IOC Case Study.Indd

Total Page:16

File Type:pdf, Size:1020Kb

IOC Case Study.Indd Iron Ore Company of Canada Linatex® 808 Hard Wall Mining Hose Minerals Case Study Above: Linatex® Hard Wall Mining Hose (808) Right: Screen feed hoses attached to distribution box. On left is a Weir hose in operation. On right is competitor’s hose which has been worn through and bandaged while awaiting replacement INDUSTRY Linatex® hoses save IOC CAD$338,800 over Iron ore mining two years and outlasts incumbent hose by 10x CUSTOMER Background The challenge Iron Ore Company of Canada The Iron Ore Company of Canada (IOC) in During a site visit, the team at Weir Minerals Labrador City, Newfoundland and Labrador, along with IOC’s Maintenance Manager and APPLICATION Canada produces iron ore pellets and high- Planner identifi ed that the incumbent screen Screen feed hoses grade iron concentrates, with average iron feed hoses were only lasting 6 to 8 weeks grades over 66%. Located in the Labrador before it needed to be replaced. Further EQUIPMENT Trough, a region known to have substantial investigation revealed that these hoses were Linatex® 808 Hard Wall iron ore deposits, IOC was founded in 1949 of very low cost and quality. Mining Hose by the M.A. Hanna Company. During a trial period, IOC decided to test The site includes a mine with fi ve operational hoses from four manufacturers in process pits, a concentrator and a pelletizing plant. conditions simultaneously, including a IOC also owns and operates the 418-km custom Linatex® 808 Hard Wall Mining Quebec North Shore and Labrador Railway, Hose from Weir Minerals. The challenge which transports the iron ore pellet and for Weir Minerals was to meet the pricing concentrate from Labrador City to shipping expectations of IOC while exceeding the terminals and water ports in Sept-Iles. wear life of the competition. Today, IOC is managed by Rio Tinto, and The solution is owned by Rio Tinto, Mitsubishi, and After careful examination of the installation the Labrador Iron Ore Royalty Income and the wear life of the previous hoses at Corporation. IOC, the engineers at Weir Minerals decided As a leading producer and exporter of iron to design a more robust version of the ® ore in North America, IOC can produce 23 Linatex 808 Hard Wall Mining Hose. The million tons of iron ore concentrate per year. custom hose was manufactured with extra thick Linacure® wear liner to last longer by better absorbing the energy from the impact of the fl ow. The solution cont. The hose also contained a wear indicator wire, which helped the maintenance team better plan for hose replacement or rotation before any failures occurred. Furthermore, Weir Minerals engineers standardized the hose length to fit in every installation at IOC in order to reduce the number of spare parts needed to be stocked in the warehouse. The total cost and life expectancy for the hoses from Weir Minerals for all 14 screens at IOC was CAD$165,200 with an 18 to 24-month life span. The results Above: Weir Minerals hoses in preparation for shipment to customer The custom-designed hose provided by Weir Minerals far exceeded the wear life of all other competitors. The Linatex® 808 Hard Wall Mining Hose lasted as long as 3 years, while the competitor hoses failed at 3, 4 and 12 months performing the same application. When compared to the incumbent hoses at IOC, Weir Minerals hoses lasted more than 10x longer. Operators at IOC needed to replace the two incumbent hoses operating on one screen six times per year, while the custom Linatex® hoses had no maintenance or downtime related issues during the same time. Replacing the incumbent hoses with the custom Linatex® 808 Hard Wall Mining Hose will save IOC CAD$338,800 over 2 years for all 14 screens, not including the added downtime to replace the hose and the mill tonnage that would need to be cut back if there were two screens down simultaneously for hose replacements. Comparison table Linatex® 808 Hard Wall Incumbent Hose Mining Hose Wear life (weeks) 78 - 104 6 - 8 Hoses needed every 2 years 2 24 Cost per hose CAD$5,900 CAD$1,500 Cost per screen every 2 years CAD$11,800 CAD$36,000 Total cost savings of the Linatex® 808 Hard Wall Mining Hose is CAD$338,800 over 2 years for all 14 screens at IOC Weir Minerals Copyright© 2019, Weir Slurry Group, Inc. All rights reserved. The trademarks mentioned in this document are trademarks and/or registered trademarks of The Weir Group PLC and/or its subsidiaries. [email protected] WMD0932/201909 www.global.weir.
