Surigao Del Norte Priority Final Table 8. Occupied Housing Units by Construction Materials of the Roof and Outer Walls and City/Municipality: 2007 Construction Materials of the Roof Construction Materials of the Outer Walls and Total Occupied Galvanized Tile Half Galvanized City/Municipality Housing Units Iron/ Concrete/ Iron and Half Aluminum Clay Tile Concrete SURIGAO DEL NORTE Total 83,528 42,360 403 4,920 Concrete/Brick/Stone 20,599 18,761 240 319 Wood 36,097 12,565 52 1,443 Half Concrete/Brick/Stone and Half Wood 15,095 9,769 84 2,833 Galvanized Iron/Aluminum 728 456 21 151 Bamboo/Sawali/Cogon/Nipa 10,167 550 - 162 Asbestos 118 85 - 2 Glass 9 7 1 - Makeshift/Salvaged/Improvised Materials 315 81 - 8 Others/Not Reported 400 86 5 2 No Walls - - - - ALEGRIA Total 2,559 1,376 5 29 Concrete/Brick/Stone 872 834 4 7 Wood 1,222 401 1 10 Half Concrete/Brick/Stone and Half Wood 167 125 - 11 Galvanized Iron/Aluminum 7 5 - - Bamboo/Sawali/Cogon/Nipa 282 10 - 1 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 8 1 - - Others/Not Reported 1 - - - No Walls - - - - BACUAG Total 2,620 799 28 212 Concrete/Brick/Stone 631 534 20 8 Wood 1,332 150 3 17 Half Concrete/Brick/Stone and Half Wood 378 107 5 181 Galvanized Iron/Aluminum 7 3 - 3 Bamboo/Sawali/Cogon/Nipa 263 5 - 2 Asbestos 1 - - 1 Glass - - - - Makeshift/Salvaged/Improvised Materials - - - - Others/Not Reported 8 - - - No Walls - - - - Table 8. Occupied Housing Units by Construction Materials of the Roof and Outer Walls and City/Municipality: 2007 Construction Materials of the Roof Construction Materials of the Outer Walls and Total Occupied Galvanized Tile Half Galvanized City/Municipality Housing Units Iron/ Concrete/ Iron and Half Aluminum Clay Tile Concrete BURGOS Total 784 376 2 7 Concrete/Brick/Stone 195 176 1 1 Wood 361 121 - 4 Half Concrete/Brick/Stone and Half Wood 120 78 - 2 Galvanized Iron/Aluminum 1 - 1 - Bamboo/Sawali/Cogon/Nipa 102 1 - - Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials - - - - Others/Not Reported 5 - - - No Walls - - - - CLAVER Total 3,822 1,573 21 200 Concrete/Brick/Stone 744 673 5 10 Wood 2,079 394 7 61 Half Concrete/Brick/Stone and Half Wood 755 457 9 118 Galvanized Iron/Aluminum 35 22 - 10 Bamboo/Sawali/Cogon/Nipa 141 2 - 1 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 21 - - - Others/Not Reported 47 25 - - No Walls - - - - DAPA Total 4,520 1,733 6 255 Concrete/Brick/Stone 655 617 1 9 Wood 2,627 813 2 41 Half Concrete/Brick/Stone and Half Wood 539 283 3 193 Galvanized Iron/Aluminum 15 5 - 5 Bamboo/Sawali/Cogon/Nipa 664 14 - 7 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 3 - - - Others/Not Reported 17 1 - - No Walls - - - - Table 8. Occupied Housing Units by Construction Materials of the Roof and Outer Walls and City/Municipality: 2007 Construction Materials of the Roof Construction Materials of the Outer Walls and Total Occupied Galvanized Tile Half Galvanized City/Municipality Housing Units Iron/ Concrete/ Iron and Half Aluminum Clay Tile Concrete DEL CARMEN Total 3,053 829 9 93 Concrete/Brick/Stone 415 376 5 7 Wood 1,329 240 1 20 Half Concrete/Brick/Stone and Half Wood 376 198 3 59 Galvanized Iron/Aluminum 11 - - 3 Bamboo/Sawali/Cogon/Nipa 899 12 - 4 Asbestos - - - - Glass 3 3 - - Makeshift/Salvaged/Improvised Materials - - - - Others/Not Reported 20 - - - No Walls - - - - GENERAL LUNA Total 2,950 1,422 1 73 Concrete/Brick/Stone 726 697 - 3 Wood 1,108 413 1 50 Half Concrete/Brick/Stone and Half Wood 284 228 - 14 Galvanized Iron/Aluminum 7 5 - 1 Bamboo/Sawali/Cogon/Nipa 818 77 - 5 Asbestos - - - - Glass 1 1 - - Makeshift/Salvaged/Improvised Materials 1 - - - Others/Not Reported 5 1 - - No Walls - - - - GIGAQUIT Total 3,799 1,185 2 171 Concrete/Brick/Stone 750 669 - 2 Wood 2,263 314 1 120 Half Concrete/Brick/Stone and Half Wood 377 196 1 48 Galvanized Iron/Aluminum 3 2 - - Bamboo/Sawali/Cogon/Nipa 385 1 - 1 Asbestos 1 1 - - Glass 1 1 - - Makeshift/Salvaged/Improvised Materials 5 - - - Others/Not Reported 14 1 - - No Walls - - - - Table 8. Occupied Housing Units by Construction Materials of the Roof and Outer Walls and City/Municipality: 2007 Construction Materials of the Roof Construction Materials of the Outer Walls and Total Occupied Galvanized Tile Half Galvanized City/Municipality Housing Units Iron/ Concrete/ Iron and Half Aluminum Clay Tile Concrete MAINIT Total 4,884 1,717 15 818 Concrete/Brick/Stone 1,094 1,030 14 17 Wood 1,913 283 - 143 Half Concrete/Brick/Stone and Half Wood 1,192 377 1 599 Galvanized Iron/Aluminum 26 13 - 11 Bamboo/Sawali/Cogon/Nipa 602 9 - 44 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 53 4 - 4 Others/Not Reported 4 1 - - No Walls - - - - MALIMONO Total 3,298 1,500 12 140 Concrete/Brick/Stone 950 732 7 20 Wood 1,133 339 3 17 Half Concrete/Brick/Stone and Half Wood 719 392 2 80 Galvanized Iron/Aluminum 32 17 - 10 Bamboo/Sawali/Cogon/Nipa 436 20 - 13 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 3 - - - Others/Not Reported 25 - - - No Walls - - - - PILAR Total 1,701 524 4 56 Concrete/Brick/Stone 261 249 4 3 Wood 913 186 - 35 Half Concrete/Brick/Stone and Half Wood 121 79 - 15 Galvanized Iron/Aluminum - - - - Bamboo/Sawali/Cogon/Nipa 403 10 - 3 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials - - - - Others/Not Reported 3 - - - No Walls - - - - Table 8. Occupied Housing Units by Construction Materials of the Roof and Outer Walls and City/Municipality: 2007 Construction Materials of the Roof Construction Materials of the Outer Walls and Total Occupied Galvanized Tile Half Galvanized City/Municipality Housing Units Iron/ Concrete/ Iron and Half Aluminum Clay Tile Concrete PLACER Total 4,714 1,683 36 298 Concrete/Brick/Stone 891 796 22 14 Wood 2,439 341 4 31 Half Concrete/Brick/Stone and Half Wood 912 459 8 230 Galvanized Iron/Aluminum 96 67 1 14 Bamboo/Sawali/Cogon/Nipa 300 8 - 7 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 20 1 - - Others/Not Reported 56 11 1 2 No Walls - - - - SAN BENITO Total 1,051 409 2 2 Concrete/Brick/Stone 167 153 - - Wood 632 224 2 2 Half Concrete/Brick/Stone and Half Wood 27 24 - - Galvanized Iron/Aluminum 1 - - - Bamboo/Sawali/Cogon/Nipa 174 3 - - Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 10 2 - - Others/Not Reported 40 3 - - No Walls - - - - SAN FRANCISCO (ANAO-AON) Total 2,559 1,186 24 355 Concrete/Brick/Stone 863 806 6 25 Wood 525 93 2 26 Half Concrete/Brick/Stone and Half Wood 731 271 12 285 Galvanized Iron/Aluminum 22 9 1 7 Bamboo/Sawali/Cogon/Nipa 406 7 - 12 Asbestos 1 - - - Glass - - - - Makeshift/Salvaged/Improvised Materials - - - - Others/Not Reported 11 - 3 - No Walls - - - - Table 8. Occupied Housing Units by Construction Materials of the Roof and Outer Walls and City/Municipality: 2007 Construction Materials of the Roof Construction Materials of the Outer Walls and Total Occupied Galvanized Tile Half Galvanized City/Municipality Housing Units Iron/ Concrete/ Iron and Half Aluminum Clay Tile Concrete SAN ISIDRO Total 1,301 458 - 66 Concrete/Brick/Stone 160 149 - 1 Wood 499 142 - 3 Half Concrete/Brick/Stone and Half Wood 374 135 - 60 Galvanized Iron/Aluminum 2 1 - - Bamboo/Sawali/Cogon/Nipa 208 3 - 2 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 56 28 - - Others/Not Reported 2 - - - No Walls - - - - SANTA