(Unit) Rehab Area

Total Page:16

File Type:pdf, Size:1020Kb

(Unit) Rehab Area Target Area (ha) Targets Under Repair & Rehabilitation Coconet Service Roads HDPE/Pre- Rehab category fund project/program subproject New Restore Earth Concrete Slope Earth/ Year Province District system type subproject Municipality Amount (P'000) Cast Structures Area Concrete code code code description Area Area Canal Lined Protection Gravel Pipes (Unit) Equivalent (km) (ha) (ha) (km.) (km.) Area (sq.m) (km) (km.) (ha) Construction of Canal Lining and 2 units 2017 South Cotabato 1st District PROGRAMS OPERATIONS NATIONAL NIS EXTENSION Buayan-Tinagacan Rehab and Expansion Project General Santos City 2,855 - - - 0.20 - 2 - - - - structures Construction of Canal Lining, 8 units structures 2017 South Cotabato 2nd District PROGRAMS OPERATIONS NATIONAL NIS EXTENSION Ala RIS Dam 1 Sto. Niňo 7,850 40 - - 1.66 - 9 - - - - and 1 unit stream check Construction of Canal Lining, 17 units 2017 South Cotabato & Sultan2nd DistrictKudarat PROGRAMS OPERATIONS NATIONAL NIS EXTENSION Ala RIS Dam 2 structures and 2 unit stream check and Norala 35,000 40 - - 2.33 - 22 920 - - - protection dike 2017 Sultan Kudarat 1st District PROGRAMS OPERATIONS NATIONAL NIS EXTENSION Antong IS Construction of canal lining and structures Lutayan 1,713 20 - - - - - - - - - 2017 Maguindanao 2nd District PROGRAMS OPERATIONS NATIONAL NIS EXTENSION Talayan RIS Construction of canal lining and structures Talayan 5,000 15 - - 0.20 - 3 - - - - Construction of canal, canal lining and 2017 Maguindanao 2nd District PROGRAMS OPERATIONS NATIONAL NIS EXTENSION Kabulnan RIS Shariff Aguak 25,832 100 - - 1.80 - 9 - - - - structures 2017 Maguindanao 2nd District PROGRAMS OPERATIONS NATIONAL NIS EXTENSION Alip RIS Construction of canal lining and structures Datu Paglas 3,000 10 - - 0.95 - 6 - - - - 2017 North Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL CIS EXTENSION Malire CIS Construction of canal lining and structures Antipas 10,000 50 - - 0.63 - 6 - - - - 2017 North Cotabato 3rd District PROGRAMS OPERATIONS COMMUNAL CIS EXTENSION Linao CIS Construction of canal lining and structures Matalam 12,500 50 - 0.59 0.97 - 7 - - - - 2017 North Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL CIS EXTENSION GANESAN CIS Construction of canal lining Kidapawan City 14,731 20 - - 1.74 - - - - - - 2017 North Cotabato 1st District PROGRAMS OPERATIONS COMMUNAL CIS EXTENSION Buluan CIS Construction of canal lining Pigkawayan 5,000 20 - - 0.41 - - - - - - 2017 South Cotabato 1st District PROGRAMS OPERATIONS COMMUNAL CIS EXTENSION LMT CIS Construction of canal lining and structures Tampakan 10,000 30 - - - - - - - - - 2017 South Cotabato 1st District PROGRAMS OPERATIONS COMMUNAL CIS EXTENSION San Jose CIS Construction of canal lining and structures General Santos City 4,000 16 - - - 0.60 2 - - - - 2017 Sarangani Lone District PROGRAMS OPERATIONS COMMUNAL CIS EXTENSION Domolok-Tokawal CIS Construction of canal lining and structures Alabel 11,000 - - - 1.50 - 3 - - - - Canal desilting, construction of canal lining and 2017 North Cotabato 3rd District PROGRAMS OPERATIONS NATIONAL RRENIS Kabacan RIS Kabacan 9,000 - - 3.00 1.00 - 3 - - - - structures Canal desilting, construction of canal lining and 2017 North Cotabato 3rd District PROGRAMS OPERATIONS NATIONAL RRENIS Mlang RIS Mlang 5,000 - - 1.00 0.50 - 1 - - - - structures Canal desilting, construction of canal lining and North Cotabato 3rd District PROGRAMS OPERATIONS NATIONAL RRENIS Malasila RIS Tulunan 7,000 - - 2.00 1.00 - 3 - - - - structures Construction of canal lining and structures Midsayap 5,216 2.09 1 1,162 2017 North Cotabato 1st District PROGRAMS OPERATIONS NATIONAL RRENIS Libungan RIS Construction of canal lining Libungan 1,854 0.80 Maguindanao 2nd District Construction of canal lining Kabuntalan 4,289 1.79 103 Canal desilting, construction of canal