MIT Civil Engineering – 1.011 Project Evaluation Spring Term 2003

Background Information The Bridge

„ Completed June 24, 1981 A Necessary Masterpiece? „ Located in Hull, England „ Connects to Barton upon Humber „ Longest when opened, now fourth longest

Image of Humber Bridge More Images of Humber Bridge

Technical Information Motivations

„ There was a demand for an efficient route for trade across the Humber River since the late 1800’s

„ Clearance above high water 30m (~100 ft) „ Ferry services existed, but they went in „ Total length of wire 71,000km (~44,000 mi) and out of business often „ Merchants and businesses needed a better „ Load in each cable 19,400 tons (~38mil lbs) connection „ Weight of Steel 27,500 tons (~55mil lbs) „ The economy of Hull was declining and „ Bridge designed for a lifespan of 120 years there was little development

Alia Burton Page 1 MIT Civil Engineering – 1.011 Project Evaluation Spring Term 2003

Motivations, continued Options for Project

„ Humber River more central than London „ Tunnel proposed in 1872 for trade with rest of Europe „ Multi-span truss bridge proposed in 1928 „ "A Humber Bridge is a national interest „ Project went nowhere because of Great because balanced regional development is Depression in USA a national interest.“ „ Other possibilities: -, Minister of Transport „ Improve ferry service „ Other type of bridge

Options for Project, continued Costs

„ Suspension bridge chosen for two reasons Suspension bridge chosen for two reasons „ Estimated to cost £28m (~$45m) „ The river bed shifts because of the boats that „ Construction cost £98m (~$160m) travel on the Humber. „ A suspension bridge would avoid the complications „ By 1981, when bridge opened, bridge debt of changing conditions in the river and only with loan charges was already £151m minimally block the pathway of boats. (~$241m) „ Because of the geology and topography of the „ Government paid more than £300m area, the construction of tunnel would be more expensive (~$480m) to pay off Humber Bridge

Opposition Problems with Project

„ Citizens oppose tolls „ High price inflation during the construction period „ £1.9 (~$3.00): 3rd highest toll in Britain „ Margaret Thatcher, Prime Minister „ Political issues: Why should drivers have to continue „ Delays caused by ground conditions to pay for a bridge that taxpayers paid for? Delays caused by ground conditions „ Labor relations difficulties „ Many citizens of the southeast area feel there is „ Some workers claimed “down-time” of up to 90% during the too much focus on Hull, not enough focus on winter months surrounding areas „ Adverse weather conditions „ Many sub-regional shopping centers lose trade to Hull „ Vehicle utilization was unchanged for 23% of firms „ Residents feel existing service facilities are run down and spread out while those in Hull are concentrated because the bridge was marginal to their operations and in better condition „ Only nine firms responded to the bridge by reorganizing internally

Alia Burton Page 2 MIT Civil Engineering – 1.011 Project Evaluation Spring Term 2003

Benefits Benefits, continued

„ Bridge connected two very distinct parts Study of Market Penetration in 1986 of England „ Increase of average cross-estuary „ £250m (~$400m) in economic growth commercial activity: -County Council's Planning Department „ from 8.1% to 13.9% of journeys across „ Barton upon Hull more developed than Humber before „ From 13.6% to 20.7% in business transactions across Humber

Benefits, continued Ongoing Problems

„ Vehicle utilization was unchanged for 23% „ Bridge hasn’t yet paid for itself. of firms because the bridge was marginal „ is now a rural area and to their operations economic growth is still needed „ Only 9 of the 52 firms interviewed „ Much of the initial traffic on the bridge responded to the bridge by reorganizing was provided by tourists and others out of internally curiosity → Benefits studied in 1986 were mixed

Ongoing Problems, continued References

„ No more than 6% of average weekday „ A Review of Yorkshire and Humberside traffic was commercial traffic „ Do Road Projects Benefit Industry?: A Case Study of the Humber Bridge “If the bridge is to become commercially viable, „ Humberside: A Feasibility Study commercial traffic will have to comprise 50% of average weekday traffic” „ http://johnlowe.net/Teaching/Projects/Project5. htm - Malcolm Stockwell, Bridgemaster „ http://ourworld.compuserve.com/homepages/ra „ Traffic from southeast is particularly y_shields/skat.htm sensitive „ http://www.humberbridge.co.uk/