Arlesey to Letchworth Garden City (Main Walk) Short Walk & Morning Extension

Total Page:16

File Type:pdf, Size:1020Kb

Arlesey to Letchworth Garden City (Main Walk) Short Walk & Morning Extension Arlesey to Letchworth Garden City (Main Walk) Short Walk & Morning Extension 1st walk check 2nd walk check 3rd walk check 1st walk check 2nd walk check 3rd walk check 13th Sept. 2014 05th April 2021 25th March 2021 Current status Document last updated Tuesday, 06th April 2021 This document and information herein are copyrighted to Saturday Walkers’ Club. If you are interested in printing or displaying any of this material, Saturday Walkers’ Club grants permission to use, copy, and distribute this document delivered from this World Wide Web server with the following conditions: • The document will not be edited or abridged, and the material will be produced exactly as it appears. Modification of the material or use of it for any other purpose is a violation of our copyright and other proprietary rights. • Reproduction of this document is for free distribution and will not be sold. • This permission is granted for a one-time distribution. • All copies, links, or pages of the documents must carry the following copyright notice and this permission notice: Saturday Walkers’ Club, Copyright © 2014-2021, used with permission. All rights reserved. www.walkingclub.org.uk This walk has been checked as noted above, however the publisher cannot accept responsibility for any problems encountered by readers. Arlesey to Letchworth Garden City Start: Arlesey Station Finish: Letchworth Garden City Station Arlesey station, map reference TL 190 378, is 8 km north of Hitchin, 39m above sea level and in Bedfordshire. Letchworth station, map reference TL 217 328, is 5 km north east of Hitchin, 84m above sea level and in Hertfordshire. Length: 25.4 km (15.8 mi), of which 6.8 km (4.3 mi) on tarmac or concrete. Cumulative ascent/descent: 200/156m. For a shorter walk, see below Walk options. Toughness: 4 out of 10 Time: 5 hours 30 minutes walking time. For the whole outing, including trains, sights and meals, allow at least 8 hours. Transport: Arlesey station is on the London Kings Cross to Peterborough East Coast Main Line but is also served by Thameslink trains via St. Pancras International. Trains usually call at Finsbury Park. Journey times are 40 minutes Mondays to Saturdays (two Thameslink trains per hour), and 37 minutes on Sundays (hourly King’s Cross service). Letchworth Garden City is on the London Kings Cross to Cambridge Main Line, the first stop after branching off from the East Coast Main Line at Hitchin, but also served by Thameslink trains from Cambridge. Journey times are 37 to 51 minutes (two to four trains per hour). Buy a return to Letchworth Garden City. You may then have to buy a Hitchin-Arlesey ticket on board the train. Saturday Walkers’ Club: Take the train closest to 9.30 hours. OS Landranger Map: 153 (Bedford & Huntingdon) and 166 (Luton & Hertford) OS Explorer Map: 193 (Luton & Stevenage) Walk Notes: This not too challenging walk in the Bedfordshire/Hertfordshire borders leads straight from the platform into the wildlife-rich riverside meadows of the Hiz River, a meandering high quality chalk stream, followed for a few kilometres. It then leads west along field boundaries and through RAF Henlow Camp to the linear hilltop village of Meppershall, past its manor house and a motte-and-double bailey. The following stretch offers far views south to the Chilterns and north to the Greensand Ridge, before heading to the imposing hilltop church in Shillington, dubbed the ‘Cathedral of the Chilterns’ by John Betjeman. After lunch green lanes lead to the pretty