Apta Health & Safety Commitments Program
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Regional Transit Technical Advisory Committee October 29, 2014 Full
MEETING OF THE REGIONAL TRANSIT TECHNICAL ADVISORY COMMITTEE Wednesday, October 29, 2014 10:00 a.m. – 12:00 p.m. SCAG Los Angeles Main Office 818 W. 7th Street, 12th Floor, Policy Committee Room A Los Angeles, California 90017 (213) 236-1800 Teleconferencing Available: Please RSVP with Ed Rodriguez at [email protected] 24 hours in advance. Videoconferencing Available: Orange SCAG Office Ventura SCAG Office 600 S. Main St, Ste. 906 Orange, CA 92863 950 County Square Dr, Ste 101 Ventura, CA 93003 Imperial SCAG Office Riverside SCAG Office 1405 North Imperial Ave., Suite 1 , CA 92243 3403 10th Street, Suite 805 Riverside, CA 92501 SCAG San Bernardino Office 1170 W. 3rd St, Ste. 140 San Bernardino, CA 92410 If members of the public wish to review the attachments or have any questions on any of the agenda items, please contact Matt Gleason at (213) 236-1832 or [email protected]. REGIONALTRANSIT TECHNICAL ADVISORY COMMITTEE AGENDA October 29, 2014 The Regional Transit Technical Advisory Committee may consider and act upon any TIME PG# of the items listed on the agenda regardless of whether they are listed as information or action items. 1.0 CALL TO ORDER (Wayne Wassell, Metro, Regional Transit TAC Chair) 2.0 PUBLIC COMMENT PERIOD - Members of the public desiring to speak on items on the agenda, or items not on the agenda, but within the purview of the Regional Transit Technical Advisory Committee, must fill out and present a speaker’s card to the assistant prior to speaking. Comments will be limited to three minutes. -
Other Transit Systems / Ostros Sistemas De Tránsito
OTHER TRANSIT SYSTEMS / OSTROS SISTEMAS DE TRÁNSITO Amtrak Laguna Beach Transit (LB Transit) Omnitrans (OT) Serves local, regional and Serves Laguna Beach and Serves the San Bernardino Valley national regions Dana Point (800) 966-6428 (800) USA-RAIL (872-7245) (949) 497-0746 omnitrans.org amtrak.com lagunabeachcity.net Riverside Transit Agency (RTA) Anaheim Resort Transit Long Beach Transit (LBT) Serves Riverside County and Serves the Anaheim and Serves Long Beach, Signal Hill, the Village at Orange Anaheim Resort area Cerritos and Lakewood (800) 800-7821 (714) 563-5287 (562) 591-2301 riversidetransit.com rideart.org lbtransit.com Foothill Transit (FT) Metrolink Commuter Rail Serves La Habra, Brea, San Gabriel & Serves Orange, Los Angeles, Ventura, Pomona Valleys in LA County San Bernardino and Riverside Counties (800) 743-3463 (800) 371-LINK foothilltransit.org (800) 371-5465 metrolinktrains.com LA County Metropolitan Transportation Authority (Metro) Norwalk Transit (NT) Serves greater Serves Norwalk, Cerritos, Bellflower, Los Angeles County area Santa Fe Springs and Whittier (323) GO-METRO (562) 929-5550 (323) 466-3876 ci-norwalk.ca.us metro.net On Demand. Unlimited Local Rides. $5 All Day. OC Flex is OCTA’s on-demand, curb-to-curb shuttle service serving parts of Aliso Viejo, Laguna Niguel and Mission Viejo as part of a pilot program. Take unlimited rides within the zone to school, shopping, and fun for $5 or less per day. Grab an early-morning coffee, run afternoon errands, and go out for a date night dinner and movie – all for one super-low fare. Use the OC Flex App to book your trip, get a day pass, and view your ride’s arrival time. -
Gold Coast Transit District
Ventura Local Agency Formation Commission Gold Coast Transit District Municipal Service Review Prepared By: Ventura Local Agency Formation Commission 800 S. Victoria Avenue Ventura, CA 93009-1850 Accepted by the Commission on July 15, 2015 TABLE OF CONTENTS Introduction ........................................................................................................................................... 1 Gold Coast Transit District Profile ........................................................................................................ 3 Growth and Population Projections ................................................................................................... 