_ eet

No. RO/VJA/Misc.24/B/OFC/NH-544D/Sr.no.75 / way Government of Ministry of Road Transport &Highways Regional Office, Vijayawada Door no. 38-2-3/2, Gorle dalapanna Veedhi, Near American Hospital, Punnammithota Vijayawada-520010. Tele: 0866-2970220; Fax: 0866-2571985 Dated:\@.02.2021 ~ Invitation of Public Comments

Sub: Proposal for Permission for l a y i n g O p t i c a l F i b r e cable (OFC) by M/s Vindhya Telelinks Limited from k m 73/525 t o km 84/976 (LHS) o f NH-544D (Ananthapuramu-Tadipatri-Bogasamudramu section) and crossing at k m 84/876 from LHS to RHS for a total length of 11.351kms in Kurnool D i s t r i c t in the State of - reg.

P l e a s e f i n d enclosed herewith t h e proposal in accordance with Ministry’s latest guidelines d a t e d 22.11.2016 forwarded by Chief Engineer(R&B), N H & CRF, A P vide letter dated 07.01.2021 f o r laying O p t i c a l Fibre cable ( O F C ) b y M/s Vindhya T e l e l i n k s Limited from km 73/525 to km 84/976 ( L H S ) of NH-544D (Ananthapuramu-Tadipatri-Bogasamudramu section) a n d crossing a t k m 84/876 from L H S to RHS for a total length of 11.351kms a t Thimmaneyunepeta, Itikala, Kolimigundla V i l l a g e s in Kurnool D i s t r i c t in t h e S t a t e of A n d h r a P r a d e s h by the Horizontal Directional D r i l l i n g (HDD) method.

2 . As p e r the guidelines, i s s u e d by the Ministry vide Circular N o . R W / NH- 33044/29/2015/S&R(R) dated 22.11.16, t h e proposal for Highway crossing permission along & a c r o s s National Highways shall be put out in t h e p u b l i c domain for 30 days for s e e k i n g claims and objections o n grounds o f p u b l i c inconvenience, s a f e t y a n d general p u b l i c interest.

3. In view o f the above, comments o f the p u b l i c on the above mentioned proposal i s invited o n the a d d r e s s mentioned below: ~

The Regional Officer, Ministry of Road Transport and Highways, Gorle Dalappana Veedhi, Near American Hospital, Punnami Thota, Vijayawada - 520010 Email id: [email protected].

Encl: As above = ( N a k u l Prakash Verma) Executive Engineer, For Regional Officer, MoRTH, Vijayawada

Copy to: 1) Senior Technical Director, NIC for uploading on the Ministry’s website. 2 ) T h e Chief Engineer(R&B), N H & CRF, AP. 3) T h e M/s Vindhya Telelinks L i m i t e d , P l o t n o . 5 6 , Ishaq c o l o n y , Opp: S y n d i c a t e Bank, P i c k e t 015, B r a n c h , Wellington road, Near AOC Center, Marredpally, Secunderbad - 500 Telangana.

CERTIFICATE

1) signed has examined the proposal of the applicant for laying optical fiber along the National Highway-544-D(Ananthapuramu-Tadipatri-Bogasamudramu Section) NH - 544-D along the road from Under Km _73/525-84/976(LHS) and Acrossing at 84/876 from LHS to RHS for total length of 11.351 Kms, in the of AP under the limits of R&B NH Division Kurnool I the state of Andhra Pradesh and confirm that all standard conditions issued vide Ministry Circular No.RW/NH-33044/29/2015/S& Dt:22.112016 has been followed 2) It is certified that any other location of utility line would be extremely difficult and unreasonable costly and installation of utility line within ROW will not adversely affect the design stability & traffic safety of the highway nor the likely future improvement such as widening of the carriageway casing of curve etc,, 3) I will ensure supervision of the work of lying of utility and ensure that the defects in the road portion after lying of utility are corrected.

4) I will notify/ forfeit the BG for claims for damages done/ disruption in working, if any 5) I will ensure the proposed permission in the entered in the register of records.

6) The récord of previous approval, if any has been considered and the copy same is enclosed with the proposal.