village of Pirton, with more impressive remains of a motte-and- double bailey and traces of an abandoned medieval village. The Icknield Way leads you to one of the very few British lavender farms and then to the World’s first and Britain’s best Garden City: Letchworth. Walk options: An optional – flat – Extension right at the start adds 2.2 km. Mutually exclusive Shortcuts around lunch reduce the length of the walk by either 3.0 or 1.4 km. An infrequent bus service (lines 79 and 89, Mon-Sat only) gets you from Meppershall, Shillington and Pirton to Henlow Camp, where you can connect to the more frequent service to Hitchin. That bus can also be caught 5 km from the end, on the A600. Lunch (details last updated 01/04/2021) Roger’s Bakery 105 High Street, Meppershall, Bedfordshire, SG17 5LZ (01462 813 398). Roger’s Bakery is located 7.8 km (4.8 mi) into the full walk. Open 8.00-17.00 Mon-Fri and 7.30-13.15 Sat. The Crown 104 High Road, Shillington, Hitchin, Bedfordshire, SG5 3LP (01462 711 667, http://crownshillington.com/). Open Mon-Thu 12.00-15.00 and 17.30-22.30, Fri 12.00-15.00 and 17.00- 23.00, Sat 12.00-23.00 and Sun 12.00-22.30. Food served Mon 12.00-14.00, Tue-Fri 12.00-14.00 and 18.00-21.00, Sat 12.00-14.30 and 18.00-21.00 (Snacks 14.30-18.00) and Sun 12.00-18.00. The Crown is located 11.3 km (7.0 mi) into the main walk and is a family run country pub and restaurant with log fires in winter and a large garden in summer. The Musgrave Arms 16 Apsley End Road, Shillington, Hitchin, Bedfordshire, SG5 3LX (01462 713 519, https://www.themusgravearms.co.uk/). Food served Tue-Fri 12.00-14.15 and 18.00-21.30, Sat 12.00- 21.15 and Sun 12.00-17.45. The Musgrave Arms is located 12.9 km (8.0 mi) into the main walk. The Motte & Bailey 1 Great Green, Pirton, Hitchin, Bedfordshire, SG5 3QD (01462 711 117, https://themotteandbaileypirton.com/). Open all day every day. Food served Tue-Thu 12.00-14.30 and 18.00-21.00, Fri-Sat 12.00-15.00 and 18.00-21.30 and Sun 12.00-16.00. The Motte & Bailey is located 16.1 km (10.0 mi) into the main walk, and 13.1 or 14.7 km if taking one of the shortcuts, and it is a family- run pub with a pretty garden by the green. The Fox High Street, Pirton, Hitchin, Bedfordshire, SG5 3PS (01462 459 304). The Fox is located 16.4 km (10.2 mi) into the main walk, and 13.4 or 15.0 km if taking one of the shortcuts. Currently looking for a new tenant. Tea (details last updated 01/04/2021) The Motte & Bailey (as above). The Motte & Bailey is located 9.3 km (5.8 mi) from the end of the walk. The Fox (as above). The Fox is located 9.0 km (5.6 mi) from the end of the walk. The Plume of Feathers Upper Green, Ickleford, Hitchin, Herts, SG5 3YD (01462 432 729). The Plume of Feathers is located 5.2 km (3.2 mi) from the end of the walk. The Old George Inn Arlesey Road, Ickleford, Hitchin, Herts, SG5 3UX (01462 629 538). The Old George is located 5.2 km (3.2 mi) from the end of the walk. Café at Hitchin Lavender Farm Cadwell Farm, Ickleford, Hitchin, Hertfordshire, SG5 3UA (01462 434 343, https://www.hitchinlavender.com/visit-us/our-cafe.aspx). The Café is located in a 17th century barn, and provides a range of lunches and home-made cakes. Open until 17.00. Broadway Hotel & Carvery The Broadway, Letchworth, Hertfordshire, SG6 3NZ (01462 480 111, http://www.broadwayhotel.co.uk/). The Platform Station Road, Letchworth, Herts, SG6 3AN (01462 486 807, https://www.craft- pubs.co.uk/theplatformletchworth). No 12 Coffee Lounge 12 Leys Avenue, Letchworth, Herts, SG6 3EU (01462 487 600, https://www.number12coffee.co.uk/). Open 07.00-18.00 Mon-Sat and 08.00-17.00 Sun. The Grapevine 14 Leys Avenue, Letchworth, Herts, SG6 3EU (01462 677 