Berkshire Passenger Rail Station Location and Design Analysis, Draft for Public Comment—August 2014
BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS, DRAFT FOR PUBLIC COMMENT—AUGUST 2014 BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS, DRAFT FOR PUBLIC COMMENT—AUGUST 2014 ACKNOWLEDGEMENTS Staff, Elected Officials, and Residents of the Berkshire Line Communities Karen Christensen and the Bring Back the Trains Campaign Bill Palmer, MassDOT Dustin Rhue, MassDOT Gary Sheppard, Berkshire Regional Transit Authority Bob Malnati, Berkshire Regional Transit Authority John R. Hanlon Jr., Housatonic Railroad Company Colin Pease, Housatonic Railroad Company Deborah Menette,Housatonic Railroad Company Berkshire Regional Planning Commission Nathaniel Karns, AICP, Executive Director Thomas Matuszko, AICP, Assistant Director Clete Kus, AICP, Transportation Manager Mark Maloy, GIS, Data and IT Manager Brian Domina, Senior Planner Patricia Mullins, Senior Planner Gwen Miller, Planner Jaclyn Pacejo, Planner BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS Page 1 ACKNOWLEDGEMENTS This page intentionally left blank. BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS Page 2 EXECUTIVE SUMMARY Executive Summary rail service. In some instances, the nearly significant challenge in locating a passen- Map 1: Locus Map The Housatonic Railroad Company (HRRC) century old historic passenger rail stations ger rail station in a downtown area was has proposed re-establishing passenger rail may meet these needs and in other instances, finding sites with sufficient room for park- service between Danbury, Connecticut and new locations may better serve them. ing. Thus, for the recommended down- Pittsfield, Massachusetts on the former town passenger rail stations a smaller To address this issue, the Berkshire Regional Berkshire Line. The passenger rail service amount of parking, compared to a regional Planning Commission (BRPC) partnered between these two locations last operated passenger rail station, will likely be availa- with HRRC to conduct this passenger rail in 1971 shortly after the Penn Central ble.
[Show full text]