Resettlement Plan (Draft)

July 2016

PRC: Liupanshan Poverty Reduction Rural Road Development Project

Prepared by the Transportation Department of Ningxia Hui Nationality Autonomous Region for the Asian Development Bank.

CURRENCY EQUIVALENTS CNY1.00 = US$0.16243 US$1.00 = CNY6.1565

ABBREVIATIONS AAOV – Average Annual Output Value ADB – Asian Development Bank AHs – Affected Households APs – Affected Persons AV – Administrative Village CRO – County Resettlement Office DI – Design Institute DMS – Detailed Measurement Survey FS – Feasibility Study HD – House Demolition JCG – Jingyuan County Government JCPMO – Jingyuan County Project Management Office LA – Land Acquisition LAB – Land and Resources Bureau LAR – Land Acquisition and Resettlement LEF – Land-Expropriated Farmer L&RO – Land & Resources Office MOU – Memorandum of Understanding M&E – Monitoring and Evaluation NDRC – National Development and Reform Commission NHAR TD – Ningxia Hui Autonomous Region Transport Department PADO – Poverty Alleviation and Development office PPTA – Project Preparatory Technical Assistance PRA – Participatory Rural Appraisal PRO – Project Resettlement Office RIB – Resettlement Information Booklet RP – Resettlement Plan SES – Socioeconomic Survey SPS – Safeguard Policy Statement of ADB TRO – Town/township Resettlement Office

WEIGHTS AND MEASURES km – kilometer m² – square meter mu – 666.7 m²

NOTE In this report, "$" refers to US dollars.

This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

NINGXIA LIUPANSHAN POVERTY REDUCTION RURAL ROAD DEVELOPMENT PROJECT FINANCED BY THE ADB

Resettlement Plan for

Shatang (Huanghua Town)–Gaodian Road and Dongxia–Digou Road project of Jingyuan County of City in Ningxia Hui Autonomous Region

(Draft based on preliminary design)

July 2016

Prepared by Transportation Department of Ningxia Hui Nationality Autonomous Region

宁夏回族白治区交通运输厅

Endorsement Letter

22Ju1y2016

Mr. Masahiro Nishimura Transport Specialist Asian Development Bank 6 ADB Avenue Mandaluyong City Metro Manila 1550 Philippines

Subject: P48023-PRG Ningxia Liupanshan Poverty Reduction Rural Road . Development project

Dear Mr. Masahiro Nishimura

In accordance with le]9ya$ laws and legislations of the pRG government Policy statement (sPS) 2oog, Resetflement plans (Rps) and a consoli D;yglonment Plan (EMDP rring att irrqelt components. (GAP) covering all project These reports are prepa pregared for the proposed projbct roads by institutes as well as site reconnaissance by consultant team. This is to formally advise you that there is no objection to the Rps, EMDp and GAp documents being posted on the ADB website according to ADB disclosure procedures. We further confirm that we will implement all required actions as set out in the RP, EMDP and GAp during project implementation and accept ADB's supervision and inspection of the action plan implemihtaiion and disclosure of monitoring reports dudng implementation.

Yours sincerely,

Deputy Director, Planning Division Ningxia Department of Transport GLOSSARY

Affected person (or – Those who are physically displaced (relocation, loss of household) residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas Compensation – Money or payment in kind to which the people affected are entitled in order to replace the lost asset, resource or income Entitlement – Range of measures comprising compensation, income restoration, transfer assistance, income substitution, and relocation which are due to affected people, depending on the nature of their losses, to restore their economic and social base Income restoration – Reestablishing income sources and livelihoods of people affected Resettlement – Rebuilding housing, assets, including productive land, and public infrastructure in another location Resettlement Impact – Loss of physical and non-physical assets, including homes, communities, productive land, income-earning assets and sources, subsistence, resources, cultural sites, social structures, networks and ties, cultural identity, and mutual help mechanisms Resettlement Plan – A time-bound action plan with budget setting out resettlement strategy, objectives, entitlement, actions, responsibilities, monitoring and evaluation Significantly affected – Persons who lose 10% or more of their farmland or income, or household persons who are affected by entire house demolition and need to be relocated Vulnerable Group – Distinct groups of people who might suffer disproportionately from resettlement effects, as specified in this plan

CONTENTS 1 PROJECT OVERVIEW ...... 1

1.1 PROJECT BACKGROUND ...... 1 1.2 OVERVIEW OF PROJECT PREPARATION ...... 3 1.3 SUBPROJECTS IN JINGYUAN COUNTY ...... 4 2 PROJECT IMPACT ...... 7

2.1 SURVEY METHOD AND PROCESS ...... 7 2.1.1 Project Survey at the Early Stage ...... 7 2.1.2 Data source and survey method ...... 7 2.2 PROJECT IMPACT SCOPE AND OVERVIEW ...... 8 2.3 IMPACT OF PERMANENT COLLECTIVE LAND ACQUISITION ...... 9 2.4 TEMPORARY LAND OCCUPATION ...... 10 2.5 ANALYSIS OF IMPACT OF RESIDENTIAL HOUSE DEMOLITION ...... 11 2.6 IMPACT OF DEMOLISHED BUILDINGS OF ENTERPRISES AND PUBLIC INSTITUTIONS ...... 11 2.7 AFFECTED INFRASTRUCTURE AND GROUND ANCILLARY FACILITIES ...... 11 2.8 AFFECTED POPULATION ...... 12 2.8.1 Overview ...... 12 2.8.2 Affected vulnerable groups ...... 12 2.8.3 Project impact on women ...... 13 2.8.4 Affected minority population ...... 13 3 SOCIAL AND ECONOMIC PROFILE ...... 14

3.1 SOCIOECONOMIC PROFILE OF PROJECT AREA ...... 14 3.1.1 Socioeconomic profile of Guyuan City ...... 14 3.1.2 Socioeconomic profile of Jingyuan County ...... 15 3.1.3 Socioeconomic profile of affected towns ...... 16 3.1.4 Introduction to Socioeconomic status of affected villages ...... 16 3.2 SOCIOECONOMIC PROFILE OF AFFECTED VILLAGES ...... 17 3.2.1 Sample survey ...... 17 3.2.2 Nationality and gender ...... 17 3.2.3 Age structure ...... 18 3.2.4 Education background ...... 18 3.2.5 Housing size ...... 19 3.2.6 Farmland resource ...... 19 3.2.7 Household income and expenditure...... 19 3.2.8 Public opinion survey ...... 20 3.3 AFFECTED ENTERPRISES AND PUBLIC INSTITUTIONS AND SENSIBILITY IMPACT ...... 21 3.4 WOMEN’S DEVELOPMENT IN PROJECT AREA ...... 21 3.4.1 Rural women profile in project areas...... 21 3.4.2 Women’s roles in household livelihoods ...... 22 3.4.3 Decision-making at household and community levels ...... 22 3.4.4 Women’s transport needs ...... 23 3.4.5 Project Impacts on Women ...... 23 3.4.6 Measures in RP in facilitating women’s development ...... 24 4 LEGAL FRAMEWORK AND POLICIES ...... 26

4.1 ADB'S POLICY ...... 26 4.2 THE PRC’S LAWS AND REGULATIONS ON LAND ACQUISITION AND RELOCATION ...... 26 4.3 RELEVANT POLICIES OF NINGXIA HUI AUTONOMOUS REGION AND JINGYUAN COUNTY ...... 28 4.4 ADB’S POLICY REQUIREMENTS ON INVOLUNTARY RESETTLEMENT ...... 29 4.5 DIFFERENCES OF ADB’S AND LOCAL POLICIES ...... 30 4.5.1 Compensation and resettlement for house ...... 30

4.5.2 Compensation and resettlement for land ...... 30 4.5.3 Compensation and resettlement for vulnerable groups ...... 31 4.5.4 Consultation and disclosure ...... 31 4.5.5 Resettlement monitoring, evaluation and reporting ...... 31 5 COMPENSATION PRINCIPLE AND ENTITLEMENT ...... 32

5.1 RESETTLEMENT PRINCIPLES ...... 32 5.2 CUT-OFF DATE OF COMPENSATION ...... 32 5.3 COMPENSATION RATE FOR PERMANENT LAND ACQUISITION ...... 32 5.4 TEMPORARY LAND OCCUPATION ...... 33 5.5 COMPENSATION RATE FOR HOUSE DEMOLITION ...... 33 5.6 COMPENSATION FOR GROUND ATTACHMENT AND INFRASTRUCTURE ...... 36 5.7 COMPENSATION FOR YOUNG CROPS ...... 36 5.8 STANDARD OF OTHER COSTS ...... 36 5.9 ENTITLEMENT MATRIX...... 36 6 INCOME RESTORATION AND HOUSING RESETTLEMENT MEASURES ...... 40

6.1 IMPACT OF LAND ACQUISITION AND INCOME RESTORATION MEASURES ...... 40 6.1.1 Impact of and acquisition ...... 40 6.1.2 Income restoration plan and assistance measures ...... 42 6.2 DEMOLITION AND HOUSING RESETTLEMENT PLAN ...... 45 6.2.1 House Demolition Impacts and Relocation options ...... 45 6.2.2 Other subsidy policy ...... 47 6.3 MEASURES FOR VULNERABLE GROUPS ...... 47 6.4 WOMEN’S DEVELOPMENT MEASURES ...... 48 6.5 RECOVERY PLAN OF GROUND ATTACHMENTS AND SPECIAL FACILITIES ...... 49 7 INSTITUTIONAL ARRANGEMENTS ...... 50

7.1 INSTITUTIONAL ARRANGEMENTS ...... 50 7.2 ORGANIZATIONAL RESPONSIBILITY ...... 51 7.3 STAFFING AND EQUIPMENT ...... 54 7.3.1 Staffing ...... 54 7.3.2 Equipment ...... 54 7.3.3 Organizational Training Program ...... 54 8 RESETTLEMENT BUDGET ...... 55

8.1 RESETTLEMENT BUDGET ...... 55 8.2 RESETTLEMENT INVESTMENT PLAN AND SOURCE OF FUND ...... 56 8.3 MANAGEMENT AND DISBURSEMENT OF RESETTLEMENT FUNDS ...... 56 8.4 APPROVAL OF BUDGET INCREASE ...... 57 9 PUBLIC PARTICIPATION AND GRIEVANCE REDRESS ...... 58

9.1 PUBLIC PARTICIPATION ...... 58 9.1.1 Stakeholder identification and information disclosure ...... 58 9.1.2 Participation during project preparation ...... 58 9.1.3 Participation plan during implementation ...... 62 9.1.4 Adaptation of RP based on public opinions ...... 63 9.2 GRIEVANCES AND REDRESS ...... 64 9.2.1 Grievances ...... 64 9.2.2 Grievance Procedures ...... 64 9.2.3 Grievance Redress Principle ...... 65 9.2.4 Contents and Form of Reply to Complaints ...... 66 9.2.5 Report of Grievance ...... 66

10 IMPLEMENTATION PLAN OF LAND ACQUISITION AND RESETTLEMENT ...... 67

10.1 PRINCIPLE FOR IMPLEMENTATION OF LAND ACQUISITION AND RESETTLEMENT ...... 67 10.2 RP IMPLEMENTATION SCHEDULE ...... 67 11 MONITORING, EVALUATION AND REPORT ...... 70

11.1 INTERNAL MONITORING ...... 70 11.2 EXTERNAL MONITORING ...... 70 11.3 SCOPE AND METHODOLOGY OF EXTERNAL MONITORING ...... 70 11.4 POST EVALUATION RESETTLEMENT COMPLETION REPORT ...... 72 ANNEXES ...... 73

ANNEX A RESETTLEMENT INFORMATION BOOKLET ...... 73 ANNEX B KEY EXCERPTS OF LOCAL REGULATIONS ...... 93 ANNEX C TERMS OF REFERENCE FOR EXTERNAL MONITORING AND EVALUATION AGENCY ...... 98

List of Tables

TABLE 1-1 BASIC INFORMATION OF JINGYUAN COUNTY SUBPROJECT ...... 5 TABLE 2-1 TOWNS AND ADMINISTRATIVE VILLAGES AFFECTED BY LAND ACQUISITION AND DEMOLITION ...... 8 TABLE 2-2 PERMANENT ACQUISITION OF COLLECTIVE LAND (BY AFFECTED VILLAGE) ...... 9 TABLE 2-3 FARMLAND LOSS AFFECTED BY PROJECT LAND ACQUISITION (BY AFFECTED HH) ...... 9 TABLE 2-4 FARMLAND LOSS OF THE HOUSEHOLDS AFFECTED BY LA ...... 10 TABLE 2-5 LIST OF IMPACT OF DEMOLISHED RURAL RESIDENTIAL HOUSE ...... 11 TABLE 2-6 AFFECTED GROUND ANCILLARY FACILITIES ...... 11 TABLE 2-7 AFFECTED POPULATION ...... 12 TABLE 2-8 BASIC INFORMATION OF VULNERABLE GROUPS OF JINGYUAN COUNTY ROAD PROJECT...... 12 TABLE 3-1 SOCIOECONOMIC PROFILE OF GUYUAN CITY ...... 14 TABLE 3-2 SOCIAL AND ECONOMIC STATUS OF JINGYUAN COUNTY ...... 15 TABLE 3-3 SOCIAL AND ECONOMIC STATUS OF AFFECTED TOWNS...... 16 TABLE 3-4 SOCIOECONOMIC INDICATORS OF THE AFFECTED VILLAGES ...... 16 TABLE 3-5 SAMPLING PROPORTION ...... 17 TABLE 3-6 ANALYTICAL TABLE OF INCOME AND EXPENDITURE OF SURVEYED HOUSEHOLDS ...... 20 TABLE 5-1 RESETTLEMENT PRINCIPLES OF THE COMPONENT ...... 32 TABLE 5-2 COMPENSATION STANDARD FOR THE PROJECT LAND UNIT: CNY /MU ...... 33 TABLE 5-3 COMPENSATION STANDARD FOR DEMOLITION OF RESIDENTIAL HOUSE AND ANCILLARY FACILITIES ...... 34 TABLE 5-4 ESTIMATION OF REPLACEMENT COST OF HOUSE BY TYPE (PER 100M²) ...... 35 TABLE 5-5 COMPENSATION STANDARD FOR GROUND ATTACHMENTS AND INFRASTRUCTURE ...... 36 TABLE 5-6 TAX AND FEE STANDARD OF RESETTLEMENT ...... 36 TABLE 5-7 COMPENSATION ENTITLEMENT AND RESETTLEMENT POLICY MATRIX ...... 37 TABLE 6-1 PERMANENT FARMLAND ACQUISITION IMPACT ...... 41 TABLE 6-2 SUMMARY SHEET OF INCOME RESTORATION WILLINGNESS OF THE ACQUIRED HOUSEHOLDS ...... 42 TABLE 6-3 PROJECT EMPLOYMENT INFORMATION ...... 43 TABLE 6-4TRAINING PLAN FOR PROJECT IMPLEMENTATION ...... 44 TABLE 6-5 DEMOLITION SCHEME OF RESIDENTIAL HOUSES ...... 46 TABLE 8-1 RESETTLEMENT BUDGET ...... 55 TABLE 8-2 RESETTLEMENT INVESTMENT PLAN ...... 56 TABLE 9-1 PUBLIC PARTICIPATION DURING PROJECT PREPARATION FINISHED ...... 60 TABLE 9-2 PROJECT PUBLIC PARTICIPATION SCHEME ...... 62 TABLE 10-1 SCHEDULE OF LAND ACQUISITION AND RESETTLEMENT ACTIVITIES ...... 67 TABLE 11-1 SCHEDULE OF MONITORING AND EVALUATION ...... 71

List of Figures

FIGURE 1-1 SKETCH MAP OF RURAL TRUNK ROAD DISTRIBUTION ...... 3 FIGURE 3-1 AGE DISTRIBUTION STRUCTURE ...... 18 FIGURE 3-2 DISTRIBUTION STRUCTURE OF EDUCATION ...... 19 FIGURE 7-1 PROJECT RELOCATION ORGANIZATIONS ...... 51 FIGURE 8-1 RESETTLEMENT FUNDS FLOW OF DISTRIBUTION ...... 57 FIGURE 9-1 PUBLIC SURVEY SITE ...... 59

EXECUTIVE SUMMARY

E1. DESCRIPTION OF THE PROJECT

1. Jingyuan County subproject (the subproject) covers the reconstruction and expansion of a rural trunk road, named as Shatang (Huanghua Town)–Gaodian Road, and a rural feeder road, named as Dongxia-Digou Road.

(i) Rural trunk road

2. Shatang (Huanghua Town)–Gaodian Road is the rural trunk road and includes main section and branch section. The main section starts from Shatang Village of Huanghua Town in Jingyuan County, intersects road S313 that is newly planned (formal Jingyuanping Road), and ends at Haodian Village in Liupanshan Town, intersects road G312 at the section of K1835+318, with the whole length of 13.443 km. The branch section starts from Tuyao Village, intersects the main section at K3+023.63, and ends at Tuyao Village, intersects the section of K0+856, with the whole length of 1.782 km. The total investment for this trunk road is estimated to be CNY 46,591,274.

