Matilda Mine Development Williamson Regent, Galaxy, Wiluna Queen

Total Page:16

File Type:pdf, Size:1020Kb

Matilda Mine Development Williamson Regent, Galaxy, Wiluna Queen For personal use only COMPANY FOCUS • Rapidly grew the free milling Matilda deposits over the last 2 years since acquisition • Fire-sale acquisition of Wiluna Gold Plant (WGP) and infrastructure unlocks the value in Matilda Gold Project • Now multi-million ounce project with 55kms of strike and 780km2 landholding • Acquisition, exploration & development cost ~ A$3/oz Au resource • Exploration focus on free-milling mineralisation For personal use only • Market cap ~ A17 Million or EV $4/oz gold resource 2 CORPORATE OVERVIEW CAPITAL STRUCTURE BOARD OF DIRECTORS Market cap. @ A$0.17 A$17M Joseph Gutnick Non-executive Chairman Bryan Dixon Managing Director Shares on issue 89.1M Executive Director Options @ A$0.20 – A$0.38 12.7M Greg Miles Cash & liquid assets @ 31 Dec 2013 A$0.3M Alan Thom Executive Director Convertible notes - drawn A$0.5M Convertible notes - undrawn A$7.5M SHAREHOLDER ANALYSIS Top 20 66% Great Central Gold 26.7% HSBC Nominees 9.0% Kingsreef Pty Ltd 6.9% For personal use only Widerange Pty Ltd 3.1% 3 MATILDA GOLD PROJECT The right address • Large, highly prospective tenement holding in the Wiluna goldfield in Northern Yilgarn, Western Australia • Regional endowment >35Moz • 4Moz Wiluna belt production, over 7Moz total endowment • Excellent access & infrastructure • Well positioned for new discoveries and economic development of For personal use only existing resources 4 MATILDA & WILUNA GOLD PROJECT • Resource 40Mt @ 3.3 g/t for 4.3Moz Au • 4Moz of historical production • +780 km2 of tenure & 55km of mine sequence strike • All deposits within 26km of the Wiluna Gold Plant (BLK agreement to acquire) by existing haul roads • Little systematic regional For personal use only exploration in over a decade 5 MATILDA STRATEGY: Free milling ore focus • Keep operations on care and maintenance while building ore reserves (~ 12 to 18 months) • Aggressive exploration strategy to focus on new oxide and/or free-milling shallow underground ore bodies • Rigorous feasibility study as a precursor to a development decision • Plant can to be used in its current location • Utilise both ball mills for free-milling ore up to 1.5mtpa • moth-ball the refractory circuit for possible future use For personal use only • Plant refurbishment to be out of debt CONSOLIDATED MATILDA & WILUNA ► JORC Resources 40Mt @ 3.3g/t for 4.3Moz Au ► Mix of open pit & high grade underground ore ► Land holding 780km2 – 55km of mine strike ► Processing plant 1.1 – 1.5Mtpa capable of treating oxide for 80,000-100,000ozpa1 ► Biox circuit capable of treating refractory ores ► 12MW gas power station & diesel backup ► Existing permitted borefields and infrastructure ► 350 person accommodation village ► Established sealed airstrip and roads For personal use only ► Full approvals and licenses 1 assumes production from the Matilda deposit 1.5Mtpa @ 2.0g/t recovery 90.5% for 89,000oz. Approximately 80% of the Matilda pit areas are to a measured and indicated resource category. 20% of the pit areas are inferred resource. There is a low level of geological confidence associated with inferred mineral resources and there is no certainty that further exploration work will result in the determination of indicated mineral resources or that the production target itself will be realiised. WILUNA PROCESSING CIRCUIT Mill 2 Circuit Up to 550,000tpa Underground Ore Mill 1 Up to 1Mtpa Oxide Ore Mill 1 & 2 Circuit Up to 1.5 Mtpa For personal use only Matilda oxide Ore EXPLORATION & DEVELOPMENT PIPELINE Advanced Resource - Matilda Mine Development Williamson Regent, Galaxy, Wiluna Queen Matilda Extensions Brown Fields Carroll – Prior, Golden Age Repeats, East & West Lodes Green Fields Mentelle Trend, Galaxy