FY2016 Feasibility Study of JCM Project for CO2 Drastic Reduction
Total Page:16
File Type:pdf, Size:1020Kb
FY2016 Project for Ministry of the Environment Japan FY2016 Feasibility Study of JCM project for CO2 drastic reduction Feasibility Study on Biomass Power Generation Fueled With Legally Cultivated Crop Residues in Pesisir Selatan Regency, West Sumatra Province, Indonesia Report March 2017 NTT Data Institute of Management Consulting, Inc. リサイクル適性の表示:印刷用の紙へリサイクルできます。 この印刷物は、グリーン購入法に基づく基本方針における「印刷」に係る判断の基準にしたが い、印刷用の紙へのリサイクルに適した材料[A ランク]のみを用いて作製しています。 CONTENTS Chapter 1: The background and purpose of the project 1.1 The outline of Sumatra Island 1.2 The policy of the Indonesian government to reduce greenhouse gas emissions 1.3 The current work and challenges of the Indonesian government to reduce greenhouse gas emissions 1.4 The purpose of the project and its outline Chapter 2: The purpose of the number of field surveys and their implementation 2.1 The outline of the project (its purpose and scope) 2.2 Applicable technologies and their related laws and regulations 2.3 Implementation system 2.4 Method of field surveys and timeline Chapter 3: The results of field surveys 3.1 Survey of biomass waste 3.2 Technological considerations 3.3 Economic considerations Chapter 4: Considerations towards JCM project 4.1 The evaluation of the project feasibility and preparations for the project 4.2 Project plan (Implementation system, funding scheme, project timeline etc.) 4.3 Implementation challenges of the project 4.4 Future plans Attachment INDEX 1.1 The outline of Sumatra Island ................................................................................. 1 1.2 Policies of the Indonesian government for reducing greenhouse gas emissions . 6 1.3 The current work and challenges of the Indonesian Government to reduce the greenhouse gas emission .................................................................................................... 8 2.1 Outline of the project (purpose and target areas) ................................................ 13 2.2 Applicable technologies and related laws and regulations ................................. 13 2.3 Project Member ........................................................................................................ 17 2.4 Method of survey studies and time frame ............................................................ 18 3.1 Survey of biomass waste ........................................................................................ 20 3.2 Technological considerations ................................................................................. 37 3.3 Economic considerations ........................................................................................ 49 4.1 Project plan ( implementation system, funding scheme, project time frame) ... 64 4.2 Evaluation of project feasibility and preparation for the project........................ 66 4.3 Challenges to project implementation .................................................................. 67 4.4 Future time line ...................................................................................................... 69 Attachment ........................................................................................................................ 71 Figure 1 Location of Sumatra Island in Indonesia ................................................. 1 Figure 2 Map of Sumatra Island .............................................................................. 2 Figure 3 logo mark of Pesisir Selatan Regency; ........................................................ 4 Figure 4 map showing land classification on the western Sumatra Island ............ 5 Figure 5 EstimatedCO2 emissions e from 2005 to 2030 in Indonesia ..................... 7 Figure 6 Burned corn stover ....................................................................................... 8 Figure 7 Burning smoke spreads in the national park .......................................... 8 Figure 8 The surface is exposed by illegal tree cutting ............................................ 9 Figure 9 Sumatra island power transmission network development plan ........... 11 Figure 10 Project Member ......................................................................................... 17 Figure 11 Gantt chart for project management ....................................................... 19 Figure 12 plotted the place where rice husk, rice straw produced ........................ 20 Figure 13 Map for Corn cob survey .......................................................................... 25 Figure 14 Map of survey target area ........................................................................ 28 Figure 15 Biomass fuel analysis result .................................................................... 31 Figure 16 central located fuel recovery scheme ...................................................... 34 Figure 17 assumed biomass fuel recovery area in this project .............................. 36 Figure 18 geographic information for site in south ................................................. 37 Figure 19 Batan Kunbun River ................................................................................ 38 Figure 20 Satellite image of the planned site .......................................................... 39 Figure 21 draft image for construcion ...................................................................... 40 Figure 22 Implementation system for this project .................................................. 64 Figure 23 Construction schedule .............................................................................. 69 Table 1 Electrification rate of each state in Sumatra Island (2012) ...................... 12 Table 2 Power supply plan for Sumatra Isrand ...................................................... 12 Table 3 the method of this survey ............................................................................ 18 Table 4 situation on rice husk occurrence ................................................................ 21 Table 5 situation on rice straw occurrence .............................................................. 23 Table 6 Current situation of Corn Cob ..................................................................... 26 Table 7 Definition and calculation method of Abundance and Usable volume ..... 30 Table 8 Negative list of foreign capital entry by business field ............................. 41 Table 9 feature of planning technology .................................................................... 46 Table 10 Options for plant construction site, number of construction .................. 47 Table 11 Plant scale of each case .............................................................................. 48 Table 12 Price table for selling all the electricity generated from the plant ......... 50 Table 13 precondition for economic calculation ....................................................... 52 Table 14 Calculation result of CO2 emission reduction for Case1 ......................... 55 Table 15 Calculation result of CO2 emission reduction for Case2 ......................... 56 Table 16 Calculation result of CO2 emission reduction for Case3 ......................... 57 Table 17 Estimated project cost for Case1 ............................................................... 58 Table 18 Estimated project cost for Case2 ............................................................... 58 Table 19 Estimated project cost for Case3 ............................................................... 59 Table 20 result of cost efficiency for CO2 reduction of Case1 ................................. 60 Table 21 result of cost efficiency for CO2 reduction of Case2 ................................. 61 Table 22 result of cost efficiency for CO2 reduction of Case3 ................................. 61 Table 23 timetable for workshop on 22nd February, 2017 ....................................... 66 1.1 The outline of Sumatra Island (1) Basic information A) Overview of Sumatra Island1 Sumatra Island is a region of the Republic of Indonesia, which consists of Sumatra Island, Java Island, Kalimantan Island, Sulawesi Island and other peripheral islands that belong to the Greater Sunda Islands. Sumatra Island is also known as Sumatera with a population of 49 million and a land area of 47,000 sq. km making it the largest island in the world. Figure 1 Location of Sumatra Island in Indonesia2 a. Geography Sumatra Island is located over the equator, as an elongated form from north-west to south-east. The south-west of the island faces the Indian Ocean and the north-east area faces the Straits of Malacca and South China Sea. The island is 1,790 km long and 435 km wide. The western and eastern coasts are surrounded by small islands. Along the western coast are the volcanic Barisan Mountains, with Mount Kerinci (3,805m) as the peak. There is a large alluvium plain at the eastern part of eastern to southern island. This was formed by several large rivers such as the Musi River, Batang Hari, Indragiri and Kampar which originated from its huge mountain ranges. Most the plain is marshland which is covered by tropical forest. At these large rivers, several plans are ongoing for hydroelectric power plants. At the south of Medan is Lake Toba, which is a caldera lake resulting from the largest volcanic eruption on earth 2 million years ago. Most of the Sumatra population 1 http://www.support-in-indonesia.com/indonesia_sumatera.html 2 http://www.sera9.com/ttvasia/ttvasia-id/id-Area-Sumatra.html 1 is concentrated around the central highlands.