522, https://www.thegrapevineletchworth.com/). Crafty’s Micropub 15 Leys Avenue, Letchworth, Herts, SG6 3EU (http://www.craftysbeershop.co.uk/). The Three Magnets 18-20 Leys Avenue, Letchworth, Herts, SG6 3EW (01462 681 093). A Wetherspoon’s. Esquires Coffee 27 Leys Avenue, Letchworth, Hertfordshire, SG6 3ED (01462 675 755, https://esquirescoffee.co.uk/store/esquires-letchworth/).Mon-Fri to 18.00, Sat to 17.30, Sun to 16.00. Cultivo Lounge 32 Leys Avenue, Letchworth, Herts, SG6 3EW (01462 686 903, https://thelounges.co.uk/cultivo/#). The Cakey Lady at the Bake House 16 The Wynd, Letchworth SG6 3EL (07932 337 980). Garden City Brewery 22 The Wynd, Letchworth SG6 3EN (07932 739 558, http://gardencitybrewery.co.uk/). Open to 22.00 Wed-Sat and 14.00-20.00 Sun. Oh My Cod ! 5 Station Parade, Letchworth, Hertfordshire, SG6 3AW (01462 683 586). A Fish & Chips. La Concha Wine & Tapas Bar Station Place, Letchworth, Hertfordshire, SG6 3AN (01462 673 804, http://www.laconchaletchworth.co.uk/). Open Tue-Sat 11.00-23.00. Food served Tue-Sat 12.30-14.30 and 18.30-21.30. A formerly derelict part of the station building lovingly converted by the proprietors in 2005. 2 Copyright © 2014-2021 Saturday Walkers’ Club, used with permission. All rights reserved. Notes: Hicca Way A linear waymarked path of 13 km (8 mi) length, opened in 2012. The choice of name for this path which meanders along the River Hiz is based on history going back to the days of King Offa of Mercia who founded a religious settlement in Hitchin. The path follows the route the Hicca tribe (‘the people of the horse’) might have followed from Hitchin to the Danish Fort south east of Henlow, where the Saxons would have regularly had to pay their ‘Danegeld’ tax.
Recommended publications
  • Rye Meads Water Cycle Study\F-Reports\Phase 3\5003-Bm01390-Bmr-18 Water Cycle Strategy Final Report.Doc
    STEVENAGE BOROUGH COUNCIL RYE MEADS WATER CYCLE STRATEGY DETAILED STUDY REPORT FINAL REPORT Hyder Consulting (UK) Limited 2212959 Aston Cross Business Village 50Rocky Lane Aston Birmingham B6 5RQ United Kingdom Tel: +44 (0)870 000 3007 Fax: +44 (0)870 000 3907 www.hyderconsulting.com STEVENAGE BOROUGH COUNCIL RYE MEADS WATER CYCLE STRATEGY DETAILED STUDY REPORT FINAL REPORT James Latham/ Dan Author Vogtlin Checker Renuka Gunasekara Approver Mike Irwin Report No 5003-BM01390-BMR-18-Water Cycle Strategy Final Report Date 5th October 2009 This report has been prepared for STEVENAGE BOROUGH COUNCIL in accordance with the terms and conditions of appointment for WATER CYCLE STRATEGY dated April 2008. Hyder Consulting (UK) Limited (2212959) cannot accept any responsibility for any use of or reliance on the contents of this report by any third party. RYE MEADS WATER CYCLE STRATEGY—DETAILED STUDY REPORT Hyder Consulting (UK) Limited-2212959 k:\bm01390- rye meads water cycle study\f-reports\phase 3\5003-bm01390-bmr-18 water cycle strategy final report.doc Revisions Prepared Approved Revision Date Description By By - 2/10/2008 Draft Report Structure JL 1 18/11/2008 First Report Draft JL/DV MI 2 27/01/2009 Draft Report JL/DV MI 3-13 03/04/2009 Final Draft Report as amended by stakeholder comments JL/DV RG 14 09/07/2009 Final Draft Report JL/DV RG 15 10/07/2009 Final Draft Report Redacted JL/DV RG 16 21/08/2009 Final Draft Report JL/DV RG 17 21/09/2009 Final Draft following core project team meeting comments JL/DV RG 18 05/10/2009 Final Report JL/DV MI RYE MEADS WATER CYCLE STRATEGY—DETAILED STUDY REPORT Hyder Consulting (UK) Ltd-2212959 k:\bm01390- rye meads water cycle study\f-reports\phase 3\5003-bm01390-bmr-18 water cycle strategy final report.doc CONTENTS 1 Introduction and Summary of Key Outcomes ....................................
