Sunshine Coast Council Transport Priorities

Sunshine Coast Council Transport Priorities

1 7810 Sunshine Motorway Upgrade - north of Maroochydore Access Sunshine Motorway Upgrade Mooloolah River Interchange (MRI) Maroochy River (TMR) Improvements (TMR / SCC) (MMTC) (TMR) (TMR) 4 Stages of work Progressively 4 lane to address capacity and • Buderim-Mooloolaba Interchange including • Upgrade between Mooloolah River Interchange • Duplication to 4 lanes of Sunshine Mwy (E-W) safety issues split interchange (TMR) (MRI) & Maroochy Blvd from Kawana Way • Collector Distributor Rd two-way road - Sugar • Additional lanes for capacity improvements • Northbound flyover of Nicklin Way to Brisbane Rd 2 Rd to Dalton Dr option (SCC) • New Mooloolah River crossing connecting to Coolum Beach Access Improvements • Plaza Pde upgrade (SCC) 9 Kawana Way Mooloolaba Transport Corridor Upgrade (TMR/SCC) • Key intersection upgrades, • Reconfiguration of existing interchange • Proposed grade separation of Yandina- - Sugar Rd, Maud St and Dalton Dr (SCC) (TMR / SCC) • Detailed Business case with Infrastructure Australia Coolum Rd with Sunshine Mwy. (TMR) - Maroochy Blvd and Dalton Dr (SCC) • Upgrade to 4 lanes along Brisbane Rd and • Suncoast Beach Drive / South Coolum Road - Wises Rd and Sugar Rd (SCC) Walan St extension to future interchange (SCC) - Maud St and Comstar Ave (SCC) • Second stage (Walan Street) is underway 3 Sunshine Coast Airport Expansion Project (SCC) New realigned runway upgraded for larger Queensland aircraft, estimated cost $319 million Sunshine Eumundi 1 Coast 4 Arundell Avenue Upgrade (SCC) Intersection improvements, then proposed 4 lane upgrade for increased capacity (when rail is upgraded) h ArmArrmm 5 Kunda Park Connection Improvements (TMR) Coolum Beach Upgrade the Hobbs Rd / Pike St / Maroochydore Rd Intersection 2 Yaroomba 6 Yandina Bruce Highway Upgrade - Maroochydore Road to Mons Road (TMR) Interchange reconfiguration and service roads each side. Estimated $301 million project cost Marcoola Construction Commenced June 2020, Kenilworth Completion late 2022. 3 Bli bli Mudjimba Mapleton Nambour 4 Woombye 5 Maroochydore 7 Mooloolaba ● Buderim Palmwoods 8 6 9 Buddina 10 11 ● SiS ppppy Warana EudEdEEuudlolo ● ConCCoononondndndaleaallele DoDownwns 12 14 Maleny 13 15 16 ● Currimundi Mooloolah 17 11 Sunshine Motorway Upgrade (TMR) 18 • Consider service roads between Dixon Landsborough ● Rd and Kawana Way interchanges 20 21 Caloundra • Investigate East West connection linking Caloundra Palmview to the East 19 South 22 Kawana Arterial Project (TMR) 12 ● Peachester • Proposed multi-lane arterial between MRI 23 and Caloundra Rd ● Beerwah • Stage 1 extend 2 lane arterial north of Creekside Blvd to Brightwater • Stage 2 Interchanges and laning upgrade 26 18 24 Landsborough to Nambour Rail 13 Steve Irwin Way Upgrade (TMR) 25 Upgrade (TMR) • Intersections rationalisation and • Duplication and realignment improvements • Upgrade to 4 lanes north of Landsborough • About 22 km 24 • Selected 4 laning of sections south of Beerburrum to Nambour Rail (Stage 1) Landsborough 14 Upgrade (TMR) Bruce Highway Upgrade Project – • Duplication and realignment to just north of Beerwah Caloundra Road to Sunshine Motorway Beerwah East Major Development Area 19 • About 17km, Estimated cost $550.8 million (TMR) • Included in the Urban Footprint in the SEQ • Commenced June 2020, Completion date late 2024 • Upgrade to 6 lanes, 2 interchange upgrades Regional Plan BeeBBeeeeerburrbburrurrrruumm and full length western service road • Well served by the CAMCOS corridor Bruce Highway Upgrade - Pine Rivers 25 • Completion date mid -2021, estimated cost • Multiple access and connectivity is available to to Caloundra Road (TMR) $813million nearby centres • TMR Planning Study from Pine River Bridge to 22 CAMCOS Project (TMR) Caloundra Rd, completion expected late 2020 15 Palmview Development 20 • Caboolture to Maroochydore Corridor Study • Upgrade to 6-8 Lanes East-West Link Road, Bells Creek (Private Developer, IA with Council) Completed 2001 Bruce Highway - Caboolture / Bribie Island Rd • Connection to and upgrading of Honey Arterial to Nicklin Way, Caloundra. • Right of way corridor is protected by to Steve Irwin Way (Exit 163) Farm Rd - conditioned infrastructure (TMR/DEV) planning • Construction to start late 2020 for Caboolture / • Connection to Pignata Rd – conditioned • State conditioned corridor from Bells Creek • High capacity faster passenger rail Bribie Island Rd to Pumicestone Rd infrastructure Arterial to Nicklin Way via connection to • Beerwah North to Airport via Maroochydore • Construction to start mid 2021 for Pumicestone Rd • Connection to Springhill Dr Bellvista Blvd to Steve Irwin Way (Exit 163) 23 Bells Creek Arterial • Completion early 2023 16 21 • Project cost of $662.5 million Sunshine Coast Mass Transit Caloundra Access Improvements (Developer, IA with TMR) ($530m Federal Govt, $132.5m Queensland Govt) (State/SCC) (TMR / SCC / DEV) State conditioned infrastructure of Caloundra • Staged proposal to serve high density Enterprise • Arthur St, Third Av extension and intersection South development: 26 Corridor with Nicklin Way (TMR / SCC) • Stage 1 - 2 lane, Caloundra Rd to Roys Rd Bruce Highway / Steve Irwin Way • Maroochydore to Kawana (Stage 1) • Queen St north facing ramps (SCC) interchange (Developer) East - West Connectors (TMR / SCC) (14km) • Oval Ave intersection Improvements (SCC) • Stage 2 - Upgrade to 4 Lanes (TMR) • Johnston Rd & Moffat Rd Upgrade • Kawana to caloundra (Stage 2) • Development conditioned infrastructure - • Stage 3 - grade separation of intersections (including realignment of western end to align (10 km) (Developer) (TMR) with Barrs Rd Overpass) (TMR / SCC) • Signed MOU in place (TMR / SCC) • Stage 4 - 6 laning (if required) (TMR) • Steve Irwin Way Upgrades (TMR) 72163C 09/2020 CoastConnect Project (TMR) 17 • Caloundra to Maroochydore Quality Bus Corridor • Concept Design and Impact Management Plan Transport Priorities completed 2010 Sunshine Coast Council • Staged implementation proposed Projects are numbered north to south. Numbering does not reflect priority. V4 – 1/09/2020.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us