National Horticulture Board Ministry of Agriculture Et Farmers Welfare Government of , Plot No.85, Sector 18, Institutional Area, Gurugram - 122 015 (Haryana) Ph. 0124-2342992, Fax: 2342991,2341225 Website: www.nhb.gov.in NHB/CC/23rd PPAC/2020-21/ ~ 5'" l January 13, 2021 \ Office Meanoranduan

Subject: Proceedings of the 23!daneeting of the Pre. Project appraisal Coananittee to cons'ider the proposals under various scheanes of the Board held on 05.01.2021 at NRB, RQ, Gurugraan (Rarvana) - Regarding.

I am directed to enclose herewith a copy of the Proceedings of the 23'd Meeting of the Pre-Project Appraisal Committee held on 05.01.2021 at NHB, Head Quarters, Gurugram (Haryana) during financial, year 2020-21 under the Chairmanship of Dr. R. Bhati, Joint Director, NHB.

This issues with the approval of Competent Authority dated 13.01.2021.

(D .. Pal) Deputy Director Distribution:

1) All Area Officers jJoint Directors, NHB, Gurugram. 2) Accounts Officer, NHB, Gurugram.

Copy for information to :

1) PS to MD, NHB, Gurugram •

National Horticulture Board Department of Agriculture, Cooperation and Farmers' Welfare Ministry of Agriculture and Farmers' Welfare

NHB ,G urugram, Dated 13.01.2021 Subject Minutes of the 23'. Pre-Project Appraisal Committee (pPAC) meeting to consider the proposals under various schemes of the Board during financial year 2020-21.

Date & Time 05.01.2021 at 11.00 am

Venue NHB, Gurul'ram

The Meeting was chaired by Dr. R. Bhati, Joint Director, NHB. The following members attended the meeting.

S. Composition Name of Officer/Representative with Designation attended the meeting No . I. Sr. Most Joint Dr. R. Bhati, Joint Director, NHB. Director, NHB- Chairman 2. Area Officers of I. Shri Dhal Singh, Area Officer, West Zone, NHB. NHB - Member 2. Shri R.S.Meena, Area Officer, North Zone, NHB 3. Shri Bani Singh, Area Officer, North-East Zone, NHB 4. Sh. H.C. Rohilla, Account Officer, NHB - Representing (JD&FA)

IN ATTENDANCE

1. Sh. Umed Singh, Deputy Director, NHB 2. Sh. D.K. Pal, Deputy Director, NHB 3. Sh. P.K. Bera, Sr. Horticulture Officer, NHB 4. Sh. Alok Kumar, Sr. Horticulture Officer, NHB 5. Sh. Ashok Kumar, Sr. Horticulture Officer, NHB 6. Sh. Ratan Lal Fulwariya, Sr. Horticulture Officer, NHB 7. Sunil Kumar Rewar, Sr. Horticulture Officer, NHB

Proceedings of the PPAC meeting held on 09.12.2020 were circulated on 17.12.2020. There being no observation from any of the members, the Committee confirmed the minutes.

It was reiterated that IPA guideline must be followed meticulously and Examination of proposals must be done with due diligence and concerned dealing officers will be accountable for any failure on their part as laid down in Internal Note dated 14.03.2019 under instruction from MD.

The summary of projects discussed in the meeting is as under:-

S.No. Particulars No. of projects 1 No. of cases considered 135 2 AODroved 68 3 Clarification soul!ht (Deferred) 60 4 Rejected 04 5 Closed/Withdrawn 03 • llPage The case-wise decision ofthe PPAC is as under:-

Approved Projects

PPAC discussed the following project proposals in the light of contents of agenda notes and scheme guidelines. PPAC noted that applicants have submitted all the documents as per the provisions under NHB Scheme guidelines and found in order. PPAC recommended/approved these projects for issuance ofIPA for the activity/area and conditions, if any, indicated against each project:-

and Condition, if any Sr. Name of the project and project Volume & Sr. Crop/Activity No. code No. of Agenda Area/Capacity Notes I Mr. Bhaurao Karbhari Rahinj & (West Division) Cultivation of Grapes Other 01, Survey/Gat No. 23/2 & Volume - 01 in as .25 acres in open 23/3, Village - Pimpame, Taluka- Sr. No. 03 field. Sangamner, District - Ahmednagar IMH) - (27BMHB048475) 2 Mrs. Samata Nanasaheb Nawale, (West Division) Cultivation of Guava Survey/Gat No. 120/1, Village - Volume - 01 in 05.50 acres in open Pohegaon, Kh., Taluka - Sr. No. 04 field. Kopargaon, District - Ahmednagar (MH) ~(27BMHB048427) 3 Mrs. Jyoti Krushnath Deshmukh & (West Division) Cultivation of Grapes Other 02, Survey/Gat No. 160, Volume - 01 (03.00 acres) and Village - Khutewadi, Taluka - Sr. No. as Custrad Apple (03.00 Tuljapur, District - Osmanahad acres) in open field. (MH) - (27BMHB048554) of 4 Mr. Sudam Vitthal Pandhare & (West Division) Cultivation other 02, Survey/Gat No. 527 & Volume - 01 Pomegranate (05.50 543, Village - Shendi, Taluka - Sr. No. 07 acres) in open field. Nagar, District - Ahmednagar (MH) - (27BMHB048569) of 5 Mrs. Priyanka Dinesh Nakate, (West Division) Cultivation Survey/Gat No. 49, At - Sangadari, Volume - 01 Capsicum in 10,000 Post - Boramani, Taluka - South Sr. No. 09 sq. mtr. under Shade Soalpur, Distt - Solapur (MH) - Net House. (27BMHB048570) of 6 Mrs. Suvama Jivan Bansode, (West Division) Cultivation Survey/Gat No. 479, Village - Volume - 01 Capsicum in 9,500 sq. Shirtav, Taluka - Man, District - Sr. No. 11 mtr. under Shade Net Satara (MH) - (27BMHB048574) House. Cultivation of Grapes 7 Mr. Ankush Ramchandra Khatal & (West Division) Other 01, Survey/Gat No. 128/1/8, Volume - 01 in 08.50 acres in open 128/2/A, Village - Shimadgi, Sr. No. 12 field. Taluka - Mangalwedhe, Distt - Solapur (MH) - (27BMHB048572)

21Page Subsidy will be 8 Mr. Ashwin Manoj Sathe, (West Division) Cultivation of Rose in Survey/Gat No. 123, Village - Volume - 01 8,000 sq. mtr. under restricted to Wahangaon, Taluka - Mawal, Sr. No. 14 Poly House. maXImum ceiling District - Pune (MH) - of Rs 56.00 lakbs (27BMHB048526) as applicant has already availed subsidy ofRs 46.95 lakbs. So, present proposal will be considered only for remaining quantum of subsidv. 9 Mr. Gajendra Sambhaji Bagal, (West Division) Cultivation of Guava Survey/Gat No. 98/1, 99/2, 99/4 & Volume - 01 (04.00 acres) and 97/3, At/Post - Belgaon, Taluka - Sr. No. 15 Orange (04.00 acres) Karjat, District - Ahmednagar in open field. (MH) - (27BMHB048495) 10 Mr. Mhatarba Vitthal Karpe, (West Division) Cultivation of Survey/Gat No. 104/16, Village - Volume - 01 Capsicum in 4,000 sq. Dhandarpal BK, Taluka - Sr. No. 16 mtr. under Shade Net Sangamner, Distt - Ahmedangar House. (MH) - (27BMHB048564) 11 Mr. Anil Maruti Randive, (West Division) Cultivation of Survey/Gat No. 155/6 & 155/7, Volume - 01 Capsicum in 6,000 sq. Village - Kandalgaon, Taluka - Sr. No. 17 mtr. under Poly Karvir, Distt - Kolhapur (MH) - House. (27BMHB048566) of 12 Mr. Kisan Rambhau Wakchaure & (West Division) Cultivation Other 02, Survey/Gat No. 204, Volume - 01 Capsicum in 6,000 sq. Village - Kalas BK, Taluka- Sr. No. 18 mtr. under Shade Net Akole, District - Ahmednagar House. (MH) - (27BMHB048559) of 13 Mr. Prasanna Chandrakant (West Division) Cultivation Dhongade, Survey/Gat No. 29/1, Volume - 01 Capsicum In 12,000 Village - Takali, Taluka - Akole, Sr. No. 20 sq. mtr. under Shade District - Ahmednagar (MH) - Net House. (27BMHB048560) Cultivation of Grapes 14 Mr. Mohan Dadasaheb Shinde, (West Division) Survey/Gat No. 148, Village - Volume - 01 (07.00 acres) in open Achkanhalli, Taluka - Jat, District- Sr. No. 21 field. Sangli (MH) - (27BMHB048563) Project cost is on 15 Mr. Shivaji Laxman Kure & Other (West Division) Cultivation of Grapes very higher side, 02, Survey/Gat No. 938/2, Volume - 01 (05.50 acres) in open NHB cost norms 1074/2/B/2/ A, 1074/2/B/l/B/2, Sr. No. 23 field. will be followed. Village - Kasegaon, Taluka - Pandharpur, District - Solapur , (MH) - (27BMHB048549)