    [Show full text]
  • Anglian River Basin District Flood Risk Management Plan 2015 - 2021 PART B – Sub Areas in the Anglian River Basin District
    Anglian River Basin District Flood Risk Management Plan 2015 - 2021 PART B – Sub Areas in the Anglian River Basin District March 2016 1 of 161 Published by: Environment Agency Further copies of this report are available Horizon house, Deanery Road, from our publications catalogue: Bristol BS1 5AH www.gov.uk/government/publications Email: [email protected] Or the Environment Agency’s National www.gov.uk/environment-agency Customer Contact Centre: T: 03708 506506 © Environment Agency 2016 Email: [email protected]. All rights reserved. This document may be reproduced with prior permission of the Environment Agency. 2 of 161 Contents Glossary and abbreviations ......................................................................................................... 5 The layout of this document ........................................................................................................ 7 1. Sub-areas in the Anglian River Basin District ...................................................................... 9 Introduction ................................................................................................................................... 9 Flood Risk Areas ........................................................................................................................ 10 Management Catchments ........................................................................................................... 10 2. Conclusions, objectives and measures to manage risk in the South Essex
    [Show full text]
  • HERTFORDSHIRE WATER STUDY 2017 HERTFORDSHIRE COUNTY COUNCIL Infrastructure & Resources, Sub-Catchment Solutions (2021 – 2051)
    HERTFORDSHIRE WATER STUDY 2017 HERTFORDSHIRE COUNTY COUNCIL Infrastructure & Resources, Sub-catchment Solutions (2021 – 2051) MARCH 2017 VERSION CONTROL Version Date Author(s) Checker Approver Comments D1 18/11/2016 Simon Ainley / Aimee Hart Neil McClung R Gunasekara Draft Issue D2 15/03/2017 Simon Ainley / Aimee Hart Neil McClung R Gunasekara 1st Issue 7.3 Identification of Water Infrastructure Options ..................... 38 CONTENTS 8 DISTRICT SUMMARIES .......................................... 42 1 EXECUTIVE SUMMARY ............................................ 4 8.1 Chiltern ..................................................................................... 43 2 STUDY PARTNERSHIP ............................................. 5 8.2 Dacorum ................................................................................... 48 8.3 East Hertfordshire ................................................................... 53 3 WATER VISION FOR HERTFORDSHIRE ................. 1 8.4 Hertsmere ................................................................................. 58 3.1 Principles of the Vision ............................................................. 1 8.5 North Hertfordshire ................................................................. 63 4 BACKGROUND .......................................................... 1 8.6 St Albans .................................................................................. 68 4.1 Overview ..................................................................................... 1 8.7 Stevenage................................................................................