Recommended publications
  • BP and Rio Tinto Plan Clean Coal Project for Western Australia I P
    BP and Rio Tinto Plan Clean Coal Project for Western Australia I p... http://www.bp.com/genericarticle.do?categoryId=2012968&content... Site Index | Contact us | Reports and publications | BP worldwide | Home Search: Go About BP Environment and society Products and services Investors Press Careers BP Global Press Press releases Press releases BP and Rio Tinto Plan Clean Coal Project for Western Speeches Australia Features and news Images and graphics Release date: 21 May 2007 Contact Information In this section BP and Rio Tinto today announced that they are beginning feasibility studies and work on plans for the potential BP Takes Delivery of development of a A$2 billion (US$1.5 billion) coal-fired World's Largest LNG Carrier power generation project at Kwinana in Western Australia What is RSS? BP and D1 Oils Form Joint that would be fully integrated with carbon capture and Venture to Develop Jatropha storage to reduce its emissions of greenhouse gases. This Biodiesel Feedstock will be the first new project for Hydrogen Energy, the new BP Announces Significant company launched by BP and Rio Tinto last week, subject North Sea Investment to Boost to regulatory approval. The planned project would be an UK Gas Supplies industrial-scale coal-fired power and carbon capture and storage project. It would generate enough electricity to BP, ABF and DuPont Unveil $400 Million Investment in UK meet 15 per cent of the demand of south west Western Biofuels Australia, while each year capturing and permanently storing about four million tonnes of carbon dioxide which BP and TNK-BP Plan otherwise would have been emitted to the atmosphere.The Strategic Alliance with project would gasify locally-produced coal from the Collie Gazprom as TNK-BP Sells its region to produce hydrogen and carbon dioxide.
    [Show full text]
  • Preparing for Carbon Pricing: Case Studies from Company Experience
    TECHNICAL NOTE 9 | JANUARY 2015 Preparing for Carbon Pricing Case Studies from Company Experience: Royal Dutch Shell, Rio Tinto, and Pacific Gas and Electric Company Acknowledgments and Methodology This Technical Note was prepared for the PMR Secretariat by Janet Peace, Tim Juliani, Anthony Mansell, and Jason Ye (Center for Climate and Energy Solutions—C2ES), with input and supervision from Pierre Guigon and Sarah Moyer (PMR Secretariat). The note comprises case studies with three companies: Royal Dutch Shell, Rio Tinto, and Pacific Gas and Electric Company (PG&E). All three have operated in jurisdictions where carbon emissions are regulated. This note captures their experiences and lessons learned preparing for and operating under policies that price carbon emissions. The following information sources were used during the research for these case studies: 1. Interviews conducted between February and October 2014 with current and former employees who had first-hand knowledge of these companies’ activities related to preparing for and operating under carbon pricing regulation. 2. Publicly available resources, including corporate sustainability reports, annual reports, and Carbon Disclosure Project responses. 3. Internal company review of the draft case studies. 4. C2ES’s history of engagement with corporations on carbon pricing policies. Early insights from this research were presented at a business-government dialogue co-hosted by the PMR, the International Finance Corporation, and the Business-PMR of the International Emissions Trading Association (IETA) in Cologne, Germany, in May 2014. Feedback from that event has also been incorporated into the final version. We would like to acknowledge experts at Royal Dutch Shell, Rio Tinto, and Pacific Gas and Electric Company (PG&E)—among whom Laurel Green, David Hone, Sue Lacey and Neil Marshman—for their collaboration and for sharing insights during the preparation of the report.
