in Moldova b) EBRD Activity in Moldova c) EU Activity in Moldova 2. Jointly Financed Water Projects a) Moldova Utilities Development Programme b) Chisinau Water c) North Moldova Water 3. Outlook 7 Nov. 2014 20th EUWI Meeting on Water Policy in Moldova 2 1. Overview of Activity in Moldova 7 Nov. 2014 20th EUWI Meeting on Water Policy in Moldova 3 EIB Activity in Moldova (1/2) Framework Agreement Signed in Nov. 2006, ratified in Feb. 2007 First loan signed in June 2007 Stock of signed loans: EUR 586 m; 14 operations 7 Nov. 2014 20th EUWI Meeting on Water Policy in Moldova 4 EIB Activity in Moldova (2/2) Current Portfolio: EUR 586 million Partners Loan Signature Project (EURm) Date EBRD EU Moldova European Roads 30 Jun-07 X X Water Sector (MUDP) 10 Sep-10 X X Chisinau Trolleybuses 5 Oct-10 X X Societe Generale SME & 20 Nov-10 Energy Env Loan Moldova Roads II 75 Nov-10 X X Filiere-du-Vin Upgrading 75 Nov-10 (Moldova) X PCH Loan For SME and 20 Oct-11 Priority Projects G Moldelectrica 17 Jun-12 X X Chisinau Urban Roads 10 Sep-12 X Moldova Roads III 150 Jun-13 X X Mobiasbanca Loan for 20 Nov-13 SMEs and Mid-Caps Chisinau Water 24 Dec-13 X X North Moldova Water 10 Jul-14 X X Fruit Garden of Moldova 120 Jul-14 X 7 Nov.
    [Show full text]
  • Report on Implementation Progress of Projects Managed by the Capmu As of September 30, 2007
    CONSOLIDATED AGRICULTURAL PROJECTS’ MANAGEMENT UNIT, FINANCED BY THE WORLD BANK (CAPMU WB) REPORT ON IMPLEMENTATION PROGRESS OF PROJECTS MANAGED BY THE CAPMU AS OF SEPTEMBER 30, 2007 Developed by CAPMU management CHISINAU October 2007 1 ACRONYMS AND ABBREVIATIONS ACSA Agency for Consultancy and Training in Agriculture ALRC Agency for Land Relations and Cadastre BCO Branch Cadastral Office CAPMU Consolidated Agricultural Projects Management Unit CIS Commonwealth of Independent States DA Development Agency EIA Environmental Impact Assessment FAO Food and Agriculture Organization of the United Nations GIS Geographical Information System GOM Government of Moldova LFA Logical Framework Approach LPSP Land Privatization Support Project (funded by USAID) MAFI Ministry of Agriculture and Food Industry NGO Non Governmental Organization PFI Participating Financial Institution PM Project Manager RISPII Rural Investment and Services Project II SIDA Swedish Development Agency TCO Territorial Cadastral Office TL Team Leader USAID US Agency for International Development WB World Bank 2 TABLE OF CONTENTS RURAL INVESTMENT AND SERVICES PROJECT ........................................................................... 6 PROJECT OBJECTIVES ...............................................................................................................6 PROJECT COMPONENTS.............................................................................................................6 PROJECT IMPLEMENTATION PROGRESS ..................................................................................8
    [Show full text]