    [Show full text]
  • PR19 FD Outcomes Corrigenda
    Corrigenda to Affinity Water’s PR19 final determinations: Outcomes performance commitment appendix Corrigenda to Affinity Water’s Outcomes performance commitment appendix that accompanied the notification of the determination by the Water Services Regulation Authority (Ofwat) of Price Controls for the period from 1 April 2020 to 31 March 2025 This notice contains minor corrections to the PR19 final determinations: Affinity Water – Outcomes performance commitment appendix that was published on 16 December 2019. Version control Version Date of issue Performance commitments with amendments 1.0 10 February 2021 PR19AFW_W-B5 1 Corrigenda to Affinity Water’s PR19 final determinations: Outcomes performance commitment appendix Number of source operating under the Abstraction Incentive Mechanism PR19AFW_W-B5 The detail for this performance commitment is set out on pages 56-59. On pages 56 and 57, in the ‘Performance commitment definition and parameters’ table for: Detailed definition of The abstraction incentive mechanism (AIM) reduces abstraction of water at environmentally sensitive sites when performance measure flow or levels are below an agreed point otherwise known as a trigger. The trigger point is based on a level or flow, below which the AIM is considered to be “switched on”. This trigger will usually be related to the point at which damage is caused and is intended to prevent this from happening or ameliorate the negative impacts. The company has included 21 sites for the period 2020-25: BRIC: The trigger threshold for this site is a
    [Show full text]
  • Low Flows and Water Resources
    NRA Water Resources 16 LOW FLOWS AND WATER RESOURCES ' ** ■ - L 7 :. r .-SIM 1 i 1 v V NRA National Rivers Authority r? :v*r; W rv- j»u National Rivers Authority Rivers House Waterside Drive Aztec West Almondsbury Bristol BS12 4UD Tel: 0454 624400 Fax: 0454 624409 © National Rivers Authority 1993 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise without the prior written permission of the National Rivers Authority. First Edition 1993 ISBN No. 1 87 3160 42 9 Price £5 (including postage and packing) Further copies may be obtained on application to National Rivers Authority Distribution Centre Washington Newcastle upon Tyne X N E 85 4ET Designed by Stott Meredith Design and Communication Ltd, Sion Road, Bristol, BS3 3BD Printed and bound by Stanley Hunt Print Ltd, Midland Road, Rushden, Northants, NN10 9VA NATIONAL RIVERS AUTHORITY LOW FLOWS AND WATER RESOURCES FACTS ON THE TOP 40 LOW FLOW RIVERS IN ENGLAND AND WALES MARCH 1993 E n v i r o n m e n t A g e n c y NATIONAL LIBRARY & INFORMATION SERVICE HEAD OFFICE Rio House, Waterside Drive, Aztec West, Almondsbury, Bristol BS32 4UD environment Agency information Centre Head Office Class N o Accession No ..b.'.LW.X...... CONTENTS Introduction 1 Possible Methods of Low Flow Alleviation 1 Steps Leading to a Solution 2 Review of Progress 3 Low Flow Sites - Anglian Region 5 Low Flow Sites - North West Region 15 Low Flow Sites - Severn Trent Region 19 Low Flow Sites - Southern Region 27 Low Flow Sites - Thames Region 37 Low Flow Sites - Welsh Region 43 Low Flow Sites - Wessex Region 53 Low Flow Sites - Northumbria/Yorkshire Region 59 Future Developments in the Assessment and Reporting 63 of Low Flow Problems and Alleviation.
    [Show full text]
  • River Basin Management Plan Anglian River Basin District
    River Basin Management Plan Anglian River Basin District Annex D: Protected area objectives Contents D.1 Introduction 2 D.2 Types and location of protected areas 3 D.3 Monitoring network 12 D.4 Objectives 19 D.5 Compliance (results of monitoring) including 22 actions (measures) for Surface Water Drinking Water Protected Areas and Natura 2000 Protected Areas D.6 Other information 118 D.1 Introduction The Water Framework Directive specifies that areas requiring special protection under other EC Directives and waters used for the abstraction of drinking water are identified as protected areas. These areas have their own objectives and standards. Article 4 of the Water Framework Directive requires Member States to achieve compliance with the standards and objectives set for each protected area by 22 December 2015, unless otherwise specified in the Community legislation under which the protected area was established. Some areas may require special protection under more than one EC Directive or may have additional (surface water and/or groundwater) objectives. In these cases, all the objectives and standards must be met. Article 6 requires Member States to establish a register of protected areas. The types of protected areas that must be included in the register are: • areas designated for the abstraction of water for human consumption (Drinking Water Protected Areas); • areas designated for the protection of economically significant aquatic species (Freshwater Fish and Shellfish); • bodies of water designated as recreational waters, including areas designated as Bathing Waters; • nutrient-sensitive areas, including areas identified as Nitrate Vulnerable Zones under the Nitrates Directive or areas designated as sensitive under Urban Waste Water Treatment Directive (UWWTD); • areas designated for the protection of habitats or species where the maintenance or improvement of the status of water is an important factor in their protection including 1 relevant Natura 2000 sites.