    [Show full text]
  • Rio Tinto BHP, Tesco, Sainsbury, Arcelormittal, National Grid
    Quarterly Engagement Rio Tinto Report July-September BHP, Tesco, 2020 Sainsbury, ArcelorMittal, National Grid 2 LAPFF QUARTERLY ENGAGEMENT REPORT | JULY-SEPTEMBER 2020 lapfforum.org CLIMATE EMERGENCY Puutu Kunti Kurrama and Pinikura Aboriginal Corporation Rio Tinto under pressure from investors over Juukan Gorge As LAPFF has been learning more about “My interaction with Mr. Rio Tinto’s involvement in the destruc- Thompson, in his roles as Chair tion of the historically significant caves of both Rio Tinto and 3i, has been at Juukan Gorge in Western Australia, there have been increasing concerns positive thus far. However, I sense about the company’s corporate govern- that investors are losing confidence ance practices. Consequently, the Forum in his leadership and in his board at – along with other investor groups, most Rio Tinto. It will be a long road back What happened at prominently the Australasian Centre for for the company.” Juukan Gorge? Corporate Responsibility (ACCR) - has been pushing the company to review its Cllr Doug McMurdo In May, Rio Tinto destroyed 46,000-year- corporate governance arrangements. old Aboriginal caves in the Juukan One of the main strategies in this Gorge region of Western Australia. The engagement has been to issue press responding to information issued by explosions were part of a government releases citing LAPFF’s concerns as vari- Australian Parliamentary inquiries into sanctioned mining exploration in ous details of Rio Tinto’s practices were this matter. There appears to be increas- the region. The caves are of cultural revealed through a range of investiga- ing evidence of corporate governance fail- significance to the Puutu Kunti tions.
    [Show full text]
  • International Value Fund Q3 Portfolio Holdings
    Putnam International Value Fund The fund's portfolio 3/31/21 (Unaudited) COMMON STOCKS (96.1%)(a) Shares Value Aerospace and defense (0.7%) BAE Systems PLC (United Kingdom) 137,249 $955,517 955,517 Airlines (1.2%) Qantas Airways, Ltd. (voting rights) (Australia)(NON) 437,675 1,698,172 1,698,172 Auto components (1.5%) Magna International, Inc. (Canada) 23,813 2,097,257 2,097,257 Automobiles (1.2%) Yamaha Motor Co., Ltd. (Japan) 70,500 1,742,181 1,742,181 Banks (14.7%) AIB Group PLC (Ireland)(NON) 708,124 1,861,795 Australia & New Zealand Banking Group, Ltd. (Australia) 165,820 3,561,114 BNP Paribas SA (France)(NON) 28,336 1,723,953 CaixaBank SA (Spain) 295,756 915,292 DBS Group Holdings, Ltd. (Singapore) 60,800 1,311,573 DNB ASA (Norway) 71,016 1,511,129 Hana Financial Group, Inc. (South Korea) 38,370 1,447,668 ING Groep NV (Netherlands) 362,345 4,432,786 Lloyds Banking Group PLC (United Kingdom)(NON) 1,014,265 594,752 Mizuho Financial Group, Inc. (Japan) 73,920 1,066,055 Skandinaviska Enskilda Banken AB (Sweden)(NON) 30,210 368,223 Sumitomo Mitsui Financial Group, Inc. (Japan) 67,400 2,450,864 21,245,204 Beverages (1.0%) Asahi Group Holdings, Ltd. (Japan) 33,700 1,426,966 1,426,966 Building products (1.1%) Compagnie De Saint-Gobain (France)(NON) 27,404 1,617,117 1,617,117 Capital markets (3.6%) Partners Group Holding AG (Switzerland) 1,115 1,423,906 Quilter PLC (United Kingdom) 798,526 1,759,704 UBS Group AG (Switzerland)(NON) 132,852 2,057,122 5,240,732 Chemicals (1.1%) LANXESS AG (Germany) 21,951 1,618,138 1,618,138 Construction and engineering (2.5%) Vinci SA (France) 35,382 3,624,782 3,624,782 Construction materials (1.2%) CRH PLC (Ireland) 38,290 1,794,760 1,794,760 Containers and packaging (0.8%) SIG Combibloc Group AG (Switzerland) 51,554 1,192,372 1,192,372 Diversified financial services (2.1%) Eurazeo SA (France)(NON) 20,542 1,563,415 ORIX Corp.