(ii) Rural feeder road

3. Dongxia-Digou Road is the feeder road project, including one main road and three branches. The main road starts from road S101 in Dongxia Town, goes southeastward and then northeastward via Pangdong Village along the old road, and ends at Digou Forest Protection Station of Longtan Forest Farm via the west part of Dongxia Village and Shidi Village, with the stake number of K8+200 (ending point). a) Branch A starts from Pangdong Village, connects stake K1+242.1 of main road, and ends at the unsurfaced road at the east end of Pangdong Village via Group 3 of Pangdong Village along the old road, with stake number of AK0+661 (ending point); b) Branch B starts from the intersection of the west part of Dongxia Village and main road K4+354.79, goes southward via Dongxia Village, and then southward at K0+725, and stops at the end of Shangxia Village along the old road, with stake number of BK2+162 (ending point); c) Branch C starts from Shidi Village, and intersects main road K5+123.81, goes westward along the old road, and ends at the unsurfaced road of the west end of the village.

4. The total length of construction is 11.717 km and the total investment is estimated to be CNY 24,542,200.

E2. LAND ACQUISITION AND RESETTLEMENT SCOPE

5. The land acquisition and resettlement (LAR) will affect three towns and 7 administrative villages.

6. A total of 394.52mu of land will be acquired, including 160.01 mu of Farmland (40.6%), 24.31 mu of Residential land (6.2%), and 210.2 mu of Forest land (53.3%).

7. The residential houses involved in the house demolition (HD) are rural houses of 2,169 m2, are brick-wood houses of 624 m2 and earth-wood houses of 1,545 m2.

i

8. In addition, scattered trees, poles, wires, tombs, enclosures, water wells and other ground ancillary facilities will be affected. The project will acquire 17 mu of temporary land that is unutilized land. No enterprises or shops are involved in the acquisition and demolition.

9. 112 households with 432 persons will be affected by LA, of which both LA and HD will affect 38 households with 134 persons. No households will lose more than 10% of farmland and income. Among 38 households with 134 persons to be affected by HD, only 4 HHs with 14 person will be demolished completely and need to be relocated, and the remaining will be affected partially. Therefore, 4 households with 14 persons to be affected by HD are regarded as severely affected.

E3. RESETTLEMENT PRINCIPLES AND ENTITLEMENTS

10. The Resettlement Plan (RP) is prepared in accordance with the related land acquisition and house demolition policies of Jingyuan County, Guyuan City, Ningxia Hui Autonomous Region, PRC, as well as Safeguards Requirement 2 on Involuntary Resettlement in ADB’s Safeguards Policy Statement (SPS 2009). The objective of the RP is to ensure the affected production and infrastructure is recovered, affected labor forces are reemployed, demolished housing is rebuilt, and the incomes and lives of affected persons (APs) are improved or at least restored to the pre-project (physical and/or economic) levels.

E4. COMPENSATION STANDARDS

11. The resettlement policy of this RP is in accordance with ADB SPS 2009, national laws, regulations, and rules, as well as the resettlement policies of Jingyuan County, Guyuan City, Ningxia Hui Autonomous Region, and based on the full and extensive consultations with the APs and confirmation of the project implementing agency. It can be implemented after the approval of local governments.

12. The compensation standard for mountainous dryland and Residential land acquisition is CNY 5,670/mu in Liupanshan Town and Huanghua Town in Jingyuan County. And the compensation standard for Forest land is CNY 3,969/mu, accounting for 70% of that for dry farmland in the area.

13. Based on the policy that the compensation for common crops should be compensated in accordance with their average annual output value in the last three years, the compensation fee for young crops is determined to be CNY 600/mu.

14. According to the ADB policies and national provisions, the replacement cost is adopted for rural residents’ housing and the compensation standard for house demolition. The compensation price will not be lower than the base price stipulated in this plan, and will increase appropriately based on the housing market in similar regions in 2016. The specific standards are: CNY 1000 per m2 for concrete and brick structures, CNY 600 per m² for brick and wood structures, CNY 310 per m² for earth-wood structures, and CNY 100 per m² for simple house structures. The affected households (AHs) will receive a moving allowance of CNY 1,000 per household, and transition subsidies of CNY 300 per household per month with the period not over 6 month in total. The compensation standards for other affected assets including trees, surface attachments, and water and power facilities are set according to replacement cost.

15. Compensation for land acquisition, residential housing, and other attachments will be paid directly to the affected villages or APs respectively.

ii E5. RESETTLEMENT AND LIVELIHOOD REHABILITATION

16. The land acquisition impacts on household’s net income are limited and will have minimal impact on the livelihood standards of the affected households. To minimize the resettlement impacts to APs and restore their living standards, a rehabilitation plan has been developed and included in this RP. The comprehensive compensation package that will be used by the affected households, which includes expanding cash crop plantation, improving existing low yield cash crops and land rental to expand agricultural plantation, can offset the losses incurred due to the land acquisition impacts. Additionally, arranged jobs, waged non-farming jobs, off-farming business, and special measures for vulnerable groups have been put in place.

17. For physically displaced households (i.e., house demolition), two options are available for them to choose according to their own desire in order to restore their living condition. In both cases, cash compensation for Residential land, house structures and attachments based on replacement costs as well as transfer allowances will be provided. The major options include: (i) Cash compensation and self-relocation by displaced household. The compensation standard will be determined in accordance with replacement cost proposed in the resettlement plan. (ii) Allocated resettlement and subsidy policy: The villagers committees select and allocate appropriate Residential land to the affected households, and the allocated area shall be not less than the former area. And the villagers committees have promised that they will arrange Residential lands within their village to relocate the APs and the resettlement place will be determined before the project is constructed.

E6. PUBLIC PARTICIPATION AND GRIEVANCE

18. From April to July 2016, over eight socio-economic surveys and public opinion consultation activities were carried out with the APs (including 40% women) by the project design agency and Survey Group of Academy of Social Sciences. The PMO, implementing agency, affected villages, towns/townships, and APs have consulted with each other on land acquisition and resettlement of the project. The issues raised included compensation scheme, resettlement plan, fees payment, economic recovery, resettlement site and procedures; their concerns and comments have been integrated into the RP. Further consultations will be held during the implementation of the RP. A grievance redress procedure has been established for the APs to manage LAR and other project related issues. Both oral and written grievances received and their redress actions will be recorded and will be made available to the external monitor and ADB missions on request. The affected masses can also lodge a complaint to the external monitor.

E7. INSTITUTIONAL ARRANGEMENT

19. Transportation Department of Ningxia Hui Nationality Autonomous Region is the executing agency (EA), who will be responsible for organizing and applying for ADB loan, coordinating the implementation of the RP, supervising and checking the payment and use of land acquisition, demolition, and resettlement fees, formulating land acquisition and demolition progress reports, and providing training for personnel of the project implementing agency.

20. Jingyuan County Transport Bureau (CTB) on behalf of Jingyuan County Government is the implementing agency (IA) of the subproject in Jingyuan County. Jingyuan PMO as a working body set up in the CTB in is mainly responsible for organizing the resettlement work of the

iii subproject, and making decisions and consultations on major issues arising from construction and resettlement.

21. Jingyuan County Resettlement Office (CRO) under Jingyuan PMO is responsible for the detailed work of preparation and implementation of the RP. Each involved town government and the affected village and community committees are responsible for working with Jingyuan Project Resettlement Office in the implementation of this RP. 1-2 leaders in each town government and each village committee respectively will be nominated to lead the RP preparation and implementation.

E8. RESETTLEMENT IMPLEMENTATION SCHEDULE

22. The resettlement implementation schedule has been prepared based on the preparation and construction progress of Jingyuan County road engineering. However, the final schedule needs to be updated based on the final design and detailed measurement before civil works contract is signed. The construction of subproject is expected to start in July 2017. It is therefore scheduled that land acquisition and housing demolition will commence in April 2017, and completed in April 2018. However, rehabilitation and residence allocation may take longer to complete. Ningxia PMO has agreed to a set of supervision milestones with ADB to ensure timely and effective implementation of the resettlement work.

E9. RESETTLEMENT COST

23. The resettlement costs are budgeted in the project. According to the price in 2016, the resettlement costs total CNY 7,265,072, including basic fees of CNY 3,521,916. In terms of impact category, the fee for permanently acquired collective land is CNY 1,975,384; housing demolition costs are CNY 959,750; compensation fee for ground attachments is CNY 403,682; compensation fee for special facilities is CNY 172,900. Other fees include the CNY 75,000 of aid for vulnerable groups, CNY 90,000 for resettlement plan formulation and monitoring fee, CNY 2,867,695 of land taxes/fees, CNY 50,000 for resettlement training fee, and CNY 323,525 for contingency.

E10. MONITORING AND EVALUATION

24. To ensure the land acquisition and resettlement work is implemented smoothly as planned, two supervision modes are adopted by two institutions. Firstly, internal supervision system composed of governmental departments (Ningxia PMO and county PMO) conducts supervision based on RP clauses from the perspective of administrative management. Secondly, Ningxia PMO will engage an independent external resettlement monitoring institute or firm to undertake external monitoring of the RP implementation. A baseline study will be conducted before the LAR begins and the first monitoring report will be submitted shortly thereafter. After that and until LAR completion, semi-annual monitoring reports will be prepared and submitted for ADB’s review. After completion of the LAR, annual evaluation reports will be submitted to ADB for 2 years or longer if there are any remaining issues.

iv 1 Project Overview

1.1 Project Background

1. The Ningxia Hui Autonomous Region is one of the most underdeveloped provinces/regions in PRC. In 2015, its per capita GDP, per capita income of urban residents, and per capita income of rural residents respectively accounted for about 88.98%, 80.74%, and 76.4% of the national average values, ranking 30th, 24th, and 24th among 31 administrative provinces and regions. There are 22 counties (districts) in Ningxia, and eight of them have been listed as nationally designated poor counties, accounting for 36.4% of the number of all counties and districts.

2. The poverty-stricken areas in Ningxia are mainly distributed in the mountain areas of southern Ningxia, including Guyuan City (, , , Jingyuan County, and zhou District), as well as Hai County in City and Wuzhong City ( and Yanchi County), which are collectively known as “Xihaigu” region (national-level poverty county), one of the “Three-Xi” (Hexi and Dingxi City of Province and Xihaigu Area of Ningxia Hui Autonomous Region) poverty-stricken regions in PRC.

3. Liupanshan region involved in the project is located in the mountain area of southern Ningxia, including Xiji County, Pengyang County, Jingyuan County, zhou District, Hai County, and Tongxin County, which are key poverty relief and development regions in PRC, as well as the destitute areas among poor rural areas nationwide and national-level poverty-stricken counties. Due to the poor natural conditions and economic foundation, and limited investment, and other constraints, the highway traffic in the region is featured by poor layout, low technical standard, insufficient construction funds, etc., and cannot satisfy the demands of economic and social development. Currently, undeveloped traffic and other infrastructure have become the bottleneck and disadvantage for the development of Liupanshan destitute area, and the poor transport infrastructures have become the most serious problem reported frequently by the masses in Liupanshan.

4. In order to accelerate the development of Liupanshan, enhance poverty alleviation, guarantee and improve people’s livelihood, facilitate people to overcome poverty and achieve prosperity, ensure all people can share the reform and development achievements, boost PRC Western Development, promote the coordinated development of regions, and achieve the overall strategic objective of national regional development, Transportation Department of Ningxia Hui Nationality Autonomous Region grasps the opportunity of historical development, starts from eliminating the phenomenon that undeveloped traffic and infrastructure restrict the development of contiguous destitute areas in Liupanshan, and now plans to implement Liupanshan rural highway development project for poverty alleviation in Ningxia Hui Autonomous Region with the ADB loan, which includes seven subprojects, involving Xiji County, Pengyang County, Jingyuan County and zhou District in Guyuan City, Hai County in Zhongwei City, and Tongxin County in Wuzhong City.

5. The construction of Liupanshan rural road development project for poverty alleviation in Ningxia Hui Autonomous Region (the Project) with the ADB loan mainly targets at: 1) improving the technical grade for road network project, increasing network capacity, and perfecting regional road network; 2) enhancing the connection between the project area and surrounding area, improving regional traffic condition, and promoting the economic development of the project area and region; 3) constructing seven trunk roads and 21 branches in Xiji County,

1 Pengyang County, Jingyuan County, and zhou District in Guyuan City, Hai County in Zhongwei City, and Tongxin County in Wuzhong City.

6. As required by ADB, resettlement plan should be formulated for seven trunk roads and two feeder roads. The other 19 roads are farm roads serving agricultural production within villages based on the provision of Notice of the General Office of Ministry of Land and Resources on Further Regulating the Identification of Land Category for Rural Roads (Guo Tu Zi Ting [2013] No.581) (see Section 4.1), so they are people-benefit projects with very limited negative impact compared to the project benefits and the counties will arrange the land acquisition and relocation according to local standards. The Project will benefit about 2.10 million residents from six project counties and districts as well as surrounding provinces, counties and cities, of which, urban residents and rural residents respectively account for 16% and 84%.

7. Jingyuan County subproject is one of subprojects of the Project, which includes one trunk road and one feeder road. (i) Trunk road Shatang (Huanghua Town)–Gaodian Road is a trunk road, with length of 15.019 km. The project is composed of a main line and a branch. The main line is 13.237 km long while the branch is 1.782 km long. The main line is constructed with the standard of tertiary road, design speed of 20 km/h, width of right of way (ROW) of 9.5 m including subgrade width of 7.5 m and pavement width of 6.5 m. The branch is constructed with the standard of the fourth-grade road, design speed of 20 km/h, width of ROW of 8.5m including subgrade width of 6.5 m, and pavement width of 6.0 m. The total investment in the project is estimated to be CNY 46,591,274. (ii) feeder road: Dongxia-Digou road is the feeder road, including one main line and three branches. The main line starts from Line S101 in Dongxia Town, goes southeastward and then northeastward via Pangdong Village along the old road, and ends at Digou Forest Protection Station of Longtan Forest Farm via the west part of Dongxia Village and Shidi Village, with the stake number of K8+200 (ending point). a) Branch A starts from Pangdong Village, connects stake K1+242.1 of main line, and ends at the unsurfaced road at the east end of Pangdong Village via Group 3 of Pangdong Village along the old road, with stake number of AK0+661 (ending point); b) Branch B starts from the intersection of the west part of Dongxia Village and main line K4+354.79, goes southward via Dongxia Village, and then southward at K0+725, and stops at the end of Shangxia Village along the old road, with stake number of BK2+162 (ending point); c) Branch C starts from Shidi Village, and intersects main line K5+123.81, goes westward along the old road, and ends at the unsurfaced road of the west end of the village.

8. The total distance of construction is 11.717 km and the total investment is estimated to be CNY 24,542,200.

2 Wangtuan- Yuwang Road

Zhengji-Jiucai- Wanzhang- Sikouzi Road Sanying Road

Guanting-Gu Sectin of Gu-Xiji Road

Jiangtai-Xitan- Pingfeng Road

Shatang-Haodian Road in Huanghua Town

Figure 1-1 Sketch Map of Rural Trunk Road Distribution

1.2 Overview of Project Preparation

9. The project is funded by the Asian Development Bank and NHAR TD. Before engineering implementation, resettlement plan shall be formulated in accordance with the standard and requirements for loan financing project.

10. On February 24-26, 2015, ADB Project Launch Delegation (hereinafter referred to as “Launch Delegation”) visited , and determined the content, principle and requirement

3 of project resettlement plan. “Launch Delegation” and Transportation Department of Ningxia Hui Nationality Autonomous Region (executing agency) confirmed that resettlement plan for subprojects will be prepared as per involved counties and districts. The resettlement plans for six independent trunk roads and 2 feeder roads in 7 counties and districts should be formulated.

11. On the basis of the task above, Transportation Department of Ningxia Hui Nationality Autonomous Region authorized the consultants and experts from Shaanxi Academy of Social Sciences to formulate corresponding documents. The document is namely RP for trunk road and feeder road construction confirmed for the subproject. There are four sources for critical data and information in RP: (i) Feasibility study report and preliminary design of the project, preliminary demographic census results, and relevant government documents; (ii) Relevant information of functional department, such as, policy document, work summary and statistical data; (iii) Information of the affected villages and towns and village collectives, such as basic information and statistical report; (iv) Information from focus group discussion (FGDs), interview and household (HH) questionnaire survey.

1.3 Subprojects in Jingyuan County

12. The subproject of Jingyuan County includes a rural trunk road and a rural feeder road, which are Shatang-Haodian Road project in Huanghua Town and Dongxia-Digou road.

(i) Rural trunk road

13. It is planned to construct Shatang-Haodian Road project in Huanghua Town.

14. Main road: The starting point of main road of this project is located at Shatang Village of Huahuang Town, Jingyuan County, and passes through Shatang Village, Tuyao Village, Bangou Forest Protection Site of Wogchuan Forest Farm, and Nonglin Village, and ends at Haodian Village of Liupanshan Town. The route is in the north and south trend generally.