MONICA (SAPAO) Total 1,632 676 5 216 Concrete/Brick/Stone 141 123 3 7 Wood 866 283 - 41 Half Concrete/Brick/Stone and Half Wood 386 182 2 168 Galvanized Iron/Aluminum 1 - - - Bamboo/Sawali/Cogon/Nipa 150 5 - - Asbestos 82 82 - - Glass - - - - Makeshift/Salvaged/Improvised Materials - - - - Others/Not Reported 6 1 - - No Walls - - - - SISON Total 2,283 1,232 22 245 Concrete/Brick/Stone 379 359 1 12 Wood 1,118 401 15 187 Half Concrete/Brick/Stone and Half Wood 551 450 6 41 Galvanized Iron/Aluminum 7 5 - 2 Bamboo/Sawali/Cogon/Nipa 217 15 - 2 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 10 1 - 1 Others/Not Reported 1 1 - - No Walls - - - - Table 8. Occupied Housing Units by Construction Materials of the Roof and Outer Walls and City/Municipality: 2007 Construction Materials of the Roof Construction Materials of the Outer Walls and Total Occupied Galvanized Tile Half Galvanized City/Municipality Housing Units Iron/ Concrete/ Iron and Half Aluminum Clay Tile Concrete SOCORRO Total 3,386 2,197 5 176 Concrete/Brick/Stone 764 698 5 12 Wood 1,433 625 - 48 Half Concrete/Brick/Stone and Half Wood 1,092 857 - 112 Galvanized Iron/Aluminum 11 10 - - Bamboo/Sawali/Cogon/Nipa 75 6 - 3 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials 2 - - 1 Others/Not Reported 9 1 - - No Walls - - - - SURIGAO CITY (Capital) Total 27,048 17,971 192 1,473 Concrete/Brick/Stone 8,225 7,439 132 152 Wood 10,396 5,897 10 577 Half Concrete/Brick/Stone and Half Wood 4,974 3,984 31 604 Galvanized Iron/Aluminum 428 280 17 85 Bamboo/Sawali/Cogon/Nipa 2,755 287 - 52 Asbestos 33 2 - 1 Glass 4 2 1 - Makeshift/Salvaged/Improvised Materials 118 43 - 2 Others/Not Reported 115 37 1 - No Walls - - - - TAGANA-AN Total 3,070 1,670 7 31 Concrete/Brick/Stone 667 635 5 8 Wood 1,198 542 - 8 Half Concrete/Brick/Stone and Half Wood 531 451 1 13 Galvanized Iron/Aluminum 10 7 1 - Bamboo/Sawali/Cogon/Nipa 659 32 - 2 Asbestos - - - - Glass - - - - Makeshift/Salvaged/Improvised Materials - - - - Others/Not Reported 5 3 - - No Walls - - - - Table 8.
Recommended publications
  • Typhoon Bopha (Pablo)
    N MA019v2 ' N 0 ' Silago 3 0 ° 3 0 ° 1 0 Philippines 1 Totally Damaged Houses Partially Damaged Houses Number of houses Number of houses Sogod Loreto Loreto 1-25 2-100 717 376 Loreto Loreto 26-250 101-500 San Juan San Juan 251-1000 501-1000 1001-2000 1001-2000 2001-4000 2001-4000 Cagdianao Cagdianao 1 N ° N San Isidro 0 ° Dinagat 1 0 Dinagat San Isidro Philippines: 1 5 Dinagat (Surigao del Norte) Dinagat (Surigao 5 del Norte) Numancia 280 Typhoon Bopha Numancia Pilar Pilar Pilar Pilar (Pablo) - General 547 Surigao Dapa Surigao Dapa Luna General Totally and Partially Surigao Surigao Luna San San City Francisco City Francisco Dapa Dapa Damaged Housing in 1 208 3 4 6 6 Placer Placer Caraga Placer Placer 10 21 Bacuag Mainit Bacuag (as at 9th Dec 5am) Mainit Mainit 2 N 1 Mainit ' N 0 ' 3 0 ° Map shows totally and partially damaged 3 9 Claver ° 9 Claver housing in Davao region as of 9th Dec. 33 Bohol Sea Kitcharao Source is "NDRRMC sitrep, Effects of Bohol Sea Kitcharao 10 Typhoon "Pablo" (Bopha) 9th Dec 5am". 3 Province Madrid Storm track Madrid Region Lanuza Tubay Cortes ! Tubay Carmen Major settlements Carmen Cortes 513 2 127 21 Lanuza 10 Remedios T. Tandag Tandag City Tandag Remedios T. Tandag City Romualdez 3 Romualdez 15 N ° N 13 9 ° Bayabas 9 Buenavista Sibagat Buenavista Sibagat Bayabas Carmen Carmen Butuan 53 200 Butuan 127 Butuan 21 Butuan 3 City City Cagwait Cagwait 254 Prosperidad 12 17 Gingoog Buenavista 631 Gingoog Buenavista Marihatag Marihatag 43 1 38 19 San Las Nieves San Agustin Las Nieves Agustin 57 Prosperidad 56 2 4 0 10
