(12) INTERNATIONAL APPLICATION PUBLISHED UNDER THE PATENT COOPERATION TREATY (PCT) CORRECTED VERSION (19) World Intellectual Property Organization International Bureau (10) International Publication Number (43) International Publication Date WO 2016/153334 A8 29 September 2016 (29.09.2016) P CT

(51) International Patent Classification: Berhad (), Tower 1, Petronas Twin Towers, F2SJ1/00 (2006.01) F17C 9/02 (2006.01) City Centre, 50088 Kuala Lumpur (MY). B WAN YAHYA, Wan Ahmad Akram; c/o Petroliam (21) International Application Number: Nasional Berhad (PETRONAS), Tower 1, Petronas Twin PCT/MY20 16/0000 14 Towers, Kuala Lumpur City Centre, 50088 Kuala Lumpur (22) International Filing Date: (MY). B ABDULLAH, Amiran; c/o Petroliam Nasional 24 March 2016 (24.03.2016) Berhad (PETRONAS), Tower 1, Petronas Twin Towers, Kuala Lumpur City Centre, 50088 Kuala Lumpur (MY). English (25) Filing Language: NAKAYAMA, Toru; c/o JGC Corporation, 2-3-1, Mi- (26) Publication Language: English natomirai, Nishi-ku, Yokohama-shi, Kanagawa 220-6001 (JP). NODA, Takashi; c/o JGC Corporation, 2-3-1, Mi- (30) Priority Data: natomirai, Nishi-ku, Yokohama-shi, Kanagawa 220-6001 PI 2015000746 25 March 20 15 (25 .03 .20 15) MY (JP). (71) Applicant: PETROLIAM NASIONAL BERHAD (74) Agent: JEFFREY, Fiona Teresa et al; Marks & Clerk (PETRONAS) [MY/MY]; Tower 1, Petronas Twin Tow () Sdn Bhd, Unit 6, Level 20, Tower A, Menara ers, Kuala Lumpur City Centre, Kuala Lumpur, 50088 UOA , 5 Jalan Bangsar Utama 1, Taman Bangsar, (MY). Kuala Lumpur, 59000 (MY). (72) Inventors: B GHAZALI, Amir Hamzah; c/o Petroliam (81) Designated States (unless otherwise indicated, for every Nasional Berhad (PETRONAS), Tower 1, Petronas Twin kind of national protection available): AE, AG, AL, AM, Towers, Kuala Lumpur City Centre, 50088 Kuala Lumpur AO, AT, AU, AZ, BA, BB, BG, BH, BN, BR, BW, BY, BZ, (MY). B AHMAD, M Fadzrul; c/o Petroliam Nasional

(54) Title: AN INTEGRATED SYSTEM AND PROCESS FOR GAS RECOVERY IN THE LNG PLANT

¾- <00

(57) Abstract: An integrated gas recovery system in an LNG plant comprising: a first inlet for receiving LNG; and a second inlet for receiving boil-off gas, wherein the system is configured to separate natural gas and LNG in the first and second inlets to produce a first outlet of gas stream and a second outlet of LNG.

[Continued on nextpage] WO 2016/153334 AS |||| || || 111|| ||| | ||| || || || ||||| || | ||

CA, CH, CL, CN, CO, CR, CU, CZ, DE, DK, DM, DO, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IR, IS, JP, KE, KG, KN, KP, KR, KZ, LA, LC, LK, LR, LS, LU, LY, MA, MD, ME, MG, MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PA, PE, PG, PH, PL, PT, QA, RO, RS, RU, RW, SA, SC, SD, SE, SG, SK, SL, SM, ST, SV, SY,TH, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, ZA, ZM, ZW. (84) Designated States (unless otherwise indicated, for every kind of regional protection available): ARIPO (BW, GH, GM, KE, LR, LS, MW, MZ, NA, RW, SD, SL, ST, SZ, TZ, UG, ZM, ZW), Eurasian (AM, AZ, BY, KG, KZ, RU, TJ, TM), European (AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR), OAPI (BF, BJ, CF, CG, CI, CM, GA, GN, GQ, GW, KM, ML, MR, NE, SN, TD, TG).

Declarations under Rule 4.17: — of inventorship (Rule 4.17(iv)) Published: — with international search report (Art. 21(3)) (48) Date of publication of this corrected version: 26 October 2017 (26.10.2017) (15) Information about Correction: see Notice of 26 October 2017 (26.10.2017)