North, Caledonian Trend For personal use only Focus on converting resources to reserves at development targets and finding new deposits in brown and green fields ADVANCED RESOURCES - MATILDA MINE Near term mining opportunity • Most advanced • Production (1987-1992): • 2.7 Mt@ 2.3g/t = 163,000oz au • Mostly oxide material mined from 7 shallow pits, generally to < 50m • Existing mining lease and previous Notice of Intent to mine Scoping Study pits and resources at Matilda • Mining heritage agreement g/t Oz RESOURCES Mt • Historical mining data - basis for Au Au Measured 0.1 2.4 9,000 For personal use only feasibility studies Indicated 4.7 2.0 300.000 Inferred 8.2 1.7 450,000 TOTAL 13.0 1.8 760,000 10 MATILDA MINE CENTRE Limited deeper drilling Drilling > 100 m • Very limited drilling of high grade down-plunge targets • Limited drilling along strike of existing pits • Pit convergence lowering stripping ratios • Further resources upgrades • Extensions of known lodes • Discovery of new lodes between For personal use only pits 11 EXPLORATION – MATILDA MINE EXTENSIONS • Very limited drilling of high grade down-plunge targets • High-grade mineralisation in pit floor • Outstanding drill results: 35m @ 5.05 g/t from 114m including 12m@ 9.1g/t • West Lode remains open – priority target • For personal use only Potential for discovery of new lodes between pits 12 M1 DEPOSIT – HIGH GRADE SHOOTS For personal use only 13 M4 DEPOSIT Shallow oxide deposit, open along strike and down plunge • Historical mining: 386,000t @ 2.2g/t for 27,000oz au to < 50m depth • Resource 204,000oz Au with 93% < 160m from surface • Resource extends 650m north of the pit & open Recent high grade intercepts include: • 10m @ 5.47g/t from 120m • 5m @ 5.30g/t from 125m • 12m @ 4.76g/t from 119m • 31m @ 2.32g/t from 120m • 1m @ 12.5g/t from 132m & 3m @ 11.4g/t from 171m For personal use only & 12m @ 2.8g/t from 180m incl. 2m @ 9.15 g/t 14 MATILDA STRIKE EXTENSIONS & MENTELLE SHEAR • Historical drilling has identified 4m @ 13.9 g/t (64m) mineralisation up to 3km from the mine area • Strike extensions partly covered by drainage – impediment to historical exploration = opportunity • Mentelle trend… parallel Mentelle structure? 4m @ 13.4 g/t (boh) • Mentelle prospect potential Target resource with Matilda characteristics • Large RAB program to test structure For personal use only • Matilda extension vector also provides bulls-eye target M11 6m @ 13.9 g/t (22m) 15 4m @ 9.51 g/t (22m) LAKE WAY / WILLIAMSON • 350Koz resource at Williamson, but structural setting similar to Wiluna – potential cluster of deposits • Numerous resource targets defined by previous drilling • Carroll -Prior targets • Previous drilling identified continuous mineralisation over 3km • Infill drilling to define resources • Extensions to Williamson splay lode • Review other auger anomalies For personal use only 16 ADVANCED RESOURCES Williamson Pit – mining 2006 WILLIAMSON DEPOSIT • High-grade shear zones bounding monzogranite stockwork up to 40m wide. Free-milling ore • High-grade mineralisation beneath current pit [email protected]/t from 117m [email protected]/t from 372m [email protected]/t from 176m [email protected]/t from 136m • Mining ceased Sept 2006, gold price averaged = A$730/oz RESOURCES Mt g/t Au Oz Au For personal use only Indicated 2.7 1.7 148,000 Inferred 3.6 1.8 202,000 TOTAL 6.3 1.7 350,000 17 CARROLL PRIOR PROSPECTS • Potential large tonnage, near surface For personal use only • Deeper drilling to identify high grade primary mineralisation 18 ADVANCED RESOURCES - GALAXY • 0.6 Mt @ 2.9 g/t = 52,000oz Au (Inferred), shallow, no recent exploration • Favourable mining economics • High grade intercepts: 4m @ 11.5g/t from 56m 3m @ 11.3g/t from 4m 4m @ 12.3g/t from 6m 8m @ 9.65g/t from 72m 7m @ 6.33g/t from 38m 4m @ 9.63g/t from 14m PeripheralFor personal use only RAB targets for follow-up 