15. Branch section: The starting point of branch is located at Tuyao Village, intersects with the main road at K3+023.63, and passes through residential buildings of Tuyao Village, while the ending point is at Tuyao Village, and intersects with the branch at K0+810.

16. The rural trunk road of Jingyuan County is 15.019 km long in total, in which the main road is 13.237 km long, and the branch is 1.782 km long. The main road adopts Grade-III highway standard for construction, with the designed speed of 30 km/h, width of subgrade of 7.5 m, and width of pavement of 6.5 m; the branch adopts Grade-IV highway standard for construction, with the designed speed of 20 km/h, width of subgrade of 6.5 m, and width of pavement of 6.0 m. The total investment is estimated to be CNY 46,591,274. The engineering construction period is scheduled as: Started in July 2017, and completed in July 2018. The total construction period is 12 months.

(ii) Rural feeder road

17. Dongxia-Digou road project is the feeder road project, including one main road and three branches. The main road starts from road S101 in Dongxia Town, goes southeastward and then northeastward via Pangdong Village along the old road, and ends at Digou Forest Protection

4 Station of Longtan Forest Farm via the west part of Dongxia Village and Shidi Village, with the stake number of K8+200 (ending point). a) Branch A starts from Pangdong Village, connects stake K1+242.1 of main road, and ends at the unsurfaced road at the east end of Pangdong Village via Group 3 of Pangdong Village along the old road, with stake number of AK0+661 (ending point); b) Branch B starts from the intersection of the west part of Dongxia Village and main road K4+354.79, goes southward via Dongxia Village, and then southward at K0+725, and stops at the end of Shangxia Village along the old road, with stake number of BK2+162 (ending point); c) Branch C starts from Shidi Village, and intersects main road K5+123.81, goes westward along the old road, and ends at the unsurfaced road of the west end of the village.

18. The total distance of construction is 11.717 km and the total investment is estimated to be RMB 24,542,200 Yuan. (See Table 1-1).

Table 1-1 Basic Information of Jingyuan County Subproject Construction Project radiation Project Category Project construction content grade effect Main road: The starting point of main road of this project is located at Shatang Village of Huahuang Town, Jingyuan County, intersects with the newly planned road S313 (Original Jingyuanping Highway) at K17+600, passes through Shatang Village, Tuyao Village, Bangou Forest Protection It affects two Site of Wogchuan Forest Farm, towns (Huanghua and Nonglin Village, and ends at Town and Haodian Village of Liupanshan Liupanshan Town, and intersects with road Town), three Shatang G312 at K1835+400. The route is Adopt tertiary administrative (Huanghua Road in the north and south trend highway villages (Shatang Town) – reconstruction generally. technology Village, Tuyao Gaodian Branch: The starting point of standard Village and Road branch is located at Tuyao Nonglin Village), Village, intersects with the main 1,535 persons, road at K3+023.63, and passes including 323 through residential buildings of impoverished Tuyao Village, while the ending people. point is at Tuyao Village, and intersects with the branch at K0+810. The project is 15.019 km long in total, in which the main road is 13.237 km long, and the branch is 1.782 km long. The total construction period is 12 months. The main road starts from road Adopts Grade- It affects one town Dongxia- Road S101 in Dongxia Town, goes IV highway (Jingheyuan Digou road reconstruction southeastward and then standard for Town), four northeastward via Pangdong construction administrative

5 Construction Project radiation Project Category Project construction content grade effect Village along the old road, and villages ends at Digou Forest Protection (Pangdong Station of Longtan Forest Farm Village, Dongxia via the west part of Dongxia Village, Shidi Village and Shidi Village, with the Village, and Digou stake number of K8+200 (ending Village), 1,482 point). persons, including Branch A starts from Pangdong 373 impoverished Village, connects stake K1+242.1 people. of main road, and ends at the unsurfaced road at the east end of Pangdong Village via Group 3 of Pangdong Village along the old road, with stake number of AK0+661 (ending point); Branch B starts from the intersection of the west part of Dongxia Village and main road K4+354.79, goes southward via Dongxia Village, and then southward at K0+725, and stops at the end of Shangxia Village along the old road, with stake number of BK2+162 (ending point); Branch C starts from Shidi Village, and intersects main line K5+123.81, goes westward along the old road, and ends at the unsurfaced road of the west end of the village. Data source: Socioeconomic and physical impact survey in July 2016.

1.4 Measures Employed to Avoid or further reduce Land Acquisition and Demolition

19. To avoid or reduce the negative impact of economic and social development and benefit people is the basic objective of this project. The following principles are followed for determination of project site selection and project boundary during the survey and design stages: (i) Avoid cultural landscape (including temples and other religious activity sites) and key culture relics protection units. (ii) Avoid schools. (iii) Avoid or try to reduce the existing or planned residential area. (iv) Avoid or try to reduce environmentally sensitive area. (v) Avoid/minimize house demolition and relocation (vi) Avoid/minimize use of good farmland (vii) Avoid/minimize ground attachments

6 2 Project Impact

2.1 Survey Method and Process

20. As for the land acquisition and demolition impact of the subproject at this stage, the survey scope is determined by the FSR and preliminary design. The results of the detailed design and detailed measurement survey shall be updated in the final RP, and the modified RP shall be submitted to ADB for approval prior to contract awards.

2.1.1 Project Survey at the Early Stage

21. The preliminary survey of land acquisition and demolition impact mainly includes two aspects: 1) Document review: Consult the feasibility study report of the project, economic and social development document in the project implementation areas, and statistical data, as well as data collection. 2) Field survey: From March 20, 2016 to July 2, 2016, by consultant experts of Shaanxi Academy of Social Sciences together with and the personnel in charge of compilation of feasibility study report and relevant personnel of the project implementing agency conducted preliminary project impact survey on the socioeconomic overview and degree of the affected area, public consultation activities, and sought for the opinions of local department and some affected villagers within a certain scope.

22. In March 2016, after receiving the feasibility study report, consultant experts of Shaanxi Academy of Social Sciences together with the project implementing agency and feasibility study report compilation unit screened, determined and made statistics of the socioeconomic development status of project affected areas as well as the land acquisition and demolition effects of the project and the various sub-projects, including the impact survey on the affected population, land, house, ground auxiliary facilities and physical quantity, and the sampling survey on economic and social development level of the affected areas. The survey includes three towns with 7 administrative villages of Jingyuan subproject. Meanwhile, all seven affected villages were surveyed, incluing Shatang Village and Tuyao Village of Huanghua Town, Nonglin Village of Liupanshan Town, and Pangdong Village, Dongxia village, Shidi Village and Digou village of Jingheyuan town. The sampling households for survey are 220, accounting for 28.24% of the total households (779 households) of in seven villages, and group interview are conducted for six times.

23. According to the conclusion of the meeting of ADB and Ningxia Autonomous Region Department of transportation in June 2016, consultant experts with the project implementing agency investigated once again project affected areas to verify the impact of LA and HD in the field from June 29 to July 2, 2016. On the basis of analysis, processing of the survey data and information above and according to resettlement policies of PRC and Asian Development Bank, the Resettlement Plan for Jingyuan County subproject was compiled.

2.1.2 Data source and survey method

24. Due to tight time and wide coverage of the survey of the project, the acquisition of background material and basic data of project impact shall include two aspects: (i) Document and literature review and information collection. Collect and collate the project information and relevant survey material and statistical material provided by relevant local government departments and project implementing agencies.

7 (ii) Field measurement and data collection, supplemented by symposium, direct exchange with relevant interest groups, etc. to further verify material and data. a) Survey on land acquisition: After the land acquisition scope is determined by feasibility study report and preliminary design, the project impact survey group shall conduct survey and statistics of the area based on the status quo of land use, ownership and land type. b) Survey on the affected population: The land acquisition scope shall be determined by feasibility study report, preliminary design and sampling survey shall be conducted for the affected population, including ethnicity, age, educational background, employment status, etc. c) Survey on the demolished houses and ancillary facilities: The component involves house demolition. On-site check was conducted for the demolished houses one by one, including all ancillary facilities. The survey team together with the village leaders based on the preliminary design, identified the affected house and ancillary facilities, documented ownership, categorized structure types and size. d) Survey on scattered trees: The scattered trees within the impact scope of the acquisition land are checked on site so as to distinguish fruit trees from other trees. Numbers and varieties were recorded. e) Survey on special facilities: Surveys were done on the affected electric power, telecommunications cables and other special facilities. Based on the existing information from the line departments, the survey team together with representatives from the owner departments carried out the field check and recording.

A. Project Impact Scope and Overview

25. The impact of land acquisition and demolition of the project involves three towns and 7 administrative villages. See Table 2-1 for reference.

Table 2-1 Towns and Administrative Villages Affected by Land Acquisition and Demolition Construction content Name of town/ street Name of village/ neighborhood committee Shatang (Huanghua Town)– Liupanshan Town and Shatang Village, Tuyao Village, and Nonglin Gaodian Road Huanghua Town Village Pangdong Village, Dongxia Village, Shidi Dongxia-Digou road Jingheyuan Town Village and Digou Village Data source: Socioeconomic and physical impact survey in July 2016.

26. The impact of land acquisition and demolition of the project involves three towns and 7 administrative villages. The project includes land acquisition of 394.52 mu, including Farmland of 160.01 mu, Residential land of 24.31 mu, and Forest land of 210.2 mu. 74 households of 298 people are affected by the land acquisition only, and 38 households of 134 people are affected by both the house demolition and land acquisition. Therefore, a total of 112 households of 432 people are affected. According to the surveys, no households will lose more than 10% of farmland and income. In sum, only 38 households with 134 persons to be affected by HD are regarded as severely affected. No enterprise or store is affected by the land acquisition and demolition of the project. In addition, scattered trees, power poles, electric wire, and other ground ancillary facilities will also be affected by the land acquisition and demolition. 17 mu temporary land occupation is involved in the project design plan up to now. are affected by the land acquisition and demolition in the project area.

8 2.2 Impact of Permanent Collective Land Acquisition

27. The project will permanently acquire 394.52 mu rural collective land of the above- mentioned areas, including Farmland of 160.01 mu (40.6%), Residential land of 24.31 mu (6.2%), Forest land of 210.2 mu (53.3%). See Table 2-2 for reference.

Table 2-2 Permanent Acquisition of Collective Land (by affected village) Village Permanent land acquisition (mu) Affected Affected Road Town committee/ Forest Residential Farmland Subtotal HH person community land land Shatang Huanghua Shatang 12.97 30.46 0 43.43 11 38 (Huanghua Town Tuyao 0 91.56 1 92.56 2 9 Town)– Liupanshan Gaodian Nonglin 0 44.18 0 44.18 0 0 Trunk Road Town

Subtotal 2 3 12.97 166.2 1 180.17 13 47 Pangdong 22.15 9 9.55 40.7 25 104 Dongxia- Jingheyuan Dongxia 64.92 15 5.43 85.35 33 110 Digou Town Feeder Road Shidi 31.86 10 5.75 47.61 15 46 Digou 28.11 10 2.58 40.69 26 78 Subtotal 1 4 147.04 44 23.31 214.35 99 385 Total 3 7 160.01 210.2 24.31 394.52 112 432 Proportion 37.04% 48.66% 5.63% \ \ \ Data source: Socioeconomic and physical impact survey in July 2016.

28. The total number of the households affected by land acquisition is 112, of which 110 are affected by farmland acquisition and two are affected by residential land acquisition.

29. Tables 2-3 and 2-4 show that, a total of 110 households are affected by farmland acquisition of this subproject. 82 households show the farmland loss rate of less than 5%, 28 households show the rate of 5%-10%, and none of the households show the rate of more than 10%. In terms of affected villages, the average farmland loss rate is only 0.88%; this is because the impacts are linear and the average farmland holdings are large, which is common in poverty areas with poor quality land. The highest farmland loss rate per household is 6.09% from Pangdong village. Among the 110 households affected by farmland loss, the highest farmland loss rate is 7.62%. The loss will be less in terms of income, because not all of the household income is land based. Thus the land acquisition of this subproject has no significant effect on the households affected by the land acquisition from the perspective of both affected villages and affected households.

Table 2-3 Farmland Loss Affected by Project Land Acquisition (by affected HH) Before land acquisition After land acquisition Per Per No. of Village Affected househol Road Town No. of househol HH Farmland Farmlan village Farmland d HH d affected loss d loss Farmland Farmland by LA rate loss rate

9 Village (HH) (mu) (mu/HH) (HH) (mu) % % name Shatang Huanghua Shatang 188 5,390 28.67 11 12.97 0.24 4.11 (Huanghua Town Tuyao 49 2,300 46.94 0 0 0.00 0 Town)– Liupanshan Gaodian Nonglin 169 1,290 7.63 0 0 0.00 0 Road Town Subtotal 2 3 406 8,980 22.12 11 12.97 0.14 5.33 Pangdong 228 3,318 14.55 25 22.15 0.67 6.09 Dongxia- Jingheyuan Dongxia 51 2,107 41.31 33 64.92 3.08 4.76 Digou road Town Shidi 33 1,600 48.48 15 31.86 1.99 4.38 Digou 61 2,224 36.46 26 28.11 1.26 2.97 Subtotal 1 4 373 9,249 24.80 99 147.04 1.59 5.99 Total 3 7 779 18,229 23.40 110 160.01 0.88 6.22 Data source: Socioeconomic and physical impact survey in July 2016.

Table 2-4 Farmland Loss of the Households Affected by LA Distribution of proportion of Farmland loss Administrative region of the households affected by LA Project name (household) Town Village 5% 5%—10% ﹥10% Shatang Shatang Village 9 2 0 Huanghua Town (Huanghua Tuyao Village 0 0 0 Town)–Gaodian Road Liupanshan Town Nongling Village 0 0 0 Pangdong 13 12 0 Dongxia-Digou Dongxia 20 13 0 Jingheyuan Town road Shidi 15 0 0 Digou 25 1 0 Total 82 28 0 Data source: Socioeconomic and physical impact survey in July 2016.

2.3 Temporary Land Occupation

30. Up to now, the temporary land use in project design scheme is 17 mu, and the land of temporary occupation all belongs to unused land. Main purposes and restoration measures for temporal land occupation are as follows: (i) Mixing station, precast yard and living quarter are set in the place 400 m away from the right side of the end point of mainline K13+237.32, and it is a flat unused land. After the construction, the mixing plant shall be cleared and leveled, and partial greening or use for other purposes shall be conducted, so as to avoid land waste. (ii) Borrow area is located at the brook, 0.5m away from the right side of Liujiagou along road S101. Combining with the local refuse landfill planning, the borrow pit can be used for refuse landfill after soil borrowing, so as to benefit the local overall planning and environmental protection. (iii) Spoil ground is located at the borrow pit, 0.5 km way from the right side of Liujiagou along road S101. The spoil shall be of regular shape, suitable for the landform. Upon completion of spoil, greening shall be conducted.

10 2.4 Analysis of Impact of Residential House Demolition

31. The residential houses involved in the demolition are rural houses of 2,169 m2, are brick- wood houses of 624 m2 and earth-wood houses of 1,545 m2. A total of 38 households with 134 people are affected in total. See Table 2-5 for the impact of residential house demolition.

Table 2-5 List of Impact of Demolished Rural Residential House Housing demolition (㎡) Affected population Road Town Village Brick- Population Earth-wood Subtotal Household wood (person) Shatang (Huanghua Huangh Tuyao 144 0 144 2 9 Town)–Gaodian ua Town Road Pangdong 400 520 920 9 34 Jinghey Dongxia-Digou Dongxia 0 485 485 11 39 uan road Shidi 0 400 400 11 34 Town Digou 80 140 220 5 18 Total 624 1,545 2,169 38 134 Data source: Socioeconomic and physical impact survey in July 2016.

32. Among the households affected by the residential house demolition, only a total of 4 households with 14 persons from Pangdong village has entire house demolition and other AHs will be affected for HD partially. All AHs will be resettled in an appropriate manner. And the resettlement scheme is shown in Chapter 6 and Table 6-5.

2.5 Impact of Demolished Buildings of Enterprises and Public Institutions

33. No enterprises and public institutions will be affected by land acquisition and demolished.

2.6 Affected Infrastructure and Ground Ancillary Facilities

34. The subproject will affect toilets, tombs, trees and other two categories. See Table 2-6 for details.

Table 2-6 Affected Ground Ancillary Facilities Item Unit Quantity Brick wall m 321 Toilet single 2 Pine(DBH <15cm) Single 2,164 Locust tree(DBH <15cm) Single 6,098 Poplar(DBH >15cm) Single 668 Weed tree(DBH >15cm) Single 145 Weed tree(DBH <15cm) Single 815 Fruit tree(Full Fruit Period) Single 15 Nursery mu 20.71 Electric pole Unit 47

11 Data source: Socioeconomic survey and physical impact survey in July 2016.

2.7 Affected Population

2.7.1 Overview

35. A total of 112 households with 432 people are affected, including 74 households with 298 people affected by land acquisition only and 38 households with 134 people affected by land acquisition and house demolition, of which, only 4 HHs with 14 person will be demolished completely and need to be relocated, and the remaining will be affected partially. Therefore, 4 households with 14 persons to be affected by HD are regarded as severely affected. No enterprise, store or public institution is affected by the land acquisition and demolition. See the Table 2-7 for details of the affected population.