(Mnclde —til yer Executive Enginedr(R&B) APRDC Division, Kurnool

Supe srintendin Engineer R&B) NH Clrcla, Dantes CERTIFICATE

1) Under signed has examined the proposal of the applicant for laying optical fiber along the National High way-544-D(Ananthapuramu-Tadipatri-Bogasamudramu Section) NH - 544-D along the roa d from Under Km 73/525-84/976(LHS) and Acrossing at 84/876 from LHS to RHS for total length of 11.351 Kms, in the Kurnool District of AP under the limits of R&B NH Division Kurnool | the state of Andhra Pradesh and confirm that all standard conditions issued vide Ministry Circular No.RW/NH-33044/29/2015/S& Dt:22.112016 has been followed ‘ It Is certified that 2) any other location of utility line would be extremely difficult and unreasonable costly and installation of utllity line within ROW will not adversely affect the design stability & traffic safety of the highway nor the likely future improvement such as widening of the carriageway casing of curve etc,. | will ensure supervision of the work of laying of utility and ensure that the defects in the road portion after laying of utility are corrected.

~s Pan 5 ‘Dh YB Slo e Wb SIio|enw Assistant Engineer (R&B) Dy. Executive Engineer(R&B) APRDC Section-111 NH Sub division, Kurnool Kurnool : CHECK - LIST Accommodation of Public and Industrial Utility Services along and across National Highways by Private Parties under Industrial Utility.

Relevant Circulars

« Ministry Circular No. RW/NH-33044/29/2015/S&R(R), Dated: 22.11.2016

Check list for qotti rovalfor laying of Optical Fibre Cable on NH land Si. No. Item Information/ Status ss Remarks

1 General Information Permission for taying Optical Fibre Cable | across National Highway No-544 D at Thimmaneyunepeta, Itikala, Kolimigundla Villages, Kurnool District, in the state of re Andhra Pradesh,

1.1 Name and Address of the Applicant / Agency M/s. Vindhya Telelinks Ltd, Plot No. 56, \ Ishaq Colony, Opp. Syndicate Bank, Picket Branch, Wellington Road, Marredpally, | Secunderabad-500015, Telangana state. | 4.2 National Highway Number NH-544 D i 13 | State Andhra Pradesh a | 1.4 Location Thimmaneyunepeta, Itikala, Kolimigundia | Villages, Kurnool District, in the state of i Andhra Pradesh, 15 (Chainage in km) Km 73/525 - 84/976 (LHS) and Acrossing at 84/876 from LHS to RHS (Anant—h Taadpipautrri- - Bogasamudram Section) 1.6 Length in Meters 14,354.00.Mits 1.7 Width of available ROW i | (a) Left side from center line towards 16.0 Mitrs 7 increasing chainage (km) direction (6) Right side from center line towards) 222.0000 ww increasing chainage (km) direction 1.8 Proposal to lay the Utility Cable -

(a) Left side from center line towards Yes, as Per Drawing attached | i increasing chainage (km) direction 15.0 mtr ee | (6) Right side from center line towards [090090 022020202000 ween increasing chainage (Km) direction 7 1.9 Proposal to acquire land ‘es (a) Left side from center line NA | (b) Right side from center line NA 1.10 Whether proposal is in the same side whe re YES land is not to be acquired If not then where to lay the cable At the edge of RoW ; | 1.11 Details of already laid services, if any, along By EE the proposed route Z Number of existing lanes (2/4 / 6/8 lanes), 4 Lanes Proposed Number of lanes (2 lane with p aved NA shoulders/4 / 6/8 lanes). 1.14 Service road existing or not NA If yes then which side (a) Left side from center line NA (b) Right sidefr amine NA

uy or 6 Ape D fouly Lp) ee o Assistg L402 y (2B) ( \ ji 5 . 1 APRA. goction - 1, ~ KURNOG: 1 « Exotweth tiareve LnAgione dr NIA NOC i, (R&B) A,P.R.D.C, Division ~ KUR NOOL, Proposed Service road (a) Left side from center line NA (b) Right side from center line NA Whether proposal to lay Cable is after the NA service road or between the service road and main carriageway Whether carrying of Electrical Poles has been | No, Utility (OFC) not proposed on bridges proposed on highway Bridges. lf Yes, then mention the methodology proposed for the same Whether carrying of Poles has been proposed No, Utility (OFC) not proposed on the on the parapet/any part of the bridges. parapet/any part of the bridges If yes, then mention the methodology proposed for the same. if crossings of the road involved lf Yes, it shall be either encased in pipes or YES through structure or conduits built for that | Passing Optical Fibre Cables with required purpose at the expenses of the agency owning Clearances for safety of users the line (a) Whether existing drainage structures NA are allowed to carry utility Poles