19 GALAXY NORTH • Structural analogue to Wiluna Mine 2km • Dextral offset fault in mafic mine sequence • Approx 2km prospective zone • This setting hosts 6Moz at Wiluna as well Galaxy as mineralisation at Regent. The target Deposit is a Wiluna-style mine camp • Galaxy deposit possibly part of mine camp cluster • Only minor drilling – exploration hampered by thin cover of overlying For personal use only basin sediments NB. Figures at same scale 20 ADVANCED RESOURCES - REGENT Considerable scope to increase deposit • 700m of strike and still open • Excellent grades and widths – steep dilatant structures open at depth • Good continuity, robust deposit • Additional extension drilling down plunge required RESOURCES Tonnes g/t Au Contained Oz Au Indicated 738,000 2.5 69,000 Inferred 3,108,000 2.1 211,000 For personal use only TOTAL 3,846,000 2.2 270,000 Open 21 WGP - Golden Age North • Golden Age Mine was highly profitable • Produced 160Koz @ 9.07 g/t • Free -milling • Mined in OP but best ore occurred at structural inflection 200-800m below surface Golden Age Quartz Reef • Terminated against East Lode Fault (ELF) • Golden Age North is the off-set extension of Golden Age on the other side of ELF • Approximate position of “Lake Way” historical mines • Drilling only to 65m – small oxide target For personal use only • Ultimate target is structural inflection 200m below surface 22 WGP - Golden Age Repeats Republic & Brothers Reefs • Republic and Brothers sub-parallel with Golden Age reef over significant depth extent. • Similar high-grade intercepts recorded where reef flattens to 25-40deg dip = Targets. Only minor drilling. 1.6m @ 12.7 g/t (103m) 6m @ 4.5 g/t (194m) 2.5m @ 8.3 g/t (312m) Targets For personal use only 0.6m @ 11.2 g/t (431m) 23 WGP – Caledonian Trend • 3km strike from Wiluna mine to Caledonian Pit • Very shallow RAB drilling (~5m) & limited RC to 60m • Caledonian mineralisation has very little 7m @ 7.15 from 40m 5m @ 5.01 from 20m surface expression to 20m. Therefore most drilling ineffective • Numerous hits indicate potential for open-pit resources.
Recommended publications
  • For Personal Use Only
    ASX Announcement ASX Code: VXR APPOINTMENT OF Released: 20 September 2011 CHIEF OPERATING OFFICER Highlights For further details Dr Tim Sugden Appointment of Mr Ian Suckling Managing Director Mining Engineer with 30+ years experience T: +61 8 6389 7400 M: +61 407 085 032 [email protected] Venturex Resources Ltd (ASX Code: VXR) is pleased to announce the appointment of Mr Ian Suckling as Chief Operating Officer. Mr Suckling will join the Venturex Executive Management Team on 10 October 2011 and his initial primary focus will be to drive the successful completion of the Bankable Feasibility Study (BFS) for the Pilbara VMS Copper-Zinc Project. Board Managing Director, Tim Sugden said “Venturex is extremely fortunate to have attracted someone of Ian Suckling’s calibre and leadership Anthony Kiernan Chairman experience to enhance the technical capabilities of our Executive Management Team. Ian joins at an exciting stage of the Company’s Tim Sugden transformation into a significant copper and zinc producer and will Managing Director assume direct responsibility for driving the BFS process through to completion before overseeing construction, commissioning and Michael Mulroney production.” Non-Executive Director Mr Suckling is a highly experienced Mining Engineer with over 30 years Allan Trench in the mining industry and is currently employed by Newmont Mining Non-Executive Director Corporation (Newmont) as the Senior Director – Underground Mine Engineering, leading a Team providing specialised technical John Nitschke engineering advice to the business units in Australia and overseas. Non-Executive Director Mr Suckling said “I’m thrilled to be joining the Venturex Executive Team Anthony Reilly at such an exciting time.