--~-- -"'" _~~O\\~~ - - - -' -" 31Page Cultivation of Change of 16 Mr. Sushant Subhash Bedmutha & (West Division) constitution from Other 02, Survey/Gat No. 1173, Volume - 01 Capsicum in 5,100 sq. Individual to Joint Village - Budhgaon, Taluka - Sr. No. 24 mtr. under poly house. Farmers/Group of Miraj, District - Sangli (MH) - Farmers by (27BMHB048550) comouter division. Open field cultivation Change of name of 17 Mr. Navalkishor Sitalmal Pande, West Division applicants from Mr. Gat No - 576, Village-Kharpi, Vol-ll of Orange in 16.00 Navalkishor Taluka-Achalpur, Dist-Amravati (Sr. No. 01) Pande to (MH) (27CMHC040002) Sitalmal Mr. Navalkishor Sitalmal Pande & others- 2 Cultivation of 18 Mr. Bhausaheb Kisan Pagere, Gat West Division No - 146, At/post - Nandgaon Vol-ll Chrysanthemum under Budruk, Tal-Igatpuri, Dist- Nashik (Sr. No. 02) Poly House in 4080 (MH) (27DMHD047499) SaM Cultivation of 19 Mr. Bhikubai Keda Nirgude, Gat no West Division - 441, At post- Dahegaon, Tal - Vol-ll Capsicum under Poly Nashik, Dist- Nashik (Maharashtra) (Sr. No. 03) House in 2600 SqM (MH) (27DMHD047540) Cultivation of 20 Mrs. Divya Diwakar Shenoy, Gat West Division no - 97, At post-Murambi, Tal - Vol-II Capsicum under Shade in 8000 Igatpuri, Dist- Nashik (MH) (Sr. No. 04) Net House (27DMHD047552) SaM Cold Storage Type-I 21 M/s Salasar Agro Preservation Pvt. West Division Ltd, Plot No.-E-12, MIDC Vol-ll (capacity 6147 MT) Industrial Area, Latur, Dist - Latur, (Sr. No. 05) (MH) (27DMHDCSOOO032) Cultivation of 22 Mrs. Anita San dip Hole & Other (West Division) (15.00 04, Survey/Gat No. 140/7/A, Volume - 02 Pomegranate Grapes Village - Shedgaon, Taluka - Sr. No. 17 acres) & Shrigonda, District - Ahmednagar (03.00 acres) in open (MH) - (27BMHB048558) field. Cultivation of 23 Mr. Champaklal Vallabhji Chheda, (West Division) in 13,000 Survey/Gat No. 539, Village - Volume - 02 Cucumber Punadi, Taluka - Mandvi, District- Sr. No. 18 sq. mtr. Shade Net Kutch (Guiarat) - (24AGJOOI 0488) House. Cultivation of 24 Mr. Kerasiya Lakhmanbhai (West Division) Devkaranbhai, Survey/Gat No. 178, Volume - 02 Cucumber in 13,000 Village - Habay, Taluka - , Sr. No. 19 sq. mtr. Shade Net House. District - Kutch () - (24AGJOOI0494) Cultivation of 25 Mr. Arvind Lakhman Kerasiya, (West Division) in 13,000 Survey/Gat No. 178, Village - Volume - 02 Cucumber Habay, Taluka - Bhuj, District - Sr. No. 20 sq. mtr. shade net Kutch (Guiarat) - (24AGJOOI0496) house.

41Page of 26 Mr. Kerasiya Devrajbhai (West Division) Cultivation Lakhmanbhai, Survey/Gat No. 178, Volume - 02 Cucumber in 13,000 Village - Habay, Taluka - Bhuj, Sr. No. 21 sq. mtr. Shade Net District - Kutch (Gujarat) - House. (24AGJOOI0497) Cultivation of Banana 27 Mr. Devendra Ramji Patel, (West Division) Survey/Gat No. 213, 215, 218 & Volume - 02 (8.00 acres) and 311/PaikiOl, Village - Jarjok, Sr. No. 22 Papaya (6.00 acres) in Taluka - Nakhtrana, District - open field. Kutch (Guiarat) - (24AGJ0010507) of 28 Mr. Suresh Lalji Gorasiya, (West Division) Cultivation Survey/Gat No. I 59/Paiki 01, Volume - 02 Cucumber III 12,000 Village - Kukma, Taluka - Bhuj, Sr. No. 25 sq. mtr. shade net District - Kutch (Gujarat) - house. (24AGJOOI0502) of Subject to entry of 29 Mr. Kana Bhachubhai Ahir, (West Division) Cultivation lease deed in ROR Survey/Gat No. 483/7 Paiki 01, Volume - 02 Cucumber in 13,000 483/7 Paiki Ol/Paiki 01, Village - Sr. No. 27 sq. mtr. shade net before issuance of Lunva, Taluka - Bhachau, District house. Grant of Clearance - Kutch (Gujarat) - (GOC). (24AGJOOI0476) Cultivation of 30 Mr. Naranbhai Kanabhai Ahir, (West Division) Survey/Gat No. 483/7, Village - Volume - 02 Cucumber III 13,000 Lunva, Taluka - Bhachau, District Sr. No. 28 sq. mtr. shade net - Kutch (Gujarat) - house. (24AGJOOI0474) Cultivation of 31 Mr. Girdharbhai Manjibhai Vadi, (West Division) Survey/Gat No. 325, Village - Volume - 02 Capsicum in 5,000 sq. Khad Khambhadiya, Taluka - Sr. No. 29 mtr. shade net house. Lalpur, District - Jamnagar (Guiarat) - (24AGJOOI0452) Cultivation of Rose in 32 Mr. Jagannath Singh, Survey nos. East Division 57/1 & 57/3, Village - Nimi, Tehsil 8000 sqmt under poly - Patan, Distt.- Jabalpur (MP) Sr. No. 01 house (23AMPOO07094) Cultivation of 33 Mr. Mangilal Kag S/o Kaisaji Kag, East Division Survey no. 4711, Village - Segawan, Cucumber in 8000 Tehsil - Barwani, Distt.- Barwani Sr. No. 02 sqmt under shade net (MP), (23AMPOO07101) house Cultivation of Rose in 34 Mr. Dinesh Kumar Shukla, Survey East Division no. 460/3/4, Village - Khangarh, 4000 sqmt under poly Tehsil - Kothi, Distt.- Satna (MP) Sr. No. 03 house (23AMPOO07102) Cultivation of Sweet 35 Mr. Rishri Raj Singh Parihar S/o East Division Shri Yuvraj Singh Parihar, Survey Orange in 5.00 acre & no. 35, Village - Kanara, Tehsil - Sr. No. 04 Custard Apple in 5.00 Betul, Distt.- Betul (MP) acre (23AMPOO07103)

------_ .. ------'" \ SIPage ~~~\\~'>\ Cultivation of Banana IPA to be issued 36 Shri Birju Ram Mandavi, Shri East Zone after entry update Saraju Ram, Shri Magaoo Ram, (Sr. No. 06) in 8.00 acres in open I name of Survey no. 84/1/kh & 84/23/gh At- field. the Mangaoo Ram. Village- Buiki Junganar, Tahsil- Keshkal, Dist- Kondagaon, (Chhattisgarh), (22ACGOOOI220)

of 37 Sm!. Parmeshwari & Sm!. East Zone Cultivation Umeshwari, Survey no - 2263, (Sr. No. 07) cucumber in 4000 Village-Sankara, RC.Sihawa, sqmt under poly Tehsil -Nagri, District-Dhamtari house. (Chhattisgarh), (22ACGOOOI242)

of 38 Rita Chandrawanshi, Survey no - East Zone Cultivation 503/1 & 503/4, Village- Jaroda Tal- (Sr. No. 08) Cucumber in 8000 Dharshiwa, Dist- Raipur sqmt under poly (Chhattisgarh), (22ACGOOOI246) house.