(b) Is it on @ line normal to NH Yes (c) What are the distances of crossing the utility pipelines from the existing structures Crossings shall not be too near the existing NA structures on the National Highway. The minimum distance being 15 meter. (d) The casing pipe (or conduit pipe in the case of electric cable) carrying the utility line shall be of steel, cast iron, or reinforced NA cement concrete and have adequate strength and be large enough to permit ready withdrawal of the carrier pipe/cable. Mention type of casing. (e) Ends of the casing /-conduit.pipe -shall-be-- NA sealed from the outside, so that it does not act as a drainage path. (f) The casing/conduit pipe should, as NA minimum extend from drain to drain in cuts and toe of slope in the fills. (g) The top of the casing/conduit pipe should be at least 1.2 meter below the surface of Applicable the road subject to being at least 0.3 m below the drain invers. Mention the proposed details. (n} Mention the methodology proposed for crossing of road for proposed Cable. Crossing shall be by boring method (HDD) (Trench-less Technology), specially. Where Using HDD Methodology the exiting road pavement is of cement concrete or dense bituminous concrete type. The casing/conduit pipe shall be installed with an even bearing throughout its length and in such a manner as to prevent the formation of a waterway along it.

Document/ Drawing to be enclosed with the YES oT proposal a Ska rp |20

2.4 Cross section showing the size of trench for open trenching method, (Is normal size of 1.65m deep x 0.5m wide) (i) Should not be greater than 60 Cm wider Enclosed than the outer diameter of the outer pipe (ii) Located as close to the extreme edge of Yes the right-of-way as possible but not less than 15 meter from the center ~ lines of the nearest carriageway Drawing Enclosed (iii) Shall not be permitted to run along the National Highways when the road formation is situated in double cutting. Nor shall these be laid over the exiting culverts NA and bridges. (iv) These should be so laid that their tap is at least 0.6 meter below the ground level so as not to obstruct drainage of the road YES Jand.

2.2 Cross section showing the size of pit and HDD Cross Section Enclosed location of cable for HDD method 2.3 Strip plan/route Pian showing the utility Cabie. | a a Chainage. Width of ROW. Distance of Strip plan showing all the details is proposed Cable from the edge of ROW. enclosed Important mile stone. Intersections. Cross drainage works ete, : 7 =} 2.4 Methodology for laying of the utility pipe line. Enclosed | | 2.4.1 | Open trenching method (may be a llowed in ' ee utility corridor only where pavement is neither | Yes, methodology of OFC laying attached. cement concrete nor dense bituminous concrete type) If yes, what is the methodology of refilling the trench ovo) The trench. width should.be atleast 30 cm. but not more than 60 cm wider Open trench cross section enclosed than the outer diameter of the pipe.

(9) For filling of the trench. Bedding shall = be to a depth of not less than 30 cm. it shall consist of granular material. Free Yes of lumps. Clods and cobbles and graded to yield a firm surface without sudden change in the bearing value. Unsuitable soil and rock edged should be excavated and replaced by selected material. {c) The back fill shall be completed in two stage (1) side fill to the level of the top Yes of the pipe and (Il) overfill to the bottom of the road crust. The side-fill shall consist of granular = Se material laid in 15 cm layers each consolidated by mechanical to 95% of Yes the proctor's density. Overfill shall be compacted to the same density as the | | material that had been removed. \ , Consolidation by saturation or ponding will not be permitted.