    [Show full text]
  • Small and Mid-Cap Resources December 2017 Review
    Small and Mid-Cap Resources December 2017 Review Let the Good Times Roll WHO IS IIR? Independent Investment Research, “IIR”, is an independent investment research house based in Australia and the United States. IIR specialises in the analysis of high quality commissioned research for Brokers, Family Offices and Fund Managers. IIR distributes its research in Asia, United States and the Americas. IIR does not participate in any corporate or capital raising activity and therefore it does not have any inherent bias that may result from research that is linked to any corporate/ capital raising activity. IIR was established in 2004 under Aegis Equities Research Group of companies to provide investment research to a select group of retail and wholesale clients. Since March 2010, IIR (the Aegis Equities business was sold to Morningstar) has operated independently from Aegis by former Aegis senior executives/shareholders to provide clients with unparalleled research that covers listed and unlisted managed investments, listed companies, structured products, and IPOs. IIR takes great pride in the quality and independence of our analysis, underpinned by high caliber staff and a transparent, proven and rigorous research methodology. INDEPENDENCE OF RESEARCH ANALYSTS Research analysts are not directly supervised by personnel from other areas of the Firm whose interests or functions may conflict with those of the research analysts. The evaluation and appraisal of research analysts for purposes of career advancement, remuneration and promotion is structured so that non-research personnel do not exert inappropriate influence over analysts. Supervision and reporting lines: Analysts who publish research reports are supervised by, and report to, Research Management.
    [Show full text]
  • Annual Report 2020 Contents
    ANNUAL REPORT 2020 CONTENTS Contents Page number Corporate Directory 1 Highlights of 2020 Financial Year 2 Chairperson’s Review 4 Review of Operations 6 Corporate Governance 43 Directors’ Report 53 Auditor’s Independence Declaration 76 Contents of Financial Statements 77 Consolidated Statement of Profit or Loss and other Comprehensive Income 78 Consolidated Statement of Financial Position 79 Consolidated Statement of Changes in Equity 80 Consolidated Statement of Cash Flows 81 Notes to the Consolidated Financial Statements 82 Directors’ Declaration 121 Independent Auditor’s Report 122 Additional Shareholder Information 126 Tenement Schedule 129 CORPORATE DIRECTORY DIRECTORS AUDITORS Andrew Boon San Teo Australia: Non-Executive Chairperson BDO (WA) PTY LTD Roy Philip Daniel 38 Station Street Non-Executive Director Subiaco West Perth WA 6008 Simon Jon Mottram Non-Executive Director Philippines: Raul Conde Villanueva RSB & Associates Executive Director 18 Floor Cityland Condominium 10 - Tower 1 Makati City Philippines 1200 COMPANY SECRETARY Peter Stanley Alphonso SOLICITORS Australia: EXECUTIVE MANAGEMENT Ashurst Australia Raul Conde Villanueva Level 10, Brookfield II President Philippines subsidiaries 123 St Georges Terrace Perth WA 6000 Patrick Warr Chief Financial Officer Philippines: James Pingul Llorca BMD Law Offices General Manager, Geology & Resources 18 Floor Cityland Condominium 10 - Tower 1 Makati City Philippines 1200 PRINCIPAL & REGISTERED OFFICE BANKERS Suite A, Level 1 1 Preston Street Commonwealth Bank Como 150 St George’s
    [Show full text]
  • 2020 Annual Report We Are Well Positioned to Deliver on Our Near-Term Growth Options of Havieron, Red Chris and Wafi-Golpu
    2020 Annual Report We are well positioned to deliver on our near-term growth options of Havieron, Red Chris and Wafi-Golpu. Sandeep Biswas, Managing Director and Chief Executive Officer OUR VISION To be the Miner of ChoiceTM for our people, shareholders, host communities, partners and suppliers. LIHIR, PAPUA NEW GUINEA NEWCREST 2020 ANNUAL REPORT 1 OUR COMPANY OUR MISSION Asset Overview 04 Key Achievements for FY20 06 To safely deliver Chairman’s Report 08 superior returns to our Managing Director’s Review 10 stakeholders from finding, Safety & Sustainability 12 developing and operating People 14 gold/copper mines. Organic Growth Opportunities 16 Newcrest’s Value Proposition 18 The