Cultivation of Orchid 39 Shri Satrughna Nayak East Zone Survey no - 1983/2740, Plot (Sr. No. 09) In 8000 sqmt under no.510, Mouza: Bidei Pur, Tahasil: poly house. Basudevpur, Dis!: Bhadrak (Odisha), (21 AOROO02990)

of 40 Shir Bipin Bihari Misro, Survey no East Zone Cultivation - 425/481, 425/276, Plot no.l46, (Sr. No. 10) Capsicum In 8000 187, Mouza: Anantai, Ps: Nuagaon, sqmt under poly Tehsil: Kukudakhandi, Dis!: house. Ganiam (Odisha) (21 AOR0002991) Construction of Cold 41 Mis Maa Cold and Agro Industries, East Zone Survey/Khasra No. 86/5, 86/8, (Sr. No. 19) Storage (Type-2) Village - Kalalda, Tahsil - Controlled Sendhwa, Distt.- Barwani (MP) Atmosphere (CA) and (23AMPOCSOOO056) other add on components for the capacity 6086 MT Cultivation of 42 MIs. Sai Infrastructure, Khasra/ East Zone 6000 Survey no. 135/min-2, Village - (Sr. No. 20) Cucumber in Jamanya Jagir, Tehsil - Dr. sqmt under poly house Ambedkar Nagar, Distt.- Indore - 453441 (MP) (23AMP0007066) Cultivation of 43 Sh. Vaibhav Varshney, Survey nos. East Zone 393/2 & 395/2, Village - Jamusar (Sr. No. 21) Cucumber in 8000 sqmt under shade net Kalan, Tehsil - Berasia, Distt.- Bhopal (MP) (23AMP00071 00) house Cultivation of 44 Shri Nagappa Babu Agasara, South Zone Capsicum under Shade Survey No. 409/3, Village (Sr. No. 01) Kokatanur, Taluka Sindagi, Dis!. net house in 4000 (Kamataka), sqm. Bijapur, l\ (29AKA002679I ) ~ . '>-\ ---- -" - . ._.- .- ---" . - ---- ~'\\~ 61Page \\ () of 45 Smt. YD. Rajalakshmi, Survey No. South Zone Cultivation 3911, 39/2, 39/3, 39/4A, 39/4B, (Sr. No. 02) Capsicum under Shade 14311, 144/2 & 144, Village net house in 9000 Musturu & Dinnehosahalli (Both sqm. Adjoining villages), Kasaba Hobli, Chikkaballapur Taluk, Chikkaballapur District, (Kamataka), (29AKA0026943) of Grape 46 Sh. Rajashekhar Basvantraya South Zone Cultivation Hosamani, Survey No. 156/2AII , (Sr. No. 03) in 6.00 acres 156/2A/2, I56/2A/3 & 156/2B/2, Village Balaganura, Taluka Sindagi, District Bijapura-586217, (Kamataka),129AKA0026982) of 47 Smt. Sukanya, Survey No. 36/2, South Zone Cultivation 36/8, 36111, Village, (Sr. No. 04) Capsicum under Shade Sadashivanahalli, Taluka net house in 8000 Gudibande, Dist. Chikkaballapura- sqm. 561209, (Karnataka), (29AKA0026983) Grape 48 Sh. Rajashekar Sio Yalagondappa South Zone Cultivation of Lakkonda, Survey No. 327/2, (Sr. No. 05) in 5.50 acres Village Kakkalameli, Taluka Sindagi, Dist. Bijapura-586128, (Kamataka), (29AKA0026984) Cultivation of Grape 49 Sh. Uma Wlo Ninganagouda Patil South Zone & Prabhugouda Sio Sanganagouda (Sr. No. 06) in 5.50 acres Pati!, Survey No. 7311 & 73/2, Village Dambala, Taluka Sindagi, Dist. Bijapura-586128, (Karnataka), (29AKA0026988) Cultivation of 50 Sh. P Rajappa, Survey No. 69/1 C3, South Zone 8000 Suligunda Village, Shoolagiri Sr. NO.20 Capsicum in Taluk, Krishnagiri District, Tamil Sqmt under Poly Nadu, (33ATNOO06710) house Cultivation of Gerbera 51 Sh. Tippani Rajashekar Reddy, Sy. South Zone Sqmt under No:- 1271 or 127/i, Gundala or Sr. No.21 in 4000 Gundal Village, Chevella Mandai, Poly house Rangareddy District, Telangana, (37TTGOOO0267) Cultivation of 52 Smt. Vadthya Dhana Laxmi, Survey South Zone No:- 341/11/10 & 341/511, Theeded Sr. NO.22 Capsicum in 10000 Poly Village, Chintha Pally Mandai, Sqmt under Nalgonda District, Telangana, house (37TTGOOO0271) ~ ~\()\\~~ ,\~ ._,,_ .. --_ .. -_...- - -,,-----~.,-- _. .._------'------7)Page 53 Smt. Vadthya Vijaya South Zone Cultivation of Survey No:- 340/3/1 or 340/a3/1 & Sr. NO.23 Cucumber In 10000 341/11/2 or 341/11/2a, Theeded Sqmt under Village, Chintha Pally MandaI, Poly house Nalgonda District, Telangana (37TTGOOO0272)

54 Smt. B. Saraswathi, Sy No. 139/2, South Zone Cultivation of Gerbera Devaganapalli Village, Sr. NO.27 in 7000 Sqmt under Denkanikotta Taluka, Krishnagiri Poly house District,Tamil Nadu, ( 33A TNOO06720)

55 Sh. Sampankiraman, Survey No. South Zone Cultivation of 2/2F, Kottasadhanapalli Village, Sr. No.30 Capsicum In 3000 Gudisadhanapalli Post, Shoolagiri Sqmt under Taluka, Krishnagiri District, Tamil Poly house Naud, (33ATNOO06722)

56 Shri Brijesh Kumar Singh, Khasra North Zone Protected cultivation no. 1034, 1053, 1262, Village- of Cucumber under Jadaul, Tehsil - Syana & Distt.- (Sr. no.2) shade net house in an Bulandshahar (UP), Area of 12000 sqm., (09CBTOO04329) Under SC category