    [Show full text]
  • Pdf | 329.37 Kb
    C. AFFECTED POPULATION (TAB C) A total of 173,617 families/830,117 persons were affected in 822 barangays in 103 municipalities in 15 provinces of Regions X, XI, CARAGA and ARMM Out of the total affected, 44,766 families / 206,888 persons were displaced and served inside 569 evacuation centers D. STATUS OF STRANDEES (as of 7:00 PM, 21 January 2014) ROLLING STRANDED PASSENGERS VESSELS MBCA’s CARGOES CGDCV CGS Cebu 6 5 CGDEV CGS Catabalogan 639 3 111 TOTAL 639 9 111 5 E. STATUS OF LIFELINES A total of 50 roads and 25 bridges are still not passable in Regions VIII, X, XI and CARAGA (TAB D) Mate, Bacolod Water System, Brgy. Purakan and Brgy. Bosque Linamon water pipes were damaged in Lanao del Norte The province of Dinagat Islands experienced total blackout on 17 January 2014 due to heavy rains and strong winds but resumed electricity earlier of 18 January 2014 F. STATUS OF MAJOR RIVERS AND DAMS Saug River, Asuncion, Davao del Norte – Overflowed Libuganon River, Kapalong, Davao del Norte – Overflowed Irrigation Dams in Aragon and Brgy Taytayan in Cateel, Davao Oriental were damaged due to flooding G. DAMAGED HOUSES (TAB E) The number of damages houses increased to 2,109 houses (831 totally/1,278 partially). H. COST OF DAMAGES (TAB F) The total cost of damages amounted to PhP383,969,253.22, with PhP128,513,750.00 for infrastructure and PhP255,455,503.22 for agriculture in Regions X, XI and CARAGA. I. SUSPENSION OF CLASSES AND GOVERNMENT OFFICES (as of 21 January 2014) REGION PROVINCE/CITY/MUNICIPALITY REMARKS Preschool, elementary
    [Show full text]
  • DSWD DROMIC Report #5 on Tropical Depression “VICKY” As of 22 December 2020, 6PM
    DSWD DROMIC Report #5 on Tropical Depression “VICKY” as of 22 December 2020, 6PM Situation Overview On 18 December 2020, Tropical Depression “VICKY” entered the Philippine Area of Responsibility (PAR) and made its first landfall in the municipality of Banganga, Davao Oriental at around 2PM. On 19 December 2020, Tropical Depression “VICKY” made another landfall in Puerto Princesa City, Palawan and remained a tropical depression while exiting the Philippine Area of Responsibility (PAR) on 20 December 2020. Source: DOST-PAGASA Severe Weather Bulletin I. Status of Affected Families / Persons A total of 31,408 families or 130,855 persons were affected in 290 barangays in Regions VII, VIII, XI and Caraga (see Table 1). Table 1. Number of Affected Families / Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangays Families Persons GRAND TOTAL 290 31,408 130,855 REGION VII 32 618 2,510 Bohol 3 15 60 Candijay 3 15 60 Cebu 15 441 1,812 Argao 1 15 45 Boljoon 2 13 44 Compostela 2 54 221 Dalaguete 1 2 8 Danao City 1 150 600 Dumanjug 1 20 140 Lapu-Lapu City (Opon) 4 163 662 Sibonga 3 24 92 Negros Oriental 14 162 638 Bais City 3 33 125 Dumaguete City (capital) 6 92 365 City of Tanjay 5 37 148 REGION VIII 2 12 38 Leyte 2 12 38 MacArthur 1 10 34 Mahaplag 1 2 4 REGION XI 22 608 2,818 Davao de Oro 13 294 1,268 Compostela 2 10 37 Mawab 1 7 20 Monkayo 3 72 360 Montevista 1 13 65 Nabunturan (capital) 4 152 546 Pantukan 2 40 240 Davao del Norte 8 310 1,530 Asuncion (Saug) 6 238 1,180 Kapalong 1 12 50 New Corella 1 60 300 Davao Oriental 1 4 20 Cateel 1 4 20 CARAGA 234 30,170 125,489 Page 1 of 9 | DSWD DROMIC Report #5 on Tropical Depression “VICKY” as of 22 December 2020, 6PM NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangays Families Persons Agusan del Norte 30 1,443 6,525 Butuan City (capital) 16 852 4,066 City of Cabadbaran 9 462 2,007 Jabonga 2 38 119 Las Nieves 1 10 50 Remedios T.