SRasyP| 20 Beiccr (R&B) Section «i ES6cutte> c Sitnebptheo | (RES) A,P.R.O.C. Division KURNOOL,

(e) The road crust shall be bullt to the same strength as the exiting crust on Yes either side of the trench. Care shall be taken to avoid the formation of a dip at the trench. (f) The excavation shall be protected by ‘flagman, signs and barricades, to Yes avoid the formation of a dip at the ___trench. (g) If required, a diversion shall be constructed at the expense of agency NA owning the utility line

2.4.2 Horizontal Directional Drilling method Details provided in methodology of laying

2.4.3 | Methodology for laying of Cable through CD works and method of laying. In cases where NA | the carrying of gas pipe line on the bridge | becomes inescapable. _ 3 Draft License Agreement is signed by two Enclosed witnesses 3.1 The license fee estimated as per Ministry's Enclosed circular No. RW/NH-33044/29/2015S&R(R) dated 22.11.2016 _ 4 Whether performance Bank Guarantee as per ministry's Circular no. RW/NH- | Undertaking for submission of BG has been 33044/29/2015S&R(R) dated 22.11.2016 is obtained from M/s Vindhya Telelinks Ltd obtained, | 4.1 Confirmation of BG has been obtained or not | Confirmation of BG shall be obtained after | as per MORTH/NHAI guidelines BG submission by M/s Vindhya Telelinks Ltd ie Affidavit / Undertaking from the Applicant YES, Enclosed

5.1 Undertaking for Not to Damage any other YES, Enclosed utility, if damaged then to pay the losses either | to NHAT or to the concerned ‘agency

a2 | Undertaking for Renewal of Bank Guarantee YES, Enclosed | as and when asked by MORTH/NHAI. | 5.3 Undertaking for Confirming all standard YES, Enclosed condition of Ministry Circulars and NHAI's guidelines. 15.4 Undertaking for Indemnity against all damages YES, Enclosed and claims

5.5 Undertaking for management _ Traffic YES, Enclosed movement during laying of Utility Line Without | hampering the traffic. | 5.6 Undertaking that If any claim is raised by the YES, Enclosed Concessionaire/contractor then the same has to be paid by the applicant. 5.7 Undertaking that prior approval of the NHAI YES, Enclosed shall be obtained before undertaking any work of installation, shifting or repairs, or alterations to the utility located in the National Highway _| tight-of-ways. Undertaking that text of the license deed is as YES, Enclosed per verbatim of MoRTH format (issued vide Ministry's Circular no. RW/NH- 33044/29/2015/S8&(R) dated 22.11.2016)

| SRenly leo ” Assistant Engineer (R&B) A.P.R.D.C. Section - th KURNOOL . ne heare Sf BPEoe AODa ea beg = If the MoRTH/NHAI considers [t necessary in YES, Enclosed future to move the utility line for any work of improvement or repairs to the road, It will be carried out as desired by the MoRTH/NHAI at the cost of the agency owning the utility line within a reasonable time (not exceeding 90 days) of the intimation given.

5.10 Undertaking that the applicant has obtained various safety clearance from the respective authorities such as directorate of Electricity. Chief controller of explosives, petroleum and Not applicable as the utility line proposed is explosive safety organization, oil industry OFC | safety directorate, state/central _ pollution control board and any other statutory clearances as applicable, before applying to Highway administration. If the MoRTH/NHAI considers it nece ssary in future to move the utility line for any work of Improvement or repairs to the road, it will be carried out as desired by the MoRTH/NHAI at YES, Enclosed the cost of the agency owning the utility line within a reasonable time (not exceeding 90 days) of the intimation given. 5.12 Certificate fram the applicant in the following format,

i)Laying of OFC will not have any deleterious effects on any of the bridge components and Enclosed roadway safety for traffic.

i)We do undertake that i/we relocate service road/approach road/utilities at my/our own cost notwithstanding the permission granted within Enclosed such time as will be stipulated by NHAI for -future.six.laning.or/any. other.develoomentmeas.-- Who will sign the agreement on behalf of cable M/s Vindhya Telelinks Ltd line agency?