57 Shri Ranjit Singh S/o Sh. Chiurdi North Zone Protected cultivation Singh, Khasra no. 2873, Village- of Cucumber under Bhaisaha, Taluka- Chauri Chaura, (Sr. no. 3) shade net house in an Distt.- Gorakhpur (UP), Area of 4000 sqm. (9FVROOOO030) Under General categorv 58 Smt. Sharmila W/o Sh. Rishi Pal, North Zone Protected cultivation KhasraIKhatoni no. 57/1, 58/5, of Cucumber under 58/6,58/15,58/16, Village- Kutani, (Sr. no. 4) shade net house in an Taluka- Badli, Distt. Jhajjar (HR), Area of 4048 sqm. (06AHROOO1588) Under General category 59 Smt. Seema W/o Sh. Dilbag, North Zone Protected cultivation Khasra/Khatoni no. 36/24/3, 45/4, of Cucumber under 43/25, Village- Kutani, Taluka- (Sr. no. 5) shade net house in an Badli, Distt. Jhajjar (HR) Area of 4048 sqrn., (06AHROOOI587) Under General categorv 60 Sh. Ram Gopal S/o Sh. Ram Sahay North Zone Protected cultivation Joint Promoter Prajapat and others, Khasra no. 108, of Cucumber under Village- Hardhyanpura, Taluka- (Sr. no. 6) shade net house in an Bassi, Distt. Jaipur (Rajasthan), Area of 4000 sqm., Under General (08ARJOO06353) . category It.. ... _ . . •. - --- - \ M.-- ...... i1 81Page ,\~\O\\~ 61 Shri Digvijay Singh, Khata sankhya North Zone Open Field Cultivation 73 & 74 , Murabba no. 42, Village- of Kinnow in an area Chak 4 Y Kaliyan, Taluka- Sri (Sr. no. 7) of 10.07 acre. Under Ganganagr, Distt. Sri Ganganagar General Category I (Rajasthan), (08ARJOO0638i\ 62 Shri Lakhbir Singh Sohal, Khatoni North Zone Earlier proposed land 83/75, Khasra no. 48, Village- 4BB, area for cultivation of Tehsi1-Padampur, Sri Ganganagar (Sr. no. 8) Orange in an area (Rajasthan), (08ARJOO06363) 15.49 acres. The promoter has represented that actual area is applied owned IS 19.37 acres, however terms & conditions of IPA would be remain unchanged. cultivation 63 Shri Sharwan Kumar Yadav, North Zone Protected Khasra no. 116, 132, Village- of Cucumber under Kumba Ka Bas, Tehsi1- Chomu, (Sr. no. 9) Poly house in an Area Distt.-Jaipur (Rajasthan), of 8000 sqm.Under (08ARJOO06377) General category Open Field Cultivation Subject to Change 64 Sh. Harmanpreet Singh & others 3, North Zone Khasra/khatoni,no.116//119//I120/l1 of Orange in an area of of constitution by computer division. 21//122//126/1127, Village- (Sr. no. 11) 23.21 acre. Under Khippanwali, Taluka & Distt. General Category Fazilka (Puniab) (03APBOOOI658) cultivation 65 Shri Vijendra Singh S/o Late Nathi North Zone Protected (Flower) Singh, Khasra/Khatoni/Gat/Survey of Orchid no. 254/3 Village- Arhera (Sr. no. 12) under Poly house in an (Vrindavan), Ta1uka- Sadar, Distt.- Area of 4000 sqm., Mathura (UP), (09CBTOO04327) Under General categorY Protected cultivation 66 Shri Mustak Meerabux Mohammad, North Zone Khasra/Khatoni/Gat/Survey no. of Cucumber under 1299/481 & 1300/481, Village- (Sr. no. 13) shade net house in an Sultanpura, Ta1uka-Hurda & Distt.- Area of 13000 sqm., Bhilwara (Rajasthan), Under General (08ARJOO06368) categorY cultivation 67 Shri Brajnandan Singh, Survey No. North Zone Protected 9, 22, 25 & 27, Village- Kanauja, of Cucumber under Paragana - Dasana, Tehsi1- (Sr. no. 14) shade net house in an Ghaziabad, Distt. Ghaziabad (U .P) Area of 12000 sqm. General (09CBTOO04338) Under categorY Cultivation of Butter 68 Miss. Varsha Nahar, Khatoni No. North Zone with 885/894, Ki1a no. 14/2(3-14), Kila Mushroom no. 20/2(3), Village- Mauja (Sr. no. 15) capacity 140.00 MT. Chandhat, Tehsil & Distt. Pa1wal Under General (HR), (06AHROOOI598) categorY • 1 ._- -"" .. . - --- .. ------.~~N.Il~t 91Page " \l':J,V~ \ em Clarification sought (Deferred) Projects

PPAC discussed the following project proposals in the light of contents of agenda notes and scheme guidelines. PPAC decided that proposal may again be placed before PPAC, after obtaining required lacking information/ clarification/documents, as indicated against each project, it was also decided that the information/clarification may be sought by giving 30 days time period Zone Concerned/Center In-charge will expeditiously follow up with the applicant. Lacking information/ Sr. Name of the project and & Volume and Sr. No. project code No. of Agenda Clarification/documents to be sought Notes Mis Bothara Cold Storage, (West Division) Clarification from applicant is required for Survey/Gat No. 484/2, Village commodity to be stored in cold storage. - Nimgaon Wagha, Taluka - Volume - 01 Nagar, District - Ahmednagar Sr. No. 01 (MH)- (27BMHBCSOOOOI7)

Fresh RoR after removing burden (boja) IS 2 Mrs. Suman Vitthal Pandhare, (West Division) Survey/Gat No. 543, Village - required. In case, the loan is KCC, then a letter Shendi, Taluka - Nagar, Volume - 01 from concerned bank is required stating that the burden (boja) on RoR is for KCC loan only. District - Ahmednagar (MH) - Sr. No. 02 (27BMHB048568)

As per land documents, IPA application & 3 Mr. Nana Ramachandra (West Division) Katare, Survey/Gat No. 109/1, undertaking the name of applicant is Mr. Nana At/Post - Ghanand, Taluka - Volume - 01 Ramachandra Katare whereas as per PAN Card & Atpadi, District - Sangli (MH) Aadhar Card the name is Mr. Nana Rama Katare. Sr. No. 06 - (27BMHB048575) The name is mismatch. The clarification in this regard required from applicant.

The proposed project land is already mortgaged for 4 Mr. Vithal Harichandra Pawar, (West Division) Survey/Gat No. 209/l/A, other activity. As per NHB scheme guidelines, the Village - Hatur, Taluka - Volume - 01 proposed project land should be free from any burden (boja). Therefore, fresh ROR required after South Solapur, District - Sr. No. 08 Solapur (MH) - removing burden (Boja). (27BMHB048573) The name of the applicant as per IPA application, 5 Mrs. Mahananda Kalyanrao (West Division) Hulgane, Survey/Gat No. PAN Card, Aadhar Card IS Mrs. Mahananda 01/01, At - Kirnalli, Post - Volume - 01 Kalyanrao Hulgane but as per land documents the Bhurikavathe, Taluka - name is Mrs. Mahanada Kallapa Hulgane. A Sr. No. 10 Akkalkot, District - Solapur undertaking/certificate required from applicant. (MH) - (27BMHB048565) The proposed project land is already mortgaged for 6 Mr. Narayan Nivrutti (West Division) Waghmode, Survey/Gat No. other activity. As per NHB scheme guidelines, the 1883/1/K/2, Village - Kadlas, Volume - 01 proposed project land should be free from any Taluka - Sangole, Distt - burden (boja). Therefore, fresh ROR required after Sr. No. 13 Solapur(MH) removing burden (Boja).

10 I P age (27BMHB048567)

7 Mr. Vikas Dnyaneshwar (West Division) I. IPA application submitted m one name, Dongare & Other 0 I, however, in details of applicants two names Survey/Gat No. 390/2, Volume - 01 have been mentioned. 390/l1B, 390!l/A, 391/4, At- 2. The details of area in favour of the applicants Sr. No. 19 Adhegaon, Post - Mr. Vikas Dnyaneshwar Dongare & Mrs. Takalishikandar, Taluka - Archana Vikas Dongare in Gat No. 390/2, Mohol, District - Solapur 390/l1B, 390/l/A & 391/4 may be provided (MH) - (27BMHB048561) supporting by 7/12 extract. 3. Only one applicant signed the IPA application, DPR & undertaking etc. Therefore, documents should be signed by both applicants. 4. Applicants may also clarifY the role of Mrs. Shrawani Vikas Dongare in the above said project as the Mrs. Shrawani Vikas Dongare is also having share of land in the proposed project land. 5. The plantation of pomegranate is already existing in 07.00 acres. Clarification is required from applicant.