    [Show full text]
  • Cbmspovertymaps Vol6 SDN.Pdf
    The Many Faces of Poverty Volume 6 The Many Faces of Poverty: Volume 6 Copyright © PEP-CBMS Network Office, 2015 ALL RIGHTS RESERVED. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means—whether virtual, electronic, mechanical, photocopying, recording, or otherwise—without the written permission of the copyright owner. Published by De La Salle University 2401 Taft Avenue, 1004 Manila, Philippines www.dlsu.edu.ph First printing, 2015 Printed in the Philippines Acknowledgments The publication of this volume has been made possible through the PEP- CBMS Network Office of the De La Salle University-Angelo King Institute for Economic and Business Studies with the aid of a grant from the International Development Research Centre (IDRC), Ottawa, Canada and the Department for International Development of the United Kingdom. CONTENTSCONTENTS i Foreword 1 Introduction 3 Explanatory Text The Many Faces of Poverty 9 Apayao 51 Benguet 91 Camiguin 119 Guimaras 155 Ifugao 195 Kalinga 237 Surigao del Norte FOREWORDFOREWORD The official poverty monitoring system (PMS) in the Philippines relies mainly on family income and expenditure surveys. Information on other aspects of well-being is generally obtained from representative health surveys, national population and housing censuses, and others. However, these surveys and censuses are (i) too costly to be replicated frequently; (ii) conducted at different time periods, making it impossible to get a comprehensive profile of the different socio-demographic groups of interest at a specific point in time; and (iii) have sampling designs that do not usually correspond to the geographical disaggregation needed by local government units (LGUs).
    [Show full text]
  • 2019-2028 SURNECO PSPP.Pdf
    SURNECOPOWER SUPPLY PROCUREMENT PLAN 2019 SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC. POWER SUPPLY PROCUREMENT PLAN In compliance with the Department of Energy’s (DOE) Department Circular No. DC 2018-02-0003, “Adopting and Prescribing the Policy for the Competitive Selection Process in the Procurement by the Distribution Utilities of Power Supply Agreement for the Captive Market” or the Competitive Selection process (CSP) Policy, the Power Supply Procurement Plan (PSPP) Report is hereby created, pursuant to the Section 4 of the said Circular. The PSPP refers to the DUs’ plan for the acquisition of a variety of demand-side and supply-side resources to cost-effectively meet the electricity needs of its customers. The PSPP is an integral part of the Distribution Utilities’ Distribution Development Plan (DDP) and must be submitted to the Department of Energy with supported Board Resolution and/or notarized Secretary’s Certificate. The Third-Party Bids and Awards Committee (TPBAC), Joint TPBAC or Third Party Auctioneer (TPA) shall submit to the DOE and in the case of Electric Cooperatives (ECs), through the National Electrification Administration (NEA) the following: a. Power Supply Procurement Plan; b. Distribution Impact Study/ Load Flow Analysis conducted that served as the basis of the Terms of Reference; and c. Due diligence report of the existing generation plant All Distribution Utilities’ shall follow and submit the attached report to the Department of Energy for posting on the DOE CSP Portal. For ECs such reports shall be submitted to DOE and NEA. The NEA shall review the submitted report within ten (10) working days upon receipt prior to its submission to DOE for posting at the DOE CSP Portal.
    [Show full text]
  • Detailed Landslide and Flood Hazard Map of Placer And
    II NN DD EE XX MM AA PP :: 125°35'0"E 125°40'0"E TA GA NA -A N 4120-III-7 4120-III-8 4120-III-9 9°40'0"N DETAILED LANDSLIDE AND FLOOD HAZARD MAP OF 9°40'0"N PLACER AND BACUAG, SURIGAO DEL NORTE, PHILIPPINES PLACER 4120-III-13 PANANAYAN QUADRANGLE 4120-III-12 4120-III-13 4120-III-14 125°36'0"E 125°37'0"E 125°38'0"E 125°39'0"E 4120-III-17 4120-III-18 GIGAQUIT BACUAG 9°35'0"N 9°35'0"N 4120-III-19 TUBOD 125°35'0"E 125°40'0"E 9°39'0"N 9°39'0"N μ 0120.5 Kilometers LL E G E N D : Main road POBLACIONP! Barangay center location So. Magaling Secondary road (Poblacion)# Purok/Sitio location (Barangay) 0 2 Track; trail n School River v® Hospital 0 4 Municipal boundary G Church 60 80 Contour (meter) Proposed relocation site Purok I (Panhutongan)# HINATUAN PASSAGE Landslide #PANHUTONGAN Purok II P (Panhutongan) 9°38'0"N 9°38'0"N Very high landslide susceptibility Purok III (Panhutongan)# Areas usually with steep to very steep slopes and underlain by 2 weak materials. Recent landslides, escarpments and tension 0 cracks are present. Human initiated effects could be an aggravating factor. 2 0 High landslide susceptibility Areas usually with steep to very steep slopes and underlain by weak materials. Areas with numerous old/inactive landslides. Purok I Moderate landslide susceptibility (Tagbongabong)# P Purok II (Tagbongabong)# 20 Areas with moderately steep slopes.