Table 2-7 Affected Population Jingyuan County Huanghua Town Jingheyuan Town Subtotal No. Category (Trunk Road) (Feeder Road) Household Person Household Person Household Person Affected household 13 47 99 385 112 432 Land 1 acquisition 11 38 63 260 74 298 only Land acquisition 2 and 2 9 36 125 38 134 Demolition impact Data source: Socioeconomic and physical impact survey in July 2016.

2.7.2 Affected vulnerable groups

36. The vulnerable groups affected by the subproject mainly include the elderly with no other supporting family members, single-parent families, orphans, family under MLSS, the disabled, poverty families, etc. A total of 25 households with 82 people of vulnerable groups are affected by the subproject; this is 19% of the APs. See Table 2-8 for the definition standard of vulnerable groups and the number of vulnerable group households.

Table 2-8 Basic Information of Vulnerable Groups of Jingyuan County Road Project Shatang-Haodian road of Type Definition standard Huanghua Town (household) The poor under Annual per capita income lower than CNY 1,560. 11 MLSS Family with women as primary labors, without Women-led family young and middle-aged men laborers (18-55 years 3 old) The elderly over 60 years old without children, The elderly family 3 relatives and other supporting members The disabled Family with the members identified according to 3 family national standard of level I or level II disabled Family with long- Family with member losing work capacity due to 8

12 Shatang-Haodian road of Type Definition standard Huanghua Town (household) term patients disease or in need of long-term medical care Total 25 Note: Double counting has been excluded in the subtotal and total. According to the poverty standard of annual income per person of less than CNY 2,736 in Jingyuan County, 25 vulnerable households all belong to poverty-stricken families. Data source: Socioeconomic survey and physical impact survey in July 2016.

37. According to the survey, poverty causes include aspects of: (1) harsh living and production conditions due to geographical location, such as high mountain, poor soil, cold and dry weather; (2) low value-added grain dominated production model due to remote geographical location and poor road condition; (3) lack of skill - limiting access as migrant labor seeking outside non-farming waged jobs; (4) lack of information; and (5) illness or disability.

38. The subproject will provide additional help to the affected vulnerable households/persons. A special budget for supporting vulnerable group has been reserved in the project resettlement budget. (See Chapter 6 for specific measures).

2.7.3 Project impact on women

39. A total of 211 (48.9%) of the affected persons are female. During the field survey, women focus group discussions were held in each surveyed village. Household interviews paid special attention to women. No outstanding negative impacts on women were found. On the contrary, women pointed out that as the women, children and elderly are the majority left behind after men and young people migrate out, the road improvements will particularly benefit women, children and elderly to transport goods to and from market, go to school and travel to clinic and other social service facilities. Travel will be safer, easier, and smoother.

40. In the longer term, women expected the road improvement will stimulate local industrial development and urbanization, bring more local non-farming job opportunities which will particularly help women with agricultural income as main source to increase their non-farm income.

2.7.4 Affected minority population

41. Project implementation area is Hui people concentrated area. The affected population is Hui people. Since the project is mainly the reconstruction of old road, hence, the lifestyles and customs of the local Hui people will not be affected by the negative effect of LAR; on the contrary, since project implementation improves the local traffic condition, Hui people will positively support the rapid implementation of the project. (See Chapter 9 Public Participation).

13 3 Social and Economic Profile

3.1 Socioeconomic Profile of Project Area

42. The subproject is located in Jingyuan County of Guyuan City and affects three towns and 7 administrative villages.

3.1.1 Socioeconomic profile of Guyuan City

43. Guyuan is located at the northwest border of Loess Plateau, with Liupan Mountain as the spine crossing from the south to north and dividing the city into two parts. The north of Guyuan is higher than the south, and elevation is between about 1,500 m and 2,200 m. The east and south of Guyuan adjoin to Qingyang City and Pingliang City of Gansu Province respectively, the west is connected with Baiyin City of Gansu Province and the north borders on Zhongwei City and Wuzhong City in Ningxia. The territorial scope is in northern latitude of 35º14'-35º38' and east longitude of 105º20'-106º58'. Sitting in the center of the triangle area constituted by Xi’an, Lanzhou and Yinchuan, Gu is an undeveloped area with outstanding prospect in West PRC, and also one of “Three-Xi (Hexi and Dingxi City of Ganshu Province and Xihaigu Area of Ningxia Hui Autonomous Region)” major poverty relief areas approved by the Central People’s Government.

44. Xiji County, Longde County, Pengyang County, Jingyuan County and Yuanzhou District are under the administration of Guyuan City, where covers a total area of 1,504 km² with the total population of 1.533 million, including agricultural population of 1.242 million, accounting for 81%; Hui nationality of 717,000, taking up 46.8%. Sex ratio of the city is 105:100, and population density is 145 person/km². In 2015, GDP of Guyuan City reached up to CNY 21.7 billion, with an annual average increase of 13.8%. Primary industry completed value added of CNY 4.513 billion, and that of secondary industry reached up to CNY 5.902 billion, and of tertiary industry was CNY 11.284 billion. The three industries structure ratio was 20.8:27.2:52. The accumulated fixed-asset investment of the whole society amounted to CNY 118.9 million, with the annual average increase of 25.2%. Local public financial budget revenue reached up to CNY 1.591 billion, with annual average increase of 24.78%. Urban per capita disposable income was CNY 21,144.1, with annual average increase accounting for 10.1%; rural per capita disposable income reached up to CNY 7,002.1, with annual average increase of 15%.

Table 3-1 Socioeconomic Profile of Guyuan City No. Item Unit Gu 1 Land area km² 10,540 1.1 Farmland area 10,000 mu 2,699 2 Population 10,000 person 153.3 2.1 Agricultural population 10,000 person 124.2 2.2 Non-agriculture population 10,000 person 29.1 3 GDP CNY 100 million 217 3.1 Primary industry CNY 100 million 45.14 3.2 Secondary industry CNY 100 million 59.02 3.3 Tertiary industry CNY 100 million 112.84 3.4 Per capita GDP CNY /person 20,588 4 Urban per capita disposable income CNY /person 21,144.1 5 Rural per capita net income CNY /person 7,002.1 Source: 2015 Gu City statistics yearbook.

14 3.1.2 Socioeconomic profile of Jingyuan County

45. Located in the southernmost area of Ningxia Hui Autonomous Region and on the east foot of Liupan Mountain, Jingyuan County, named for the source of Jingyuan River, is the core area of Great Liupan Mountain Ecological Economic Circle and the important ecological security area of West PRC. There are four townships, three towns and 106 administrative villages in Jingyuan County, with total population of 126,000, among which, the Hui nationality takes up 75% and agricultural population accounts for 92.5%. The total administration area covers 1,131 km² (including 678 km² of forest region of Liupanshan forest region), including land area of 1.6965 million mu and Farmland of 579,000 mu. The forest coverage rate accounts for 48.5%. With Liupan Mountain passed through the western part, the terrain of Jingyuan County is higher in northwest and lower in southeast, with elevation from 1,608 m to 2,942 m. The county belongs to temperate semihumid forest steppe region, with annual precipitation of 641.5 mm. The spatial distribution of rainfall is uneven, mainly concentrated in July to September and featured by “drought in spring and summer and waterlogging in autumn and winter”. The annual average temperature is 5.7 , with maximum temperature of 32.6 and minimum temperature of -27.4 . Sunshine duration of the county is 2,370 hours, and frost-free period 132 days, featured by “cold spring, cool summer℃ as well as short autumn and long winter”.℃ ℃

46. In 2015, the county achieved a regional GDP of CNY 1.338 billion, increased by 11.4%, and the proportion among primary, secondary and tertiary industry reached 19:33:48. The primary industry achieved value added of CNY 250 million, with the featured agriculture accounting for over 75%; the secondary and tertiary industries completed value added of CNY 442 million and CNY 646 million, increased by 17.4% and 10.3% respectively; local public financial budget revenue reached up to CNY 126 million, increased by 24.2%; fixed-asset investment of the whole society was CNY 4 billion and increased to CNY 4.085 billion, increased by 27.6%. Urban per capita disposal income amounted to CNY 19,735, increased by 6.3%; rural per capital disposable income was CNY 6,375, increased by 9.8%.

Table 3-2 Social and Economic Status of Jingyuan County No. Item Unit Jingyuan County 1 Land area km² 1,131 1.1 Farmland area 10,000 mu 57.9 2 Population 10,000 person 12.6 2.1 Agricultural population 10,000 person 11.655 2.2 Non-agricultural population 10,000 person 0.945 2.2 Population density Person/km² 112 3 GDP CNY 100 million 13.38 3.1 Primary industry CNY 100 million 2.5 3.1.1 Proportion in GDP % 19 3.2 Secondary industry CNY 100 million 4.42 3.2.1 Proportion in GDP % 33 3.3 Tertiary industry CNY 100 million 6.46 3.3.1 Proportion in GDP % 48 3.4 Per capita GDP CNY /person 10,619 4 Urban per capita disposable income CNY /person 19,735 5 Rural per capita net income CNY /person 6,375 Source: 2015 statistical yearbook of Jingyuan County.

15 3.1.3 Socioeconomic profile of affected towns

47. The subproject affects three towns in Jingyuan County and 7 administrative villages in Huanghua Tow, Liupanshan Town and Jingheyuan town. In the three affected towns, the average population is 3.92 per household, per capita farmland is 3.92 mu, and per capita income is CNY 6726. The conventional agricultural crops in the affected villages are corn, wheat, etc. According to survey, the affected villages are mainly along the road under construction, and located in mountain area. The economy of the villages mainly relies on migration working, breeding and farming. The income of villagers in the project area mainly comes from migration working and breeding.

Table 3-3 Social and Economic Status of Affected Towns Rural Average Per per Territo Number Populati Labor Farmla househ capita capita ry of Road Town on (perso nd old farmla net area househ (person) n) (mu) populati nd income (km²) old on (mu) (CNY/ye ar) Shatang Huangh 154.2 2,886 11,364 7,074 23,760 3.94 2.09 6,256 (Huangh ua Town ua Liupans Town)– han 229 4,070 15,895 10,094 81,500 3.91 5.13 7,320 Gaodian Town Road Dongxia Jingheyu 121,96 -Digou 176 5,461 21,211 16,303 3.88 5.75 6,533 an Town 3 road 227,22 Total 3 559.2 12,417 48,470 33,471 3.92 4.69 6,726 3 Source: July 2016: Socioeconomic survey.

3.1.4 Introduction to socioeconomic status of affected villages

48. The subproject affects 7 administrative villages in total. The total population of 7 villages is 3,017. The per capita farmland ranges from 2.04 to 14.81 mu. The per capita income of the 7 administrative villages is between CNY 3,000 and CNY 6,900.

Table 3-4 Socioeconomic Indicators of the Affected Villages Per Annual capita rural Number Laborer Househol per of Populatio Farmlan Road Town Village s d capita househol n (person) d (mu) cultivate (person) population net d d land income (CNY ) Shatang 5,80 188 729 474 5,390 3.88 7.39 Shatang- Huanghua Village 0 Haodian Town Tuyao 6,40 Road of 49 175 112 2,300 3.57 13.14 Village 0 Huanghu Liupansha Nonglin 6,87 a Town 169 631 416 1,290 3.73 2.04 n Town Village 0

16 Per Annual capita rural Number Laborer Househol per of Populatio Farmlan Road Town Village s d capita househol n (person) d (mu) cultivate (person) population net d d land income (CNY ) 6,30 Subtotal 2 3 406 1,535 1,002 8,980 3.78 5.85 8 Pangdon 4,69 228 948 520 3,318 4.16 3.5 g 6 3,68 Dongxia- Dongxia 51 199 123 2,107 3.9 10.59 Jingheyua 5 Digou n Town 3,09 road Shidi 33 108 58 1,600 3.27 14.81 6 3,22 Digou 61 227 89 2,224 3.72 9.8 5 4,21 Subtotal 1 4 373 1,482 790 9,249 3.97 6.24 8 5,28 Total 3 7 779 3,017 1,792 18,229 3.87 6.04 2 Source: July 2016: Socioeconomic survey.

3.2 Socioeconomic Profile of Affected Villages

3.2.1 Sample survey

49. In order to understand the basic status of population affected by the land acquisition, the socioeconomic survey group conducts sampling survey for sampling households. The 7 sample villages are Shatang Village and Tuyao Village in Huanghua Town, Nonglin Village in Liupanshan Town, Pangdong Village,Dongxia Village,Shidi Village and Digou Village in Jingheyuan town with 3,017 people from 779 households in total. The project surveys the sample of 854 people from 220 households, with the sampling proportion of 28.24% of the total population. See the distribution of sample in Table 3-5.

Table 3-5 Sampling Proportion Number of Sample household in Sampling No. Town sampling proportion Number of household Population village (%) (household) Huanghua 1 237 70 269 29.54% Town Liupanshan 2 169 50 193 29.59% Town Jingheyuan 3 373 100 393 26.81% Town Total 3 779 220 854 28.24% Source: July 2016: Socioeconomic survey.

3.2.2 Nationality and gender

17 50. The 220 sample households have a total population of 854, a total labor force of 658 and an average population of 3.88 per household. Most of the households surveyed are Hui people. There are 407 females (48.2%) of the total surveyed population; most women are mainly engaged in agriculture, housework and other production activities.

3.2.3 Age structure

51. Among the 854 sample people from 220 households, 105 are under 16 years old (12.3%), 270 are from 16-39 years old (31.6%); 313 from 40-59 (36.7%); and 166 people are over 60 (19.4%). The affected villages have an older age structure because young people have moved to towns for employment. See age structure in Figure 3-1.

19.4% 12.3%

1.under 16 years old 31.6% 2.16~39 years old 36.7% 3.40~59 years old 4.over 60 years old

Figure 3-1 Age Distribution Structure

3.2.4 Education background

52. Among the surveyed households, 437 people have received primary or below education(51.2%); 300 people received junior high school education (35.1%); 108 people received senior high school or technical secondary school education (12.6%); 8 people had received junior college or above education (0.9%). See education distribution in Figure 3-2. The education levels are very low due to the remote location of villages and the age structure of villagers.

18 1.primary or below 0.9% 12.6% 2.junior school 51.2% 35.1% 3.senior high school/technical secondary school

4.college or above

Figure 3-2 Distribution Structure of Education

3.2.5 Housing size

53. The sampled houses are of earth-wood or brick-wood structure mainly, with a total housing area of 42,603m², and 191.2 m² per household on average and 49 m² per capita. 6 households (2.7%) have an area less than 100 m²; 95 (43.2%) households with an area of 100- 150 m²; 108 (49.1%) households with an area of 151-300 m²; 6 (4.5%) with an area of 301-450 m² and 1 household (0.5%) with an area over 451 m². These are typical housing sizes for rural people but the quality of housing in these villages is quite simple due to the poverty conditions.

3.2.6 Farmland resource

54. Of the surveyed households, per household Farmland is 20.2 mu and per capita Farmland is 5.2 mu. The Farmland mainly refers to dryland and the major crops are corn and wheat, with yearly net return of about CNY 500 /mu. There are 103 households (46.8%) with per capita farmland of less than 5 mu; 81 households (36.8%) with 5-10 mu; 36 (16.4%) households with more than 10 mu.

3.2.7 Household income and expenditure

(i) Annual household income

55. Among the 854 sample people from 220 households, the average annual income of household is CNY 21,920, including annual average crop income of CNY 6,060 per household, taking up 27.6%; annual average animal husbandry income of CNY 4,900 per household, accounting for 22.4%; annual average odd jobs income of CNY 10,360 per household, taking up 47.3%; annual average income of others of CNY 600 per household, accounting for 2.7%. The per capita annual net income is CNY 5,647. The farmers’ largest source of income comes from working in cities. Males in middle age and females mainly engage in agriculture and breeding, and young male laborers usually engage in go out for working.

19 (ii) Annual family expenditure

56. The per household total annual expenditure is CNY 16,860, including household operating expenditure of CNY 4,020 (23.8%); living expenditure of CNY 8,840 (52.4%); other expenditure of CNY 4,000 (23.7%). See sample survey on income and expenditure of affected household in Table 3-6.