    [Show full text]
  • How Do Extractive Companies Measure and Report Their Social Performance? Review of Approaches to Impact Assessment
    ECONOMIC AND PRIVATE SECTOR PROFESSIONAL EVIDENCE AND APPLIED KNOWLEDGE SERVICES HELPDESK REQUEST How do extractive companies measure and report their social performance? Review of approaches to impact assessment Carolin Williams ODI April 2014 How do extractive companies measure and report their social performance? EPS-PEAKS is a consortium of organisations that provides Economics and Private Sector Professional Evidence and Applied Knowledge Services to the DfID. The core services include: 1) Helpdesk 2) Document library 3) Information on training and e-learning opportunities 4) Topic guides 5) Structured professional development sessions 6) E-Bulletin To find out more or access EPS-PEAKS services or feedback on this or other output, visit the EPS- PEAKS community on http://partnerplatform.org/eps-peaks or contact Yurendra Basnett, Knowledge Manager, EPS-PEAKS core services at [email protected]. Disclaimer Statement: The views presented in this paper are those of the authors and do not necessarily represent the views of Consortium partner organisations, DFID or the UK Government. The authors take full responsibility for any errors or omissions contained in this report. 2 How do extractive companies measure and report their social performance? Table of Contents 1 Query and approach 4 2 Individual company level reviews of social performance reporting 6 2.1 Anglo American 6 2.2 BG Group 11 2.3 BHP Billiton 13 2.4 BP 17 2.5 Newmont 19 2.6 Rio Tinto 21 2.7 Royal Dutch Shell 24 2.8 Tullow Oil 27 3 Headlines from reviews of companies’ social performance reporting 30 3 How do extractive companies measure and report their social performance? 1 Query and approach Extractive companies tend to spend significant amounts on community based development projects to improve their social performance.
    [Show full text]
  • Rio Tinto Group from Wikipedia, the Free
    Rio Tinto Group From Wikipedia, the free encyclopedia Rio Tinto (LSE: RIO) is a multinational mining and resources group founded originally in 1873. The group is one of the world's largest mining companies, with a pre-tax profit of approximately 10.2 billion US dollars in 2006 on consolidated turnover of 25.4 billion USD. Since 1995, Rio Tinto has been a dual listed company. Rio Tinto Limited, formerly known as CRA, is listed on the Australian Stock Exchange, with Rio Tinto plc (formerly RTZ) listed on the London Stock Exchange as well as New York Stock Exchange (under ticker RTP). The two companies are managed as a single economic unit by a unified board, with a share in either company entitling the owner to the same voting rights and dividend payouts. RTZ shareholders made up 76.7% of the new unified entity, which is primarily managed from London. Its current chief executive is Leigh Clifford and the company board is chaired by Paul Skinner. History Rio Tinto's origins are in southern Spain, at the site of an ancient mine which supplied the Roman Empire. In 1873 N M Rothschild & Sons of London and de Rothschild Frères of Paris joined with other investors to acquire the Spanish government's money-losing Rio Tinto mines. The new owners restructured the company and turned it into a profitable business. By 1905, the Rothchild interest in Rio Tinto amounted to more than 30 percent. In 1962 the (British) Rio Tinto Company acquired a majority stake in Consolidated Zinc, an Australian company, and was renamed the Rio Tinto-Zinc Corporation (RTZ).