    [Show full text]
  • World Bank Document
    RP24 Volume 6 REPUBUC OF THE PHIUPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Public Disclosure Authorized PROJECT MANAGEMENT OFFICE FOR IBRD NATIONAL ROAD IMPROVEMENT AND MANAGEMENT PROJECT - PHASE I (NRIMP-I) DETAILED ENGINEERING DESIGN AND PREPARATION OF BIDDING DOCUMENTS FOR REHABILITATION OF Public Disclosure Authorized SURIGAO-DAVAO COASTAL ROAD (CW-RU-1.4 A) BACUAG-GIGAQUIT-CLAVER SECTION RESETTLEMENT ACTION PLAN (RAP) (Volume 1/6) MAIN TEXT Public Disclosure Authorized JUNEJUE202FILE 2002 COPY LIZ EI KATAHIRA & ENGINEERS INTERNATIONAL Public Disclosure Authorized in association with ialCrow HALCROW GROUP LIMITED TECHNIKS GROUP CORPORATION {|> wDCCD ENGINEERING CORPORATION MULTI-INFRA KONSULT, INC. RESETTLEMENT ACTION PLAN (RAP) NATIONAL ROADS IMPROVEMENT AND MANAGEMENT PROGRAM PHASE I(NRIMP-I) BACUAG-GIGAQUIT-CLAVER SECTION VOLUME I JUNE 2002' KATAHIRA & ENGINEERS INTERNATIONAL TABLE OF CONTENTS Volume I (Main Text) Page Executive Summary 1. Rationale 1 2. Objectives 1 3. Methodology 3.1 Institutional Collaboration 2 3.2 Data and Sources 2 3.3 Population 3 3.4 Analytical Tools 3 4. Public Consultation Proceedings 4 5. Resettlement Action Plan 5.1 Project Description 4 5.2 The Local Government Units 6 5.2.1 Bacuag 6 5.2.2 Gigaquit 7 5.2.3 Claver 8 5.3 Socio-Economic Profile of Project Affected Families 9 5.3.1 Demography 10 5.3.2 Economy 13 5.3.3 Level of Living 15 5.4 Project Impacts 5.4.1 Impacts on Land 17 5.4.2 Impacts on Structures 17 5.4.3 Loss of Income 17 5.4.4 Impact on Land Improvements 18 5.5 Compensation Package 5.5.1 Entitlements 18 5.5.2 Affected Structures 18 5.5.3 Severely Affected Structures 19 5.5.4 Compensation Matrix 19 5.5.5 Value of Land Improvement in Absentee Landholdings 27 5.5.6 Compensation Matrix for Residents PAFs 27 5.5.7 Compensation Package 27 5.5.8 RAP Implementation Cost 30 5.5.9 Distribution of Total Compensation by Municipality30 5.5.10 Total RAP Cost 32 6.
    [Show full text]
  • Southern Philippines Irrigation Sector Project
    Resettlement Planning Document Resettlement Plan for the Gibong Left Bank National Irrigation System Final Project Number: 27245 November 2006 PHI: Southern Philippines Irrigation Sector Project Prepared by: National Irrigation Administration; PRIMEX The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Republic of the Philippines NATIONAL IRRIGATION ADMINISTRATION (Pambansang Pangasiwaan ng Patubig) Southern Philippines Irrigation Sector Project (SPISP) (ADB Loan No. 1668-PHI) LLAANNDD AACCQQUUIISSIITTIIOONN AND RESETTLEMENT PLAN GIBONG LEFT BANK NATIONAL IRRIGATION SYSTEM NOVEMBER 2006 SOUTHERN PHILIPPINES IRRIGATION SECTOR PROJECT LAND ACQUISITION AND RESETTLEMENT PLAN (LARP) FOR THE GIBONG LEFT BANK NATIONAL IRRIGATION SYSTEM TABLE OF CONTENTS Page List of Figures iii List of Tables iv List of Annexes v List of Acronyms vi Executive Summary viii 1. Introduction 1 1.1 Background of the Project 1 1.2 Objectives of the LARP 2 1.3 General Project Description 5 1.4 Service Area 2. Impacts Base-Line Information and Socio-Economic Survey 6 2.1 Impacts to Assets and People 6 2.2 Impact Mitigating Measure 7 2.3 Socio-Economic Survey 9 3. Detailed Compensation and Rehabilitation Strategy 11 3.1 Equity Conversion Aspect of the LARP Compensation Process for Ben PAPs 11 3.2 Compensation for the Donation by NB PAPs 12 3.3 Process of ROW Acquisition 12 3.4 Process of ROW Negotiation 16 3.5 Process of PAPs Identification & Valuation of Affected Properties 17 3.6 Establishment of FMV 18 4.