10 Review of Municipal Services ............................................................................................................. 11 Written Determinations ...................................................................................................................... 13 Appendix A........................................................................................................................................... 17 TABLE OF FIGURES Figure 1: Population and Service Area Table ....................................................................................... 5 Figure 2: Operating Revenues Table .................................................................................................... 8 Figure 3: Operating Expenses Table ..................................................................................................... 9 -
Updated Default Values for Transit Dependency and Average Length
Updated Default Values for Transit Dependency and Average Length of Unlinked Transit Passenger Trips, for Calculations Using TAC Methods for California Climate Investments Programs Summary Report California Climate Investments Quantification Methods Assessment California Air Resources Board Agreement #16TTD004 Prepared by: Elisa Barbour with Susan Handy, Alissa Kendall and Jamey Volker Institute of Transportation Studies, University of California, Davis August 13, 2019 Background Under California’s Cap-and-Trade program, the State’s portion of the proceeds from Cap-and-Trade auctions is deposited in the Greenhouse Gas Reduction Fund (GGRF). The Legislature and Governor enact budget appropriations from the GGRF for State agencies to invest in projects that help achieve the State’s climate goals. These investments are collectively called California Climate Investments. Senate Bill (SB) 862 requires the California Air Resources Board (CARB) to develop guidance on reporting and quantification methods for all State agencies that receive appropriations from the GGRF. CARB may review and update quantification methods, as needed. CARB has developed quantification methods to provide project-level greenhouse gas (GHG) and co-benefit estimates for administering agencies to use when selecting projects for funding from California Climate Investments programs. To measure GHG emission reductions from transportation projects, CARB relies on a method it published with the California Department of Transportation (Caltrans) in 2005 for evaluating motor vehicle fee registration projects and congestion mitigation and air quality improvement (CMAQ) projects, specifically transit and connectivity (TAC) features.1 This report addresses whether and how CARB might update two adjustment factors in the TAC methods that apply to transit facility and/or service expansion projects. -
Omnitrans Offers Free Vaccination Shuttles
FOR IMMEDIATE RELEASE CONTACT: Nicole Ramos April 5, 2021 Dir. of Marketing & Communications Office: 909.379.7155 Mobile: 909.229.2410 [email protected] Omnitrans Offers Free Vaccination Shuttles (San Bernardino, CA) Beginning Tuesday, April 6, Omnitrans will offer free shuttle service to COVID-19 vaccination sites in Ontario and San Bernardino to those with vaccine appointments, five days per week. “Omnitrans has been providing essential transportation service since the beginning of the COVID- 19 pandemic, and we are pleased to continue to do our part to help protect the health and safety of our community and support the reopening of our region,” said CEO/General Manager Erin Rogers. The Ontario shuttle will pick customers up at the Montclair Transit Center for transportation to the Ontario Convention Center, one of the region’s largest vaccination sites. The shuttle will operate every 40 minutes, beginning at 9:25 a.m., Tuesday through Saturday. Twelve bus routes from three agencies (Omnitrans, Foothill Transit, Riverside Transit Agency) and Metrolink trains connect at the Montclair Transit Center, allowing for convenient regional connections to the shuttle. In San Bernardino, a shuttle will pick up customers at the San Bernardino Transit Center (SBTC) for transportation to the vaccination site at Arroyo Valley High School. The shuttle will operate every 30 minutes, beginning at 9:40 a.m., Tuesday – Saturday. Nineteen bus routes from five agencies (Omnitrans, Beaumont Transit, Mountain Transit, Riverside Transit Agency, Victor Valley Transit) and Metrolink trains connect at the SBTC, allowing for convenient regional connections to the shuttle. Shuttle trips are free to the community. -