Board 20 Mineral Resources and Ore Reserves 24 Directors’ Report 34 Corporate Directory 184 2 FORGING A STRONGER NEWCREST Forging a Stronger Newcrest Our clear focus remains on eliminating The health and safety of fatalities and life-changing injuries from our business, while striving to make continual progress on reducing all injuries our people is of primary and health impacts. importance at Newcrest. We believe that a strong and enduring commitment to the health and safety of our workforce best reflects our values and underpins and sustains optimal business performance. To achieve Newcrest’s full potential for our stakeholders, our company strategy focuses on five key pillars, each with associated aspirations which were set in February 2016. Safety & People Operating Technology Profitable sustainability performance & innovation growth Our aspirations Zero
    [Show full text]
  • Statistics Digest 1997-98
    1997-1998STATISTICSDIGEST CONTENTS Page FOREWORD ..................................................................................................... 1 1. ECONOMIC AND SOCIAL ENVIRONMENT .................................................... 2 1.1 World Economy Review ..................................................................................... 2 1.2 Review of the Western Australian and Australian Economies ...................... 5 1.3 Economic Factors Affecting the Mining Industry ........................................... 7 1.4 Social and Political Factors Affecting the Mining Industry ........................... 9 2. REVIEW OF MAJOR MINERALS AND PETROLEUM IN WA ......................... 14 2.1 Overview and Outlook ....................................................................................14 2.2 Petroleum...........................................................................................................15 2.3 Iron Ore .............................................................................................................18 2.4 Gold ....................................................................................................................20 2.5 Alumina ..............................................................................................................23 2.6 Nickel .................................................................................................................25 2.7 Heavy Mineral Sands ........................................................................................28
    [Show full text]
  • Equities Research
    EQUITIES BW RESEARCH 27 FEBRUARY 2015 Blackham Resources Ltd (BLK) | Initiation Coverage Rating: Matilda Gold Project , a re-emerging BUY mining district 1 Target Price : $0.40 Investment Summary Projected Return: Blackham Resources has commenced drilling at the Matilda mine as 300% initiation of a 13 month plan to establish a free milling gold Reserve and 1 recommence production at the Wiluna Processing Facility. Underpinned by 12 month target a large tenement position and sizeable gold resources Blackham has the ability to emerge in 2016 as a producer of over 100,000 ozs of gold per year with a mine life in excess of ten years. Company Statistics Investment Highlights Share Price (AUD$) 0.135 Market Cap (AUD$) 24.0 Enterprise Value (AUD$) 21.0 Purchase of the Wiluna Mine and processing facility allowed Issued Shares (mil) 177.9 consolidation of the region under single ownership Options (mil) Tenements of 780km2 surrounding the Wiluna Processing Facility (unlisted) 20.3 with a total gold resource of 4.7million oz Cash 3.0 13 month time line to re-establish >100,000ozpa gold production Debt nil All proposed mining operations within 20km of the Wiluna Processing Facility. Low capital requirement to re-start gold EV/Resource ounce $4.45 production Drilling underway to confirm 5 year Reserve with Initial focus on Earnings Summary free milling gold ore at the Matilda Mine FY Yr. End 2015e 2016e 2017e 2018e High grade underground quartz reef deposits will provide Revenue ($AU) 0 0 132 167 additional low cost ounces EBITDA ($AU) N/A N/A 57 70 Potential to quickly expand gold Reserves for mine life of more Net Income than ten years N/A N/A 36.7 45.0 ($AU) EV/EBITDA 0.37 0.30 Investment Recommendation Initiate with a BUY Rating and a $0.40 price target.