lining and 2017 North Cotabato 1st District PROGRAMS OPERATIONS NATIONAL RRENIS Maridagao RIS Pikit 5,000 - - 1.00 1.50 - 2 - - - - structures Canal desilting and construction structures Banga 3,333 3.00 1 500 2017 South Cotabato 2nd District PROGRAMS OPERATIONS NATIONAL RRENIS Ala Dam 1 RIS Construction structures Surallah 1,032 1 1,500 Construction of canal lining , structures and Sto. Niňo 14,635 2.20 30 322 protection dike Construction of canal lining , structures and South Cotabato 2nd District Norala 5,162 0.78 9 50 2017 PROGRAMS OPERATIONS NATIONAL RRENIS Ala Dam 2 RIS protection dike Construction of canal lining , structures and Sultan Kudarat 1st District Isulan 10,959 0.57 10 730 protection dike 2017 South Cotabato 2nd District PROGRAMS OPERATIONS NATIONAL RRENIS Banga RIS Construction of canal lining . Banga 13,000 - - - 1.72 - - 562 - - - Construction of canal lining , structures and 2017 South Cotabato 2nd District PROGRAMS OPERATIONS NATIONAL RRENIS Marbel # 1 RIS Koronadal City 10,000 - - - 1.11 - 2 300 - - - protection dike 2017 South Cotabato 2nd District PROGRAMS OPERATIONS NATIONAL RRENIS Marbel # 2 RIS Construction of canal lining . Koronadal City 8,000 - - - 1.39 - - 283 - - - 2017 Sultan Kudarat 1st District PROGRAMS OPERATIONS NATIONAL RRENIS Antong IS Construction of canal lining . Lutayan 16,605 - 40 - 2.00 - - - - - - Construction of canal lining , structures and 2017 South Cotabato 1st District PROGRAMS OPERATIONS NATIONAL RRENIS Siluay-Buayan RIS General Santos City 862 - - - 0.90 - 1 6 - - - protection dike Construction of canal lining , structures and 2017 South Cotabato 2nd District PROGRAMS OPERATIONS NATIONAL RRENIS Buayan-Tinagacan Rehab and Expansion Project General Santos City 15,000 1.00 4 100 protection dike Canal desilting and construction of 2017 Maguindanao 2nd District PROGRAMS OPERATIONS NATIONAL RRENIS Talayan RIS Talayan 7,000 - - 2.47 - - 24 - - - - structures Canal desilting and construction of 2017 Maguindanao 2nd District PROGRAMS OPERATIONS NATIONAL RRENIS Kabulnan RIS Shariff Aguak 30,000 - - 5.00 - - 3 - - - - structures Canal desilting and construction of 2017 Maguindanao 2nd District PROGRAMS OPERATIONS NATIONAL RRENIS Alip RIS Datu Paglas 20,000 - - 1.04 - - 7 - - - - structures 2017 Maguindanao 2nd District PROGRAMS OPERATIONS NATIONAL RRENIS Pagalungan RIS Canal desilting Datu Montawal 6,195 - - 5.88 - - - - - - - 2017 North Cotabato 3rd District PROGRAMS OPERATIONS COMMUNAL RRECIS Damawato CIS Construction of structures Tulunan 36,184 - - - - - 1 - - - - Canal desilting and construction of canal 2017 North Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL RRECIS Labuo Alegria CIS Pres. Roxas 6,000 - - 0.32 0.99 - 2 - - - - lining and structures Target Area (ha) Targets Under Repair & Rehabilitation Coconet Service Roads HDPE/Pre- Rehab category fund project/program subproject New Restore Earth Concrete Slope Earth/ Year Province District system type subproject Municipality Amount (P'000) Cast Structures Area Concrete code code code description Area Area Canal Lined Protection Gravel Pipes (Unit) Equivalent (km) (ha) (ha) (km.) (km.) Area (sq.m) (km) (km.) (ha) 2017 North Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL RRECIS Linangkob CIS Construction of canal lining and structures Kidapawan City 5,000 - - - 0.55 - 1 - - - - Canal desilting and construction of canal 2017 North Cotabato 3rd District PROGRAMS OPERATIONS COMMUNAL RRECIS Malamote CIS Matalam 5,000 - 40 0.20 0.30 - 1 - - - - lining and structures 2017 North Cotabato 3rd District PROGRAMS OPERATIONS COMMUNAL RRECIS Gastav CIS Construction of canal lining , structures Banisilan 4,000 - 58 - 0.50 - 1 - - - - 2017 North Cotabato 3rd District PROGRAMS OPERATIONS COMMUNAL RRECIS Kapanikan CIS Construction of stream check & canal Banisilan 3,000 - 50 - - - - - - - - Canal desilting and construction of