    [Show full text]
  • Mining Tenements Control
    CARAGA Dinagat Is. Siargao is. Surigao del Norte Agusan del Norte Surigao del Sur Agusan del Sur MINDANAOMINDANAO MINING TENEMENTS CONTROL MAP PHILIPPINESPHILIPPINES VICINITYVICINITY MAPMAP CARAGACARAGA 125º45'E 125º45'E 125º45'E 125º30'E 125º30'E 125º30'E 125º45'E 125º45'E 125º45'E 125º30'E 125º30'E 125º30'E 125º45'E 125º45'E 125º45'E 125º30'E 125º30'E 125º30'E 126º00'E 126º00'E 126º00'E 126º00'E 126º00'E 126º00'E 126º15'E 126º15'E 126º15'E 125º15'E 125º15'E 125º15'E 126º00'E 126º00'E 126º00'E 126º15'E 126º15'E 126º15'E 125º15'E 125º15'E 125º15'E 126º15'E 126º15'E 126º15'E ASAS OFOF JULYJULY 20182018 125º15'E 125º15'E 125º15'E ASAS OFOF JULYJULY 20182018 10º30'N 10º30'N Parcel-3 90 Panamaon Conservation Area Omasdang Metallurgical Chromite Project ScaleScale 11 :: 250,000250,000 Co.:Heirs of C.B. Gupana ScaleScale 11 :: 250,000250,000 8686 OA: CRAU Min. Resources, Inc. 10 0 232232 0 15 30 202 149 AAM-PHIL/PMDC JointJoint OperatingOperating AgreementAgreement (Parcel(Parcel I)I) Parcel-2 2 JointJoint OperatingOperating AgreementAgreement (Parcel(Parcel I)I) kilometers Esperanza Conservation Area 143 11 Parcel--8 25 Mt. Redondo Bosai Forest TENEMENTTENEMENT TYPETYPE CODECODE Parcel-1 283 Conservation Area Loreto Conservation Area 283 8 Exploration Permit Application (EXPA) LoretoLoreto MineralMineral ProductionProduction SharingSharing AgreementAgreement (MPSA)(MPSA) Exploration Permit Application (EXPA) Redondo Metallurgical Chromite Project 216 291 Co.: KROMINCO, Inc. ExplorationExploration PermitPermit (EP)(EP) Approved/ Proposed Minahang Bayan Area 3 216 TubajonTubajon ApplicationApplication forfor ProductionProduction SharingSharing AgreementAgreement (APSA)(APSA) 63 TubajonTubajon 1414 ApplicationApplication forfor ProductionProduction SharingSharing AgreementAgreement (APSA)(APSA) Area of Denied Mining Application with MR Appeal TubajonTubajon PeoplesPeoples SmallSmall ScaleScale MiningMining AreaArea Resolution No.
    [Show full text]
  • The Use of Cbms in Disaster Risk Reduction and Climate Change Adaptation Planning and Management
    THE USE OF CBMS IN DISASTER RISK REDUCTION AND CLIMATE CHANGE ADAPTATION PLANNING AND MANAGEMENT Introduction Ladies and gentlemen, good morning. Before I begin my presentation on the use of Community-Based Monitoring System in disaster risk reduction and climate change adaptation planning and management, I would like to give a brief perspective of the Province of Surigao del Norte. Surigao del Norte, being a poor province, is highly vulnerable to disasters. Disasters hit poor people the most, affecting their lives, properties and livelihood. The prevalence of malnutrition, high incidence of maternal deaths, school drop- out rates, and unemployment make it more vulnerable. The increasing mining activities, urban migration and human congestion and developing tourism industry contribute to the complexity of the problem. Surigao del Norte Profile Surigao del Norte is located in the Northeastern tip of Mindanao. It is bounded on the east by the vast Pacific Ocean, on the north and west by the Mindanao Sea, and on 1 the south by the provinces of Surigao del Sur and Agusan del Norte. It is considered the gateway to Mindanao because of its strategic location. It is the entry point of the Japan- Philippines Friendship Highway connecting Mindanao to the rest of the Visayas and Luzon. Because of its geographic location, it is proximate to the deepest parts of the world, the Philippine Deep and the Marianas Trench. Fast facts The province has a land area of 201, 710 hectares with Surigao City as its capital. It has 20 municipalities, one city and 335 barangays. Surigao del Norte’s population in 2007 was 409,468, with 1.24% growth rate and population density off 203 persons per square kilometer.