    [Show full text]
  • The Delisted
    THE 1998 ASX DELISTED COMPANIES BOOK 1929 TO 1998 69 YEARS OF DELISTINGS Published by: Australian Stock Exchange Limited ACN 008 624 691 Level 7, Riverside Centre, 123 Eagle Street, Brisbane QLD 4000 Telephone 61 7 3835 4000 Facsimile 61 7 3835 4141 © Copyright Australian Stock Exchange Limited - 1998 All rights reserved. No part of this publication may be photocopied, reproduced, stored in a retrieval system, or transmitted in any form or by any means whether electronic, mechanical or otherwise, without prior written permission of the publisher. Enquiries should be addressed to The National Manager - Market Data, Australian Stock Exchange Limited. Australian Stock Exchange Limited believes that all information contained in this publication is accurate and reliable. The information has been sourced from company reports and announcements lodged with Australian Stock Exchange Limited by each corporation. The information does not contain recommendations, reports, analysis, or other advisor information relating to specific securities or issuers of securities and does not constitute an invitation to persons to enter or offer to enter into an investment agreement or to exercise any rights conferred by an investment, to acquire, dispose of, underwrite or convert an investment or contain information calculated to lead directly or indirectly to responsibility for loss arising in any way from or in connection with errors or omissions in any information provided (including responsibility to any person by reason of negligence) is accepted by Australian Stock Exchange Limited, its subsidiaries or employees. NAME CHANGE CROSS REFERENCE FOR DELISTED COMPANIES New Name Old Name Date A.F.M. DEVELOPMENTS LIMITED N.C.
    [Show full text]
  • For Personal Use Only Use Personal For
    ARUMA Aruma Resources Limited ABN 77 141 335 364 www.arumaresources.com PROSPECTUS For the Offer of 25,000,000 Shares at an issue price of 20 cents each to raise $5,000,000 with the capacity to accept Oversubscriptions for up to 10,000,000 Shares to raise up to a further $2,000,000. Proposed ASX Code: AAJ Lead Manager Patersons Securities Limited AFSL 239052 For personal use only This Prospectus provides important information to assist investors in deciding whether or not to invest in the Company and should be read in its entirety, together with the Application Form attached to this Prospectus. If, after reading this Prospectus, you have any questions about the Shares being offered under this Prospectus, or any other matter relating to an investment in the Company, you should consult your professional adviser. An investment in the Shares offered under this Prospectus should be considered highly speculative. CORPORATE DIRECTORY DIRECTORS Mr Paul Boyatzis (Non-Executive Chairman) Mr Peter Schwann (Managing Director) Mr Danny Costick (Non-Executive Director) COMPANY SECRETARY Mr Phillip MacLeod PRINCIPAL PLACE OF BUSINESS 24 Colin Street West Perth WA 6005 Tel: +61 8 9481 2425 Fax: +61 8 9481 1756 CONTENTS WEBSITE www.arumaresources.com KEY POINTS 2 LETTER FROM THE BOARD 3 SOLICITORS TO THE OFFER Fairweather & Lemonis 1. INVESTMENT OVERVIEW 4 Ground Floor 2. DETAILS OF THE OFFER 6 1 Havelock Street West Perth WA 6005 3. COMPANY AND PROJECT OVERVIEW 10 4. DIRECTORS AND CORPORATE GOVERNANCE 16 INDEPENDENT GEOLOGIST Hellman & Schofield Pty Ltd 5. RISK FACTORS 20 Suite 6, 3 Trelawney Street 6.
