Rye Meads Water Cycle Study\F-Reports\Phase 3\5003-Bm01390-Bmr-18 Water Cycle Strategy Final Report.Doc

Total Page:16

File Type:pdf, Size:1020Kb

Rye Meads Water Cycle Study\F-Reports\Phase 3\5003-Bm01390-Bmr-18 Water Cycle Strategy Final Report.Doc STEVENAGE BOROUGH COUNCIL RYE MEADS WATER CYCLE STRATEGY DETAILED STUDY REPORT FINAL REPORT Hyder Consulting (UK) Limited 2212959 Aston Cross Business Village 50Rocky Lane Aston Birmingham B6 5RQ United Kingdom Tel: +44 (0)870 000 3007 Fax: +44 (0)870 000 3907 www.hyderconsulting.com STEVENAGE BOROUGH COUNCIL RYE MEADS WATER CYCLE STRATEGY DETAILED STUDY REPORT FINAL REPORT James Latham/ Dan Author Vogtlin Checker Renuka Gunasekara Approver Mike Irwin Report No 5003-BM01390-BMR-18-Water Cycle Strategy Final Report Date 5th October 2009 This report has been prepared for STEVENAGE BOROUGH COUNCIL in accordance with the terms and conditions of appointment for WATER CYCLE STRATEGY dated April 2008. Hyder Consulting (UK) Limited (2212959) cannot accept any responsibility for any use of or reliance on the contents of this report by any third party. RYE MEADS WATER CYCLE STRATEGY—DETAILED STUDY REPORT Hyder Consulting (UK) Limited-2212959 k:\bm01390- rye meads water cycle study\f-reports\phase 3\5003-bm01390-bmr-18 water cycle strategy final report.doc Revisions Prepared Approved Revision Date Description By By - 2/10/2008 Draft Report Structure JL 1 18/11/2008 First Report Draft JL/DV MI 2 27/01/2009 Draft Report JL/DV MI 3-13 03/04/2009 Final Draft Report as amended by stakeholder comments JL/DV RG 14 09/07/2009 Final Draft Report JL/DV RG 15 10/07/2009 Final Draft Report Redacted JL/DV RG 16 21/08/2009 Final Draft Report JL/DV RG 17 21/09/2009 Final Draft following core project team meeting comments JL/DV RG 18 05/10/2009 Final Report JL/DV MI RYE MEADS WATER CYCLE STRATEGY—DETAILED STUDY REPORT Hyder Consulting (UK) Ltd-2212959 k:\bm01390- rye meads water cycle study\f-reports\phase 3\5003-bm01390-bmr-18 water cycle strategy final report.doc CONTENTS 1 Introduction and Summary of Key Outcomes ..................................... 1 1.1 Why is a strategy needed? ................................................................ 1 1.2 Who is it for? ..................................................................................... 2 1.3 Who helped to develop this strategy? ................................................ 2 1.4 What does it comprise? ..................................................................... 3 1.5 How does it work? ............................................................................. 4 1.6 What are the key outcomes? ............................................................. 5 2 The Rye Meads Study Catchment ................................................... 10 2.1 Location .......................................................................................... 10 2.2 Hydrology ....................................................................................... 12 2.3 Hydrogeology.................................................................................. 15 2.4 Surface Water Quality ..................................................................... 19 2.5 Environment and Conservation ........................................................ 27 2.6 Infrastructure .................................................................................. 35 2.7 Key Catchment Constraints ............................................................. 40 3 Planning Policy Context .................................................................. 41 3.1 National Policies ............................................................................. 41 3.2 Regional Policies ............................................................................ 42 3.3 Local Policies .................................................................................. 44 3.4 Development Locations ................................................................... 46 3.5 Catchment Contribution Summary ................................................... 51 4 Development Impact Calculations ................................................... 52 4.1 Introduction ..................................................................................... 52 4.2 Variables ........................................................................................ 52 4.3 Methodology ................................................................................... 53 4.4 Scenarios ....................................................................................... 55 4.5 Development Impact Results ........................................................... 56 5 Catchment Capacity ........................................................................ 59 5.1 The Water Cycle ............................................................................. 59 5.2 Managing Potable Water Demand ................................................... 60 5.3 Water Resources and Distribution Network ...................................... 65 5.4 Sewerage Network and Wastewater Treatment ................................ 70 5.5 Flood Risk ...................................................................................... 76 5.6 Environmental Opportunities............................................................ 80 5.7 Catchment Capacity Summary ........................................................ 81 6 Preliminary Optioneering ................................................................. 83 RYE MEADS WATER CYCLE STRATEGY—DETAILED STUDY REPORT Hyder Consulting (UK) Limited-2212959 Page i k:\bm01390- rye meads water cycle study\f-reports\phase 3\5003-bm01390-bmr-18 water cycle strategy final report.doc 6.1 Methodology ................................................................................... 