Table 3-6 Analytical Table of Income and Expenditure of Surveyed Households Per capita Per household Item Proportion % (CNY (CNY /household) /person) Agricultural income 27.6 6,060 1,561 Forestry income 0 0 0 Income from animal 22.4 4,900 1,262 husbandry Industrial income 0 0 0 Income from construction 0 0 0 industry Income from transportation 0 0 0 Annual household industry income Income from trade, food 0 0 0 and service industry Income from other non- 2.7 600 155 farming jobs Income from working out 47.3 10,360 2,669 Income from collective 0 0 0 distribution Income from property 0 0 0 Subtotal 21,920 5,647 Per household Per capita Proportion (CNY /year) (CNY /year) Household operation 23.8 4,020 1,036 expenditure Annual household Living expenditure 52.4 8,840 2,277 expenditure Others 23.7 4,000 1,030 Subtotal 16,860 4,343 Sources: July 2016: Survey on physical impact and socioeconomic.

3.2.8 Public opinion survey

57. People formulating the Resettlement Plan surveyed the public opinion of the 220 households on a sample. 112 households affected by land acquisition and demolition are all sampling households for survey on public opinion. The results are shown as follows: (i) Awareness: 55% of surveyed households are aware the subproject is going to be constructed, 30% are not quite clear about the subproject and 15% know nothing about it. (ii) Attitude: 97.5% of surveyed households support the project construction, and 2.5% do not care about it. (iii) Livelihood options: 60% surveyed households are not willing to continue in agriculture anymore; 35% are willing to be given non-agricultural status; 100% are willing to participate in social insurance; and 97% are willing to receive technical training. See public opinion survey in Table 3-7.

20 58. See public opinion survey in Table 3-7.

59. The survey has issued 220 questionnaires, and all of them have been returned.

Table 3-7 Public Opinion Survey Selection proportion of the opinions No. Questions Answers of the affected households (%) 1 2 3 Total Do you know the project will be(1) Yes (2) Not quite clear 1 55 30 15 100 constructed? (3) No Do you approve the project 2 (1)Yes (2)No (3) I don’t 97.5 0 2.5 100 construction? care Who do you think can benefit from (1) Nation (2) Collectivity 3 100 97 90 100 the project? (multiple choices) (3) Individual Do you know the compensation 4 (1) Yes (2) No 20 80 \ 100 policy for land acquisition? Do you accept the land acquisition 5 (1) Yes (2) No 70 30 \ 100 for supporting the project? Are you willing to do business after 6 (1) Yes (2) No 50 50 \ 100 land acquisition? Are you willing to participate in 7 social insurance after land (1) Yes (2) No 100 0 \ 100 acquisition? Are you willing to receive technical 8 (1) Yes (2) No 97 3 \ 100 training after land acquisition? Selection of housing resettlement (1) Land allocation methods. resettlement (2) Unified 9 construction resettlement 58 22 20 \ (3) Monetary compensation Where do you want to choose as (1) The group (2) The 10 housing resettlement point? village/community (3) 60 20 20 \ The town/township Do you know you can lodge a 11 complaint when your lawful rights (1) Yes (2) No 43 57 \ \ and interests are violated? Sources: July 2016: Survey on physical impact and socioeconomic.

3.3 Affected Enterprises and Public Institutions and Sensibility Impact

60. The survey shows that there are no affected enterprises, public institutions, schools, hospitals as well as religion facilities and cultural relics.

3.4 Women’s Development in Project Area

3.4.1 Rural women profile in project areas

61. The proportion of female population was 49% in Jingyuan County in 2015, of which the majority were rural women accounting for 69.7% of total female population. Women are playing important roles both in agricultural sector as well as rural household development.

62. Based on the socioeconomic survey, there are differences in the education level between women and men. Specifically, 20% of female respondents are in the no-schooling

21 category, higher than male respondents (15%). Similarly, the proportion of female respondents with 7-9 years of education (30%), is lower than that of males (45%), and female respondents with 10-12 years of education (1%), is also lower than that for males (6%).

63. The majority of respondents were farmers with 75% of females and 60% of males being concentrated in agriculture on their farmland. Both long-term and seasonal migrant laborers were mostly men. 15% of males were engaged in the long-term migrant labor compared to 5% for women. 20% of men were seasonal migrant labors against only 8% of women. Women were often left at home both for cultivating household land and taking care of household members. Women were 100% responsible for household work. The survey indicated that there were slightly more females running small businesses than men. However, of the respondents, only 2% of females were village cadre compared to males (5%), indicating that women’s participation in decision-making at village level was lower than for men.

3.4.2 Women’s roles in household livelihoods

64. Among surveyed villages, women and men are involved not only in agricultural activities but also non-agricultural practices. Women and men have different roles in agricultural production practices. Males usually dominate ploughing and clearing activities, while females are more engaged in planting and weeding. Both women and men take part in activities such as fertilizing, harvesting and animal husbandry. Tending poultry feeding is solely a woman’s activity.

65. It is very common for both females and males to be involved in income-generating activities. Among middle-aged groups, more males are long-term as well as seasonal migrant laborers compared to women. Whereas more women are left at home to undertake agricultural practices as well as to look after their household members such as children and elderly.

66. Women exclusively perform household work in addition to their agricultural work. Their roles are cooking, washing and care of small children and elders in their households.

67. It is obvious that men contribute more to cash income generation in the household, and women’s roles tend to be in household maintenance like growing corn and grain, raising animals for household consumption rather than for selling purpose. Looking after children is women’s domain. Some interviewed women (36 females) reported that they are living in rented houses in the town to look after their school children. They no longer cultivated their land in the village. The household expenditures were fully met from their husbands’ non-farm earnings.

3.4.3 Decision-making at household and community levels

68. Among the surveyed households, women in few families have decision-making power, and in most households, men made the decision. Couples jointly discuss agriculture production activities such as planting, crop selections, seed purchases, fertilizer and equipment/tools. In many cases, women’s voices are heard during the discussion process but men make final decisions.

69. Men dominate decision making on household investments such as buying vehicles, running small shops or building new houses. The interviewed villagers indicated that men have more opportunities to go outside than women and therefore have more experience and knowledge with which to make decisions.

22 70. Men also dominated with respect to decision making on renting out land and on borrowing and lending money. These are very important household decisions and are definitely the responsibility of household heads.

71. Men and women equally share decision-making on household saving and buying durable consumables such as TVs, furniture, washing machines and electronic cookers. Women dominate decisions on purchase of daily consumables.

72. The participation of women in community decision-making is still much less than for men because there are the fewer women members in decision-making bodies of communities. Women’s participation in community management include organizing traditional festivals, special occasions like marriage ceremonies and funeral activities, attending community meetings in the absence of men, and contributing labor for public works such as village road routine maintenance and irrigation repair.

3.4.4 Women’s transport needs

73. The women’s role in the household shapes their transport patterns, frequency of women’s mobility and travel costs. Women’s transport activities are different from men’s since women often have the primary responsibility for transporting goods to and from market, and for accompanying children and elders to hospital, and for seeking job opportunities to meet increasing cash demand of households.

74. Women have similar transport needs to other social groups. Due to their higher level of domestic responsibility, women assign greater importance to transport that is easier, faster, and safer and provides more mobility, as this in turn provides more home time for productive work. Women also expect more buyers to come to the village, which would in turn further reduces travel time and thus saves more time. Specifically, women are more reliant on public transport and prefer safe and regular public transports with fixed fares.

3.4.5 Project Impacts on Women

75. The subproject will bring benefits equally to women and other social groups through improvement of road safety facilities, trunk road rehabilitations and particular rural road upgrade. Shorter travel time on roads is beneficial to them, as it increases mobility, and allows more productive use of time.

76. Women are primarily local travelers for buying home consumption goods and selling produce, sending and picking up small children to and from school, traveling for health purposes, and more frequently accompanying family members to hospital. Accessing better roads, thereby, will provide them easier, faster and safer travel.

77. Public or private transport operators will be more willing to provide services when the road condition and road safety is improved. This could increase the potential for young women to travel outside the village to seek employment. Specifically, availability of public transport services, which are their primary means of travel, is important to women.

78. In case the land acquisition and resettlement problems are not solved, the project construction will pose potential negative impacts on women, while most men act as migrant workers, and also the project has less land acquisition and demolition impact, so it has a limited negative effect on men. Firstly, the affected area of the subproject is located in Jingyuan

23 County, with vast farmland, although the availability of water is poor. Male in the prime of life all choose migration for work, and females continue to engage in agriculture. The phenomenon may be caused by: I. Cultural environment and historical factors. The local traditional customs think male is in power of family affairs, and female should take care of the home. Hence, most females choose to stay at home, doing housework and engaging in agriculture; II. Salary factor. With the study on surrounding labor market, the income of male is generally higher (30% to 50%) than females for the same job. Hence, females prefer to engage in agriculture. On the basis of above conditions, the plan adopts several measures for females living problems. Second, women’s needs or interests tend to be ignored during public consultation and participation since few women can voice their opinions in public and/or fewer women are invited to attend consultation meetings, for example, consultation on selection of resettlement sites.

79. To facilitate income restoration for affected women, various skill-training programs will be provided through a number of ongoing government initiatives. According to women’s needs, relevant training courses such as housekeeping and handicrafts will be introduced to women through Women’s Federation, or the Human Resources and Social Security Bureau with close cooperation with the Project sponsor. Provision of jobs to women will be prioritized during project construction.

80. Local government should constantly promote the restoration of income of affected females. Firstly, on the basis of actual situation of local females and the small land acquisition of the project, the government can conduct agricultural support for female, and provide them with channels and subsidies for planting high-yield crops and fruiters as well as livestock breeding, so as to restore their incomes as soon as possible. Secondly, relevant departments of government should take the lead of providing various skill training. According to the demand of female, Women’s Federation, Department of Human Resources and Social Security and project sponsor should closely cooperate with each other to introduce relevant training causes to females, such as housekeeping, handicraft, etc. Thirdly, in the project construction period, female should be given priority to employment, with improving the salary for females according to workload.

81. All the above measures have been included in the Gender Action Plan (GAP), which has been extensively discussed with project sponsor. The GAP addresses women’s needs and ensures women will be benefited equally by the Project and to mitigate negative impacts for women that might arise.

3.4.6 Measures in RP in facilitating women’s development

82. Participation and consultation: separate consultation meetings and focus group discussions have been undertaken in each surveyed village. These were very helpful for women to voice their particularly needs on road safety, compensation modes, concerns over compensation standards, etc. Women’s needs, comments and suggestions on the project have been documented and incorporated in the RP, such as training needs of handicraft, landscaping, seedling producing and fruit tree caring.

83. Women show stronger desire for project participation and most of them expressed willingness to take part in the project activity in their free time. They also expressed desires to be informed about the project job opportunities.

84. In terms of compensation on LA and HD, women are not worried about their rights. The national laws and regulations guaranteed that women have equal rights on land use rights and

24 house property legal rights. All households constructed or purchased during marriage automatically have shared-ownership between the couple, regardless of how or to whom the property was registered.

25 4 Legal Framework and Policies

85. The resettlement policies of this project are based on ADB’s policies and on the laws and regulations of the People’s Republic of (PRC). These are as follows.

4.1 ADB's Policy

86. The relevant ADB policy is:

ADB Safeguard Policy Statement (2009), Safeguard requirement 2: Involuntary Resettlement

4.2 The PRC’s Laws and Regulations on Land Acquisition and Relocation

87. The PRC relevant laws and regulations include the following:

(1) The Land Administration Law of the People’s Republic of PRC

88. (Amended at the Eleventh Session of the Standing Committee of the Tenth National People’s Congress on August 28, 2004; and effective as of then).

89. Main contents: formulations on land ownership, overall land use plan, farmland protection, land for construction, supervision and inspection, legal responsibility, including land expropriation compensation, subsidy standard for relocation, and manner of relocation of relocated people.

(2) Regulations on the Protection of Basic Farmland

90. (No. 257 Decree of the State Council of The People’s Republic of PRC on December 27, 1998).

91. Main contents: in line with Agriculture Law of the People’s Republic of PRC and the Land Administration Law of the People’s Republic of PRC, concrete formulations for the country’s protection of basic farmland, including delimitation, protection, supervision and management, legal responsibility, etc.

(3) Interim Regulations on Farmland Use Tax of the People’s Republic of PRC

92. (No. 511 Document of the State Council issued on December 1, 2007 and effective on January 1, 2008).

93. Main contents: formulations about tax contribution standard and contribution range of state construction occupied Farmland

(4) Decision on Furthering Reform of Land Management of the State Council (Guofa [2004] No. 28)

94. Main contents: In order to use the land properly, to protect the legal rights of the farmers whose land i`s expropriated, to maintain social stability, and to perfect the land expropriation and resident relocation system, the decision puts forward the guiding principle and way to perfect the compensation of land expropriation. The decision requires all the county, city and

26 province governments to take effective measures to ensure that farmers’ living standards will not decrease after their land is expropriated, and that according to laws in force, the land compensation, relocation compensation, ground ancillary facilities and young crop compensation are paid in full and in time. If after the payment of land compensation and relocation compensation in accordance with the laws in force, the farmers whose land has been expropriated cannot maintain their original living standard and their social safeguards cannot be paid, the province, autonomous region and/or municipality government should agree to provide further relocation compensation. If the sum of land compensation and relocation compensation reaches the legal upper limit, but the farmers whose land has been expropriated cannot maintain their previous living standard, the local people’s government can offer subsidy with the state-owned land income. The government of province, autonomous region and/or municipality should work out and promulgate the standard of output value or price of land. The land expropriation should be the same price for the same land. National key construction projects should incorporate the expense of land expropriation into its budget.

(5) Notice on the Suggestions for Completing Compensation and Relocation System of Land Expropriation by the Ministry of Land Resources of People’s Republic of PRC (November 3, 2004, Guotuzifa [2004] No. 238)

95. The main contents: to put forward how to carry through The Decision of the State Council on Deepening the Reform and Strictly Enforcing Land Administration especially aiming at some problems during the land expropriation compensation and relocation system. There are two aspects: (i) To formulate unified annual output value standard. The provincial land and resources administration along with relevant agencies woks out the minimum unified annual output value of every county in the province, then announce and carry out it after the approval of the province government. The workout of unified annual output value standard should consider the type and quality of expropriated land, the investment on the land, the price of agricultural products, the grade of land, and so on. (ii) To affirm unified annual output value multipliers. The unified annual output value times of land compensation and resettlement subsidy should ensure the farmers whose land is expropriated remain a standard no lower than before and be worked out within the legal limit. According to the legal unified annual output value times, if the land compensation and resettlement subsidy couldn't ensure that the peasants whose land is expropriated can’t maintain the original living level or pay for their social security, the times can be increased after the approval of provincial government. If the sum of land compensation and resettlement subsidy is 30 times as the unified annual output value, the farmers whose land is expropriated couldn't remain the original living standard, the local government can provide subsidy from the state-owned land income. If the basic farmland is expropriated by the legal approval, the land compensation should be carried out according to the highest compensation standard announced by the local government.

(6) Real Property Right Law of the People’s Republic of PRC (Order of the People’s Republic of PRC No. 62, in effect as of October 1, 2007)

96. Main contents: In accordance with the Constitution Law, the present Law is enacted with a view to maintaining the basic economic system of the state, protecting the socialist market economic order, clearly defining the attribution of the property, utilization of property, and safeguarding the real right of the right holder. The civil relationships incurred from the attribution and utilization of the property shall be governed by the present Law.

27 (7) Notice on Further Specification of the Land Type Identification of Farm Road of General Office of Ministry of Land and Resources of the People’s Republic of PRC (Guo Tu Zi Ting [2013] No. 581)

97. Main contents: Define and specify the definition and scope of farm road, clearly propose that farm road refers to road (including farm track) serving the transportation between villages and fields and the rural agricultural production, and excluding from the national highway network system. Public road (including overpass) and land for street trees inside towns and villages do not belong to farm road. The pavement width of farm road shall not exceed 6.0 m, or the subgrade width of 6.5 m. In case the road’s pavement or subgrade exceeds the limitation width after reconstruction and expansion, and only has unidirectional lane, it cannot be identified as farm road, and shall be included in construction land management, and handle relevant land using procedure according to regulations.

4.3 Relevant Policies of Ningxia Hui Autonomous Region and Jingyuan County

(i) Notice on Implementing Compensation Standard for Land Acquisition for Towns (Cities and Districts) of Ningxia Hui Autonomous Region of the People’s Government of Ningxia Hui Autonomous Region (Ning Zheng Fa [2010] No.3) (taking effect on January 7, 2010).

98. Main contents: Specify the detailed implementation regulations according to the reality of Ningxia Hui Autonomous Region and complying with Land Administration Law of the People’s Republic of PRC.

(ii) Notice on Publishing the Compensation Standard for Land Acquisition of Ningxia Hui Autonomous Region of the People’s Government of Ningxia Hui Autonomous Region (Ning Zheng Fa [2015] No.101), which was issued and took into effect January 1, 2016.

99. Main contents: According to Land Administration Law of the People’s Republic of PRC and Land Administration Regulation of Ningxia Hui Autonomous Region, decide to publish Compensation Standard for Land Acquisition of Ningxia Hui Autonomous Region after deliberation of executive meeting of the People’s Government.

(iii) Notice on Issuing Compensation Standard for Land Acquisition and Demolition of the Additional Construction of the Second Line Project in Ningxia Section of Baotou-Lanzhou Railway of the General Office of the People’s Government of Ningxia Hui Autonomous Region (Ning Zheng Ban Fa [2010] No.43).