Power of Attorney to sign the agreement is Yes Available or not The EE/RB, will submit the following Certificate, 7.1 Certificate for confirming of all standard condition issued vide Ministry Circular No. YES, Enclosed RW/NH-33044/29/2015/S&R(R), Dated: 22.11.2016 7.2 Certificate from the EE/PD, in the following format i)It is certified that any other location of the OFC would be extremely difficult and Enclosed/Net-enctosed unreasonably costly and the installation of OFC within RoW will not adversely affect the design, stability and traffic safety of the highway nor the likely future improvement such as widening of the carriage way, easing of etc., il) for 6 laning a) Where feasibility is available “| do certify that the no hindrance to proposed_six | _. laning based on the feasibility report Enclosed/Not Enclosed considering sed structures at the said location. 44 ELIAS aes WY ty PROM cj {90 oa : Assistant kfigineer (R&B) Hl i A.PR.D.C. Section - Il! Anan KURNOOL

b) in case feasibility report is not available “| do certify that sufficient RoW Is available at Enclosed/Not Enclosed site for accommodating proposed six-laning’,

| IF NH Section proposed to be taken up by NHAI on BOT basis a clause is to be inserted in the agreement. "The permitted Highway on which licensee has been granted the right to lay cable/ducts has also been granted as a NA right of way to the concessionaire under the concession agreement for up gradation of ( section from Km to Km , of NH No. on build, Operate and transfer basis) and therefore the licensee shallhonerthe same. _ Who will supervise the Work of laying of Cabies. (a) On behalf of the Applicant Vindhya Telelinks Ltd (b) On behalf of MoRTH/NHAI Executive Engineer R&B) NH Division, Kurnool | 10 Who will ensure that the defects in road portion after of laying OFC are corrected and if not corrected then what action will be taken: (a) On behalf of the Applicant Vindhya Telelinks Ltd (6) On behalf of NHAI / MORTH Executive Engineer R&B) NH Division, Kurnool! 11 Who wilf pay the claims for damages done/ disruption in working of Concessionaire if asked by the Concessionaire On behalf of the Applicant M/s Vindhya Telelinks Ltd 12 A certificate from EE/PD that he will enter the proposed permission in the register of Enclosed records of the permissions. in the prescribed proforma (copy enclosed) 413 lf any previous approval is accorded for laying of Electricity Poles then Photocopy of register NA of records of permissions accorded (as maintained by EE/RB) be enclosed

Name Designatior d Name Designation and signature of the authorized representatlo! cancerned field authority of NHAI/PWD f

Se Ryf ; ” Assistant Engineer (R&B) oN S [sof Ro AP.R.D.C. Section - il ~ KURNOOL dis cholrar Executive Enpinee (REB) A,P.R.D.C, Division KRURNOOL,

t

}

| t

NET NET

S

U

GAlsISadS GAlsISadS

S

— L

aR

w I

a

SINT

W

M

9

A

gg

€ —

<4

G NI 6

5

3

A %

H -

O Sev Sev

S Kr: 76/461

} B

S

mm mm P

e

— I

a

e

HLONATNOLLOSS HLONATNOLLOSS

M S

miomano.

n

e

L

Y N

:

n z z a

wo S

t

a

a

O

H P

e

D —

s

I

A L

a

N O

S

x

N

S S

3 —

Z S a

W A

s

o

I

I Ty Ty

t

S

S

N

s d

O

N

3 H

V

O

T

Fl N

H “L

.

€ € Zo Zo

A

2 | | |

Km: 78/354 (G?vS-HN)

=

;

Fog

&

15.0

14.0-—|

-

& | GVO GVO 7.25—|

p

)

— —

a a

WVYCNWYSVD08 WVYCNWYSVD08

| ‘

e

n

n p

s

(

e

a L

r

:

9

P w

( /

Krn: ATEOT t 9

|

r

) 2

eBke

syuysjay syuysjay

U M

8

aesads

j

: :

OL OL

*

E

é SzsieZuy) SzsieZuy)

-

o

'

g

- - e

s

e

A

I SS SS

y

n

Y N

: .