canal 2017 North Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL RRECIS Tinagasan CIS Magpet 3,000 - - 1.00 0.30 - - - - - - lining 2017 North Cotabato 1st District PROGRAMS OPERATIONS COMMUNAL RRECIS Montay CIS Construction of canal lining and structures Libungan 5,000 - - - 1.17 - 2 - - - - 2017 North Cotabato 1st District PROGRAMS OPERATIONS COMMUNAL RRECIS Tigbawan CIS Construction of canal lining and structures Pigkawayan 3,000 - - - 0.30 - 1 - - - - 2017 South Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL RRECIS Cadidang CIS Construction of canal lining and structures Koronadal City 3,410 - - - 0.61 - 10 37 - - - 2017 South Cotabato 1st District PROGRAMS OPERATIONS COMMUNAL RRECIS Magsaysay-Polomolok CIS Construction of canal lining and structures Polomolok 5,000 - - - 1.32 - 7 30 - - - 2017 South Cotabato 1st District PROGRAMS OPERATIONS COMMUNAL RRECIS Silway 7 CIS Construction of canal lining and structures Polomolok 7,500 - - - 0.73 - 8 659 - - - 2017 South Cotabato 1st District PROGRAMS OPERATIONS COMMUNAL RRECIS Glamang CIS Construction/Rehabilitation of Canal Polomolok 5,000 - - - - - - 370 - - - 2017 South Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL RRECIS Bo. 7 (Bo.4 Sector) Construction of canal lining and structures Koronadal City 5,000 - - - 0.82 - 8 74 - - - 2017 South Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL RRECIS Cacub CIS Construction of canal lining and structures Koronadal City 4,000 - - - 0.34 - 4 30 - - - 2017 South Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL RRECIS Mani CIS Construction of canal lining and structures Koronadal City 5,000 - - - 1.01 - 3 48 - - - Canal desilting, construction of canal lining 2017 South Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL RRECIS Supon CIS Koronadal City 4,000 - - 0.75 0.72 - 9 75 - - - and structures 2017 South Cotabato 2nd District PROGRAMS OPERATIONS COMMUNAL
Recommended publications
  • A. O. No. 62-2014
    iRtpuhlic nf tl}e 'lJilippines §upr.em.e arnurt ilmanila ADMINISTRATIVE ORDER NO. 62-2014' In the interest of an effective administration of justice and pursuant to Sec. 5(3), Art. VIII of the Constitution, the Hon. ALANDREX M. BETOYA, Presiding Judge, Regional Trial Court (RTC), Branch 16, Kabacan,' North· Cotabato, is hereby DESIGNATED as Assisting Judge of Regional Trial Court (RTC), Branch 23, Kidapawan City, North Cotabato, effective immediately. and to continue until further orders from this Court. As Assisting Judge, Judge Betoya shall take cognizance of all newly filed cases, and pending civil cases which have not yet reached the pre-trial stage and criminal cases, where the accused have not been arraigned. Judge Betoya shall be entitled to reimbursement of traveling expenses with per diems and additional expense allowance and judicial incentive allowance, as provided for in the Resolution of the Court En Banc in A.M. No. 99- 1-04-SC dated February 2, 1999, as amended. April 15, 2014 MARIA LOURDES P. A. SEREN Chief Justice 2 Copy Furnished: The Office of the Chief Justice, Supreme Court, Manila The Office of the Associate Justices, Supreme Court, Manila The Judicial & Bar Council, Supreme Court, Manila The Philippine Judicial Academy, Supreme Court, Manila The Office of the Court Administrator, Supreme Court, Manila The Deputy Court Administrators, Supreme Court, Manila The Clerk of Court, Supreme Court, Manila The Assistant Court Administrators, Supreme Court, Manila The Chief, EDP, Supreme Court, Manila The Legal Office, OCA, Manila The Court Management Office, OCA, Manila The Office of the Administrative Services, OCA, Manila The Financial Management Office, OCA, Manila The Chief, Library, Supreme Court, Manila The Chief, Official Gazette, National Printing Office, Quezon City The Executive Judge, RTC, Kabacan, North Cotabato The Executive Judge, RTC, Kidapawan City, North Cotabato The Hon.