Sgr Descriptions
SGR DESCRIPTIONS ALASKA Municipality of Anchorage Project: People Mover Maintenance Facility Roof Replacement Amount: $2,400,000 The Municipality of Anchorage will use funds to replace the aging, leaking, poorly insulated roof of their People Mover maintenance facility. ALABAMA City of Huntsville, Alabama Project: Public Transit Bus Maintenance Facility Construction Amount: $3,293,061 The City of Huntsville, which currently leases its bus maintenance facility, will use the funds to build a maintenance facility of its own. ARKANSAS Central Arkansas Transit Authority (CATA) Project: Maintenance Building Conversion to CNG Amount: $1,009,088 This project will allow the Central Arkansas Transit Authority to convert their existing maintenance facility to accommodate the maintenance needs of compressed natural gas vehicles. CATA anticipates that half of its fleet will be fueled by CNG by 2016. ARIZONA City of Phoenix Public Transit Department Project: Regional Operating and Maintenance Facility Refurbishment Amount: $6,320,000 The City of Phoenix Public Transit Department will use the funds to upgrade and refurbish the North Operations and Maintenance Facility. City of Tucson Project: Transit Vehicle Replacement (CNG) Amount: $3,697,650 The City of Tucson will replace buses in its fleet that are beyond their useful lives with compressed natural gas (CNG) buses. City of Tucson Project: Upgrade Compressed Natural Gas (CNG) Fueling Station Amount: $1,920,000 The City of Tucson will upgrade its inefficient 20-year-old compressed natural gas fueling system. The project includes replacing 4 compressors and adding back-up generators to run the system. Navajo Transit System Project: Transit Vehicle Replacement (Electric) Amount: $5,000,000 The Navajo Transit System will replace buses in its fleet that have met their useful lives with electric buses. -
Apta Health & Safety Commitments Program
APTA HEALTH & SAFETY COMMITMENTS PROGRAM We’re all In This Together! Participating Agencies Transit Agency Headquarters Location Antelope Valley Transit Authority Lancaster CA Battle Creek Transit Battle Creek MI Blacksburg Transit Blacksburg, VA Broward County Transit Plantation FL Cambria County Transit Authority (CamTran) Johnstown PA Capital District Transportation Authority Albany NY Central Contra Costa Transit Concord CA Central Ohio Transit Authority Columbus OH Central Pennsylvania Transportation Authority York PA Champaign-Urbana Mass Transit District Urbana IL Chatham Area Transit Authority Savannah GA Chicago Transit Authority Chicago IL City of Fresno Transit Fresno CA City of Gardena (G-Trans) Gardena CA City of Modesto Area Express Modesto CA Collins Bus service Windsor CT Community Transit Everett WA Connecticut DOT -- CT Rail Glastonbury CT Culver City Transit Culver City CA Dallas Area Rapid Transit Dallas TX Delaware Transit Corporation Dover DE Denton County Transportation Authority Lewisville TX Des Moines Area Regional Transit Authority Des Moines IA Eastern Contra Costa Transit Authority Antioch CA Embark Transit Authority Oklahoma City OK Everett Transit Everett WA Foothill Transit West Covina CA Fort Bend County Public Transportation Rosenberg TX Franklin Transit Authority Franklin TN Georgia Regional Transportation Authority Atlanta GA Gold Coast Transit District Oxnard CA Greater Bridgeport Transit District Bridgeport CT Greater Hartford Transit District Harford CT Greater New Haven Transit District New Haven -
Solanoexpress Bus Routes Transit Information Fairfield Transportation Center Fairfield