_ P

Bokpp

L

U

V

I

GvsS-HN GvsS-HN

a

d

A

r

I

s

O

s

W

-

L

H

N

- -

Pore

Y A

pyar G

Km: 74/319 W

i

H

a

z

T L

W

A

TNVOTTERY TNVOTTERY

e

t

o avou N

v

f

1 V

T

v

pS N

e

O

S Y

N

s

n

o |

v

u

e

p

7

~

a a ¢

é

seyyrguyo seyyrguyo

t

Km: 74/085 S

L

A

5

N

O

[ Y

Jyaaino

(mow) (mow)

40 40

e

D A

v

O

SNM SNM

e

TaSOdOud TaSOdOud AuvaNnog AuvaNnog

s own own

sears NaINGO NaINGO

ous>

Km: 73/525 a 8

_ T |

J

ONT

- -

- - -

-

N

O

M ~

MOU

o

S S

e

5IN2537

= -~- -~-

7

| |

Frei sE “yoy yy — 1 i -L omas anesHie, O O N Y NO ] nino/aeana = = s DSHD OAT iets Jua - *s 8g (ALa\ (poet as raRA ER O's“UA B

eze yuajo, BAYPUIA . Q Dy (MOY) AYWONNOS -

/

WHS pe - HLONS] NOLLOSS“z = “NYOMI | zovievd JO ANIMALNaD - dalsi0ad$SSIMYSHLO SS TINN ee

YSLSW I AY SNOISNSMIG TT¥ “+ (90Z/08 “WY OL 1 9r/9Z:uWy) S N Oud 31Now O40 TasOd - ) dICVL YNdVHLNYNY A o i ‘Salon | (CrpS-HN GVO WWHONWVSV908 - IBL V -

(>) =a F AAON SNIT MOY S NIT | 3y0TTaNOL b | LL, b | AYVTISd OL => <= |) at es i —- __}_\—Jfhp—#~ Mi

\ [ t d LH LU | = iz ee =| ta = t T [yl [ n rl x o NM ;,

a 2 7] A G?ss - HN | I 3 7 H

hy T 1 pI LI I LI PA oN PN PN oN

= = = (Ps) | SANIT MO’ ® — = ee === — _ st |

MIT M O Y A O V T T I A AT W o l d O Y N Y N Y e =x _

|

g 5 g 2 8 3 §

| 8 2 © = x mS e

§ E é & 5 é g x x = ao MJ =< =<

ate ate

w

W

| y

r

eee eee

S

U

d3tsiOadS d3tsiOadS

a A

S

I uy uy

| S

ONT O

ann

W

S

309" 309"

e O

<= N t moe

MOY

r

3YV¥ 3YV¥

N

z- z-

e

A e

z z 5

S a

E

r

I

*

p A

' K i i

5 5 d

|SMOTISNOL

M

S

A

n

dv dv

Y

N

A

S

z

O

S

“Sin- “Sin-

N

I

H

e

S

S

Y

L

x

T

N

O (

8 8

N

S

y

e

W

O

Z =

SST SST

I

I

a

C

A

L

e

D

“SALON O

)

INN INN

A

T

S

S

Y

ps ps

E '

L

2

| |

(

G v

s p t © |

S

- H

| | < N

_ _ )

8

] | | |

an

avOY avOY

a

/peyu] /peyu] WVYCNNVSV908 WVYCNNVSV908 -

=u =u | | I I fy fy tl = ri

3

5 S

i 0 ! !

| | e 1 i i i i : :

oe

e

(219/78 (219/78

s

>

PW) PW) ks

Gees

E

n

syuefey syuefey

“Wy “Wy

e

-

e q

E|

HN

e

y

OL OL

s

o7aRE o7aRE o

x x y

ui ®)aovria|

y

e

e

90z/08U») 90z/08U»)

-

O

'

g

- -

ana

e

w

A

IL IL i

E n | |

E E

Y g Ll '

i |

| \ \ |

i i

p

B

o U v

SNV¥dAGdSYvLVHNSA

p

I

d

A

I

G

V 1

VIVAL

SOVTHA

SDVTIA

-

Y

A d E

| V

— H

as L cINWOMdd¥ cINWOMdd¥

t t g T T 3 N

Y N | Be Be

Y

|

A

V M

ql A

2) D

E

V I

ALNOY ALNOY

N

Y

V

S

l

(

a

M J

240

s

O u

a

)

al

i

INIT INIT n

dasodoud

AUVONNOS AUVONNOS

o

/ Tr. q

“TT

a

Y

v

o S

lan o

a4

a

L u

UI UI

N

i

tf 3

g g Z

— 1 1

v

1d 1d O

T_aNITMos

a

3NM -

>

- -

- - -

- - MOwW MOwW Y~ -LN2531 -LN2531

f

ae US)B8 5 Dowey eccin Ci S o w s (gay) f oahoe hi BPP (

, assur du AD wil F ILI] SyUTa}a | PAYPUIA SIN- J1v9OS € G {MO¥Y AMVONNOS ~~ )

k Atenen nowoas z = UNVOTT AY | y z o v i u 4O ST USINSO e l v o - - d31s1I94dSSS IMYSHLO SSSINN | avou ia -