    [Show full text]
  • II III IVIV VV Davao Davao 0 75 150 Km II II III
    Earthquake Green Shaking Alert M 6.3, MINDANAO, PHILIPPINES Origin Time: Mon 2014-07-14 07:59:57 UTC (15:59:57 local) PAGER o o Location: 5.71 N 126.48 E Depth: 20 km Version 4 Created: 6 weeks, 2 days after earthquake Estimated Fatalities Green alert for shaking-related fatalities Estimated Economic Losses 99% and economic losses. There is a low 99% likelihood of casualties and damage. 1% 1% 1 100 10,000 1 100 10,000 10 1,000 100,000 10 1,000 100,000 Fatalities USD (Millions) Estimated Population Exposed to Earthquake Shaking ESTIMATED POPULATION - -* 17,501k 620k 0 0 0 0 0 0 EXPOSURE (k = x1000) ESTIMATED MODIFIED MERCALLI INTENSITY PERCEIVED SHAKING Not felt Weak Light Moderate Strong Very Strong Severe Violent Extreme Resistant none none none V. Light Light Moderate Moderate/Heavy Heavy V. Heavy POTENTIAL Structures DAMAGE Vulnerable Structures none none none Light Moderate Moderate/Heavy Heavy V. Heavy V. Heavy *Estimated exposure only includes population within the map area. Population Exposure population per ~1 sq. km from Landscan Structures: Overall, the population in this region resides in structures that are a mix of vulnerable and 124°E 126°E 128°E II earthquake resistant construction. Historical Earthquakes (with MMI levels): Date Dist. Mag. Max Shaking ButigButig ButigButig WaoWao DonDon CarlosCarlos CompostelaCompostela ImeldaImeldaImelda WaoWao DonDon CarlosCarlos CompostelaCompostela (UTC) (km) MMI(#) Deaths NewNew CorellaCorella BagangaBaganga BayangaBayanga NewNew CorellaCorella BagangaBaganga BayangaBayanga DamulogDamulog
    [Show full text]
  • Download (6195KB)
    SOIL MANAGEMENT COLLABORATIVE RESEARCH SUPPORT PROGRAM PROJECT YEAR 10 ANNUAL PROGRESS REPORT Cornell University Montana State University North Carolina State University University of Florida University of Hawaii 2006-2007 Photo on cover page taken by Russell Yost. Photo caption: Improved water availability with ACN technology allowed Sorofi n Diarra of Siguidolo in Konobougou, Mali to raise vegetables in the dry season. Without ACN, the wells are typically dry. This report was made possible through support provided by the Offi ces of Agriculture and Natural Resources Management, Bureau for Economic Growth, Agriculture and Trade, U.S. Agency for International Development, under the terms of Award No. LAG-G-00-97-00002-00. The opinions expressed herein are those of the authors and do not necessarily refl ect the views of the U.S. Agency for International Development. ii TABLE OF CONTENTS Executive Summary ........................................................................................................... 1 Program Area Progress Reports ................................................................................. 3 Nutrient Management Support System (NuMaSS) .............................................. 5 Project: Testing, Comparing and Adapting NuMaSS: The Nutrient Management Support System ......................................................................................................................................................................................................5 Project: Adoption of the Nutrient Management
    [Show full text]
  • TACR: Philippines: Road Sector Improvement Project
    Technical Assistance Consultant’s Report Project Number: 41076-01 February 2011 Republic of the Philippines: Road Sector Improvement Project (Financed by the Japan Special Fund) Volume 1: Executive Summary Prepared by Katahira & Engineers International In association with Schema Konsult, Inc. and DCCD Engineering Corporation For the Ministry of Public Works and Transport, Lao PDR and This consultant’s report does not necessarily reflect the views of ADB or the Governments concerned, and ADB and the Governments cannot be held liable for its contents. All the views expressed herein may not be incorporated into the proposed project’s design. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE SECRETARY PORT AREA, MANILA ASSET PRESERVATION COMPONENT UNDER TRANCHE 1, PHASE I ROAD SECTOR INSTITUTIONAL DEVELOPMENT AND INVESTMENT PROGRAM (RSIDIP) EXECUTIVE SUMMARY in association KATAHIRA & ENGINEERS with SCHEMA KONSULT, DCCD ENGINEERING INTERNATIONAL INC. CORPORATION Road Sector Institutional Development and Investment Program (RSIDIP): Executive Summary TABLE OF CONTENTS Page EXECUTIVE SUMMARY 1. BACKGROUND OF THE PROJECT ................................................... ES-1 2. OBJECTIVES OF THE PPTA............................................................ ES-1 3. SCOPE OF THE STUDY ................................................................. ES-2 4. SELECTION OF ROAD SECTIONS FOR DESIGN IN TRANCHE 1 ....... ES-3 5. PROJECT DESCRIPTION .............................................................. ES-8
    [Show full text]
  • Infrastructure
    Infrastructure Php 3,968.532 M Roads & Bridges Php 2,360.126 M Sch bldgs/classrooms Php 958.116 M Electrical Facilities 297.400 M Health Facilities and Others Php 352.891M Cost of Assistance Provided by Government Agencies/LGUs/NGOs (TAB E) NDCC - Php 16,233,375 DSWD - Php 26,018,019 DOH - Php 15,611,099 LGUs - Php 19,874,903 NGOs - Php 2,595,130 TOTAL - Php 80,332,527 International and Local Assistance/Donations (Tab F) Total International/Donations Cash - US $ 510,000 Aus $ 500,000. In kind - Php 8,000,000 (generator sets, and other non-food items NFI’s) US $ 650,000 (relief flight) Local Assistance/Donations Cash - Php 1,025,000 In Kind - Php 95,539 (assorted relief commodities) 90 sets disaster kits Areas Declared under a State of Calamity by their respective Sanggunians : 10 Provinces Albay, Antique, Iloilo, Aklan, Capiz, Sarangani, Sultan Kudarat, North Cotabato, Marinduque and Romblon 8 Municipalities Paombong and Obando in Bulacan; Carigara, Leyte; and Lake Sebu, Surallah, Sto. Nino and Tiboli in South Cotabato, and San Fernando, Romblon 3 Cities Cotabato City, Iloilo City and Passi City 9 Barangays (Zamboanga City) – Vitali, Mangusu, San Jose Gusu, Tugbungan, Putik, Baliwasan, Tumaga, Sinunuc and Sta. Catalina 2 II. Actions Taken and Resources Mobilized by Agencies: Relief and Recovery Operations NDCC-OPCEN Facilitated release of 17,790 sacks of rice in 11 regions (I – 200, III – 950, IV-A – 1,300, IV-B – 1,150, V – 250, VI – 11,300, VII – 500, VIII – 500, XII – 740, NCR – 300, ARMM – 600) amounting to P16,233,375.00 AFP-PAF Disaster Response Transported the 15 th sortie (assorted goods and medicine boxes) from DZRH & PAGCOR to Iloilo III.
    [Show full text]
  • Mindanao Displacement Dashboard SEP 2020
    OCTOBER 2020 ISSUE NO. 74 MINDANAO DISPLACEMENT DASHBOARD @UNHCR/Pangalian UNHCR recently distributed hygiene kits to the families in Boganga, and is building a water facility to help address health and sanitation concerns as well as promote community empowerment and peaceful co-existence. DISPLACEMENT OVERVIEW DISPLACEMENT IN OCTOBER st As of the 31 of October, a total number of 60,133 families (277,232 individuals) are currently displaced in Mindanao. Those displaced can be classified into three main groups, depending on the length of displacement: 5,149 Group A: 1,310 families (6,435 individuals) remain displaced out of 5,149 Families families displaced within the month; Group B: 1,025 families (6,299 individuals) remain displaced, and have been protractedly displaced for more than 30 days but less than 180 days; and 19,617 Individuals Group C: 57,798 families (265,687 individuals) remain displaced and have been protractedly displaced for more than 180 days. Those classified under CIVILIAN CASUALTIES Group C are concentrated in five main areas: since January 2020 Zamboanga City: 1,362 families (6,810 individuals) still displaced due to Zamboanga siege in September 2013. 19 Persons dead Lanao del Sur & Lanao del Norte: 25,367 families (126,835 individuals) still displaced due to Marawi siege in May 2017. Northern Mindanao: 29 families (145 individuals) still displaced due to 26 Severe Tropical Storm Vinta (Temblin) in December 2017 and 14 families Persons injured (62 individuals) still displaced due to Typhoon Facon in July 2019. LOCATIONS Eastern Mindanao: 491 families (2,304 individuals) still displaced due to armed conflict between Armed Forces of the Philippines (AFP) and New Breakdown of displaced individuals by region People’s Army (NPA) since February 2018.