83 6.2 Wastewater Treatment Technologies ............................................... 83 6.3 WwTW Location Options ................................................................. 85 6.4 WwTW Options Screening............................................................... 90 6.5 Other Catchment Wide Strategic Opportunities ................................ 91 7 Development of the Preferred Strategy to address Key Strategic Constraints...................................................................................... 93 7.1 Strategy context .............................................................................. 93 7.2 Thames Water Options.................................................................... 95 7.3 Anglian Water Options .................................................................. 101 7.4 Preferred Strategy Conclusion ....................................................... 107 8 Recommended Strategy ................................................................ 111 8.1 Potable Water ............................................................................... 111 8.2 Wastewater Treatment and Sewerage network .............................. 112 8.3 Flood Risk .................................................................................... 121 9 Strategy Guidance ........................................................................ 124 9.1 Local Authorities ........................................................................... 124 9.2 Developer Guidance ..................................................................... 133 9.3 Water Companies ......................................................................... 135 10 Conclusions and Recommendations.............................................. 136 10.1 Conclusions .................................................................................. 136 10.2 Recommendations ........................................................................ 139 Strategy Boxes Box 1: East of England Plan (2008) extract ................................................................................................... 1 Box 2: The context of this WCS ..................................................................................................................... 4 Box 3: Flood Risk Management Strategies .................................................................................................. 13 Box 4: Restoring Sustainable Abstraction Programme ................................................................................. 13 Box 5: Catchment Flood Management Plan ................................................................................................ 14 Box 6: Strategic Flood Risk Assessment ..................................................................................................... 15 Box 7: Draft Water Resource Management Plan ......................................................................................... 15 Box 8: Catchment Abstraction Management Strategy .................................................................................. 16 Box 9: Groundwater Directive...................................................................................................................... 18 Box 10: Water Framework Directive ............................................................................................................ 22 Box 11: River Basin Management Plans...................................................................................................... 22 Box 12: EU Habitats Directive ..................................................................................................................... 27 Box 13: Local Biodiversity Action Plans ....................................................................................................... 30 RYE MEADS WATER CYCLE STRATEGY—DETAILED STUDY REPORT Page ii Hyder Consulting (UK) Ltd-2212959 k:\bm01390- rye meads water cycle study\f-reports\phase
Recommended publications
  • Purple Emperor (Apatura Iris) Report for Hertfordshire and Middlesex 2012
    Purple Emperor (Apatura iris) report for Hertfordshire and Middlesex 2012 Background Unlike 2011 there was no funding available for survey work in 2012. The spring of 2012, started very dry with dire warnings of impending drought and hose pipe bans were put in place. At times in March it was very mild, however this changed with a vengeance at the beginning of April with a period of very wet weather which continued off and on throughout the summer. 2012 ended up being one of the wettest years on record. This left woodland complexes saturated with rain, very wet, cold and extremely muddy. Horseflies and mosquitoes were in their element! Prospects for a good Purple Emperor season were bleak but in truth in our opinion it was no different to a ‘normal season’ except for one factor, it started late and ground on for what seemed like forever. Flight period Nationally, the first sighting of Purple Emperor occurred on the 29 th June 2012 in Surrey. Surrey as the first sighting location has become normal in recent years although even this was late! Andrew Middleton (AM) and Liz Goodyear (LG) had been watching the Northaw Great Wood assembly area since the 26 th June but it wasn’t until the 4th July 2012, that a single male appeared in the territory area just after 2.30pm. Whereas the last confirmed sighting in 2011 was on the 15 th July, the species not did not peak until the week beginning the 22 nd July (see chart below) when a week of good sunshine occurred.