1. NOC for Gat No. 463/2 from other co-applicant 8 Mr. Dilip Narsu Barade & (West Division) Other 03, Survey/Gat No. of proposed project land is required. 488/1, 494/2, 463/2, 494/1 & Volume - 01 2. The name of applicants as per IPA application, 498/1, Village - Ravgaon, Aadhar Card & PAN Card & land documents Sr. No. 22 Taluka - Karmala, District - are mismatching. Clarification required from Solapur (MH) applicants. (27BMHB048562) 3. Constitution is mentioned as Individual instead of Joint Farmers/Group of farmers. Clarification is required.

9 Mr. Sanjay Janardhan (West Division) I. Submitted undertaking is without date. Fresh Deshmukh & Other 01, undertaking with date is required. Survey/Gat No. 518, Village- Volume - 01 2.NOC from other co-owner of the proposed Hivtad, Taluka - Atpadi, project land is required. Sr. No. 25 District - Sangli (MH) - 3. Constitution is mentioned as Individual instead of (27BMHB048546) Joint Farmers/Group of Farmers. 4.Proposed project cost i.e. Rs. 57.91 lakh is on very higher side for cultivation of Grapes in 09.00 acres. Clarification in this regard required from applicant.

10 Mr. Jaiprakash Hariram West Division 1. Revised implementation schedule to start the Bhawsagar, Gat no -32/2, At Vol-II project work (with months & year) after Post -Devhada (BK),Tahsil- (Sr. No. 06) receipt of grant of clearance from NHB Mohadi, Dist-Bhandara, required. Maharashtra 2. Certified copy of Detail Project Report (DPR) (27CMHC040009) (on the suggestive lines of NHB Model DPR Templates) required.

lllPage II M/s Shree Balaji Sahakari West Division I. Revised implementation schedule to start the Soot Girini Ltd, Gat no - 130, Vol-l1 project work (with months & year) after At/Post - Pangari, Taluka- (Sr. No. 07) receipt of grant of clearance from NHB Deulgaon Raja, Dist - Buldana required. Maharashtra 2. Certified copy of Aadhaar card & PAN Card (27CMHC040007) of all Directors required. 3. Certified copy of Memorandum of Association and Board Resolution required. 4. Cost of Drip irrigation system in DPR, not mentioned whereas as per scheme guideline drip irrigation is essential component. Without drip irrigation project not eligible under the scheme, Clarification is required.

12 Mrs. Sarita Jayendra Chauhan, West Division I. Proposed project land is already mortgage for Gat no - 23, At post- Pilapur, Vol-II other purpose/activity. Fresh land documents Taluka -Narkhed, Dist- (Sr. No. 08) after removing burden in proposed project Nagpur, Maharashtra land are required. (27CMHC040008) 2. Revised implementation schedule to start the project work (with months & year) after receipt of grant of clearance from NHB required. 13 Mr. Diwakar Katapadikar West Division 1. [PA applied for group of farmers, whereas Shenoy and Other 2, Gat no - Vol-II applicant detail mentions only for one person, 1001E, 98, 97, At post- (Sr. No. 09) clarification required. Murambi, Taluka -Igatpuri, 2. Proposed project land is already mortgage for Dist- Nashik, Maharashtra other purpose/activity. Fresh land documents (27DMHD047553) after removing burden in proposed project land is required.

14 M/s MSJ Cold Storage, Plot West Division No. II, 12, 13, 14 IN Gut No. Vol-II 683/1, Amalner Co-Operative (Sr. No. 10) Industrial Estate Limited, Village - Mangrul, Taluka - Amalner, Dist - Jalgaon, Maharashtra (27DMHDCS000037)

121Page project was availed. 7. Revised basic data sheet is required including the commodities proposed to be stored as mentioned in DPR.

Proposed project land is already mortgage for other 15 Mr. Sanjay Shivram Revgade, West Division Gat no - 424, At post- Padali, Vol-II purpose/activity required fresh land documents Taluka - Sinnar, Dist- Nashik, (Sr. No. II) after removing burden from proposed project land. Maharashtra (27DMHD047547) Revised implementation schedule to start the 16 Mr. Prasad Baburao Kandekar, West Division 1. project work (with months & year) after receipt Gat uo - 638/2, At/post - Vol-II of grant of clearance from NHB required. Khadak Ojhar, Taluka - (Sr. No. 12) Technical standard submitted for an area for Chandwad Dist-Nashik, 2. Maharashtra 8000 SqM, whereas in IPA application & DPR SqM. Clarification (27DMHD047549) area is proposed 4000 required from aoolicant. Certified copy of land documents Le. 8A required. 17 Mr.Sandeep Prakash Kadam, West Division Gat no - 714/2, A/post - Vol-II Khakurdi, Taluka -Malegaon, (Sr. No. 13) Dist- Nashik, Maharashtra (27DMHD047543)

Revised implementation schedule to start the 18 Mrs. Shweta Vidyadhar West Division 1. Mahale, Gat no - 134, AtPost - Vol-II project work (with months & year) after receipt of grant of clearance from NHB is required. Pangari Taluka -Deulgaon (Sr. No. 14) Specification/Standards of the Raja, Dist-Buldhana, 2. Technical Maharashtra proposed shade net house in prescribed format (27CMHC040001) ofNHB required. 3. Certified copy of land documents Le. 8A required. copy of TSP area notification, 19 Mr.Subhash Mahadu Khode, West Division 1. Certified Gat no - 79/2, AtlPost - Vol-II required. In proposed gat no 79/2 total land is 2.61 ha Mohadi, Taluka- Dindori, (Sr. No. 15) 2. and grapes plantation already existing in area Dist- Nashik, Maharashtra 2.46 ha. It means remaining area available for (27DMHD047546) applicant is only 1500 SqM, whereas proposed area for this project is 8000 SqM. Clarification is required. IPA application duly singed by applicant on each 20 Mr. Amolkumar Ramdas West Division Sawarkar, Gat no - 388, At- Vol-II page required. Amboda, Post-Akolkhed, (Sr. No. 16) Taluka - Akot, District-Akola Maharashtra (27CMHC040000) ~, ~\&\()\\~~

13 I P age 21 M/s Aprash Industry, Plot No. (West Division) I. English version of partnership deed is required. 609, GIDC Estate, Dahod-2, 2. Submitted DPR is incomplete. Financial District - Dahod (Gujarat) - Volume - 02 projections not furnished. Fresh complete DPR (24AGJOOI0503) with technical programme & financial viability Sr. No. 23 of the project is required. 3. Gov!. Certificate being TSP area is required. 4. Resolution from partners to sign all the documents on behalf of firm. 5. Entry of leased deed in ROR is required. 22 Mrs. Pindoliya Premiia Vipul, (West Division) The name of applicant as per IPA application, PAN Survey/Gat No. I 149/Paiki 02, Card, Aadhar Card is Mrs. Pindoliya Premiia Vipul Village - Bhujodi, Taluka - Volume - 02 but as per land documents the name is Premilaben Bhuj, District - Kutch Zinabhai Gangjibhai Dabasiya. The applicant has Sr. No. 24 (Gujarat) - (24AGJOO 1050 I) submitted an affidavit In regarding the difference of name. English/Hindi version of name affidavit is required.

