Physical Progress of PMGSY - II Project (Ending 31.03.2018)
Total Page:16
File Type:pdf, Size:1020Kb
Physical Progress of PMGSY - II Project (ending 31.03.2018) Length Sr. Package Length Upgradation %age of Expenditure Distt. Name of Road Completed No. No. (Km) Cost (lacs) work (Rs. lacs) (Km) PB01-123 Jandiala Verowal Road (Ekal Gadda) to 1 16.38 958.78 15.18 90% 663.17 MB Tangra to Tarsikka via jabbowal Attari-Chogawan Road (Beharwal) to Manj- PB01-124 2 Bachiwind Road via Shahura, kiralgarh 10.20 692.60 8.49 75% 394.11 MB and Gagarmal Asr. - Fathegarh Churian to Asr. Ajnala PB01-125 3 Raod via Birbalpura, Loharka Kalan, Bua 11.20 766.71 10.00 65% 435.17 MB Nagali upto Rajasansi Amritsar - Attari (Khassa Bazaar) to PB01-126 4 Varpal via Chak Mukand, Mulla Behram, 16.81 1133.27 16.81 Completed 653.80 MB Kotli Mian Khan, Sangna and Chaba Gujjapir to Bhalapind via Dhariwal, Teri- 5 PB01-128 8.29 618.62 7.00 83% 245.44 Rajjian-Kotla Amritsar Amritsar Ajnala Road to Loharka Jagdev 6 PB01-130 9.95 686.62 6.00 59% 244.10 Kalan Road Amritsar Majitha Fatehgarh Churrian road 7 PB01-133 6.36 321.29 65% 106.05 to Kotla Gujjran via Viram Amritsar Sohian Fatehgarh Churrian Road 8 PB01-134 (Mehdipur) to Amritsar Majitha Fatehgarh 5.12 327.49 4.85 80% 149.45 Churrian Road (Bhalowali) Amritsar Majitha Fatehgarh Churrian Road 9 PB01-136 5.62 397.46 2.50 72% 208.33 to Jajjiani via Budha Theh Ramana chak Beas Amritsar (Muchal) to Batala Beas 10 PB01-137 road (Gaggarbhana) via Dhulka, Kaleke, 19.45 1203.68 19.40 82% 468.46 Sudhar, Wadala Kalan Length Sr. Package Length Upgradation %age of Expenditure Distt. Name of Road Completed No. No. (Km) Cost (lacs) work (Rs. lacs) (Km) Beas Amritsar (Rayya) Cheema Bath Bulle 11 PB01-138 9.45 651.37 9.45 Completed 406.64 Nangal Kot Mehtab to Pheruman Amritsar Kaler Bala to Arjan Manga to Amritsar 12 PB01-139 7.24 235.47 7.24 Completed 161.47 Mehta Road Total 126.07 7993.36 106.92 4136.19 Patti Khem Karan road to Valtoha 13 PB01-140 5.00 303.78 30% Dasuwal Maneke Jand Gajjal to Kotli Wasawa Singh Sran to 14 PB01-141 7.45 454.06 2.00 28% Assal Uttar Cheema Kot Budha Road to Harike Khalra 15 PB01-143 12.09 656.68 4.00 48% 193.46 Tarn Taran Road PB22-01 Manan to Dhand to Sarai Amanat Khan 16 8.07 545.52 7.70 82% 262.10 MB Road Via Kasel PB22/03 Harike Khalra Road to Mari Megha to 17 10.95 713.16 4.70 63% 195.19 MB Mari Udoke to Choong Total 43.56 2673.20 18.40 650.75 Bathinda Barnala road to Ghareli, Gharella, Balloh, Chowke Pirkot, Bhaini 18 PB02-018 30.10 1755.42 30.10 Completed 1132.04 Chuhar, Kuttiwal Khurd to Ghummn Khurd to BSBK road 19 Bathinda PB02-019 Chowke to Dhade to Balianwali 14.50 886.72 14.50 Completed 621.09 Ballianwali to Nandgarh Kotra to 20 PB02-020 6.50 389.28 6.50 Completed 246.63 Harkishanpura PB02-021 21 Bhunder