    [Show full text]
  • Archive Page
    Archive Page Sightings and news from July to December 2005 Archive Index Photo House Index This page contains sightings details of all the butterflies and moths reported to the Sightings page between July and December 2005. Note: These pages have been copied from the original sightings page and some links will no longer work. All images of butterflies or moths have been removed, but most can be found in the Photo House December 2005 Tuesday 20th December Are these the last butterflies of 2006? Have a great Christmas and best wishes to everyone for 2006 Had a peacock in flight near Baldock on 11th December, and one near Newbury, Berks on 19th December - Andrew Middleton Monday 19th December Two late red admirals on footpath from Gosmore to Charlton (south of Hitchin) on Sunday 11th December 2005 - Stuart Pittman November 2005 Saturday 19th November Hatch End, I spotted a small tortoishell in the garden this morning in bright sunshine and about 44 F. It was spotted on a flowering Hebe bush at around noon in the garden. This is the latest I can remember seeing any kind of butterfly - John Kreeger Hemel Hempstead, Red Admiral reported on local allotment this morning although I didn't see it, but when I got home at midday there was one nectaring on Colletia Armata in full sun but with the pond iced-over! - Malcolm Newland Ware garden, 1 Red Admiral flying around and then basking on the bricks of my neighbour's house at 2pm. My latest garden record for Red Admiral - Liz Goodyear Friday 18th November On Monday 14th November a Red Admiral was in my garden in Ruislip - Steve Pash Monday 14th November Epping Forest this morning, one Red Admiral in a sheltered area of woodland - Andrew Middleton 12 November, Government Row, Enfield Lock: red admiral south at 13.38 and one north at 14.05 - Martin Shepherd Sunday 13th November An off topic congratulations to Robert Callf.
    [Show full text]
  • Archive Page
    Archive Page Sightings and news from July to December 2006 Archive Index Photo House Index This page contains sightings details of all the butterflies and moths reported to the Sightings page between July and December 2006. Note: These pages have been copied from the original sightings page and some links will no longer work. All images of butterflies or moths have been removed, but most can be found in the Photo House December 2006 Thursday 28th December When you think it is all over for sightings of butterflies this year, it isn't! On the way to Kew Gardens for the ice skating today the 28th December on the Chiswick roundabout, I spotted a Red Admiral flying past. Then while waiting for the children to get their boots on at the ice rink another Red Admiral flew past, probably disturbed from it's hibernation from the massive influx of people, or the fact it was a very warm day for this time of year? If this is the result of global warming, well it's not all bad!! Helen George My father told me that he saw a butterfly in Bronte Paths, Stevenage this morning. I assume it was a Red Admiral (just hope it wasnt a wind blown leaf!. It was very warm today, with lots of insects and one or two bees in my garden but despite all my attention no butterflies appeared - Phil Bishop Tuesday 26th December I enjoyed today even more with a totally unexpected Red Admiral flying along the eaves of my house and then the neighbours, at about 10.45 this am - weather was grey, dull and 5C.
    [Show full text]
  • LONDON METROPOLITAN ARCHIVES Page 1 BRITISH WATERWAYS BOARD
    LONDON METROPOLITAN ARCHIVES Page 1 BRITISH WATERWAYS BOARD ACC/2423 Reference Description Dates LEE CONSERVANCY BOARD ENGINEER'S OFFICE Engineers' reports and letter books LEE CONSERVANCY BOARD: ENGINEER'S REPORTS ACC/2423/001 Reports on navigation - signed copies 1881 Jan-1883 Lea navigation Dec 1 volume ACC/2423/002 Reports on navigation - signed copies 1884 Jan-1886 Lea navigation Dec 1 volume ACC/2423/003 Reports on navigation - signed copies 1887 Jan-1889 Lea navigation Dec 1 volume ACC/2423/004 Reports on navigation - signed copies 1890 Jan-1893 Lea navigation Dec 1 volume ACC/2423/005 Reports on navigation - signed copies 1894 Jan-1896 Lea navigation Dec 1 volume ACC/2423/006 Reports on navigation - signed copies 1897 Jan-1899 Lea navigation Dec 1 volume ACC/2423/007 Reports on navigation - signed copies 1903 Jan-1903 Lea navigation Dec 1 volume ACC/2423/008 Reports on navigation - signed copies 1904 Jan-1904 Lea navigation Dec 1 volume ACC/2423/009 Reports on navigation - signed copies 1905 Jan-1905 Lea navigation Dec 1 volume ACC/2423/010 Reports on navigation - signed copies 1906 Jan-1906 Lea navigation Dec 1 volume LONDON METROPOLITAN ARCHIVES Page 2 BRITISH WATERWAYS BOARD ACC/2423 Reference Description Dates ACC/2423/011 Reports on navigation - signed copies 1908 Jan-1908 Lea navigation/ stort navigation Dec 1 volume ACC/2423/012 Reports on navigation - signed copies 1912 Jan-1912 Lea navigation/ stort navigation Dec 1 volume ACC/2423/013 Reports on navigation - signed copies 1913 Jan-1913 Lea navigation/ stort navigation
    [Show full text]
  • Surface Water Management Plan London Borough Of
    SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF ENFIELD FINAL DRAFT v2.0 Quality Management Quality Management DOCUMENT INFORMATION Title: Surface Water Management Plan for London Borough of Enfield Owner: Ian Russell Version: v3.0 Status: Final Project Number: CS/046913 File Name: DLT2_GP4_Enfield_SWMP Final_V3.0 REVISION HISTORY Date of Summary of Changes Completed By Version Issue Initial draft SI 12/06/2011 1.0 Final Draft SI 01/08/2011 2.0 Final IR 05/01/2012 3.0 AUTHOR Name Organisation and Role Stephanie Ip Senior Consultant, Capita Symonds Ruth Farrar Consultant, Capita Symonds APPROVALS Name Title Signature Date Ruth Goodall Director, Capita Symonds Principal Consultant, Capita Michael Arthur Symonds Ian Russell Senior Engineer, LB Enfield Kevin Reid Programme Manager DISTRIBUTION Name Organisation and Role Ian Russell Senior Engineer, LB Enfield Kevin Reid Programme Manager, GLA RELATED DOCUMENTS Date of Doc Ref Document Title Author Version Issue i Acknowledgements Acknowledgements A number of people and organisations outside Enfield Council have contributed to this Surface Water Management Plan. Their assistance is greatly appreciated, and in particularly inputs and information provided by: • The British Geological Survey • British Waterways • Drain London Group 4 boroughs: o London Borough of Haringey o London Borough of Hackney o London Borough of Waltham Forest o London Borough of Newham o London Borough of Tower Hamlets • The Environment Agency • The Greater London Authority • London Councils • The London Fire Brigade • Network Rail • Thames Water • Transport for London and London Underground ii Executive Summary Executive Summary This document forms the Surface Water Management Plan (SWMP) for the London Borough (LB) of Enfield.
    [Show full text]
  • HERTFORDSHIRE and MIDDLESEX WILDLIFE TRUST LIMITED (A Company Limited by Guarantee)
    HERTFORDSHIRE AND MIDDLESEX WILDLIFE TRUST LIMITED (A company limited by guarantee) Company Registration Number 816710 Charity Number 239863 TREASURERS’ REPORT AND FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 MARCH 2020 CONTENTS Page number Legal and administrative information 2 Introduction from the Chairman 3 Trustees’ Report, consisting of the following: Structure, governance and management 4 Trust vision, objectives and strategic plans 7 Review of year ended 31 March 2020 8 Headline actions for year ending 31 March 2021 16 Financial review and results for the year 18 Trustees’ responsibilities and approval 23 Independent auditor’s report 24 Statement of financial activities 27 Balance sheet 28 Cash flow statement 29 Notes to the financial statements 30 1 Herts & Middlesex Wildlife Trust Trustee Report and Financial Statements F20 HERTFORDSHIRE AND MIDDLESEX WILDLIFE TRUST LIMITED LEGAL AND ADMINISTRATIVE INFORMATION Honorary President Sir Simon Bowes-Lyon, KCVO Honorary Vice President Robert Wilson Council of Management (Trustees) Olivia Bertham Andy Brown (retired at AGM September 2019) Dr Veronica Edmonds-Brown (Vice Chairman) Keith Cotton Peter Delaloye (retired at AGM September 2019) Clive Hinds (Treasurer) Jackie Hunter (appointed at AGM September 2019) Amy Jankiewicz (appointed at AGM September 2019) Paul Knutson Sarah Kohl Michael Master (Chairman) Andrew Woods Chairman, Finance & Resources Committee Clive Hinds Chairman, Conservation, Community Dr Veronica Edmonds-Brown & Education Committee Chairman, Health & Safety Committee
    [Show full text]
  • Chapter 16 Bittern 16.1-16.6
    A Biodiversity Action Plan for Hertfordshire < Return to contents page for wintering Bitterns and has the potential to make a significant contribution to their conservation. It regularly supports three or four Bitterns throughout the winter and it could with appropriate management support breeding Bitterns. 16.2 Current status The total European population of Bitterns was estimated to be 2500-2700 pairs in 1976. There was a 30-50% decline after the 1978/79 winter. Bittern 16 Bittern numbers appear to be declining in 17 countries, stable species action plan or fluctuating in nine, and increasing in only three. In the UK the Bittern is a declining, localised and rare breeding species. Breeding pairs are confined almost 16.1 Introduction entirely to lowland marshes in Norfolk, Suffolk and Lancashire. In 1994 there were only 15 or 16 booming Bitterns Botaurus stellaris are secretive birds which are males. Numbers are boosted in winter by continental confined almost entirely to lowland marshes dominated immigrants when between 30 and 100 birds are by Common Reed. They feed predominantly on fish recorded each year. (notably eels) but they also take a wide variety of other foods such as amphibians, insects, small birds and Records published in the annual London Bird Report mammals. The males advertise their territories by a and Birds of the Lee Valley show that until the late characteristic deep booming noise which allows the 1960s the Bittern was an irregular visitor to the Lee breeding population to be well known. Valley. During the 1970s between one and two birds wintered in the Lee Valley below Ware, with the same Up to the 17th century bitterns were widespread pattern during the 1980s.