23 Mr. Jadav Bavalbhai (West Division) The proposed project land is already mortgaged for Karmanbhai, Survey/Gat No. Volume - 02 other activity. As per NHB scheme guidelines, the 366, Village - Ogan, Taluka - Sr. No. 26 proposed project land should be free from any Viramgram, District - burden (boja). Therefore, fresh ROR required after Ahmedabad (Gujarat) removing burden (Boja). (24AGJOOI0500) 24 Shri Gaurav S/o Anil Soni, East Division I. Hard copy of IPA application duly signed by the Survey no. 191/1, Village - applicant on each pages is required Sutareti, Taluka - Thandla, Sr. No. 05 2. The name of applicant not matched with IPA Distt.- Jhabua (MP) application, Land records, Aadhar & PAN Card. (23AMP0007120) Please clariry it. 3. Revised implementation schedule required to start the project work (with months & year) i.e. after receipt of

26 Shir Shatrughan Mishra, East Zone 1.As per IPA 2020-21 scheme guidelines, the Khasra/ Survey no - 554, project work and release of term loan to be 555, 556, 557, 558, 559, (Sr. No. 12) started after obtaining the grant of clearance 562, 563, 564, 565, 566/1, (GoC) from, NHB. Therefore, revised 141Page \ .... ).-\ ~i\O'\~ 566/2, 567, 572, 573, 577, implementation schedule is required. 581 & 582 village - Khamharmuda, RC - 2. Certified copy of the land documents (Khasra, Patewa, Tehsil & dist - Khatoni etc) in the name of applicant issued by Mahasamund (CG), revenue department with entry in RoR. (22ACGOOOI241)

27 Smt. Sanjna Mishara, Survey East Zone I. Undertaking from promoter corrected and no - 16, Gram: Aamdi, completed in all respect. Detail Project Report on the suggestive lines is Sihawa, Tehsil -Nagri, Dist (Sr. No. 13) - Dhmtari (CG), required. A notarized confirmation about the name Sanjna (22ACGOOO1247) Mishra and Sanjna Devi are the name of same person who has applied IPA. As per IPA 2020-21 scheme guidelines, the project work and release of term loan to be started after obtaining the grant of clearance (GoC) from NHB. Therefore, revised imnlementation schedule is reauired. 1. As per IPA 2020-21 scheme guidelines, the 28 Smt. Nirlipta Ojha, Khata no East Zone project work and release of term loan to be - 446, plot no - 1283/3969 started after obtaining the grant of clearance & 1350/3970, Mouza: (Sr. No. 14) (GoC) from NHB. Therefore, revised Balam, Tahsil- barkote, Ps- implementation schedule is required. Deogarh, Dist -Deogarh Certified copy of encumbrance certificate in the (Odisha), (2IAOR0002989) name of lessor in local language, issued by revenue department and its English version. Certified copy of Patta of project land in the name of lessor local language, issued by revenue department and its English version. 1. As per IPA 2020-21 scheme guidelines, the 29 Shri Guru Charan Dandia, At East Zone project work and release of term loan to be _ Bonaigarh, Po -Bonaigarh, (Sr. No. 15) started after obtaining the grant of clearance Tehsil - Bonai, dist - (Goe) from NHB. Therefore, revised Sundargarh (Odisha), implementation schedule is required. (2 1AOR0002992) Certified copy of encumbrance certificate in the name of lessor in local language, issued by revenue department and its English version. Certified copy of Patta of project land in the . name of lessor local language, issued by revenue department and its English version.

1. Latest Encumbrance certificate ROR -IB of Sh. Boyapati Mahesh, Survey South Zone 30 project land for survey number 424-1,424-2. No. 424-1, 424-2, Village (Sr. No. 07) Malyavantham, Mandai 2. Undertaking from applicant in prescribed format Bhathalapalli, District of NHB in the name of applicant & proposed Ananthapuramu -515661, survey numbers should be mentioned. (Andhra Pradesh), (28AAP0023335)

.. - ."'.--- -"" "-- - ,- 15 I P age 31 Sh. Basavaraj S/O Ningodappa South Zone J. Latest Encumbrance certificate (EC) of project 8abalagaon, Survey No. 61, land in Kannada language and its English Village Lachyana, Taluka Indi, (Sr. No. 08) version. Dis!. 8ijapura-5862I J, 2. Self attested copy of RTC in Kannada language (Kamataka), for the proposed survey number. (29AKA0026970) 3. The online IPA application received with proposed survey number 61 whereas land documents, DPR, undertaking received for survey number 256/3. 4. Confirmation from applicant for actual survey number on which project will be implementing.

32 Sh. Basappa S/o South Zone I. Confirmation from applicant that no any project Chandrashekar Yalameli, work is yet started which can be started only Survey No. 138/2A, Village (Sr. No. 09) after obtaining grant of clearance from NHB. Bandala, Taluka Sindagi, Dis!. Bijapura-586128, (Kamataka), 2. Latest Encumbrance certificate (EC) of project (29 AKA0026971) land in Kannada language and its English version.

3. Cost of shade net house not indicated by aoolicant in IPA aoolication. 33 Sm!. Manjula W/o Shrishail South Zone I. Confirmation from applicant that no any project Yalameli, Survey No. 13814, work is yet started which can be started only Village Bandala, Taluka (Sr. No. 10) after obtaining grant of clearance from NHB. Sindagi, Dis!. Bijapura- 586 J 28, (Kamataka), 2. If applicant is one or few of joint owners of (29AKA0026972) project land then NOC from others co-owners be submitted indicating the share of each co-owner in proposed Survey number of land.

3. Latest Encumbrance certificate (EC) of project land in Kannada language and its English version.

4. Cost of shade net house not indicated by applicant in IPA application.

5. Self attested copy of RTC in Kannada language for the proposed survey number.

34 Sh. Jotyiba Shankar Desai, South Zone J. Confirmation from applicant that no any project Survey No. 143/6, Village work is yet started which can be started only Nada 8.K., Taluka Indi, (Sr. No. I J) after obtaining grant of clearance from NHB. District Bijapura-586217, 2. Latest Encumbrance certificate (EC) of project (Karnataka), land in Kannada language and its English (29AKA0026975) verSIOn. 3. Cost of shade net house not indicated by applicant in 1PA application. 4. Self attested copy of RTC in Kannada lanllualle

\ - ..... ~ .. 16 I P age ~~o~)J> for the proposed survey number. 5. Self attested copy of Aadhar card of applicant should be readable. 35 Sh. Bhimaraya S/o Gurappa South Zone I. Confirmation from applicant that no any project Badanura, Survey No. 253/1, work is yet started which can be started only 257/5, 37/2A3, 37/2B3 & (Sr. No. 12) after obtaining grant of clearance from NHB. 37/1BIK, Village Bandala, Taluka Sindagi, District 2. The online application received with proposed Bijapura-586128, (Kamataka), area 9 acres however, total land holding in the (29AKA0026976) name of applicant is 8.85 acres in the proposed survey numbers.

3. Latest Encumbrance certificate (EC) of project land in Kannada language and its English verSIOn.

4. Cost of grape structure not indicated in IPA application & DPR bv applicant. 36 Sh. Mallikarjuna S/o Vittalla South Zone I. Confirmation from applicant that no any project Logavi, Survey No. 285/2, work is yet started which can be started only Village Jambhagi, Taluka (Sr. No. 13) after obtaining grant of clearance from NHB. Bijapura, District Bijapura- 586112, (Karnataka), 2. Latest Encumbrance certificate (EC) of project (29AKA0026978) land in Kannada language and its English versIOn.

3. Cost of shade net house not indicated by applicant in IPA application & mentioned project cost in place of cost of shade net house.

4. The online IPA application received for 12000 SQM shade net house whereas applicant has submitted undertaking for area 4000 SQM.

5. Confirmation from applicant whether proposed activity in application is completely new activity. 37 Sh. Nanasaheba S/o Sangappa South Zone I. Confirmation from applicant that no any project Beunra, Survey No. 700/1, work is yet started which can be started only Village Balaganura, Taluka (Sr. No. 14) after obtaining grant of clearance from NHB. Sindagi, District Bijapura- 586217, (Kamataka), 2. If applicant is one or few of joint owners of (29AKA0026979) project land then NOC from others co-owners be submitted indicating the share of each co-owner in proposed Survey number of land.

3. Latest Encumbrance certificate (EC) of project land in Kannada language and its English version.

4. Cost of shade net house not indicated by applicant in IPA application & mentioned total proiect cost in place of cost of shed net house . .. ~ .. ...•.•. _. 17 I P age ~~\\~~ 38 Sh. Subash Sio Sangappa South Zone I. Confirmation from applicant that no any project Beunra, Survey No. 70011, work is yet started which can be started only Village Balaganura, Taluka (Sr. No. IS) after obtaining grant of clearance from NHB. Sindagi, District Bijapura- 2. Latest Encumbrance certificate (EC) of project 586217, (Kamataka), land in Kannada language and its English (29AKA0026980) version.