to Ballianwali road 150.07 Completed 80.20 (Bridge) Length Sr. Package Length Upgradation %age of Expenditure Distt. Name of Road Completed No. No. (Km) Cost (lacs) work (Rs. lacs) (Km) Ballianwali to Mandi Khurd to Ramnagar 22 PB02-022 8.90 522.77 8.85 90% 267.10 to Rampura Maur Road Maur Talwandi Road to Rajgarh Kubbe to kotli and Rajgarh kube 23 PB02-023 12.10 724.20 12.10 Completed 470.80 to Behniwal upto MC limit via Kamalu Swaitch Bathinda Bhikhi Kot Shamir road to Raikhana upto 24 PB02-024 6.60 395.03 6.60 Completed 236.16 Kot Fatta Bhucho road Reconstruction of High Level Bridge over PB02-025 Lassara Drain RD 352588 Crossing Link 25 150.07 Completed 89.09 (Bridge) Road BSBK road to Raikhanna upto Kot Fatta Bhucho Road Total 78.70 4973.56 78.65 3143.11 Kotkapura - Shri Mukatsar Sahib Road PB03-024 26 wander Jattana to Dhimanwali upto 7.23 412.50 4.80 70% 288.14 MB Machai Mal Singh PB03-025 Kotkapura-Bathinda Road to Bargari to 27 6.40 364.89 6.40 95% 313.67 MB Bambiha Bhai upto Channuwala Wander PB03-026 Wandar Jattan to Phide Kalan upto 28 7.10 444.19 7.10 Completed 358.26 MB (Marrar Chack Motlewala) PB03-027 29 Faridkot Chahal to Kot Sukhia to Bhaloor 14.70 805.95 14.70 Completed 536.49 MB PB03-028 Faridkot to Dhiman Wali upto Block 30 6.70 426.34 5.50 80% 299.02 MB Boundary PB03-030 Faridkot-Sadiq road to Mehemuana to 31 13.00 795.04 13.00 79% 627.7 MB Golewala to Fridkot-Ferozepur raod PB03-031 Kotkapura-Jaitu Road to Harinau via Ajit 32 7.63 528.09 4.30 82% 344.37 MB Gill, Matta Length Sr. Package Length Upgradation %age of Expenditure Distt. Name of Road Completed No. No. (Km) Cost (lacs) work (Rs. lacs) (Km) PB03-032 Jaitu to Kotli Ablu upto Block Boundary via 33 Faridkot 9.12 548.47 9.12 Completed 408.66 MB Chaina Karirwal Total 71.88 4325.47 64.92 3176.31 Khamano to Bhadla via Bhari, Sahib Pur & 34 PB04-020 17.30 1090.45 6.00 66% 266.92 Ismailpur NH-I road to Rasulpur via Rajindergarh, 35 PB04-021 13.63 1079.49 11.15 74% 508.25 Boras 36 Fatehgarh PB04-022 Bhamarsi to Mudharian upto Boundary 2.89 176.77 2.89 Completed 141.28 Sahib Patiala Sirhind road (Rurki Adda) to 37 PB04-023 Reona Neewan via Nalina Kalan, Nalina 7.01 446.70 7.01 Completed 357.92 Khurd, Panjola Kalan Patiala Sirhind Road (Rurki Adda) to Sehri 38 PB04-024 upto Rajpura-Akar road via Nalini, 10.18 637.54 9.50 67% 233.65 Mulepur, Saifalpur, Muhamdipur, Sehri Total 51.01 3430.95 36.55 1508.02 PB05-089 Ludhiana-Ferozepur Road (Village Malwal) 39 0.00 0.00 Deleted 75.47 MB to Ferozepur-Zira Road via Satiyewal Ludhiana-Ferozepur Road to Ferozepur- PB05-090 40 Ferozepur Faridkot Road via Piareana, Maan Singh 5.08 376.71 4.50 86% 212.70 MB Wala, Sappanwali Talwandi Khosa Dal Singh Road (Hardasa) PB05-091 41 to Zira Mallanwala road (Alipur) via 9.60 636.00 9.60 Completed 