Sunshine Coast Council Transport Priorities
Total Page:16
File Type:pdf, Size:1020Kb
1 7810 Sunshine Motorway Upgrade - north of Maroochydore Access Sunshine Motorway Upgrade Mooloolah River Interchange (MRI) Maroochy River (TMR) Improvements (TMR / SCC) (MMTC) (TMR) (TMR) 4 Stages of work Progressively 4 lane to address capacity and • Buderim-Mooloolaba Interchange including • Upgrade between Mooloolah River Interchange • Duplication to 4 lanes of Sunshine Mwy (E-W) safety issues split interchange (TMR) (MRI) & Maroochy Blvd from Kawana Way • Collector Distributor Rd two-way road - Sugar • Additional lanes for capacity improvements • Northbound flyover of Nicklin Way to Brisbane Rd 2 Rd to Dalton Dr option (SCC) • New Mooloolah River crossing connecting to Coolum Beach Access Improvements • Plaza Pde upgrade (SCC) 9 Kawana Way Mooloolaba Transport Corridor Upgrade (TMR/SCC) • Key intersection upgrades, • Reconfiguration of existing interchange • Proposed grade separation of Yandina- - Sugar Rd, Maud St and Dalton Dr (SCC) (TMR / SCC) • Detailed Business case with Infrastructure Australia Coolum Rd with Sunshine Mwy. (TMR) - Maroochy Blvd and Dalton Dr (SCC) • Upgrade to 4 lanes along Brisbane Rd and • Suncoast Beach Drive / South Coolum Road - Wises Rd and Sugar Rd (SCC) Walan St extension to future interchange (SCC) - Maud St and Comstar Ave (SCC) • Second stage (Walan Street) is underway 3 Sunshine Coast Airport Expansion Project (SCC) New realigned runway upgraded for larger Queensland aircraft, estimated cost $319 million Sunshine Eumundi 1 Coast 4 Arundell Avenue Upgrade (SCC) Intersection improvements, then proposed 4 lane upgrade for increased capacity (when rail is upgraded) h ArmArrmm 5 Kunda Park Connection Improvements (TMR) Coolum Beach Upgrade the Hobbs Rd / Pike St / Maroochydore Rd Intersection 2 Yaroomba 6 Yandina Bruce Highway Upgrade - Maroochydore Road to Mons Road (TMR) Interchange reconfiguration and service roads each side. Estimated $301 million project cost Marcoola Construction Commenced June 2020, Kenilworth Completion late 2022. 3 Bli bli Mudjimba Mapleton Nambour 4 Woombye 5 Maroochydore 7 Mooloolaba ● Buderim Palmwoods 8 6 9 Buddina 10 11 ● SiS ppppy Warana EudEdEEuudlolo ● ConCCoononondndndaleaallele DoDownwns 12 14 Maleny 13 15 16 ● Currimundi Mooloolah 17 11 Sunshine Motorway Upgrade (TMR) 18 • Consider service roads between Dixon Landsborough ● Rd and Kawana Way interchanges 20 21 Caloundra • Investigate East West connection linking Caloundra Palmview to the East 19 South 22 Kawana Arterial Project (TMR) 12 ● Peachester • Proposed multi-lane arterial between MRI 23 and Caloundra Rd ● Beerwah • Stage 1 extend 2 lane arterial north of Creekside Blvd to Brightwater • Stage 2 Interchanges and laning upgrade 26 18 24 Landsborough to Nambour Rail 13 Steve Irwin Way Upgrade (TMR) 25 Upgrade (TMR) • Intersections rationalisation and • Duplication and realignment improvements • Upgrade to 4 lanes north of Landsborough • About 22 km 24 • Selected 4 laning of sections south of Beerburrum to Nambour Rail (Stage 1) Landsborough 14 Upgrade (TMR) Bruce Highway Upgrade Project – • Duplication and realignment to just north of Beerwah Caloundra Road to Sunshine Motorway Beerwah East Major Development Area 19 • About 17km, Estimated cost $550.8 million (TMR) • Included in the Urban Footprint in the SEQ • Commenced June 2020, Completion date late 2024 • Upgrade to 6 lanes, 2 interchange upgrades Regional Plan BeeBBeeeeerburrbburrurrrruumm and full length western service road • Well served by the CAMCOS corridor Bruce Highway Upgrade - Pine Rivers 25 • Completion date mid -2021, estimated cost • Multiple access and connectivity is available to to Caloundra Road (TMR) $813million nearby centres • TMR Planning Study from Pine River Bridge to 22 CAMCOS Project (TMR) Caloundra Rd, completion expected late 2020 15 Palmview Development 20 • Caboolture to Maroochydore Corridor Study • Upgrade to 6-8 Lanes East-West Link Road, Bells Creek (Private Developer, IA with Council) Completed 2001 Bruce Highway - Caboolture / Bribie Island Rd • Connection to and upgrading of Honey Arterial to Nicklin Way, Caloundra. • Right of way corridor is protected by to Steve Irwin Way (Exit 163) Farm Rd - conditioned infrastructure (TMR/DEV) planning • Construction to start late 2020 for Caboolture / • Connection to Pignata Rd – conditioned • State conditioned corridor from Bells Creek • High capacity faster passenger rail Bribie Island Rd to Pumicestone Rd infrastructure Arterial to Nicklin Way via connection to • Beerwah North to Airport via Maroochydore • Construction to start mid 2021 for Pumicestone Rd • Connection to Springhill Dr Bellvista Blvd to Steve Irwin Way (Exit 163) 23 Bells Creek Arterial • Completion early 2023 16 21 • Project cost of $662.5 million Sunshine Coast Mass Transit Caloundra Access Improvements (Developer, IA with TMR) ($530m Federal Govt, $132.5m Queensland Govt) (State/SCC) (TMR / SCC / DEV) State conditioned infrastructure of Caloundra • Staged proposal to serve high density Enterprise • Arthur St, Third Av extension and intersection South development: 26 Corridor with Nicklin Way (TMR / SCC) • Stage 1 - 2 lane, Caloundra Rd to Roys Rd Bruce Highway / Steve Irwin Way • Maroochydore to Kawana (Stage 1) • Queen St north facing ramps (SCC) interchange (Developer) East - West Connectors (TMR / SCC) (14km) • Oval Ave intersection Improvements (SCC) • Stage 2 - Upgrade to 4 Lanes (TMR) • Johnston Rd & Moffat Rd Upgrade • Kawana to caloundra (Stage 2) • Development conditioned infrastructure - • Stage 3 - grade separation of intersections (including realignment of western end to align (10 km) (Developer) (TMR) with Barrs Rd Overpass) (TMR / SCC) • Signed MOU in place (TMR / SCC) • Stage 4 - 6 laning (if required) (TMR) • Steve Irwin Way Upgrades (TMR) 72163C 09/2020 CoastConnect Project (TMR) 17 • Caloundra to Maroochydore Quality Bus Corridor • Concept Design and Impact Management Plan Transport Priorities completed 2010 Sunshine Coast Council • Staged implementation proposed Projects are numbered north to south. Numbering does not reflect priority. V4 – 1/09/2020.