3. Cost of shade net house not indicated by applicant in IPA application & mentioned project cost in place of cost of shed net house.

4. If applicant is one or few of joint owners of . project land then NOC from others co-owners be submitted indicating the share of each co-owner in proposed Survey number of land.

5. Confirmation from applicant whether proposed activity In application is completely new activity.

39 Sh. Mallanagouda Sio South Zone I. Confirmation from applicant that no any project Shankaragouda PatH, Survey work is yet started which can be started only No. 38, Village Antharagangi, (Sr. No. 16) after obtaining grant of clearance from NHB. Taluka Sindagi, District 2. Latest Encumbrance certificate (EC) of project Bijapura-586128, (Kamataka), land in Kannada language and its English (29 AKA002698I ) version.

3. It appears from the applicant's PAN card that it was signed during the making of the PAN card but applicant has submitted all documents with thumb impression even PAN card also.

40 Sh. Sunil Sio Chennappagouda South Zone I. Confirmation from applicant that no any project Biradar & Ravikumar Sio work is yet started which can be started only Chennappagouda Biradar, (Sf. No.17) after obtaining grant of clearance from NHB. Survey No. 48/4 & 48/2, 2. Whether proposed activity in IPA application is Village Chikka Sindagi, completely new activity. Taluka Sindagi, Dis!. Bijapura-586128, (Kamataka), 3. Latest Encumbrance certificate (EC) of project (29AKA0026985) land in Kannada language and its English version.

4. Cost of Grape structure not indicated by applicant in IPA application & DPR, please clarifY the reason.

I. Confirmation from applicant that no any project 41 Sh. Vithabai Wlo Kenchappa South Zone Nagaralli, Survey No. 77/IB, work is yet started which can be started only Village Yankanchi, Taluka (Sr. No. 18) after obtaining grant of clearance from NHB. Sindagi, Dis!. Bijapura- 2. Whether pr~ osed activity in IPA application is _. -- 181Page 586128, (Karnataka), completely new activity. (29 AKA0026986) 3. Latest Encumbrance certificate (EC) of project land III Kannada language and its English version.

4. Cost of shade net house not indicated by applicant in IPA application.

42 Sh. Bheemashankar Sio South Zone 1. Confirmation from applicant that no any project Yalagondappa Lakkonda, work is yet started which can be started only Survey No. 327/1, Village (Sr. No. 19) after obtaining grant of clearance from NHB. Kakkalameli, Taluka Sindagi, 2. If applicant is one or few of joint owners of Dist. Bijapura-586128, project land then NOC from others co-owners be (Karnataka ), submitted indicating the share of each co-owner (29AKA0026987) in proposed Survey number of land.

3. Latest Encumbrance certificate (EC) of project land in Kannada language and its English version.

4. Cost of grape structure not indicated by applicant in IPA application & DPR.

43 Smt. Nakka Asha Devi South Zone 1. Complete IPA application duly signed by Survey No. 502,503,504, 516, Sr. NO.24 applicant in each & every page. Veldanda - Village, Narmetta 2. Certified copy of the readable Patta pass book MandaI, Jangoan District, in local language and its English version. Telangana 3. Certified copy of Encumbrance Certificate in (37TTG0000276) Local Language and its English version. 4. Undertaking from Applicant in prescribed format as submitted undertaking is old format and survey no. not mentioned. 5. As per Detail Project Report (DPR) mentioned two crops i.e. Mango & Guava in 10 acres whereas as per IPA application proposed crop is Mango in 6 acres. A corrected DPR is required. 44 Dr. Rajendran, Survey No. South Zone 1. Encumbrance Certificate of the project land 14/lB, 14/3 B, ,359/1A,3 59/1B, Sr. NO.25 in local language and its English version. Perungarai -Village, 2. Submitted local language land document Paramakudi Taluka, survey no. 15 area is 2-63.00 whereas its Ramanathapuram District, English version land survey no. 15 is 0-63.00. Tamil Nadu A corrected English version Patta is required. (33A TN00067 16) 3. As per IPA application the proposed month for the start of project is January 2012, whereas, IPA scheme guideline 2020-21 the project work and release of term loan should be started after obtaining of Grant of Clearance from NHB. Revised implementa~ion schedule is required.

...... \\ ).\ 19 I P age ~~\\)\\~ 45 Dr. Jeyachitra, Survey No. South Zone I. Encumbrance Certificate of the project land 4,5&6, Perungarai- Village, Sr. NO.26 in local language and its English version. Paramakudi Taluka, 2. As per IPA application the proposed month Ramanathapuram District, for the start of project is January 2012, Tamil Nadu, whereas, IPA scheme guideline 2020-21 the (33ATN0006717) project work and release of term loan should be started after obtaining of Grant of Clearance from NHB. Revised imolementation schedule is reauired. 46 Sh. Aileni Shyam Sunder South Zone 1. IPA application with sign on each & every Reddy, Survey no. 206/ AA, page by applicant. Village - Yadgaripally, District Sr. NO.28 2. Undertaking from Applicant In prescribed - Keesara, Telangana format with mentioned survey no and location (37TTG000027 4) of the project. 3. Certified copy of Palla pass book in local language and its English version with notarized. 4. Certified copy of Encumbrance Certificate in local language and its English version. 5. Technical Standard/specification in prescribed format in case of Protected cultivation i.e. Poly house. 6. Technical & financial Viability in Detailed Project Report (DPR). 7. Revised implementation scheduled of the oroiect work. 47 Smt. Aileni Laxmi South Zone 1. IPA application with sign on each & every Survey no. 206/ A, Village - page by applicant. Yadagarpalli, MandaI - Sr. No.29 2. Undertaking from Applicant in prescribed Keesara, Dist - Medchal format with mentioned survey no and location Malkajigiri, Telangana of the project. (37TTG0000275) 3. Certified copy of Palla pass book in local language and its English version with notarized. 4. Certified copy of Encumbrance Certificate in local language and its English version. 5. Technical Standard/specification in prescribed format in case of Protected cultivation i.e. Poly house. 6. Technical & financial Viability in Detailed Project Report (DPR). 7. Revised implementation scheduled of the oroject work. 48 Sh. Kammari Venkatesham South Zone Component wise cost of the project in the IPA (@ Sh. Kammari Venkatesh) Sr. No.3 I application is required. Sy.No:-73/2, Chanvelly Village, Chevella Mandai, Rangareddy District, Telangana, (37TTG0000277)

20lPage 49 Sh. Boya Thirumalesh South Zone Component wise cost of the project in the IPA Survey no:- 23/?/2 or 23/b/2 & Sr. NO.32 application is required. 39/7 or 39/c, Vithalapuram Village, Maldakal MandaI, Jogulamba Gadwal (new) Mahaboobnagar (old) District, Telangana, (37TTGOOO0282) 50 Smt. Boya Saritha South Zone Component wise cost of the project in the IPA Survey No:- 44/5, Sr. No.33 application is required. Vithalapuram Village, Maldakal Mandai, Jogulamba Gadwal (New) Mahaboobnagar (Old) District, Telangana, (37TTGOOO0278) 51 Sh. Sanjeev Kumar South Zone Proposed area in IPA application and technical Survey No. - 138/4, 13911, Sr. NO.34 standard are not matching. 14711A, Poonapalli - Village, Hosur - Taluka, Krishnagiri - Dist, Tamilnadu, (33A TN00067 I 8)

52 Smt. J. Sudha Rani South Zone Component wise cost of the project in the IPA Survey no:- 23/?/2/1/1 or Sr. NO.35 application is required. 23/d/21111 & 39/3, Vithalapuram Village, Maldakal Mandai, Jogulamba Gadwal (new) Mahaboobnagar (old) District, Telangana (37TTGOOOO279) 53 Smt. V ithalapuram Saritha, South Zone Component wise cost of the project in the IPA Survey No:- 56?1 or 56Al, Sr. NO.36 application is required. Vithalapuram Village, Maldakal MandaI, Jogulamba Gadwal (New) Mahaboobnagar (Old) District, Telangana, ( 37TTGOOO0280). 54 Sh. Nanavath Mothilal South Zone Component wise cost of the project in the IPA Survey No:- 145/B/1/2 or Sr. No.37 application is required. I45"B"JI'2 & I45/B/2/2 or 145"B"2"2, Bompally Village, Doma MandaI, Vikarabad (New) Ranga Reddy (Old) District, Telangana (37TTGOOO0281) 55 M/s Asian Cold Storage, North Zone Decision awaited about technical scrutiny being Khasra/Khatoni no. 910/495 project relates to setting up of Solar Power Plant (2-3),911/495 (1-17), 496 (4- (Sr. no. 10) capacity 200 KVA under scheme no. 2. 0), Village- Bhagwanpur, .