    [Show full text]
  • Natural Environment 20
    20 Natural Environment 20 . Natural Environment 20 Natural Environment 266 20.1 Introduction 20.1.1 The natural environment is one of the district’s greatest resources. Environmental quality is however under threat from many directions. The District Council is therefore committed to conserving and enhancing those important landscape and townscape elements which form a key part of the district’s character and the quality of life of its residents. 20.2 Nature Conservation 20.2.1 Nature conservation is an integral part of the planning system and as such needs to be taken into consideration in any development. Ensuring that future generations can enjoy the district’s rich geological and biological inheritance as well as the wider experience that a healthy, functioning natural environment can provide means that East Herts District Plan 2018 we must continue to improve the protection and management of what we have today. 20.2.2 To assist with this, the most important areas in the district are identified on the Policies Map. These include sites of international, national and local importance. The sites are correct at the time of publication of the District Plan but may be subject to change through future reviews. The Council will continue to work with the Hertfordshire Environmental Records Centre as the primary resource for ecological data in the County. Applicants will be expected to seek the advice of the Herts and East Herts Council | Middlesex Wildlife Trust, the Hertfordshire Environmental Records Centre, Hertfordshire Ecology at the County Council, Natural England, and other advisory groups where appropriate, where proposals affect or have the potential to affect the natural environment and nature conservation assets, including valued landscapes, geological conservation interests and soils.
    [Show full text]
  • Sustainability Appraisal Scoping Report
    East Hertfordshire District Council Sustainability Appraisal Scoping Report Final Report March 2010 Photographs courtesy of East Herts District Council East Hertfordshire District Council Sustainability Appraisal Scoping Report Revision Schedule Sustainability Appraisal Scoping Report March 2010 Rev Date Details Prepared by Reviewed by Approved by 01 September Draft SA James Allan Vanessa Barri Dr Steve Smith 2009 Scoping Report Assistant Environmental Senior Environmental Associate Consultant Consultant 01 September Draft HRA Graeme Down Dr James Riley Dr James Riley 2009 Report Assistant Ecologist Principal Ecologist Principal Ecologist 02 October 2009 Draft Scoping James Allan Vanessa Barri Dr Steve Smith Report for Assistant Environmental Senior Environmental Associate Consultation Consultant Consultant 03 March 2010 Final Report James Allan Vanessa Barri Dr Steve Smith Assistant Environmental Senior Environmental Associate Consultant Consultant Scott Wilson 6-8 Greencoat Place London This document has been prepared in accordance with the scope of Scott Wilson's appointment with its client and is subject to the terms of that appointment. It is addressed SW1P 1PL to and for the sole and confidential use and reliance of Scott Wilson's client. Scott Wilson accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. No person other than the client may copy (in whole or in part) use or rely on the contents of this document, without the prior written permission of the Company Secretary of Scott Wilson Ltd. Any advice, opinions, Tel: +44 (0)207 798 5000 or recommendations within this document should be read and relied upon only in the Fax: +44 (0)207 798 5001 context of the document as a whole.