    [Show full text]
  • Comprehensive Capacity Development Project for the Bangsamoro Development Plan for the Bangsamoro Final Report Sector Report 2
    The Republic of the Philippines Japan International Cooperation Agency Bangsamoro Transition Commission (BTC) (JICA) Bangsamoro Development Agency (BDA) Comprehensive Capacity Development Project for the Bangsamoro Development Plan for the Bangsamoro Final Report Sector Report 2: Infrastructure April 2016 RECS International Inc. Oriental Consultants Global Co., Ltd. CTI Engineering International Co., Ltd. EI IC Net Limited JR 16-056 The Republic of the Philippines Japan International Cooperation Agency Bangsamoro Transition Commission (BTC) (JICA) Bangsamoro Development Agency (BDA) Comprehensive Capacity Development Project for the Bangsamoro Development Plan for the Bangsamoro Final Report Sector Report 2: Infrastructure Source of GIS map on the cover: JICA Study Team (base map by U.S. National Park Service). April 2016 RECS International Inc. Oriental Consultants Global Co., Ltd. CTI Engineering International Co., Ltd. IC Net Limited Currency Equivalents (average Interbank rates for May–July 2015) US$1.00=PHP 45.583 US$1.00=JPY 124.020 PHP 1=JPY 2.710 Source: OANDA.COM, http://www.oanda.com Comprehensive capacity development project for the Bangsamoro Sector Report 2-1: Road Transport Comprehensive Capacity Development Project for the Bangsamoro Development Plan for the Bangsamoro Final Report Sector Report 2-1: Road Transport Comprehensive capacity development project for the Bangsamoro Sector Report 2-1: Road Transport Comprehensive capacity development project for the Bangsamoro Sector Report 2-1: Road Transport Table of Contents
    [Show full text]
  • DSWD DROMIC Terminal Report on the Flashflood Incident in Kabacan and Pikit, North Cotabato and Sultan Kudarat, Maguindanao 03 December 2020, 6PM
    DSWD DROMIC Terminal Report on the Flashflood Incident in Kabacan and Pikit, North Cotabato and Sultan Kudarat, Maguindanao 03 December 2020, 6PM This is the final report on the flashflood incident that occurred in North Cotabato and Maguindanao on 14 October 2020 at around 11:00AM due to heavy rains brought by the trough of Tropical Depression “Ofel”. Source: DSWD-FO XII SUMMARY I. Status of Affected Families / Persons A total of 30,554 families or 152,770 persons were affected by the flashflood incident in 68 barangays in North Cotabato and Maguindanao (see Table 1). Table 1. Number of Affected Families / Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangays Families Persons GRAND TOTAL 68 30,554 152,770 REGION XII 38 24,232 121,160 North Cotabato 38 24,232 121,160 Kabacan 8 1,991 9,955 Pikit 30 22,241 111,205 BARMM 30 6,322 31,610 Maguindanao 30 6,322 31,610 Sultan Kudarat 30 6,322 31,610 Source: DSWD-FO XII II. Status of Displaced Families / Persons a. Inside Evacuation Center A total of 750 families or 3,750 persons took temporary shelter in three (3) evacuation centers in Kabacan, North Cotabato (see Table 2). All of these families have returned home. Table 2. Number of Displaced Families / Persons Inside Evacuation Centers NUMBER OF NUMBER OF DISPLACED REGION / PROVINCE / EVACUATION INSIDE ECs MUNICIPALITY CENTERS (ECs) Families Persons CUM NOW CUM NOW CUM NOW GRAND TOTAL 3 - 750 - 3,750 - REGION XII 3 - 750 - 3,750 - North Cotabato 3 - 750 - 3,750 - Kabacan 3 - 750 - 3,750 - Source: DSWD-FO XII Page 1 of 3 | DSWD DROMIC Terminal Report on the Flashflood Incident in Kabacan and Pikit, North Cotabato and Sultan Kudarat, 03 December 2020, 6PM b.