    [Show full text]
  • O.5-1 S.,2Otg
    EN] OF I RELEASET., I DATE RAGA RE Republic of the Philippines DEPARTMENT OF EDUCATION Region Xlll Corogo J.P. Rosoles Ave., Buluon Cily Jonvory 22,2018 REGIONAT MEMORANDUM No.--o.5-1 s.,2otg REGIONAL ENHANCEMENT WRIIESHOP ON CAMPUS JOURNALISM FOR 2OI8 NATTONAT SCHOOTS PRESS CONTERENCE (NSPC) QUALTFTERS To: Schools Division Superiniendents Division Journolism Coordinotors Public ond Privoie Elementory ond Secondory Schools Heods I . Reloiive lo ihe conduct of the 2018 Nollonol Schools Press Conference (NSPC) on Februory 19-23,2018 in Dumoguete City, the Deportmenl of Educotion (DepEd) Corogo Region through the Cuniculum ond Leorning Monogemeni Division (CLMD) sholl conduct o Regionol Enhoncement ttYriteshop for NSPC Quolifiers on Februory '12-14,2018. The venue ol lhe wrileshop sholl be onnounced lhrough on odvisory. 2. This two-doy octivity oims to: o. heighlen the iournolistic skills of the conleslonls ond the cooching techniques of lhe School poper odvisen prior to the notionol coniest; ond b. updole, prepore ond enhoncethe 201B NSPC quolifiers ond their School Poper Advisen in terms of the lotest irends, contents ond mechonics of writing. 3. The porliciponls to this writeshop ore the lop ihree winners in the lndividuol Wriling Contests, First Ploce winners in Colloborolive Desktop Publishing ond their winning cooches, Division Journolism Coordinotors ond Troining focilitotors. Pleose see enclosure I for reference. 4. This is o live in oclivily. The first meol sholl be breokfost on Februory 12, 2018 ond the lost meol sholl be dinner on Februory 14, 2018. 5. Eoch division sholl conduci q division initioted writeshop/cliniquing for their 2018 NSPC quolifiers prior lo ihe conduct of the regionol wrileshop.
    [Show full text]
  • Republic of the Philippines ENERGY REGULATORY COMMISSION San Miguel Ave., Pasig City
    Republic of the Philippines ENERGY REGULATORY COMMISSION San Miguel Ave., Pasig City IN THE MATTER OF THE APPLICATION FOR APPROVAL OF AN ADJUSTMENT IN RATES UNDER THE RULES FOR SETTING ELECTRIC COOPERATIVES’ WHEELING RATES (RSEC- WR), WITH PRAYER FOR PROVISIONAL AUTHORITY ERC CASE NO. 2009-112 RC SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC. (SURNECO), Applicant. x--------------------------------------x DECISION Before this Commission for resolution is the Amended Application dated 09 November 2009 (Amended Application) filed by the Surigao del Norte Electric Cooperative, Inc. (SURNECO) on 20 November 2009 for the approval of the rates adjustment pursuant to the new Rate Setting Methodology as provided under Resolution No. 20, Series of 2009 or the Rules for Setting Electric Cooperatives’ Wheeling Rates (RSEC-WR)1, with prayer for provisional authority. FACTUAL ANTECEDENTS The allegations of SURNECO in its Amended Application is hereby quoted as follows: 1. Surigao del Norte Electric Cooperative, Inc. (SURNECO) an electric cooperative duly organized and existing under and by virtue of the laws of the Republic of the Philippines, with principal office at Espina St., Surigao City where it may be served with summons and other legal processes. It is represented by its General Manager, Engr. Danny Z. Escalante; 1 A Resolution Adopting the Rules for Setting the Electric Cooperatives’ Wheeling Rates, Resolution No. 20, Series of 2009 [RSEC-WR] (23 September 2009). ERC CASE NO. 2009-112 RC DECISION/23 SEPTEMBER 2020 PAGE 2 OF 25 2. Applicant is the exclusive franchise holder issued by the National Electrification Administration (NEA) to operate an electric light and power services in the cities/municipalities of the Province of Surigao del Norte, namely: the Municipalities of Alegria, Bacuag, Claver, Gigaquit, Mainit, Malimono, Placer, San Francisco, Sison, Taganaan, Tubod and the City of Surigao; 3.