    [Show full text]
  • Project List
    ORWAY MINERAL CONSULTANTS OPTIMISATION, EXPANSION AND TRAINING REFERENCE LIST COMPANY NAME PROJECT NAME LOCATION Abesque Engineering Ltd KANMANTOO COPPER PROJECT Australia Acacia Resources Limited BROCKS CREEK Australia UNION REEFS Australia Aditya Birla Minerals MT GORDON EXPANSION Australia MT GORDON ESPERANZA SOUTH Australia Agnew Gold Mining Company Pty Ltd AGNEW UPGRADE PREFEASIBILITY Australia Agnico-Eagle Mines Ltd KITTILA EXPANSION - AGNICO Europe Alcoa of Aust. Limited PINJARRA Australia Alel FIC JSC SUZDAL DESK TOP STUDY Asia Allegiance Metals Pty Ltd HELLYER BALL MILL TRIAL Australia ALLEGIANCE AVEBURY PLANT - GRINDING Australia OPTIMISATION AVEBURY EXPANSION STUDY Australia HELLYER SAG MILL MODELLING Australia Anaconda Nickel Ltd MURRIN MURRIN Australia AngloGold Ashanti Australia - Sunrise Dam SUNRISE DAM FLASH FLOAT Australia Apex Minerals WILUNA - APEX MINERALS Australia Ararat Gold Recovery Company ARARAT COMMINUTION STUDY Asia Arccon (WA) Pty Ltd CO-O GOLD MINE Asia Ashanti Goldfields Co. Ltd - Iduapriem Gold Mine IDUAPRIEM GOLD MINE Africa Ausenco Ltd WAIHI Asia Australian Diatomaceous Eath Pty Ltd BARRABA DIATOMACEOUS EARTH Australia Avocet Mining PLC ZERAVSHAN GOLD MINE AUDIT Asia ZERAVSHAN PLANT UPGRADE OPTION STUDY Asia Barrick - Plutonic Gold Mine FINER FEED TO PP1 CIRCUIT Australia PLUTONIC GOLD MINE SAG MILL CONVERSION Australia PLUTONIC PP1 FINER GRIND 1.6MTPA Australia PLUTONIC UPGRADE STUDY Australia Barrick Gold Corp - Russia and Central Asia DARASUN Europe Barrick Gold Mine PLUTONIC Australia Battery Limits
    [Show full text]
  • The Mineral Industry of Australia in 1997
    THE MINERAL INDUSTRY OF AUSTRALIA By Travis Q. Lyday Australia is estimated to be the third largest producer of minerals owned by the Government, about 36% of Australia, and then only if and metals, excluding coal and petroleum, in the world, and its they had maintained a continuing association with the land being minerals industry is a leading catalyst in promoting the growth of the claimed. The Wik ruling threw the issue into confusion because it economy. The country’s gross domestic product (GDP) in fiscal year allowed the possibility of native title extending to land held under 1996-97 (July-June) was A$491.3 billion (about $359 billion). The lease, thus increasing the proportion of land open to possible native minerals industry represented $23.3 billion, or 6.5% of the title claim to about 78% of the country (Mining Journal, 1997c). Australian economy (Minerals Council of Australia, 1998, Current economic impacts in Australia, accessed July 7, 1998, on the World Environmental Issues Wide Web at URL http://www.minmet.uq.au/ugrad/courses/5e103/ aspin/notes18.html). The real GDP growth rate for 1997 was 2.9% In October, the Government set its goal to contain greenhouse gas (U.S. Energy Information Agency, May 1998, Australia, accessed emissions at an 18% increase from the 1990 levels by 2120 (instead May 21, 1998, on the World Wide Web at URL http://www.eia.doe. of the projected 28% increase without restraint). Included with the gov/emeu/cabs/australi.html). In 1997, Australia was the world’s $130 million that will be spent to achieve this goal was a leading producer of alumina, bauxite, chrysoprase, diamond, requirement that electricity retailers source an additional 2% of ilmenite, monazite, opal, rutile, sapphire, and zircon; second largest electricity from renewable sources by 2010 (UIC Newsletter, producer of lead and zinc; third largest producer of gold and iron ore; 1997a).