    [Show full text]
  • It's Getting Serious Presentation to Mine Africa December 2011 Rupert
    Power – it’s getting serious Presentation to Mine Africa December 2011 Rupert Soames, Chief Executive, Aggreko plc | 2 Why listen to Aggreko? • One of the world’s largest providers of generation capacity in developing economies • Over the last five years – > 1,000 MW of additional capacity brought on-line in Africa – > 1,000 MW of additional capacity brought on-line in Asia – > 800 MW of additional capacity brought on-line in Latin America • >$600m of new fleet investment in 2011 alone • Currently delivering large scale power in 50 countries • World-wide power fleet of around 8,000 MW • One of the largest sponsors of research into power supply & demand in emerging countries | 3 Aggreko in mining • Temporary power and temperature control • Some key customers: – BHP – Chile, W A – Vale – Mozambique and Brazil – Barrick – Africa & Carribean – Bisha – Eriteria – Ivanhoe – Mongolia – Rio Tinto – Australia – Xtrata - Australia – Anglo American – Australia & South Africa • Typical applications of temporary power and temperature control – Project acceleration: guaranteeing power before permanent generation is available – Managing through temporary interruptions – Managing volatility in demand Mine cooling, South Africa| 4 Mine power, Mongolia | 5 Mine power, Australia | 6 | 7 Grid Power: 100 MW at Embakasi, Kenya | 8 Grid Power: 30 MW Gas at Batam, Indonesia Volatility is a fact of life: copper 2004 - 2011 | 9 Volatility is a fact of life: nickel 2004 - 2011 | 10 | 11 THE WORLD HAS A PROBLEM | 12 Demand for power growing fast Rolling 3-average
    [Show full text]
  • Its Your Turn: How Small- to Mid-Tier Mining Companies Can Win the Innovation Race
    Indian Oil & Gas Exploration and Production: Catalyzing Growth through Business Model Innovation | 1 Its Your Turn: How Small- to Mid-Tier Mining Companies Can Win the Innovation Race Satish Rao | Partner, Clareo rior studies have highlighted the challenges to ramp up productivity in the Mining sector. P Mining companies are struggling to be sufficiently profitable and to satisfy investors with the returns on capital, despite prices being 3 to 5 times higher than the lows of 2000. While pricing and increased extraction of deeper or lower grade ore are contributing factors, a significant threat to mining’s growth is its innovation deficit: the lack of application of technologies proven in other industries, and the slow speed from idea to adoption and scale. This is exasperated by recent events such as Vale’s tailings dam collapse in Brazil at Córrego do Feijão, which resulted in the deaths of an estimated 300 people and highlighted the significant safety challenges for mining companies. This is in addition to other health and safety risks, such as diesel emissions, water scarcity and pollution, dust, noise, and chemical hazards. Indian Oil & Gas Exploration and Production: Catalyzing Growth through Business Model Innovation | 2 When you consider the imperative to address rising non-discretionary, and there is both the obligation and the environmental concerns from the use of energy and water, opportunity for the industry to be more creative and to do so and decreasing carbon intensity, mining companies face more efficiently. increasingly significant challenges. THE TIDE IS STARTING TO TURN, BUT NOT Napier-Munn highlights challenges to SUFFICIENTLY AND NOT FAST ENOUGH.
    [Show full text]
  • The Mining Engineer the First MS&T-UMR
    The Mining Engineer The first MS&T-UMR-MSM Engineer Newsletter for the Mining Engineering Program October 2008 December 2007 Graduates May 2008 Graduates This issue of The Mining Engineer is dedicated to our graduates. In December 2007 the last “UMR” graduate walked across the stage during commence- ment. This University started in 1870 as the Mis- souri School of Mines (MSM) and the first graduates were mining engineers. It was only befitting that the last UMR graduate was also a mining engineer. Alex Hofstetter, proudly wearing his hard hat, light and light belt, was the last undergraduate to walk across the stage in December 2007 to accept the con- gratulations by Chancellor Carney. Alex is working for Barrick in Elko, NV. Enrollment and Capacity Expansion: FS 2007 started with 33% increase in overall enrollment over the 2006-07 academic year. The total enrollment was about 215, which included 150 undergraduate and 65 graduate students. The program also graduated 25 mining engineers in the December and May Commencements. A number of program initiatives including the Summer Explosives Camps, Jackling Introduction to Engineering, and aggressive introduction of the program to the public contributed to this increase. The key to sustaining and growing this enrollment capacity is to provide the appropriate resources to train and educate the students. Toward this objective, the Department is planning a Capacity Renewal Conference to bring our alums and supporters to campus in April 2009 to discuss and develop a plan for reinvestments in critical areas of the program. The Department is also looking to boost the recruitment efforts by recruiting a Resident Recruiter for Mining Engineering.