    [Show full text]
  • Stevenage Borough Council Rye Meads Water Cycle Strategy Detailed Study Report
    STEVENAGE BOROUGH COUNCIL RYE MEADS WATER CYCLE STRATEGY DETAILED STUDY REPORT FINAL REPORT Hyder Consulting (UK) Limited 2212959 Aston Cross Business Village 50Rocky Lane Aston Birmingham B6 5RQ United Kingdom Tel: +44 (0)870 000 3007 Fax: +44 (0)870 000 3907 www.hyderconsulting.com STEVENAGE BOROUGH COUNCIL RYE MEADS WATER CYCLE STRATEGY DETAILED STUDY REPORT FINAL REPORT James Latham/ Dan Author Vogtlin Checker Renuka Gunasekara Approver Mike Irwin Report No 5003-BM01390-BMR-18-Water Cycle Strategy Final Report Date 5th October 2009 This report has been prepared for STEVENAGE BOROUGH COUNCIL in accordance with the terms and conditions of appointment for WATER CYCLE STRATEGY dated April 2008. Hyder Consulting (UK) Limited (2212959) cannot accept any responsibility for any use of or reliance on the contents of this report by any third party. RYE MEADS WATER CYCLE STRATEGY—DETAILED STUDY REPORT Hyder Consulting (UK) Limited-2212959 k:\bm01390- rye meads water cycle study\f-reports\phase 3\5003-bm01390-bmr-18 water cycle strategy final report.doc Revisions Prepared Approved Revision Date Description By By - 2/10/2008 Draft Report Structure JL 1 18/11/2008 First Report Draft JL/DV MI 2 27/01/2009 Draft Report JL/DV MI 3-13 03/04/2009 Final Draft Report as amended by stakeholder comments JL/DV RG 14 09/07/2009 Final Draft Report JL/DV RG 15 10/07/2009 Final Draft Report Redacted JL/DV RG 16 21/08/2009 Final Draft Report JL/DV RG 17 21/09/2009 Final Draft following core project team meeting comments JL/DV RG 18 05/10/2009 Final Report JL/DV MI RYE MEADS WATER CYCLE STRATEGY—DETAILED STUDY REPORT Hyder Consulting (UK) Ltd-2212959 k:\bm01390- rye meads water cycle study\f-reports\phase 3\5003-bm01390-bmr-18 water cycle strategy final report.doc CONTENTS 1 Introduction and Summary of Key Outcomes ....................................
    [Show full text]
  • HERTFORDSHIRE WATER STUDY 2017 HERTFORDSHIRE COUNTY COUNCIL Infrastructure & Resources, Sub-Catchment Solutions (2021 – 2051)
    HERTFORDSHIRE WATER STUDY 2017 HERTFORDSHIRE COUNTY COUNCIL Infrastructure & Resources, Sub-catchment Solutions (2021 – 2051) MARCH 2017 VERSION CONTROL Version Date Author(s) Checker Approver Comments D1 18/11/2016 Simon Ainley / Aimee Hart Neil McClung R Gunasekara Draft Issue D2 15/03/2017 Simon Ainley / Aimee Hart Neil McClung R Gunasekara 1st Issue 7.3 Identification of Water Infrastructure Options ..................... 38 CONTENTS 8 DISTRICT SUMMARIES .......................................... 42 1 EXECUTIVE SUMMARY ............................................ 4 8.1 Chiltern ..................................................................................... 43 2 STUDY PARTNERSHIP ............................................. 5 8.2 Dacorum ................................................................................... 48 8.3 East Hertfordshire ................................................................... 53 3 WATER VISION FOR HERTFORDSHIRE ................. 1 8.4 Hertsmere ................................................................................. 58 3.1 Principles of the Vision ............................................................. 1 8.5 North Hertfordshire ................................................................. 63 4 BACKGROUND .......................................................... 1 8.6 St Albans .................................................................................. 68 4.1 Overview ..................................................................................... 1 8.7 Stevenage................................................................................