    [Show full text]
  • Technical Report (Amended) Plutonic Gold Mine Mineral Resources and Mineral Reserves Superior Gold Inc
    AMC Consultants Pty Ltd ABN 58 008 129 164 — Level 21, 179 Turbot Street BRISBANE QLD 4000 AUSTRALIA — T +61 7 3230 9000 F +61 7 3230 9090 E [email protected] W amcconsultants.com Technical Report (Amended) Plutonic Gold Mine Mineral Resources and Mineral Reserves Superior Gold Inc. Plutonic Gold Mine, Western Australia, Australia In accordance with the requirements of National Instrument 43-101 “Standards of Disclosure for Mineral Projects” of the Canadian Securities Administrators Qualified Persons: R. Carlson, MAIG (RPGeo Mining and Exploration), MAusIMM, BSc(Geology), MSc(Ore Deposit Geology) D. Kahler, FAusIMM (Chartered Professional), BEng (Mining), Registered Professional Engineer of Queensland G. Williamson, MAusIMM (Chartered Professional), BEng (Mining), Registered Professional Engineer of Queensland AMC Project 316042 Effective date 30 September 2016 Adviser of choice to the world’s minerals industry Plutonic Gold Mine Mineral Resources and Mineral Reserves Superior Gold Inc. 316042 1 Summary Billabong Gold Pty Ltd (Billabong), an Australian corporation, owned 100% by Superior Gold Inc., acquired the Plutonic Gold Operations (the Property) from Northern Star Resources Limited (Northern Star) on 12 October 2016. The purpose of this report is to present Mineral Resources1 and Mineral Reserves2 for the Property, Western Australia, for public disclosure. The effective date of this report is 30 September 2016. The report has been compiled by the Qualified Persons3 employed by AMC Consultants Pty Ltd (AMC) for Billabong. Plutonic Gold Mine currently produces gold from a large underground operation through a traditional crushing, grinding, and carbon-in-leach (CIL) circuit. Historically, numerous open pits were mined at Plutonic Gold Mine between 1990 and 2005.
    [Show full text]
  • The Mineral Industry of Australia in 1999
    THE MINERAL INDUSTRY OF AUSTRALIA By Travis Q. Lyday Australia was estimated to be the third largest producer of that was passed along to the consumer as part of the retail minerals and metals, excluding coal and petroleum, in the price. In 1999, the Commonwealth Government passed new world, and its minerals industry was a leading catalyst in legislation for a goods and services tax (GST) of 10% to replace promoting the growth of the economy. The country’s 1999 the wholesale sales tax effective July 1, 2000. The GST will be gross domestic product (GDP) was $390 billion (Bureau of East levied at 10% of the value added at each point in the production Asian Affairs, October 2000, Australia—Background notes, and distribution chain for all goods and services including accessed November 2, 2000, at URL http://www.state.gov/ imports, with some exceptions (U.S. Department of State, July www/background_notes/australia_0010_b gn.html). The 1999, FY 2000 country commercial guide: Australia, p. 87, minerals industry, which included exploration, mining, and accessed November 1, 2000, at URL http://www.state.gov/ mineral processing, represented about 6.6% of the Australian www/about_state/business/com_guides/2000/eap/australia_ economy (Resource Information Unit, 2000, p. 4). The real CCG2000.pdf). growth rate of the GDP for 1999 was 3.9% (U.S. Energy Information Administration, April 2000, Australia, accessed Environmental Issues November 1, 2000, at URL http://www.eia.doe.gov/emeu/cabs/ australi.html). Although less than 0.02% of Australia’s land surface has In 1999, Australia was the world’s leading producer of been affected by mining activities, care and maintenance of the alumina, bauxite, chrysoprase, diamond, ilmenite, mined lead, environment was a prominent and recurrent concern of the monazite, opal, rutile, sapphire, mined zinc, and zircon; the Commonwealth and state governments.
    [Show full text]