    [Show full text]
  • Strategies for Vertical Integration in the Mining Industry
    Executive Insights Volume XXI, Issue 55 Why are Battery Companies Investing in Mines? — Strategies for Vertical Integration in the Mining Industry As the market in batteries for electric and direct investments in minority interests, other peers have taken an indirect investment approach through long-term offtake autonomous vehicles develops, the downstream agreements (think Ganfeng Lithium, LionEnergy and Tesla). players that traditionally participate in chemical The common thread in all this activity is a desire for vertical and battery fabrication have shown a propensity integration. In this paper, we consider the rationale for companies for investment in upstream mineral extraction to take a vertically integrated position in the mining sector, review and processing. the application of these rationales for vertical integration in the battery minerals sector (using lithium as an example), and examine the impact that this has on the capabilities necessary for success. The battery mineral mining sector is currently one of the hottest for merger and acquisition activity and companies such as Vertical integration in the mining sector Ningbo Shanshan, Toyota Tsusho and Great Wall Motors have all taken steps to become participants in upstream mineral Vertical integration in the mining sector is not a new assets over the past 24 months. While these are all examples of phenomenon (Figure 1). A cursory glance at the histories of Figure 1 Vertical integration in the mining sector Extraction and Logistics and Exploration Development processing trading Rening Fabrication Iron and steel BHP Bluescope Glencore Zinc and lead Nyrstar Aluminium Rio Tinto Alcan Constellium Copper Anglo American Current focus Some current exposure Divested position Why are Battery Companies Investing in Mines? — Strategies for Vertical Integration in the Mining Industry was written by Philip Wheeler, Yong Teng and David Ogilvy, Partners at L.E.K.
    [Show full text]
  • Ticket Export May 27-2019
    Company Job Title Abra Mining Pty Ltd Environmental Manager ACCIONA Marketing Coordinator ACCIONA Senior Manager, Sales & Policy Aerocompact Sales Director APAC Aggreko Head of Sales & Marketing Aggreko Manager - Asia Pacific - Aggreko Microgrid & Energy Storage Aggreko Mining Sector Manager Aggreko Vice President of Sales for Aggreko Microgrid and Storage Solutions (Americas and AusPac regions) AGL Energy Sales Manager, Business Energy Solutions Alberfield Marketing Manager Alcoa Energy Development Manager Alcoa Global Technical Manager – Refining Energy Alinta Energy Business Development Manager Alinta Energy Commercial Advisor Alinta Energy General Manager, Asset Strategy Alinta Energy Major Account Manager Alinta Energy Regional Manager C&I Alinta Energy Senior Commercial Analyst Alloy Resources Limited Executive Chairman Anglo American Energy Projects Specialist Anglo American Head of International Policy AngloGold Ashanti Australia Business Improvement Coordinator AngloGold Ashanti Australia Chief Engineer - Australia AngloGold Ashanti Australia Manager: Maintenance and Engineering (Sunrise Dam Gold Mine) ANT Energy Solutions Executive Director ANT Energy Solutions Sales and Channels Manager ANZ Bank Director, Natural Resources Group APA Group Customer Relationship Manager ArcelorMittal Mining Head of Energy ARENA Business Development and Transactions ARENA Chief Executive Officer Company Job Title ARENA Energy Productivity Manager ARENA Investment Director Asian Renewable Energy Hub Project Manager ATCO Australia Business Development
    [Show full text]
  • DRAFT Protecting Shareholder and Natural Value
    Protecting shareholder and natural value Biodiversity risk management: towards best practice for extractive and utility companies COVER PAGE WITH IMAGE BACKD HERERA OFTNCE DRAFT CONSOLIDATED 1 This report and the benchmark upon which it is based were designed and written by Annelisa Grigg, Director of the independent consultancy Global Balance, and by Kerry ten Kate, Director, Investor Responsibility, Insight Investment. Acknowledgements The analysis for this survey was greatly assisted by the collaboration of the companies benchmarked, in its design and in checking and supplementing the data used. We greatly appreciate their input and hope that this report and our engagement with them on the basis of their individual results will help them manage biodiversity risks and opportunities to the advantage of the company and of biodiversity. Many thanks also to Assheton Carter of Conservation International; Sally Johnson, Independent Consultant; Mike Kelly, KPMG and to Rachel Crossley, Craig MacKenzie and Rory Sullivan of Insight Investment for their comments on initial drafts of this report. The authors have made their best efforts to ensure the accuracy of the information contained in this report and apologise for any inadvertent errors. 2 Contents Executive summary 4 Section 1. Introduction 10 Section 2. Is biodiversity an issue for business? 11 Section 3. Methodology 14 Section 4. How Insight will use this report 15 Section 5. The benchmark results 16 Section 6. Conclusions and recommendations 35 Appendix 1: Methodology 43 Appendix 2: Benchmark
    [Show full text]