403.92 MB Kassoana, Mankianwali Length Sr. Package Length Upgradation %age of Expenditure Distt. Name of Road Completed No. No. (Km) Cost (lacs) work (Rs. lacs) (Km) Zira-Moga Road (Jhatra) to Zira-Talwandi PB05-092 42 Road via Wara Chain Singh, Longo Deva, 11.70 671.19 10.40 94% 274.04 MB Pandori Khatrian, Mansoorwal Kalan Zira-Talwandi Road to (Ratool Rohi) PB05-093 43 Khosa Dal Singh - Talwandi Road 5.55 329.08 5.55 Completed 292.90 MB (Dhanna Sheed) PB05-094 Makhu-Kot Ise Khan Road to Makhu-Zira 44 6.70 437.79 6.30 96% 317.05 MB road via Chamb, Shihan pari PB05-095 Makhu-Jallandhar road to Makhu-Zira 45 6.50 409.24 6.14 96% 318.50 Ferozepur MB road via Sudan, Femiwala Mallanwala road to Fathegarh Sabrah via 46 PB05-097 17.85 1184.63 4.50 51% 489.78 Fattewala, Alewala 47 PB05-098 Guruharsahai to Kanian Wali 9.77 684.99 5.60 77% 378.58 Reconstruction of Bridge 4 span 7mtr PB05-099 each over eastern canal crosing link road 48 91.30 96% 67.85 (Bridge) Guruharsahai to Kanian Wali at RD 7425 (length 31.40 mtr) Grain Market Guruharsahai to Bahadure 49 PB05-100 Ke via Basti Joye Singh Wala,Dune Wala, 13.42 850.95 60% 353.69 Pindi Total 86.17 5671.88 52.59 3184.48 PB05-101 50 Pattre Wala to Khippan Wali 8.10 597.31 6.00 88% 407.01 MB Maunana Bridge to Tahliwal Jatan - PB05-102 51 Fazilka Kandhwala - Hajar Khan Mammukhera 7.55 509.79 6.50 70% 302.74 MB upto Block Boundary PB05-103 Dodhan(Defence Road) to Rajpura to 52 14.00 972.04 8.50 77% 550.89 MB Sherewala to Patti Sadik Length Sr. Package Length Upgradation %age of Expenditure Distt. Name of Road Completed No. No. (Km) Cost (lacs) work (Rs. lacs) (Km) PB05-104 Gidderanwali main road to Jandwala 53 11.00 738.74 7.25 80% 471.13 MB Hanuwanta to Achadiki PB05-105 Arniwala to Jandwala Bhime Shah - 54 10.98 709.87 4.50 49% 185.09 MB Roranwali Road up to Block Boundary PB05-106 Ratta Khera Bridge along Canal to Khuranj 55 9.40 704.23 2.50 46% 129.24 MB to Roranwali upto Block Boundary Fazilka (DHS road) to Fannayan to PB05-107 56 Audiyan, Kerian, Bandiwala upto Block 11.85 728.93 9.35 80% 684.95 MB Fazilka Boundary PB05-108 Fazilka-Hindumal Kot Road Shateer Wala 57 5.05 329.92 32% 82.96 MB to Bandi Wala 58 PB05-110 Kabarwala to Roranwala 9.09 627.03 5.50 52% 220.10 Reconstruction of Bridge 4 span 7mtr PB05-111 each over eastern canal crosing link road 59 90.31 98% 68.79 (Bridge) Kabarwala to Roran Wala at 5580 (length 31.40 mtr) Sukhera Bodla to Jallalabad-Puran Patti 60 PB05-112 9.68 616.35 4.00 60% 285.57 road via Chak Lamochar Total 96.70 6624.52 54.10 3388.47 PB06-054 Behrampur to Primala Dodwan, Bahmani 61 5.77 412.59 5.77 Completed 180.29 MB to Bala Pindi Gurdaspur Purana Shalla to Talibpur Pandori via 62 PB06-083 10.41 723.97 9.20 76% 129.29 Chhina Bet Pakhowal Total 16.18 1136.56 14.97 309.58 Length Sr.