    [Show full text]
  • A 50-Year Vision for the Wildlife and Natural Habitats of Hertfordshire A
    A Biodiversity Action Plan for Hertfordshire A 50-year vision for the wildlife and natural habitats of Hertfordshire A Local Biodiversity Action Plan Prepared by Herts & Middlesex Wildlife Trust April 1998 Revised and reprinted by the Biodiversity Partnership March 2006 www.hef.org.uk A Biodiversity Action Plan for Hertfordshire Contents Page Foreword and acknowledgements i.i Introduction Chapter 1 Introduction 1.1-1.4 Chapter 2 Geology 2.1-2.2 Chapter 3 Habitat and species review and evaluation 3.1-3.15 Habitat action plans Chapter 4 Woodland 4.1-4.32 Chapter 5 Wetlands 5.1-5.29 Chapter 6 Heathland and acid grassland 6.1-6.20 Chapter 7 Neutral grassland 7.1-7.14 Chapter 8 Chalk grassland 8.1-8.12 Chapter 9 Farmland 9.1-9.22 Chapter 10 Urban 10.1-10.27 Species action plans Chapter 11 Water Vole 11.1-11.6 Chapter 12 Common Dormouse 12.1-12.7 Chapter 13 Natterer’s Bat 13.1-13.4 Chapter 14 Otter 14.1-14.4 Chapter 15 Tree Sparrow 15.1-15.4 Chapter 16 Bittern 16.1-16.6 Chapter 17 Stone-curlew 17.1-17.4 Chapter 18 Song Thrush 18.1-18.3 Chapter 19 Great Crested Newt 19.1-19.7 Chapter 20 Chalkhill Blue 20.1-20.4 Chapter 21 Grizzled Skipper 21.1-21.5 Chapter 22 Stag Beetle 22.1-22.3 Chapter 23 White-clawed Crayfish 23.1-23.4 Chapter 24 Great Pignut 24.1-24.4 Chapter 25 Cornflower 25.1 Chapter 26 River Water-dropwort 26.1-26.4 Chapter 27 Pasqueflower 27.1-27.4 Generic action plan Chapter 28 Generic actions 28.1-28.2 ii.i A Biodiversity Action Plan for Hertfordshire The future Chapter 29 The way forward and implementation 29.1-29.4 Glossary, abbreviations
    [Show full text]
  • Folia 4/02-Def
    Folia Zool. – 51(4): 319–336 (2002) Comparative morphology of threespine Gasterosteus aculeatus and ninespine Pungitius pungitius sticklebacks in lowland streams of southeastern England Vladimír KOVÁâ1, Gordon H. COPP 2,3,4, Yaël DIMART 2,5 and Martina UÎÍKOVÁ1 1 Comenius University, Faculty of Natural Sciences, Department of Ecology, Mlynská dolina B2, SK-842 15 Bratislava, Slovakia; e-mail: [email protected] 2 University of Hertfordshire, Hatfield, U.K., and 3 INRA Station d’Hydrobiologie lacustre, Thonon-les-Bains, France; 4 Current address: CEFAS, Pakefield Road, Lowestoft, Suffolk NR33 0HT, U.K.; e-mail: [email protected]; 5 Current address: 26, hameau de Lambrissart, 59830 Bachy, France Received 10 August 2001; Accepted 10 July 2002 Abstract. We examined the relative growth of threespine sticklebacks collected from 11 lowland streams in southeastern England during late autumn to test for between-catchment variations as well as development-related shifts in morphology. And, to understand better the sympatric relationship between threespine Gasterosteus aculeatus and ninespine Pungitius pungitius sticklebacks in small lowland streams, we compared growth variability in 35 mensural characters and morphological indices related to functional morphology in adults from one of these sites. Threespine demonstrated great plasticity, with some morphological differences observed between stream catchments, mainly in ventral spine and dorsal spine length, pre-anus and preanal distances, fin depth, and ventral body width (represented in the basipterygium medial plate width). Developmentally, three groups of mensural characters were found: 18 characters best explained by a linear regression (isometric growth), 9 characters best explained by a quadratic equation (gradual allometry), and 8 characters best explained by a split- linear regression (mainly isometric growth, with an abrupt shift in proportional growth – between 40 and 58 mm SL).