    [Show full text]
  • Chapter 4 Traffic and Logistics Survey
    CHAPTER 4 TRAFFIC AND LOGISTICS SURVEY 4.1 SURVEYS UNDERTAKEN 4.1.1 Type of Surveys Undertaken In order to better understand the characteristics of the Study area, several types of survey were conducted as shown in Table 4.1.1-1. Traffic Count Survey was carried out to count and classify motor vehicles traversing a particular road section and recording the data to determine the present traffic volume and traffic composition. OD survey was conducted to establish the present OD matrices for the trips of passengers, commodities and vehicles. Interview Survey to logistics facilities such as ports, airports, agricultural processing plants and transport companies was also undertaken to capture freight movements in the study area. TABLE 4.1.1-1 TYPES OF SURVEY Survey Item No. of Stations (1) Traffic Count Survey 37 Stations (2) Roadside OD Survey 9 Stations (3) Interview Survey on Logistics Facilities/Plants 19 (total) - Port 5 - Airport 1 - Agricultural Processing Plant 8 - Logistics Transport Company 5 4.1.2 Mobilization Due to unfavorable peace and order condition in the study area, attention was given in the planning of activities of all the surveys. This means that broad consultations with different actors having particular roles in the area were undertaken as illustrated in Figure 4.1.2-1. Initially, traffic survey stations were plotted in the map taking into account the study’s objectives. After preparation of traffic survey map, meeting with GRP-MILF CCCH was sought to get their feedbacks on the potential security threats of each survey station. Recommendations from the both CCCH to defer survey activities or relocate survey station on risk-possible areas were taken into account were thus adjustment to the location of the survey stations and change of dates of survey are sometimes carried out.
    [Show full text]
  • Solid Waste Management Sector Project (Financed by ADB's Technical Assistance Special Fund [TASF- Other Sources])
    Technical Assistance Consultant’s Report Project Number: 45146 December 2014 Republic of the Philippines: Solid Waste Management Sector Project (Financed by ADB's Technical Assistance Special Fund [TASF- other sources]) Prepared by SEURECA and PHILKOEI International, Inc., in association with Lahmeyer IDP Consult For the Department of Environment and Natural Resources and Asian Development Bank This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. All the views expressed herein may not be incorporated into the proposed project’s design. THE PHILIPPINES DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ASIAN DEVELOPMENT BANK SOLID WASTE MANAGEMENT SECTOR PROJECT TA-8115 PHI Final Report December 2014 In association with THE PHILIPPINES THE PHILIPPINES DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ASIAN DEVELOPMENT BANK SOLID WASTE MANAGEMENT SECTOR PROJECT TA-8115 PHHI SR10a Del Carmen SR12: Poverty and Social SRs to RRP from 1 to 9 SPAR Dimensions & Resettlement and IP Frameworks SR1: SR10b Janiuay SPA External Assistance to PART I: Poverty, Social Philippines Development and Gender SR2: Summary of SR10c La Trinidad PART II: Involuntary Resettlement Description of Subprojects SPAR and IPs SR3: Project Implementation SR10d Malay/ Boracay SR13 Institutional Development Final and Management Structure SPAR and Private Sector Participation Report SR4: Implementation R11a Del Carmen IEE SR14 Workshops and Field Reports Schedule and REA SR5: Capacity Development SR11b Janiuay IEEE and Plan REA SR6: Financial Management SR11c La Trinidad IEE Assessment and REAE SR7: Procurement Capacity SR11d Malay/ Boracay PAM Assessment IEE and REA SR8: Consultation and Participation Plan RRP SR9: Poverty and Social Dimensions December 2014 In association with THE PHILIPPINES EXECUTIVE SUMMARY ....................................................................................5 A.