Regional Transit Map Transit REGIONAL TRANSIT DIAGRAM To To Eureka Clearlake Information Mendocino Transit DOWNTOWN AREA TRANSIT CONNECTIONS Authority To Ukiah Lake Oakland Mendocino Transit 12th Street Oakland City Center BART: Greyhound BART, AC Transit FA FA 19th Street Oakland BART: FA BART, AC Transit Cloverdale San Francisco Yolobus To Davis Civic Center/UN Plaza BART: Winters Fairfi eld and Suisun Transit SolanoExpress is Solano SolanoExpress is Solano BART, Muni, Golden Gate Transit, SamTrans Fairfield 101 Embarcadero BART & Ferry Terminal: County’s intercity transit connection. County’s intercity transit connection. BART, Golden Gate Transit, Muni, SamTrans, (FAST) is the local transit system Baylink, Alameda/Oakland Ferry, Alameda Harbor Faireld and Healdsburg Bay Ferry, Blue & Gold Fleet, Amtrak CA Thruway Suisun Transit SolanoExpress routes connect cities SolanoExpress routes connect cities Transit To Sacramento for Fairfi eld and Suisun City and also Mongomery Street BART: Healdsburg BART, Muni, Golden Gate Transit, SamTrans Dixon within the county and provide service within the county and provide service Calistoga Readi- operates many of the SolanoExpress (Operated by FAST) (Operated by SolTrans) Handi Powell Street BART: Transportation Ride Van Calistoga BART, Muni, Golden Gate Transit, SamTrans regional routes. Please visit www.fasttransit. to neighboring counties, BART, and the ferry. to neighboring counties, BART, and the ferry. San Francisco Caltrain at 4th & King: Dixon Windsor Deer Caltrain, Muni, Amtrak CA Thruway org or call 707-422-BUSS (707-422-2877) for For more information, call (800) 535-6883 or For more information, call (800) 535-6883 or Park Transbay Temporary Terminal: Guerneville AC Transit, Muni, Golden Gate Transit, SamTrans, 80 visit www.solanoexpress.com. -
Smart Location Database Technical Documentation and User Guide
SMART LOCATION DATABASE TECHNICAL DOCUMENTATION AND USER GUIDE Version 3.0 Updated: June 2021 Authors: Jim Chapman, MSCE, Managing Principal, Urban Design 4 Health, Inc. (UD4H) Eric H. Fox, MScP, Senior Planner, UD4H William Bachman, Ph.D., Senior Analyst, UD4H Lawrence D. Frank, Ph.D., President, UD4H John Thomas, Ph.D., U.S. EPA Office of Community Revitalization Alexis Rourk Reyes, MSCRP, U.S. EPA Office of Community Revitalization About This Report The Smart Location Database is a publicly available data product and service provided by the U.S. EPA Smart Growth Program. This version 3.0 documentation builds on, and updates where needed, the version 2.0 document.1 Urban Design 4 Health, Inc. updated this guide for the project called Updating the EPA GSA Smart Location Database. Acknowledgements Urban Design 4 Health was contracted by the U.S. EPA with support from the General Services Administration’s Center for Urban Development to update the Smart Location Database and this User Guide. As the Project Manager for this study, Jim Chapman supervised the data development and authored this updated user guide. Mr. Eric Fox and Dr. William Bachman led all data acquisition, geoprocessing, and spatial analyses undertaken in the development of version 3.0 of the Smart Location Database and co- authored the user guide through substantive contributions to the methods and information provided. Dr. Larry Frank provided data development input and reviewed the report providing critical input and feedback. The authors would like to acknowledge the guidance, review, and support provided by: • Ruth Kroeger, U.S. General Services Administration • Frank Giblin, U.S. -
Getting Rail to Redlands
Getting Rail to Redlands Carrie Schindler Rob Klovsky SBCTA, Director of Transit & Rail HDR, So. Cal. Transit Director ctaSan Bernardino, CA Irvine, CA San Bernardino County Transportation Authority Video cta cta cta Stage 1 Consolidating Train Storage cta Goals/Scope Expand from 5 to 12 train cap. cta cta Goals/Scope of Facility: • Connect Omnitrans sbX, Fixed Bus Routs, Metrolink and Future Arrow DMU Service • 22 fixed route bus bays • 8,000 SF Transit Center • LEED “Gold” Facility • Dedicated 60,000 SF of TOD/Mixed Use Stage 2 San Bernardino Transit Center cta cta Goals/Scope: • Extend Metrolink terminus to SBTC • Convert Depot to run-through station • Eliminate Puzzle-Switch • Grade Separate Pedestrians at Station • Construct Rail Station Platforms at SBTC • Project Cost: $125M Stage 3 DSBPRP Extension