SUSI NISYY SNOISN3MIG Thy “b (9/8/r8 “WH OL ZLB/Z9iWy)

FUNOY 940 Gasodoud - i San0n| (GvyS-HN)G V WVYCNNVSV9O0¢E- IHLVdIOVL O - YUNdVHLNVNY oe

oO 2 3 oy

ays bel : E S S e S , p 3Nn MOM e gedp e_omvisna @)

rh 1 S JHOTISN OL 3 | a | ASVTISa OL =>

H [}-= 4s }- 8

I e t L I

2 E | = = a 2

lf || 4

:! H lt | e+ | 3 i | S | Qvss - HN | g = |

| | |

ia Fu

an Mo = _ — n e 7 = = — = — — — SNITMOd

39ana | 3OVTHNA a TIONNSIAIIOM iz |

|

. 8 S z 3 z

2 2 z 2 2 3

CROSS SECTION OF THE TRENCH

400.0 mm GL

3 RYN

— EXCAVATED SOIL

m eee |

m

0

.

0

5

7

m

m

0

.

0

5

6 HOPE PIPE 40MM DIA

1

HDPE PIPE 40MM DIA

OPTICAL FIBER CABLE (10,5 MM DIA)

mm 15 Assistam M7 YRGB) i APRD.C. Section - Wt NH. Sub-D} Mobi ™ . SURNOOL | Executive ey) (BEB) A,P.R,D.C, Divi: — KURNOO!

PY] SYUTSTIL SAWN Bincy eAyp HA BaD SSO nos

QOHLAW GdH GOHLAW GGH GOHLAW HONAYL NI 340 ONIAVI NI 940 ONIAVT NadO NI 040 ONIAVI tg 330 G I s S O d O a d — DIO AISOAONS. | 9 = oT seats | 340 GasHdoNs w o : a Le f ye W 9 T w SOT

Sab ices me = Res Pomaxs. Se a 2 gt i Sey —<$ i

. tw Belgou oe LULLELI Le W L L L fa LLL ASL Sb LLL

Sa a WAN S e a d

W Std

LICENSE FEE CHARGES

S No Description No Measurements Quantity Rate Per Amount |

L B D Sq.m_ | per Sq.m

1 2 3 4 5 6 7 8 9 10

1 |:Name of the work: Towards License fee for Laying of O.F.Cable by from Km 73/525 - Km 84.876 (LHS) and acrossing at 84.876 fram LHS to RHS for a total length of 11.351 Kms on (Ananthapuram ~ Tadipatri - Bogasamudram Section) NH - 544D by M/s Vindhya Telelinks Limited.

1_|Km_ 73.525 to 76.725 1 3200 | 0.08 - 256.0 64,247 sqm 16,447.32

2_|Km 76.725 to 81.225 1 4500 | 0.08 - 360.0 98.842.’| Sqm 35,583.14

3 |Km 81.225 to 84.876 4 3651 | 0.08 - 292.1 98.842 ;| Sqm 28,869.79 4 |Crossing at 84.876 4 32 0.10 o 3,2 98.842 | Sqm 316.29

81,216.55

Licene Fee (Rs/Sq.m/Month) = ee = 876.80 License Fee for 5 years =| 5x 12x | 676.8048 = 40,608.27 Rounding off 2.00 | Total 40,610.00

or Public utility 33% of industrial Utilities as per point no.5 of MORTH guide lines vide letter No. RW/NH-33044/29/2015/S&R® Dated: 22nd Nov ,2016 feaor00 (Rupees Thirteen Thousand Four Hundred and One only)

SN T No] : T~ Amount

1 2 10

1 {Km 73.525 to 84.876 2 |Crossing at 84.876 11,38,

ance Guara Rs. 11,358,300

even usan ree Au

-