    [Show full text]
  • Annex B: Baseline Information Prepared June 2012
    Local Flood Risk Management Strategy for Hertfordshire Strategic Environmental Assessment Environmental Report - Annex B: Baseline Information Prepared June 2012 Place Services Produced by Place Services on behalf of Hertfordshire County Council The information contained in this document can be made available in alternative formats: large print, braille, audio tape or on disk. We can also translate this document into other languages. © Hertfordshire County Council ….....…...…….....…………………………..June 2012 Place Services CONTENTS 1 Introduction .......................................................................................................1 1.1 Background ............................................................................................1 1.2 Baseline Information...............................................................................1 2 Flooding.............................................................................................................2 2.1 Impacts of Flooding in Hertfordshire.......................................................2 2.1.1 Surface Water Flooding..........................................................................2 2.1.2 Groundwater Flooding............................................................................2 2.1.3 Sewer Flooding ......................................................................................3 2.1.4 Historic Flooding Episodes .....................................................................3 2.1.5 Recent Flooding Episodes......................................................................4
    [Show full text]
  • Internal Report with Numbered Headings Plain Cover
    Draft Drought Management Plan Appendices 2017 Affinity Water May 2017 Drought Management Plan – Appendices Security This document has been written in compliance with our security policy so that no redaction is required for publication. Codes have been used to preserve the security of our production locations. Page 0 of 105 May 2017 Drought Management Plan – Appendices List of Appendices APPENDIX 1 LONG TERM CONTROL CURVES ................................................. 2 APPENDIX 2 SHORT TERM CONTROL CURVES ............................................... 4 APPENDIX 3 DROUGHT SCENARIO TESTING ................................................... 6 APPENDIX 4 DROUGHT MANAGEMENT ACTIONS ......................................... 24 APPENDIX 5 ENVIRONMENTAL ASSESSMENT STATEMENTS ..................... 54 APPENDIX 6 ENVIRONMENTAL MONITORING PLAN ..................................... 77 Page 1 of 105 May 2017 Drought Management Plan – Appendices Appendix 1 Long Term Control Curves A1.1 Long term control curves: Chalfont Centre, Lilley Bottom and Elsenham Nursery This Appendix shows long-term measured water levels at the three observation boreholes used by us to evaluate the groundwater level conditions across our supply area. Their locations are shown on Figure 14 in the DMP. Onto the long-term measured water levels, five drought trigger levels have been super-imposed, which are based upon historical information relating to when publicity campaigns and hosepipe bans were used in the past. These relate to return periods, ensuring that Drought Trigger Zone 2 corresponds with a 1-in-5 year event and drought zone 3 corresponds with a 1-in-10 year event. Drought Trigger Zone 4 has been set just below lowest recorded levels. Of particular note is the 1996-1997 drought event, as we managed to maintain supply without having to resort to any drought permits, drought orders or standpipes and rota-cuts.
    [Show full text]