to SBTC cta cta cta cta Celebrating our Successes! cta Stage 4 Redlands Passenger Rail Project cta Strategic Plan RPRP – Phase 1 cta Strategic Plan RPRP – Phase 2 cta Positive Train System Quiet Zones Control Interoperability Project Elements cta Schedule cta General Plan Transit Villages cta New York Street Station cta New York Street Station cta Downtown Redlands Station cta Downtown Redlands Station cta Grant Recipient A modern rail service brought to you by the Redlands Passenger Rail Project First of its kind in San Bernardino County …from DMU to ZEMU First of its kind in North America TIRCP Grant Recipient cta Plan. Build. Move. www.goSBCTA.com 909.884.8276 @goSBCTA. -
Solano Express Bus Routes Transit Information Pleasant Hill Station Area Contra Costa Centre
Fare Information effective January 1, 2016 Senior3 Adult/ (65+) Youth2 County Connection & (6-64) For more detailed information about BART Disabled service, please see the BART Schedule, BART 1 Transit CASH FARES (exact change only) Regional Transit Map System Map, and other BART information REGIONAL TRANSIT DIAGRAM displays in this station. Regular Ride $2.00 $1.00 To To Express Ride (900 series route numbers) $2.25 $1.00 Eureka Clearlake Information Mendocino Transit DOWNTOWN AREA TRANSIT CONNECTIONS PREPAID FARES Authority To Ukiah Lake Oakland ® 4 $2.00 $1.00 Mendocino Transit 12th Street Oakland City Center BART: Clipper Cash Value Greyhound BART, AC Transit 19th Street Oakland BART: 5 $3.75 $1.75 BART, AC Transit Day Pass Cloverdale San Francisco Yolobus To Davis Discount Regular/Express 20-Ride Pass N/A $15.00 Civic Center/UN Plaza BART: Winters BART, Muni, Golden Gate Transit, SamTrans Commuter Card (20 Regular+BART Transfer-Rides) $40.00 N/A Pleasant Hill 101 Embarcadero BART & Ferry Terminal: BART, Golden Gate Transit, Muni, SamTrans, Baylink, Alameda/Oakland Ferry, Alameda Harbor Faireld and 6 $60.00 N/A Healdsburg Bay Ferry, Blue & Gold Fleet, Amtrak CA Thruway Suisun Transit East Bay Regional Local 31-Day Transit To Sacramento Mongomery Street BART: Healdsburg BART, Muni, Golden Gate Transit, SamTrans Dixon 6 $70.00 N/A Calistoga Readi- County Connection (CCCTA) effective January 1, 2016 East Bay Regional Express 31-Day Handi Powell Street BART: San Francisco Bay Area Rapid Fare Information Station Area Ride BART Red* Ticket -
Attachment a 101 CC Project List 01082020.Xlsx
US 101 Connected Communities Transit Projects (Committed) Completion Project Cost Background Comments Project Type Sub‐Type Lead Agency ID Description Source Year ($1,000’s) on Final Draft ‐ Need TTAC input Transit/Passenger Rail Other Capital Projects Camarillo ST‐5070 Las Posas Park and Ride Parking Lot Expansion 2024 $320 2019‐2024 CIP Project is not included in the FTIP. Construction funding is programmed in Transit/Passenger Rail Passenger Rail Camarillo ST‐14‐05 Metrolink Undercrossing 2024 $8,826 2019‐2024 CIP 2022/2023 Transit/Passenger Rail Other Capital Projects Oxnard ‐ Route 23 Bus Stop Installation (Ventura Rd) 2024 $588 2019 ‐ 24 CIP Project is currently underway. Transit/Passenger Rail Other Capital Projects Thousand Oaks CI 5473 Electric Vehicle (EV) Charging Infrastructure 2021 $1,500 2019‐24 CIP Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN030612 DIAL‐A‐RIDE SERVICE ‐ CAPITAL LEASE By 2029 $788 2019 FTIP On‐going Project Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN101104 DIAL‐A‐RIDE VEHICLE CAPITAL LEASE AND MAINTENANCE By 2029 $857 2019 FTIP On‐going Project PURCHASE 5 BUSES FOR EXPANSION AND OPERATING ASSISTANCE DEMONSTRATION Transit/Passenger Rail Vehicle Purchase/Lease Gold Coast Transit VEN151101 By 2029 $6,428 2019 FTIP Project is currently underway FOR VENTURA ROAD BUS LINE INCLUDING PUBLIC OUTREACH. Project is currently underway ‐‐ only 2 buses purchased for expansion. The Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN151102 PURCHASE 4 CNG BUSES FOR EXPANSION By 2029 $2,468 2019 FTIP remainder of funds is to be used for VEN170702 EV Replacement buses Transit/Passenger Rail Vehicle Purchase/Lease Thousand Oaks VEN150603 ADA SERVICE ‐ PARATRANSIT CAPITAL By 2029 $500 2019 FTIP On‐going Project ‐‐ operations.