100. Main contents: compensation rates of LA range from CNY 1500/mu for natural grassland to CNY 4790 for mountainous dry land, and rates of HD range from CNY 210/m2 for earth and timber structure to CNY 650/m2 for concrete and brick structure.

(iv) Document of Jingyuan County People’s Government: Notice on Compensation Standard for Land Acquisition, Demolition and Resettlement of Highway Engineering Construction of Qingshizui-Jingyuan Section of G344 (Jingyuan Zheng Fa [2014] No.36).

28 101. Main contents: compensation rates of LA range from CNY 1500/mu for natural grassland to CNY 4790 for mountainous dry land, and rates of HD range from CNY 210/m2 for earth and timber structure to CNY 650/m2 for concrete and brick structure.

4.4 ADB’s Policy Requirements on Involuntary Resettlement

102. ADB involuntary resettlement safeguards covers physical displacement (relocation, loss of residential land, or loss of shelter) and economic displacement (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. It covers them whether such losses and involuntary restrictions are full or partial, permanent or temporary.

103. The objectives of the policy: To avoid involuntary resettlement wherever possible; to minimize involuntary resettlement by exploring project and design alternatives; to enhance, or at least restore, the livelihoods of all displaced persons in real terms relative to pre-project levels; and to improve the standards of living of the displaced poor and other vulnerable groups.

104. The basic principle include: (i) Screen the project early on to identify past, present, and future involuntary resettlement impacts and risks. Determine the scope of resettlement planning through a survey and/or census of displaced persons, including gender analysis, specifically related to resettlement impacts and risks. (ii) Carry out meaningful consultations with affected persons, host communities, and concerned nongovernment organizations. Inform all displaced persons of their entitlements and resettlement options. Ensure their participation in planning, implementation, and monitoring and evaluation of resettlement programs. Pay particular attention to the needs of vulnerable groups, especially those below the poverty line, the landless, the elderly, women and children, and Indigenous Peoples, and those without legal title to land, and ensure their participation in consultations. Establish a grievance redress mechanism to receive and facilitate resolution of the affected persons’ concerns. Support the social and cultural institutions of displaced persons and their host population. Where involuntary resettlement impacts and risks are highly complex and sensitive, compensation and resettlement decisions should be preceded by a social preparation phase. (iii) Improve, or at least restore, the livelihoods of all displaced persons through (i) land-based resettlement strategies when affected livelihoods are land based where possible or cash compensation at replacement value for land when the loss of land does not undermine livelihoods, (ii) prompt replacement of assets with access to assets of equal or higher value, (iii) prompt compensation at full replacement cost for assets that cannot be restored, and (iv) additional revenues and services through benefit sharing schemes where possible. (iv) Provide physically and economically displaced persons with needed assistance, including the following: (i) if there is relocation, secured tenure to relocation land, better housing at resettlement sites with comparable access to employment and production opportunities, integration of resettled persons economically and socially into their host communities, and extension of project benefits to host communities; (ii) transitional support and development assistance, such as land development, credit facilities, training, or employment opportunities; and (iii) civic infrastructure and community services, as required.

29 (v) Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards. In rural areas provide them with legal and affordable access to land and resources, and in urban areas provide them with appropriate income sources and legal and affordable access to adequate housing. (vi) Develop procedures in a transparent, consistent, and equitable manner if land acquisition is through negotiated settlement to ensure that those people who enter into negotiated settlements will maintain the same or better income and livelihood status. (vii) Ensure that displaced persons without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation for loss of non-land assets. (viii) Prepare a resettlement plan elaborating on displaced persons’ entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule. (ix) Disclose a draft resettlement plan, including documentation of the consultation process in a timely manner, before project appraisal, in an accessible place and a form and language(s) understandable to affected persons and other stakeholders. Disclose the final resettlement plan and its updates to affected persons and other stakeholders. (x) Conceive and execute involuntary resettlement as part of a development project or program. Include the full costs of resettlement in the presentation of project’s costs and benefits. For a project with significant involuntary resettlement impacts, consider implementing the involuntary resettlement component of the project as a stand-alone operation. (xi) Pay compensation and provide other resettlement entitlements before physical or economic displacement. Implement the resettlement plan under close supervision throughout project implementation. (xii) Monitor and assess resettlement outcomes, their impacts on the standards of living of displaced persons, and whether the objectives of the resettlement plan have been achieved by taking into account the baseline conditions and the results of resettlement monitoring. Disclose monitoring reports.

4.5 Differences of ADB’s and Local Policies

4.5.1 Compensation and resettlement for house

105. Difference: ADB policies require that compensation is based on replacement cost. Chinese laws accept that depreciation is reasonable, and the compensation rate for the old structure should be lower than that for new housing.

106. Solution: Compensation rates in in this RP are based on replacement cost.

4.5.2 Compensation and resettlement for land

107. Difference: ADB policies require that compensation should be sufficient to offset any income loss, and restore long-term income-generating potential. Chinese standards are based on AAOV.

108. Solution: An early stage solution is to provide replacement land. Cash compensation is the preference of most people, though they cannot ensure the rational use of such

30 compensation. Therefore, further technical support is needed to monitor the income of seriously affected households; especially those in vulnerable groups, and local governments should provide assistance to those in need. These are specified in this RP.

4.5.3 Compensation and resettlement for vulnerable groups

109. Difference: Difference: ADB policies require that special compensation be granted to all vulnerable groups, especially seriously affected households faced with impoverishment. Chinese provisions do not require social analysis, and compensation is based only on the amount of loss. Other social programs are in place for vulnerable groups regardless of the project.

110. Solution: Special funds have been allocated to assist the vulnerable groups, who will be further identified during the DMS. All measures have been specified in the RP. For significantly affected households, the RP includes specific provisions.

4.5.4 Consultation and disclosure

111. Difference: ADB policies require APs are fully informed and consulted as soon as possible. Chinese provisions have improved the transparency of disclosure and compensation. However, APs still play a weak role in project decision-making, and the disclosure period is usually too short.

112. Solution: Consultations have begun at the early stage (before and during technical assistance) and will continue through out the project cycle. Ningxia Provincial Communication Bureau and the local Government agreed to disclose the RP to APs as required by ADB.

4.5.5 Resettlement monitoring, evaluation and reporting

113. Difference: ADB requires internal and external resettlement monitoring. However, laws of PRC have no such requirement except projects that have reservoir resettlement.

114. Solution: Follow the ADB requirements, internal and external resettlement monitoring systems have been established for all ADB financed projects, and this has been included in the RP. The requirements for internal and external monitoring reporting are specified in the RP.

31 5 Compensation Principle and Entitlement

5.1 Resettlement Principles

115. The principles for compensation and entitlement of the Project have been developed in accordance with the regulations and policies of the PRC and ADB, with the aim of ensuring that APs obtain sufficient compensation based on replacement cost and assistance so that their production and livelihoods are at least restored to pre-project levels. Table 5-1 presents the resettlement principles of the Component.

Table 5-1 Resettlement Principles of the Component No. Principle 1 Involuntary resettlement should be avoided where feasible. The APs are granted compensation and rights that can at least maintain or even improve their 2 livelihoods in the absence of the project. The rate of compensation for acquired housing, land and other assets will be calculated at full replacement costs. The APs are given compensation in full replacement cost and assistance in resettlement whether 3 legal title is available or not. If the land available to everyone is insufficient to maintain his/her livelihood, replacement in cash or 4 in kind and other income-generating activities are provided for the lost land. The IA will ensure that APs fully understand their entitlements, the method and standard of 5 compensation, the livelihood and income restoration plan, and the project schedule, and participate in the implementation of the RP. The IA will ensure that no physical displacement or economic displacement will occur until (i) compensation at full replacement cost has been paid to each AP for project components or sections 6 that are ready to be constructed; (ii) other entitlements listed in the RP have been provided to APs; and (iii) a comprehensive income and livelihood rehabilitation program, supported by an adequate budget, is in place to help APs improve, or at least restore, their incomes and livelihoods. Vulnerable groups are provided special assistance or treatment so that they lead a better life, and all 7 APs should have an opportunity to benefit from the project. At least two members of each AH receive skills training, including at least one woman. 8 The resettlement plan should combine with the overall planning of county/ city/ district. - 9 If feasible, changing from “agricultural to non agricultural” status can be provided to LEF on a voluntary basis. All resettlement cost is included in the project budget and sufficient to cover all affected aspects. 10 The fund needs to be paid in time. The IA and an external monitoring agency will monitor and measure the progress of implementation 11 of the RP and will prepare monitoring reports to ensure that the implementation of the RP has produced the desired outcomes.

5.2 Cut-off Date of Compensation

116. The cut-off date for the eligibility for compensation is on November 1, 2016, which is also the date of Jingyuan PMO and RO conducting resettlement DMS. Any newly claimed land, newly built house or settlement in the project area by the APs after this date is not entitled to compensation or subsidization. Any building constructed or tree planted purely for extra compensation is not counted in the inventory of losses.

5.3 Compensation Rate for Permanent Land Acquisition

117. According to the Notice of Further Regulating the Farm Road Land Affirmation Work of the General Office of Ministry of Land and Resources(Guo Tu Zi Ting [2013] No.581): “ First,

32 farm roads refer to the roads (inclusive of farm track) that conform to the definitions for land in Land-use Status Classification (GB/T21010-2007)”, and is used for the transportation in village and field within the rural scope and served rural agricultural production outside of the state road network system. The public roads (inclusive of interchange) in town and village and land for border tree are not farm roads. Second, the width of farm roads shall not be larger than 6.0 m, or the width of subgrade not larger than 6.5 m. The width of farm roads or the width of subgrade exceeds the upper limits after reconstruction and expansion, and the roads only with one-way lanes shall not be identified as farm roads and shall be incorporated into the management scope of construction land.”

118. The subproject does not belong to farm road construction, and if land acquisition and resettlement is involved, policies shall be formulated in accordance with the Government’s requirements for construction land.

119. According to the Notice of Releasing the Compensation Standard for Land Acquisition in Ningxia Hui Autonomous Region by the People’s Government (Ning Zheng Fa [2015] No.101) (see the attachments) issued on January 1, 2016, the project is being implemented in Area V in Jingyuan County, Guyuan City, where the compensation standard for mountainous dryland and Residential land is CNY 5,670 /mu.

120. The acquisition of Forest land is executed by the 70% of that of dryland and Farmland of the same area, the compensation standard for Forest land of the RP is CNY 3,969 /mu.

121. According to the compensation policy for the same crop by the average annual output value in the first three years for the common crops (inclusive of manual seeding), the compensation standard for young crops is CNY 600 /mu:

122. Table 5-2 has summarized the compensation standard for land acquisition of this RP by land category.

Table 5-2 Compensation Standard for the Project Land Unit: CNY /mu mountainous Residential Category Forest land Young crops dryland land Compensation 5,670 5,670 3,969 (70% of Farm land) 600 standard

5.4 Temporary Land Occupation

123. Temporary land occupation of the subproject is 17 mu, and is the land belongs to unused land. According to the document of Jingyuan County People’s Government of Notice on Compensation Standard for Land Acquisition, Demolition and Resettlement of Highway Engineering Construction of Qingshizui-Jingyuan Section of G344 (JingZheng Fa [2014] No. 36), the compensation standard is determined as CNY 600 per mu per year. It will be for a maximum of 2 years and the land will be restored to its pre-occupation standards prior to its redistribution to the owners.

5.5 Compensation Rate for House Demolition

124. The compensation for all houses demolished will follow the following principles.

33 (i) Full replacement costs without depreciation: House demolition will be compensated at replacement costs. Table 5-4 has the detailed cost estimations based on the local house construction practice by type. The affected persons shall receive full replacement price without depreciation for the original house. Meanwhile, the affected people can use the building materials of the original house free of charge/cost. (ii) Various voluntary replacement choices available: The affected household can choose scattered settlement by providing similar condition of individual housing site, or choose concentrated settlement by participating in new rural construction scheme or other planning construction projects of the government, or self-settlement by using cash compensation. (iii) No demolition prior to new house ready/or agreement on new house plot/ apartment units singed: No house demolition will commence prior to the new house constructed or transition house arranged. Transition period should not be over 6 months. The affected households will obtain transition compensation prior to moving to the new house. In case of some household facing difficulties of moving, village committee and Jingyuan PMO will provide assistance of transport. For those household facing difficulties to find transition house, the village committee and Jingyuan PMO will provide assistance in renting.

125. According to the policy of Asian Development Bank and regulations of PRC, market price evaluation is adopted for the rural residential houses of the RP. The houses to be demolished will receive compensation according to the “replacement price”, the compensation price will be determined through market price evaluation, and will not be lower than the compensation base price of the RP. The compensation base standard for house demolition of the document (Jingyuan Zheng Fa [2014] No. 36) of Jingyuan People’s Government is formulated based on the document (Ning Zheng Ban Fa [2010] No. 43) - Notice of Issuing Compensation Standard for Land Acquisition, Demolition, and Resettlement of the Second Line Rebuilding Project for Baotou-Lanzhou Railway in Ningxia (Ning Zheng Ban Fa [2010] No.43). Therefore, the RP also refers to the compensation price of the document (Ning Zheng Ban Fa [2010] No. 43), and combines the actual conditions of the current economic investigation to raise the price properly, which is basically same to cost of constructing a new house in project area in 2015. The residential land for resettlement will be distributed prior to demolition, and the resettlement site shall be determined in villagers’ representative meeting organized by village committee, within the same village group or village as much as possible. The “three supplies and one leveling” for the residential land will be carried out by the project construction unit, and the expense is included in construction budget. Table 5-3 shows the classified compensation standards.

Table 5-3 Compensation Standard for Demolition of Residential House and Ancillary Facilities Type Structure type Unit Base price Remark Residential land CNY/mu 5,670 The compensation House brick-concrete CNY/m² 1,000 for the house shall on Compensation Brick-timber CNY/m² 600 not be lower than collective for house the proposed base land Brick, and earth-timber CNY/m² 410 Earth-timber CNY/m² 3101 price.

1 In the compensation standard of Ning Zheng Ban Fa [2010] No.43 document, the price is CNY210/m2, but the standard was released in 2011. In view of the current economic and social development, the standard has not been suitable for the existing housing compensation. Hence, through the consultations with the representatives of

34 Type Structure type Unit Base price Remark Makeshift house CNY/m² 100 10002 CNY 1,000 per relocation subsidy CNY/HH household for one time. Transition subsidy: CNY 300 per household each Other subsidy month. Generally, for house Subsidy for temporal and the transition resettlement / transition CNY/HH 3003 period is 6 months. subsidy The exceeded time should be calculated in accordance with actual condition.

Table 5-4 Estimation of Replacement Cost of House by Type (per 100m²) Brick-wood Earth-wood Item No. Unit price Amount Unit price Amount No. (CNY) (CNY) (CNY) (CNY) A. Subtotal of main 25,320 11,830 building materials Wood 4 1,000 4,000 5 1,000 5,000 Concrete 8 380 3,040 0 0 0 Adobe 0 0 0 12,000 0.2 2,400 Brick 50,000 0.28 14,000 1,000 0.35 350 Lime (coating) 4 400 1,600 6 400 2,400 Tile (tilestone) 8,000 0.21 1,680 8,000 0.21 1,680 Sand 20 50 1,000 0 0 0 B. Subtotal of other 7,500 7,000 materials Nails, iron wire, Nails, iron wire, Miscellany 2,500 3,000 electronic charge electronic charge Water and 5,000 4,000 electricity materials C. Subtotal of labor 19,000 12,000 Skilled 70 200 14,000 40 200 8,000 Unskilled 50 100 5,000 40 100 4,000 Total 51,820 30,830 Source: Socioeconomic and physical impact survey in July, 2016.

affected villages, and comprehensive consideration of the local current economic level and the compensation policies of Jingyuan County in the past, it is increased to CNY310 /m2 in the RP. 2 In the compensation standard of Ning Zheng Ban Fa [2010] No.43 document, the subsidy is CNY 500household. In view of the current economic and social development survey, the removal subsidy in the RP is increased to CNY 1,000 /household. 3 The subsidy for temporary resettlement is used as house rent of relocation households after relocation. Through the survey on local house rent and the negotiation with the representatives of affected villages, the fees in the RP are determined to be CNY 300/household/month.

35 5.6 Compensation for Ground Attachment and Infrastructure

126. The compensation standard for the ground attachment facilities and infrastructure of the subproject is determined based on the principle of “replacement price”, shown as Table 5-5.

Table 5-5 Compensation Standard for Ground Attachments and Infrastructure Item Unit Compensation standard Brick wall m 80 Toilet CNY /single 280 Pine tree(DBH <15cm) CNY /single 28 Locust tree(DBH <15cm) CNY /single 28 Poplar tree (DBH >15cm) CNY /single 42 Weed tree(DBH >15cm) CNY /single 42 Weed tree(DBH <15cm) CNY /single 28 Fruit tree(Full Fruit Period) CNY /single 420 Nursery CNY /mu 4000

5.7 Compensation for Young Crops

127. According to the compensation policy for the same crop by the average annual output value in the first three years for the common crops (inclusive of manual seeding), the compensation standards for young crop are CNY 500 /mu for corn, and CNY 700/mu for wheat.