    [Show full text]
  • Annual Review 2020 Standing up for Your Countryside
    ANNUAL REVIEW 2019/2020 www.cpreherts.org.uk PRESIDENT’S WELCOME TO OUR ANNUAL REVIEW Looking back to 2019, We objected in previous years to plans put forward by there were two events that Stevenage Borough and by East Hertfordshire District caught my attention. Council as they both contained proposals to remove land from the Green Belt and to set aside these sites First, the local elections in for house building. The Secretary of State at the May of last year brought Ministry of Housing, Communities and Local change to the political Government called in the plans but eventually control of several of the approved them. Then the two councils adopted local authorities in the them. Now we are campaigning to ensure that high county. quality homes are built. Change there has been, So we do ask members to fight for the right homes to not everywhere, but, as is be built in the right places always with the reported elsewhere, the preservation of the Green Belt. I urge all members to numbers of homes and the Green Belt sites have been join us in giving their views to MPs and Councillors. looked at anew. In a number of cases reductions have been made or, at least are proposed. Despite the lockdown I am glad and thankful that our staff and active volunteers have never stopped. Secondly, we campaigned strongly against the local Everybody is working from home and using emails, plans, challenging the assumptions underpinning the telephone and video technology. them and calling for the protection given to the Green Belt in public policy to be respected.
    [Show full text]
  • The State of England's Chalk Streams
    FUNDED WITH CONTRIBUTIONS FROM REPORT UK 2014 The State of England’s Chalk Streams This report has been written by Rose O’Neill and Kathy Hughes on behalf of WWF-UK with CONTENTS help and assistance from many of the people and organisations hard at work championing England’s chalk streams. In particular the authors would EXECUTIVE SUMMARY 3 like to thank Charles Rangeley-Wilson, Lawrence Talks, Sarah Smith, Mike Dobson, Colin Fenn, 8 Chris Mainstone, Chris Catling, Mike Acreman, FOREWORD Paul Quinn, David Bradley, Dave Tickner, Belinda by Charles Rangeley-Wilson Fletcher, Dominic Gogol, Conor Linsted, Caroline Juby, Allen Beechey, Haydon Bailey, Liz Lowe, INTRODUCTION 13 Bella Davies, David Cheek, Charlie Bell, Dave Stimpson, Ellie Powers, Mark Gallant, Meyrick THE STATE OF ENGLAND’S CHALK STREAMS 2014 19 Gough, Janina Gray, Ali Morse, Paul Jennings, Ken Caustin, David Le Neve Foster, Shaun Leonard, Ecological health of chalk streams 20 Alex Inman and Fran Southgate. This is a WWF- Protected chalk streams 25 UK report, however, and does not necessarily Aquifer health 26 reflect the views of each of the contributors. Chalk stream species 26 Since 2012, WWF-UK, Coca-Cola Great Britain and Pressures on chalk streams 31 Coca-Cola Enterprises have been working together Conclusions 42 to secure a thriving future for English rivers. The partnership has focused on improving the health A MANIFESTO FOR CHALK STREAMS 45 of two chalk streams directly linked to Coca-Cola operations: the Nar catchment in Norfolk (where AN INDEX OF ENGLISH CHALK STREAMS 55 some of the sugar beet used in Coca-Cola’s drinks is grown) and the Cray in South London, near 60 to Coca-Cola Enterprises’ Sidcup manufacturing GLOSSARY site.
    [Show full text]
  • A Distinctive Collection of 2 and 3 Bedroom Homes
    A distinctive collection of 2 and 3 bedroom homes Brought to you by Clarendon Living THE LIMES page 2 THE LIMES THE LIMES, PUCKERIDGE A family friendly development of two and three bedroom homes in the East Hertfordshire village of Puckeridge. INTRODUCING Set back from the road and surrounded by mature trees, this attractive development has been thoughtfully designed with families in mind. Conveniently located for travel into London and Cambridge, you can enjoy village life with easy access to the nearby historic market towns of Buntingford, Ware, Bishop’s Stortford and the county town of Hertford. Crafted with care and attention to detail, each home perfectly blends contemporary style with traditional character. The interiors boast a superb quality specification and a bright, elegant design for the very best in comfort and convenience; you can just move in and start living. Puckeridge is mentioned twice in Samuel Pepys’ diary when he described resting at The Crown and Falcon in the village. 03 PUCKERIDGE welcomes you Located between the villages of Standon and Braughing, both recorded in the Domesday Book, Puckeridge sits at the cross roads of two major Roman roads. In the eighteenth century it was a busy staging post on the London to Cambridge coaching route. Today, the high street boasts many Georgian fronted houses with high archways for wagons and carriages. The community centre and village hall hosts a range of activities for children including Beavers, Cubs & Scouts, karate, performing arts classes and a toddler group for little ones. The WASPS Out of School Club offers a term-time breakfast, after school and holiday club.
    [Show full text]