Scotland's Most Iconic Industry
Total Page:16
File Type:pdf, Size:1020Kb
Head Office Back-up power for Scotland’s biggest distilleries Cadder House 160 Clober Road Milngavie Scotland’s most Glasgow G62 7LW 0141 956 7764 [email protected] iconic industry www.dtgen.co.uk Case Study Recent projects Torabhaig Macallan The Torabhaig installation includes a Macallan was supplied with a 180kVA We were appointed to supply and install back-up power for 300kVA generator housed in a modular generator housed in a modular acoustic acoustic canopy designed to reduce canopy designed to reduce the generator a series of Scottish whisky distilleries: Torabhaig Distillery, the generator noise to 80dBA at one noise to 80dBA at one metre from the a new £5m development housed in a 19th century farm metre from the enclosure. Fuel is enclosure. Fuel is provided from the 500 steading on the Isle of Skye; Glenfiddich Distillery in provided from a 5000 litre bunded tank litre integral bunded tank. The generator installed adjacent to the generator and control system is designed for automatic Dufftown, Glenmorangie Distillery in Tain; The Macallan interconnecting fuel lines feature ‘twin start stop control ensuring immediate Distillery, part of the Macallan Estate near Moray in Speyside; wall’ design ensuring full compliance with generator back-up power in the event of all relevant standards. The generator loss of mains power to the facility. and William Grant and Sons’ Girvan Distillery – founded in control system is designed for automatic 1963 and producer of the world famous Hendricks Gin. start stop control ensuring immediate Girvan generator back-up power in the event of William Grant and Sons’ Girvan Distillery loss of mains power to the distillery. was supplied with a 300kVA generator housed in a modular acoustic canopy Glenfiddich designed to reduce the generator noise to At Glenfiddich, we installed a 150kVA 80dBA at one metre from the enclosure. generator housed in a modular acoustic Fuel is provided from the 500 litre integral canopy designed to reduce the generator bunded tank. The generator control system noise to 80dBA at one metre from the is designed for automatic start stop control enclosure. Fuel is provided from the 425 ensuring immediate generator back-up litre integral bunded tank. The generator power in the event of loss of mains power control system is designed for automatic to the facility. start stop control ensuring immediate generator back-up power in the event of loss of mains power to the facility. FIND OUT MORE: 0141 956 7764 Glenmorangie [email protected] The Glenmorangie site had been subject to www.dtgen.co.uk a number of prolonged power outages, the most recent lasted five hours. A 100kVA generator, housed in a modular acoustic canopy designed to reduce the generator noise to 80dBA at one metre from the We are delighted to be enclosure, was supplied. Fuel is provided from a 300 litre integral bunded tank. The able to support this vital generator control system is designed for Scottish industry and automatic start stop control ensuring immediate generator back-up power in look forward to delivering the event of loss of mains power to the robust, secure and well ETP (effluent treatment plant) facility. supported systems for these global brands..