- ... ------.v-'...... --~ 211 P age ,~n\\~ Taluka- Derabassi, Distt.- Mohali (Punjab), (03APBOCSOOOI08 ) 56 Sh. Beerabal Singh Huf Karta North Zone I. DPR is incomplete. Please submit complete Pramod Kumar, Harish Kumar DPR on the suggestive lines of NH~Moclel Choudhary and Narayani Devi, (Sr. no. 16) DPR Templates duly signed by applicant on Village- Manpur (Rural), each and every page: Taluka- Abu Road, Distt. 2. Fresh copy of land documents i.e. :copy of Sirohi (Rajasthan), Nakai Jamabandi, Register Intkal & Khasra (08ARJ0006412) Girdawari indicating proposed Survey no. as per IPA application. 3. Physical status of the project, as no work should be started before e.ettiO!!IPA. 57 Sh. Radhey Shyam Sharma North Zone I. Please provide fresh land document i.e. copy Sio Ramakant Sharma, of Nakai Jamabandi, Register Intkal & Village- Amiya Tiwari, Taluka (Sr. no. 17) Khasra Girdawari indicating proposed Survey & Distt. Tonk (Rajasthan), no. as per IPA.application. (08ARJ0006406) 2. Land is in the name of several persons, kindly provide Hissa Parman Patra (Land share) from Revenue Authority. NOC from others co-owners indicating share of each co~ owner 3. DPR is incomplete. Please submit complete DPR on the suggestive lines of NHB Model DPR Templates duly signed by applicant on each and every page: 4. Non encumbrance certificate. As per scheme guideline the project land should be free from any burden such as mortgage to 3'" party. 5. Physical status of the project, as no work should be started before e.ettine.IPA. 58 Mrs. Namita Trivedi W/o North Zone 1. Readable copy of Land ownership in the Achyut Trivedi, Village- name of Applicant with clear survey No. and Daiya, Tehsil- Kolayat, Distt.- (Sr. no. 18) Plot. and entry in RoR with latest record self- Bikaner (Rajasthan), attested (08ARJ0006395)

59 Shri Jagmal, VPO- Bhanwar, North Zone 1. Land is in the name of several persons, kindly Tehsil-Sedwa, Distt.- Barmer provide Hissa Parman Patra (Land share) from (Rajasthan), (08ARJ0006388) (Sr. no. 19) Revenue Authority and NOC from others co- owners indicating share of each co-owner. 2. Land is under mortgaged with Bank. As per guideline the project land should be free from any burden such as mortgage to 3'" party. Please submit the fresh land document after clearance of mortgage alongwith Non encumbrance certificate. 3. Physical status of the project, as no work should be started before getting IPA.

22 I P age •

60 Shri Jalam Singh, VPO- Garal, North Zone 1. Land is in the name of several persons, kindly Tehsil & Distt.- Barmer ' provide Hissa Parman Patra (Land share) from (Rajasthan), (08ARJOO06389) (Sr. no. 20) Revenue Authority and NOC from others co- owners indicating share of each co-owner 2. Land is under mortgaged with Bank. As per guideline the project land should be free from any burden such as mortgage to 3'd party. Please submit the fresh land document after clearance of mortgage alongwith Non encumbrance certificate. 3. Physical status of the project, as no work should be started before getting IPA.

Ie) Rejected Projects

PPAC discussed the following project proposals in the light of contents of agenda notes and scheme guidelines. PPAC decided to reject these project proposals on the grounds! reasons indicated against each project: -

Sr. Name of the Project and Volume and Sr. Grounds! Reasons for closure of application No. Project code No. of Agenda Notes I M!s Malhar Cold Storage East Zone IPA applied in the name of Malhar Cold Unit 2, SurveylKhasra No. Storage whereas as per lease deed, registration 479!2, 480!3, 481, village- Sr. No. 16 certificate, MOU etc. the name of Sanawadia,l Taluka - applicant/company is Vikram Agritech Pvt. Indore, Dist -Indore (MP) Ltd. Hence, proposal doesn't fulfill the (23AMPOCSOOO058) eligibility criteria and committee rejected the proposal.

2 Mr. Rajendra Agrawal, East Zone As per IPA scheme guideline 2020-21 the Survey!Plot No.- 66, 67 & project should not be started! implemented 68, Spice Park, Village - Sr. No. 17 before Grant of Clarence (GOC). Whereas, as Mavan, Tehsil - Guna, informed in Pre-Inspection report project work Distt.- Guna (MP) has been started & made progress under the project. Hence, proposal doesn't fulfill the (23AMPOCSOOO057) I eligibility criteria and committee rejected the proposal.

3 Mis Balaji Wafers Pvt. Ltd, East Zone 1. As per IPA scheme guideline 2020-21 the Survey! Plot no 2 to 5 project should not be started! implemented Industrial area Soney Sr. No. 18 before Grant of Clarence (GOC). Whereas, Bhenslay, Tehsil - Mhow, as informed in Pre-Inspection report project Distt.- Indore (MP) work has been started & made progress (23AMPOCS000061) under the project. 2. As per lease deed dt. 10.09.2014 the land used is for manufacturing of Wafers & Namkeens. " 231Page ~()\\~~ ~ \f}J •

Hence, proposal doesn't fulfill the eligibility criteria and committee rejected the proposal. 4 Shri Raghuveer Singh North Zone As per land document land is declared under Amar Singh, Survey No. section 143 as non -agriculture land. 135,136, Village- Barauli (Sr. no. I) Goojar, Tehsil- Agra, Distt. Agra (U.P), (09CBT0004336)

(D) ClosedlWithdrawn Projects:

PPAC discussed the following project proposals in the light of contents of agenda notes and scheme guidelines. PPAC decided to close/withdrawn these project proposals on the grounds/reasons indicated against each project: -

Sr. Name of the project and & Volume and Sr. No. of Reason for closing No. project code Agenda Notes

I Mr. Narayan Nivrutti (West Division) Applicant informed that bank did not Waghmode, Survey/Gat No. sanction the term loan within IPA validity Volume - 01 COVID-19. Therefore, 1883/11K/2, Village - Kadlas, period due to Taluka - Sangole, District - applicant applied a fresh IPA with project Sr. No. 13 code 27BMHB048567 on the same land Solapur (MH) - (27BMHB048268) and requested NHB to close this project. Applicant failed to submit the hard copy 2 Mr. Bidhan Malakar, Patta no. (NE Zone) 103, Dag No. 12/125, Pargona and lacking documents/information Sorospur,Assam Sr. No. 01 within prescribed time limit, despite (18AASOOOO925) repeated letters/reminders dated 27.1 0.2020, 10.11.2020 & 27.11.2020 and last opportunity vide letter dated 14.12.2020. Accordingly, PPAC decided to close the case. 3 M/s Bhola Barman Cold (NE Zone) Applicant firm does not have ownership Storage LLP, Dag No. 605, right of project land on which project is to Sr. No. 02 Patta No. 90, Mouza be set up on the date of IPA application Govardhana, Village Domoni, (03.11.2020) which is required as per P.O. Barpeta Road, District Scheme Guidelines. Accordingly, PPAC Barpeta - 781315 (Assam) decided to close the case. (18AASOCSOOOO19)

Meeting ended with a Vote of Thanks to the chair.

241Page