5.8 Standard of Other Costs

128. The standard of other expenses is given in Table 5-6.

Table 5-6 Tax and Fee Standard of Resettlement No Item Tax and fee standard Policy basis Notice on re-issuing the Levying Farmland Reclaiming Land reclaiming Fee and Use Management Methods of Ningxia Hui 1 CNY 2,666.8 /mu fee Autonomous Region. Ning Cai (Zong) Fa [2012] No.13) Notice on Adjustment of Policy of New Construction Land Use Fee of Ministry of Finance, Ministry of Land New and Resources and People's Bank of PRC (Cai Zong 2 construction CNY 6,667 /mu [2006] No. 48); Notice on Adjustment of Classification land use fee of New Construction Land Use Fee in Some Regions by Ministry of Finance and Ministry of Land and Resources (Cai Zong [2009] No. 24) Farmland Provisional Regulations on Farmland Occupation Tax 3 CNY 3,333.5 /mu occupation tax of the People’s Republic of PRC

5.9 Entitlement Matrix

129. The entitlement matrix has been established in accordance with the applicable policies in this chapter. See Table 5-7 for details.

36

Table 5-7 Compensation Entitlement and Resettlement Policy Matrix Applicable Entitled No. of entitled Compensation Implementation item Type of loss Compensation policy targets person/collective person/collective entitlement The village meeting a. Pay land acquisition will determine the compensation to the rural fund using, re- collectives according to allocation of land, the compensation investment and standard in Table 5-2 of development project this RP The supervising b. Re-allocation of Land compensation authority shall Land within the a) Rural a) Three village farmland OR payment by allocation: The share approve and project collectives collectives affected village division among the supervise the implementation owning the land b) 432 APs of collectives of cash farmers losing land is Permanently proposals and area - road b) Farmers with 112 HHs losing compensation (100%) to decided by villager acquired farmland requirements of right of way land use rights land (all with AHs losing land with user meeting; cash village and provide (estimated as c) Farmers land use rights) rights if land is compensation shall convenience for 160.01 mu) renting the land c) no APs contracted to APs be directly paid to training project. renting the land c. Cash compensation individual. Those agreed for all the ground compensation for attachment (e.g., trees) individual shall be according to standards in paid according to Table 5-5 and standing the agreement and (young) crops according prior to to standard in Table 5-2. dispossession. Land Cash compensation for temporarily the annual loss during The village used as land loss period. Restore The villagers losing committee must construction To be to the status prior to the a) Farmers with crops will get total inform the original area within the determined construction, and Temporary loss of land use rights compensation land user and make project during maintain the life of APs land b) Farmers according to the corresponding implementation construction at the former level at renting the land compensation compensation. area or close period least. The compensation standard Maximum period of by area standards are use is 2 years. (estimated as CNY500/mu for corn and 17 mu) CNY700/mu for wheat. Residence and HHs or APs 134 APs of 38 Cash compensation for Cash compensation Village and APs will Loss of property within losing buildings HHs, of which 4 AHs, including residential paid to the owners of determine the residence/property the project or housing due HHs suffer land, and housing, and housing/building and location of new implementation to demolition complete loss attachments. Cash attachments. residence. The

37 Applicable Entitled No. of entitled Compensation Implementation item Type of loss Compensation policy targets person/collective person/collective entitlement area or and require compensation for various For households contractor shall be affected by the relocation housing type according affected by complete responsible for filling project to the replacement cost house demolition, the and leveling the (estimated as in Table 5-3. The moving compensation for area of new 2169 m2) compensation is CNY residential land shall residence and 1,000 per HH, the be paid to collective connect it to the transitional and residential land existing public compensation is CNY shall be re-allocated facilities. 300 /month of standard to the affected subsidy, and the households by the transitional period is six villages . months. 5.10 For households affected partially, cash compensation for houses and residential land will be paid. Compensation Non-Farmland according to the RP. within the Rural collective Funds can be used Loss of non- project 7 project affected owning land Cash compensation Village collective for village Farmland implementation villages ownership development as area (estimated decided in a village as 234.51 mu) committee meeting. All facilities within the project Cash compensation Proprietor receives Affected public implementation Proprietor of all Proprietor of all based on the market the total facilities area (no facilities facilities price and negotiation with compensation impacts have proprietor been identified yet)

38

Applicable Entitled No. of entitled Compensation Implementation item Type of loss Compensation policy targets person/collective person/collective entitlement Refers to the old and weak, The project will assist the women, children, villages and towns in the disabled, or 25 HHs with 82 meeting the demands of In the same Any affected those lacking persons the vulnerable groups, condition, enjoy the Assistance by person who is Vulnerable groups living ability, and belonging to the and each household will priority of project government also vulnerable the poverty vulnerable receive about CNY 3,000 compensation and department

HHs, HHs groups special subsidy for the assistance lacking labor or economic recovery of the with heavy vulnerable groups. burden

39 6 Income Restoration and Housing Resettlement Measures

6.1 Impact of Land Acquisition and Income Restoration Measures

6.1.1 Impact of and acquisition

130. The subproject involved permanent land acquisition of 394.52 mu of rural collective land, including Farmland of 160.01 mu (37.04%), Residential land of 24.31 mu (5.63%), and Forest land of 210.2 mu (48.66%). The land acquisition will affect 432 persons in 112 households in 7 administrative villages of three towns of Jingyuan County.

131. For the 7 affected villages, the average farmland loss rate per village is 0.88%, and highest farmland loss rate is of Dongxia Village, reaching 3.08%. The main crops in Jingyuan County are corn and wheat. Jingyuan County is located at mountain area with an altitude of 2,000 m, with one harvest in a year and a relatively low output value. About 55% of farmland in Jingyuan County grows wheat, and the annual average output value is about CNY 700 per mu; about 45% grows corn, average output value is about CNY 500 per mu. Therefore, after comprehensive calculation, the annual average output value of farmland is about CNY 600 per mu. Besides, the production cost of grain crops is about CNY 100 per mu according to the investigation. Seeing from the planting of main crops in the project area, the net income is about CNY 500 per mu. Therefore, according to the condition of Dongxia Village, land acquisition will reduce the farmland by 3.08%, and reduce the income of CNY 32,460, only accounting for 4.4% of the total net income of CNY 733,315 of the village in 2015. On the other hand, for the land acquisition HHs, even calculated by the highest loss rate of 7.62% for farmland (one household in Pangdong Village, with 1.37 mu land to be acquired), if the compensation for land acquisition is not calculated, it will directly lead to the income loss of CNY 685 per year for the farmer, only accounting for 3.66% of the total family income (about CNY 18,700). Therefore, land acquisition of the project will exert small influence on the affected villages and AHs.

40

Table 6-1 Permanent Farmland Acquisition Impact Before land acquisition After land acquisition Income loss Per Per Annual capita capita Per Total AH of AP of Village Farmlan income lost income averag Affected Total Capita Per HH Farmlan Road Town Total farm land land farmlan d loss of affected loss e Village person net farmlan d loss HH land acquisitio acquisitio d loss rate of village of income s income d (mu) (mu) (mu) n n rate % AH % (CNY/villag village loss of (CNY) e) (CNY/ village person) (%) 18 5,80 0.15 Shatang 729 5,390 28.67 11 38 12.97 0.24 4.11 6,485 Shatang Huanghua 8 0 8.90 % (Huanghu Town 6,40 4 0.00 Tuyao 49 175 2,300 46.94 2 9 0 0.00 0.00 0 a Town)– 0 0.00 % Gaodian Liupansha 16 6,87 Road Nonglin 631 1,290 7.63 0 0 0 0.00 0.00 0 0.00 n Town 9 0 0.00 % Pangdon 22 4,69 0.25 948 3,318 14.55 25 104 22.15 0.67 6.09 11,075 g 8 6 11.68 % 3,68 163.1 4.43 Dongxia- Dongxia 51 199 2,107 41.31 33 110 64.92 3.08 4.76 32,460 Jingheyua 5 2 % Digou n Town 3,09 147.5 road Shidi 33 108 1,600 48.48 15 46 31.86 1.99 4.38 15,930 4.76 6 0 3,22 1.92 Digou 61 227 2,224 36.46 26 78 28.11 1.26 2.97 14,055 5 61.92 % 77 3,01 4,21 18,22 160.0 0.63 Total 3 7 23.40 112 385 0.88 6.22 80,005 9 7 8 9 1 26.52 % Source: Socioeconomic and physical impact survey in July 2016.

4 This 2 HH affected by HD have just a loss of residential land, and does not involve the loss of farmland. So they will still be affected by land requisition.

41 6.1.2 Income restoration plan and assistance measures

132. The land acquisition impact is limited and no household will lose more than 10% of their farmland or income, and thus there is no significant on APs’ livelihoods. Consequently, the rehabilitation strategy focuses on income restoration rather than livelihood restoration. The income restoration plan formulated is based on the will of the APs, impact degree and the feasibility of the potential options in each village. During the field consultation, cash compensation, agricultural resettlement with or without land readjustment, arranged jobs during the project construction and operation, assistance to non-farming employment and self- employment, social insurance approaches were discussed. Table 6-2 summarizes the preferences expressed by APs.

Table 6-2 Summary Sheet of Income Restoration Willingness of the Acquired Households Selection of income restoration willingness of AHs No. No. Job Road Town Village of of Improve Non farmSelf- Social arrangement AHs APs Agriculture employment employment Insurance by Project Shatang Huang (Huang Shatang 11 38 2 5 3 1 11 hua hua Town County) Tuyao 2 9 0 2 0 0 2 – Liupan Gaodian shan Nongling 0 0 0 0 0 0 0 Road Town Pangdong 25 104 5 10 6 4 25 Dongxia Jinghe Dongxia 33 110 6 15 7 5 33 -Digou yuan road Town Shidi 15 46 4 5 6 0 15 Digou 26 78 5 8 10 3 26 Total 7 112 385 22 45 32 13 112 Proportion (%) 20% 40% 29% 12% 100% Source: Socioeconomic and physical impact survey in July 2016.

(i) Cash compensation and distribution

133. The affected villages/village groups will be compensated in cash based on the standards discussed in Section 5, where compensation rate for farmland is CNY 5,670, residential land CNY 5,670, and forest land CNY 3,969 per mu respectively (refer to Table 5-2). The land compensation distribution from village to AP has two scenarios: 1) If the land is contracted to APs, 100% of the compensation will be distributed to APs directly. 2) If the land is not contracted to APs, the compensation will be reserved for village infrastructure maintenance or improvement.

134. The compensation rate is very comprehensive compared the current land lease price. According to the current land-leasing price in the project area, dry farmland (the main armland type) is CNY 100-150/mu per year, depending on location for convenience of transport. The project compensation for dry farmland per mu is CNY 5,760 that is worth of land leasing price at the existing higher rate of CNY 150 for 38 years, annual average output value (CNY 600/mu) for 9.5 years and net income (CNY 500/mu) for 11.5 years. Due to limited land acquisition per household and high compensation rate, most of APs are not worrying about income loss caused

42

by land acquisition because the compensation will free up there labor and the road will bring new economic opportunities.

135. Also, to ensure that the affected households use the compensation in a rational manner, Jingyuan PMO and other related agencies will provide guidance and required training. The following are restoration options and assistance measures for households affected by permanent land acquisition.

(ii) Improve Agriculture

136. About 22 AHs or 20% of the total AHs chose agriculture restoration. They will use the cash compensation to improve the remaining land by increase of fertilizer use or change grain crops plantation to cash crops plantation such as ginger, chili, fruit trees, and garden plant seedlings which require intensive labor and capital investment. It is estimated that the plantation of ginger and garlic will generate net income of about CNY 800-1000 per mu compared to that of CNY 500 of grain plantation. The annual growth is about 30% to 100% a year. It will be easy to offset their economic loss caused by land acquisition.

137. For the garden seedlings and fruit tree plantation, corresponding training will be provided. For other crop plantation types, training is not desired by APs because most households have such skills already. It is estimated that about 50 members need training on garden plant seedling production and fruit tree care.

(iii) Arranged Jobs

138. About 45 APs expressed interest in job arrangement for this project. The Ningxia Transport Department and Jingyuan PMO committed to give priority to employing APs for the job opportunities from this project. It is estimated around 50 unskilled jobs are only available during project construction, and 10-20 jobs during operation, including road maintenance, greening and cleaning. Their preferential treatment shall be implemented according to the provisions of Labor Law. All interested in the jobs will receive training. It is estimated a total of 45 APs will be trained. Table 6-3 summarizes the direct job opportunities from the project.

Table 6-3 Project employment information Proposed Planned Standard Projected Proposed Jobs No. targets workdays income income employment time (day) (CNY) (CNY) After the project Local Earth- moving 20 20 CNY 80 /day 32,000 starts (estimated villager from July 2017 to Local Logistical support 10 July 2018) villager 100 CNY 50 /day 50,000

Road Local 10 After project 200/year CNY 50 /day 100,000 maintenance villager completion (2018 Local Unskilled labor 10 onwards) 100/year CNY 80 /day 80,000 villager Local Total 50 villager Note: The remuneration for above jobs will be paid by day due to the existing financial system and job nature. The annual income of the position is predicted under full workload. Source: Socioeconomic and physical impact survey in July 2016.

43 (iv) Non-farming employment/business

139. As the income loss per household from land acquisition is quite limited and agricultural income is no longer their main income sources, about 45 AHs (41% of total AHs) stated that they will spend the land compensation and saved time on non-farming employment or self- employment business to offset their income loss. As indicated in Table 6-2, the maximum per AP loss is CNY 346 per year, a few days of non-farming employment at a common rate of CNY 80 per day would cover their annual income loss.

140. As discussed in Section 3, over 80% of the households’ main income is from non- farming sources and agricultural source is supplementary. Regarding labor input, four basic models are used in operating their farmland: 1) by either female or the old family members left home to carry out agricultural plantation; 2) with the migrant family members who come back home during busy season to help with planting or harvesting, 3) by giving land to relatives to plant without charge, or 4) leasing out the land convenient for irrigation and transport at a price of CNY 100-150 per mu per year. Before year 2000, almost all households adopted the first two models, but now more and more households adopt the last two models to avoid interruption to their non-farming migrant jobs. For female left at home, they are willing to spend their saved time in either handicraft or finding local non-farming jobs. The surveyed households expressed their interest in non-farming jobs stimulated by the road improvements and hoped the project can provide market information and skills about handicraft, local non-farming jobs or business opportunities (including transport services). It is estimated that about 50 households or 100 people need relevant skill training which has been provided for in the budget of this RP.

(v) Training

141. Based on the above restoration options chosen by the AHs, training programs will be designed to meet the specific needs and preferences of AHs.

142. For the households that choose agricultural improvement measures, agricultural technical training such as gardening plant seedling producing, fruit tree plantation and other cash crop plantation will be provided as required.

143. For the non-farming employment, skill training will include landscaping, house decoration, handicraft production, car repair, transport services and other skills. It is estimated that about 100 AHs with 150 members require such training.

144. Additionally, training in the form of farmer-back-farmer training will be organized. The farmers with skills in cash crops could be invited to share experiences and skills to the new growers in the same or other villages. It will be useful to organize study tours to other villages for APs who are interested in planting new cash crops. It will either be organized by Jingyuan PMO directly or by entrusted government agencies such as agriculture bureau, forestry bureau, or women’s federation. In terms of non-farm training, it will be delegated to labor and social insurance bureau.

145. A total of CNY 50,000 has been budgeted in the RP. The trainees shall receive three skill trainings at least before completion of project in 2018.

Table 6-4Training Plan for Project Implementation Year Target Scope Agency responsible Budget 2016- 300 people Gardening plant seedling PMO, women’s CNY 50,000

44

Year Target Scope Agency responsible Budget 2018 in total, plantation, fruit tree or other new federation, labor and included in project including cash crop plantation, handicraft social security RP budget in 200 production, farm machinery, bureau, agriculture addition to local females motorcycle or other vehicle repair, and forestry bureaus government fiscal and 100 driver, stonecutter, painter, funds. males concrete worker, waterproofing worker, masonry worker, house decoration worker, etc. Source: Field Socioeconomic survey and survey on physical impact, April, 2016.

(vi) Social insurance

146. All affected households expressed their interest in social insurance. However, the endowment insurance for land-expropriated farmers (LEF) only targets at eligible households. The land acquisition of the component is linear, so there are few opportunities to create LEF. No endowment insurance will be provided if there are no eligible APs. However, the APs are encouraged to participate in the general pension and insurance.

147. To guarantee the vulnerable groups livelihood restoration, MLSS will be made available for officially identified poor. Other insurance options are optional and subject to APs voluntary decision. Since APs will receive cash compensation, they will have an opportunity to participate in voluntary programs; this may be attractive for older farmers.