    [Show full text]
  • North-Cotabato-Ph-Corn.Pdf
    124°20' 124°30' 124°40' 124°50' 125° 125°10' 125°20' 7°40' 7°40' R E P U B L I C O F T H E P H I L I P P I N E S DEPARTMENT OF AGRICULTURE Province of Lanao del Sur BUREAU OF SOILS AND WATER MANAGEMENT Elliptical Road Cor. Visayas Ave., Diliman, Quezon City SOIL pH MAP ( Key Corn Areas ) PROVINCE OF NORTH COTABATO ° SCALE 1:130,000 0 2 4 6 8 10 Kilometers Projection : Transverse Mercator Banisilan ! Datum : PRS 1992 7°30' DISCLAIMER : All political boundaries are not authoritative 7°30' Province of Bukidnon Province of Maguindanao Alamada ! Arakan ! 7°20' Province of Davao del Sur 7°20' Libungan ! Pigcawayan ! Antipas ! !Carmen !Midsayap 7°10' 7°10' !Aleosan !President Roxas Kabacan ! Province of Maguindanao Magpet Matalam ! ! Pikit ! LOCATION MAP Kidapawan \ 7° 7° Lanao Del Sur 20°0' Bukidnon LUZON 15°0' Province of Maguindanao !Makilala NORTH COTABATO !M'lang 7°0' VISAYAS 10°0' Maguindanao Davao Del Sur Sultan MINDANAO Kudarat 5°0' LEGEND South Cotabato 125°0' 120°0' 125°0' pH Value GENERAL AREA MAPPING UNIT DESCRIPTION (1:1 Ratio) RATING ha % Nearly Neutral to CONVENTIONAL SIGNS 6.9 and above; !Bagontapay Low Extremely Alkaline, 1,914 11.84 4.5 and below Province of Davao del Sur ROADS BOUNDARY HYDROLOGY Extremely Acid Expressway Regional Rivers / Lake 4.6 - 5.0 Moderately Low Very Strongly Acid 57 0.35 Trunk line Provincial Shoreline Primary City PLACES 5.1 - 5.5 Moderately High Strongly Acid 2,079 12.86 Secondary Municipal \ ^ Capital City / City Tulunan 6°50' Tertiary Moderately Acid ! 6°50' P ! Capital Town / Town 5.6 - 6.8 High 12,122 74.95 Residential to Slightly Acid TOTAL 16,172 100.00 Area estimated based on actual field survey, other information from DA-RFO's, MA's, NAMRIA Land Cover (2010) and BSWM Land Use MISCELLANEOUS INFORMATION System Map.
    [Show full text]
  • Philippines Lives Destroyed
    July 2007 HUMAN LIVES DESTROYED RIGHTS Attacks Against Civilians in the Philippines WATCH Above: Philippines Coast Guard firefighters working to put out the fire started by the bomb on Superferry 14 , February 27, 2004. © 2004 Reuters/Erik De Castro July 2007 HUMAN RIGHTS WATCH Manila • Ozamis Mindanao • Pagadian • Cotabato • • Davao Zamboanga • • Digos Basilan Koronadal • Jolo General Santos • LIVES DESTROYED Attacks Against Civilians in the Philippines Major bombings and other attacks on civilians in the Philippines since 2000 include: Ozamis City ferry bombing (February 25, 2000—39 killed) General Santos City multiple bombings (May 3, 2000—3 killed) Manila megamall bombing (May 21, 2000—1 killed) General Santos City multiple bombings (June 24, 2000—2 killed) Manila Rizal Day multiple bombings (December 30, 2000—22 killed) Basilan beheadings near Lamitan town (August 2, 2001—11 killed) Pagadian bus terminal bombing (September 4, 2001—3 killed) Zamboanga Puericulture Center bombing (October 28, 2001—5 killed) General Santos City bombing at Fitmart store (April 21, 2002—15 killed) Zamboanga karaoke bar bombing (October 2, 2002—4 killed) Kidapawan bus terminal bombing (October 10, 2002—8 killed) Zamboanga shopping mall bombings (October 17, 2002—6 killed) Manila bus bombing (October 18, 2002—2 killed) Zamboanga Fort Pilar bombing, (October 20, 2002—1 killed) Maguindanao bombing in Datu Piang town (December 24, 2002—16 killed) Tacurong City (December 31, 2002—9 killed) Kidapawan bombing (January 28, 2003—1 killed) Kabacan , North Cotabato
    [Show full text]