148. As mentioned above, this project provides land acquisition farmers with diversified relocation measures, which widely covers affected households. See details in Table 7-5.

(vii) Special assistance to vulnerable families

149. The following special assistances are provided for the identified vulnerable families: (i) Priority will be given to arrange jobs. One member from each household will be guaranteed an arranged job. (ii) Preferential credit will be provided if needed to develop non-farming business such as purchase of vehicles for transport business, repair shop, small business of buying and selling, or change from grain plantation to gardening plant seedlings or fruit trees as requested. (iii) Specific training will be provided as desired including farmer-to-farmer exchange visit. (iv) Special measures for vulnerable group will be provided to them too as described in Section 6.3

6.2 Demolition and Housing Resettlement Plan

6.2.1 House Demolition Impacts and Relocation options

150. The subproject will involve demolition of 2169 m² of housing and will affect 38 households with 134 members. The affected households list is shown in Table 6-5. Field surveys reveal that most of the affected houses are not in good condition in terms of indoor facility, structure, and surrounding facilities. Guided by the principles of the replacement costs and no depreciation, most APs consider that the subproject provides reasonable compensation as described in Section 5. Only four HHs suffer complete house demolition, of which three will

45 need to be relocated to new housing plots allocated by the village and rebuild new houses; one household hopes to purchase a house in the town. The other 24 HHs will lose 14-40% of their housing area but they have sufficient land to rebuild new rooms/buildings on the existing site

151. Guided by the principles of housing demolition and resettlement in this resettlement plan and after negotiation with affected people and relevant organizations in the village and town, a preliminary demolition and resettlement scheme was formulated as shown in Table 6-5:

Table 6-5 Demolition Scheme of Residential Houses Name ofHead ofFamily Original Demolitio Degre Brick Earth- Relocation scheme village household numbe living n areae ofand timber r area (m²) loss timber structur (m²) structure e (m²) (m²) Tuyao Lu Xin 4 210 64 30% 64 0 Resettlement on site5 Village Yang 5 240 80 33% 80 0 Resettlement on site Qinshan Pangdon Relocate with Li 100 g Village 4 180 180 120 60 residential land Guangdong % 6 distribution 100 Currency Yu Wanxing 4 160 160 100 60 7 % compensation Li Fucai 4 200 60 30% 0 60 Resettlement on site Relocate with 100 Li Youfu 3 140 140 80 60 residential land % distribution Residential land Li Wanbao 4 180 60 33% 0 60 distribution Relocate with 100 Ma Wujin 3 160 160 100 60 residential land % distribution Ma Wendong 5 220 60 27% 0 60 Resettlement on site Residential land Bai Deyun 3 180 60 33% 0 60 distribution Zhao Wujiu 4 180 40 22% 0 40 Resettlement on site Residential land Ma Guoxi 3 200 80 40% 0 80 distribution Ma Jianying 4 180 40 22% 0 40 Resettlement on site Ma 4 200 35 18% 0 35 Resettlement on site Zhongxue Dongxia Yu Chunqing 4 200 30 15% 0 30 Resettlement on site Village Lan Shenglv 3 200 30 15% 0 30 Resettlement on site Lan 5 240 80 33% 0 80 Resettlement on site Zhongzhi Residential land Yu Sanjiang 4 200 60 30% 0 60 distribution

5 Over 2 mu of residential land per household is affected and when the APs with partial building demolished receive the demolition compensation, they can build new houses within the scope of their residential land. 6 The APs with whole building demolished or residential land affected greatly can select a site from the unoccupied land for reconstruction. 7 The APs with whole building demolished hope to buy a house in town after obtaining all compensations. 46

Name ofHead ofFamily Original Demolitio Degre Brick Earth- Relocation scheme village household numbe living n areae ofand timber r area (m²) loss timber structur (m²) structure e (m²) (m²) Yu Quangui 3 160 30 19% 0 30 Resettlement on site Lan Qisi 4 200 30 15% 0 30 Resettlement on site Ma Nuha 2 120 30 25% 0 30 Resettlement on site Ma Wenxue 3 150 40 27% 0 40 Resettlement on site Ma 3 160 30 19% 0 30 Resettlement on site Liangcheng Ma 3 160 30 19% 0 30 Resettlement on site Wansheng Ma Liangjun 3 180 40 22% 0 40 Resettlement on site Ma Wanjin 3 160 30 19% 0 30 Resettlement on site Ma Wangui 4 200 40 20% 0 40 Resettlement on site Shidi Village Ma Mingliang 3 200 30 15% 0 30 Resettlement on site Ma Zhiguo 3 150 30 20% 0 30 Resettlement on site Bai Fangping 4 180 30 17% 0 30 Resettlement on site Ma Zhiliang 2 120 40 33% 0 40 Resettlement on site Residential land Ma Panshe 3 160 60 38% 0 60 distribution Ma Decheng 3 200 40 20% 0 40 Resettlement on site Ma 4 220 30 14% 0 30 Resettlement on site Zhongchang Wu 3 180 30 17% 0 30 Resettlement on site Digou Wanqiang Zhan Residential land Village 4 240 80 33% 80 0 Mancang distribution Ma Jinbao 3 180 40 22% 0 40 Resettlement on site Ma Yuchun 4 180 40 22% 0 40 Resettlement on site Total 38 134 6970 2169 31% 624 1545 Source: Field Socioeconomic survey and survey on physical impact, April and July 2016.

6.2.2 Other subsidy policy

152. The affected households will be entitled the following rights and interests. (i) Preferential labor training; (ii) Benefits from the social security policy in project implementation area; (iii) Access to the suitable jobs created by the project directly and indirectly, including jobs under project implementation agencies and jobs relating to enterprises attracted into the project area.

6.3 Measures for Vulnerable Groups 153. A support fund for vulnerable groups (25 AHs with 82 people) of CNY 75,000 will be established under the project to support vulnerable groups affected by the project. The main affected vulnerable groups are the poor, single parent family and women-led family, Wubao (five-guarantee households), households affected by disability and illness. A series of additional

47 measures have been put in place to help them with income restoration, livelihood improvements and/or house relocation restoration.

(i) Giving priority to vulnerable groups in resettlement measures

A. Land acquisition affected households

154. Priorities will be given in obtaining replacement land through allocation of reserved land, or through land transfer if the vulnerable AH chooses to restore their income through agricultural measures.

155. The households with a labor force will be given priority in skill training and priorities given in provision of arranged jobs by the project and local government. Eliminating zero employment of poor households (with a labor force) is the target of government poverty alleviation; it will also be the target of this project.  Include all eligible AH into social insurance. The new rural social insurance will be an optimal option for the AH on a voluntary basis.  Provide preference loan to the significantly affected households if necessary in developing non-farm business, such as purchasing vehicles for transport business, operating repair shops, developing other income generating business.

B. House demolition affected households  Priorities will be given to vulnerable group to choose resettlement locations.  A one-off advance moving reward of CNY 3,000 will be provided to vulnerable households after they show relevant valid certificates.  Minimum size housing (25 m2/person) will be guaranteed for the poor (assistance can be provided for housing materials and labor costs).

(ii) Including eligible vulnerable groups in MLSS as a priority

156. According to the MLSS policy of residents of Jingyuan County, eligible vulnerable groups affected by the Project will be included in the MLSS in time and receive MLSS benefits so as to ensure that the average per capita income of each rural AH is not less than CNY 200 per month.

(iii) Providing rural medical assistance to eligible vulnerable groups

157. Rural medical assistance will be provided to eligible vulnerable groups to solve their difficulty in receiving medical care. Jingyuan County People’s Government will provide medical assistance for the rural residents in line with the policies.

6.4 Women’s Development Measures

158. During the resettlement process, women’s rights and interests will be fully protected, and women will play an important role in socioeconomic and resettlement activities.

159. Ensuring women’s equal rights: During the preparation of RP, separate meetings were held with female representatives of APs and the Women’s Federation in order to allow women to express their needs, expectations and suggestions on resettlement and restorations measures. Most of them including women-headed households stressed their concerns, namely: (i) receiving compensation on time; (ii) selection of resettlement mode and housing land, (iii)

48 improving agricultural production with limited farmland; and (iii) operating small businesses at home or at agricultural product fairs or markets with either the compensation or small loan which will be provided by the project. Measures to address these concerns have been included in the RP.

160. Training priorities to women with preferential training methods and content: As women have relatively lower education levels and experience generated in migrant jobs, they have less available employment and income generation choices than men. Training is particularly crucial to them in developing new income sources given to opportunity generated from the industrialization and urbanization development. They hope to have not only agricultural skill training on horticulture, fruit tree caring, but also non-farming skills with handicraft, urban employment skills such as hotels, restaurants, shopping malls, and skills working in factories e.g. garment factories. Their training needs have been designed in this RP and training budget has been reserved (refer to Section 6.1). The project will ensure that 40%-67% training opportunities are provided for the affected females. The Women’s Federation representatives together with the employer agencies will further consult with women to detail the training design on methods and contents.

161. Providing and assisting women to apply for the project-generated job opportunities: For those who are interested in participating in project job opportunities, Women’s Federation staff at the township and village levels will be responsible to inform them of job opportunities in advance and facilitate women to apply for the employment. Basic skill on landscaping and other relevant skill training will be provided prior to recruitment.

6.5 Recovery Plan of Ground Attachments and Special Facilities

162. To minimize disruption to residents, detailed surveys have been done and the budget has been included in the RP budget. The relevant line agencies will be responsible for detailed relocation planning and rebuilding electric power and communication facilities.

49 7 Institutional Arrangements

7.1 Institutional Arrangements

163. Since resettlement is a very comprehensive task that needs the assistance and cooperation of various departments, relevant departments including transportation department, department of land and resources, department of finance, etc. shall participate in and support resettlement implementation. Each affected town/township or village has one or two chief leaders responsible for resettlement. The agencies responsible for the LA and the HD in the Project are:  Leading Group for Poverty Relief Road Project with ADB Loan of Transportation Department of Ningxia Hui Autonomous Region  Project Management Office for Poverty Relief Road with ADB Loan of Transportation Department of Ningxia Hui Autonomous Region  Jingyuan County Transport Bureau (implementing agency which also has a PMO)  Jingyuan County Project Resettlement Office of Poverty Relief Project with ADB Loan  Project town/township governments  Village committees  Project design institute  External monitoring and evaluation agency  Other departments: Land Resources Bureau (LRB), Demolition and Relocation Office, Women’s Federation, Labor and Social Security Bureau. 164. The Organizational Chart is show in Figure 7-1.

50

Ningxia Transportation Department Project Leading Group with ADB loan

Project Management office with ADB Loan of Ningxia Transportation Department

Jingyuan Transportation Bureau

Internal monitorin Project g Jingyuan Project Resettlement Office design institute

town/township Gov External monitoring

Village/ Community committees

Affected people

AH by HD AH by LA Infrastructure

Figure 7-1 Project Relocation Organizations

7.2 Organizational Responsibility

(i) Leading Group for Poverty Relief Road Project with ADB Loan of Transportation Department of Ningxia Hui Autonomous Region

165. Leading Group for Poverty Relief Road Project with ADB Loan of Transportation Department of Ningxia Hui Autonomous Region is the executing agency for the overall deployment of the Project and solving major issues. The group includes Comprehensive Planning Department and Road Management Department, and is led by Deputy Director of Transportation Department of Ningxia Hui Nationality Autonomous Region.

166. Ningxia PMO is the working body of Ningxia Hui Autonomous Region Project Leading Group as coordinating agency in charge of applying for ADB loan, coordinating the formulation and implementation of RP, monitoring and evaluation of the RP implementation.

51 (ii) Leading Group and Management Office of Poverty Relief Project with ADB Loan of Jingyuan County

167. Jingyuan County People’s Government is the implementing agency of this Project, and the project leading group consists of heads from relevant bureaus, including transport bureau, land and resources bureau, resettlement bureau, development and reform bureau, etc. Jingyuan County PMO is the key working body of Jingyuan Leading Group set up in Jingyuan County Transport Bureau, responsible for the project management, coordination, supervision, direction, quality assurance and annual planning, and the follow-up monitoring of the implementation, reporting to Ningxia Hui Autonomous Region Project Leading Group regularly. The main responsibilities in resettlement include organizing the resettlement work of the project, developing the local policy on resettlement activities, coordinating relations among resettlement agencies at all levels, coordinating the work of the bureaus concerned at the preparation and implementation stages, and making decisions and consultation on major issues arising from construction and resettlement.

(iii) Jingyuan County ADB Loan Poverty Reduction Road Project Resettlement Office

168. Jingyuan County ADB Loan Poverty Reduction Road Project Resettlement Office, consisting of 4 persons, responsible for identifying and confirming the quantity of land acquisition and house demolition, special facilities and ground attachments, conducting the DMS and saving data; assisting in preparing the RP and implementing RP; selecting resettlement officials for operational training; organizing public consultation, and communicating resettlement policies; directing, coordinating and supervising LA and resettlement activities and progress; disbursing resettlement costs according to the agreement and handling grievances of APs; assisting and supervising the affected villages’ carrying out economic rehabilitation plans and ensuring the income restoration of the affected people; carrying out internal monitoring, preparing internal monitoring reports and reporting to Jingyuan County PMO.

(iv) Town/township Government

169. The town/township resettlement offices, headed by each Town/township leader are comprised of key officials of the land and resources office, police office, civil affairs office and villages. The main responsibilities are:  Participating in the survey of the Project, and assisting the preparation of the RP.  Organizing public participation, and communicating the resettlement policies;  Implementing, inspecting, monitoring and recording all resettlement activities within the town;  Settling the house demolition and reconstruction;  Responsible for the disbursement and management of land compensation fees;  Supervision of LA, HD, income restoration and house reconstruction;  Reporting LA, HD and resettlement information to Jingyuan County Project Management Office;  Coordinating and handling conflicts and issues arising from its work.

(v) Village committees and village groups  The resettlement working team of a village committee or village group comprises its key community leaders and representatives of APs and with authorization of villagers’ convention. Its main responsibilities are:

52

 Participating in the socioeconomic survey and DMS;  Assistance in preparing the Resettlement Plan;  Organizing public consultation, and communicating the policies on LA and HD;  Organizing village meetings in discussing the proportion of compensation distribution to APs and supervision of the use of collective compensation funds in a village,  To choose resettlement sites and distribute housing land for relocated families; helping APs to get house construction approvals,  Organizing the implementation of agricultural (including land redistribution) and nonagricultural resettlement activities;  Reporting the APs’ opinions and suggestions to the relevant authorities;  Providing assistance to relocated households with difficulties, particularly the vulnerable families  Supervising land acquisition, housing and ancillary facilities demolishing and reconstruction;  Reporting the progress in land acquisition and resettlement;  Preparing clearance letter to confirm the facility and infrastructure have been restored and meet their requirement.

(vi) Agency undertaking RP formulation

170. Shaanxi Academy of Social Sciences has been entrusted by Ningxia Hui Autonomous Region PMO to formulate the RP. The responsibilities include: i) formulating the RP and ii) providing training to the RP implementation staff of PMO in provincial, county and township level.

(vii) Internal supervision agency

171. Jingyuan County PMO sets up an internal supervision office for land acquisition and resettlement, consisting of 2 persons. The duty of the office is to guarantee all the land acquisition and resettlement officers can fulfill their tasks, carry out the requirements of the RP, and guarantee all the affected people can get their rights and interests.

(viii) Design Institute

172. At the planning and design stage, it will survey the physical indicators of LA and HD, environmental capacity, usable resources, etc. accurately, and assist the governments in the Project area in developing resettlement programs, preparing budgetary investment estimates for compensation for LA and HD, and preparing the relevant drawings.

173. At the implementation stage, it will submit the design documents, technical specifications, drawings and notices to the owner, make design disclosure to the PMOs of all levels.

(ix) External monitoring and evaluation agency

174. The Ningxia PMO will invite qualified M&E institutes as external M&E agency. The main responsibility includes:  Monitoring all aspects of resettlement planning and implementation as an independent M&E agency, monitoring and evaluating the effectiveness of compensation, resettlement and income restoration measures for the APs,

53 including women and vulnerable APs, and submitting M&E reports to NPMO and ADB semi-annually;  Providing technical advice to the Resettlement Office in data collection and processing.  Follow the TOR for external M&E (see Annex C).

7.3 Staffing and Equipment

7.3.1 Staffing

175. In order to ensure the successful implementation of the RP, all resettlement agencies of the project have been provided full-time staff, and an efficient communication channel has been established.

7.3.2 Equipment

176. All resettlement agencies of the Project have been provided basic office, transport and communication equipment, including desks and chairs, PCs, printers, telephones, facsimile machines and vehicles.

7.3.3 Organizational Training Program

177. In order to ensure the successful implementation of the resettlement work, the resettlement staff will be provided training. As Ningxia Hui Autonomous Region Transport Department has implemented previous ADB and World Bank projects, they are familiar with both ADB and PRC resettlement policy and procedures, and therefore do not need much training. In contrast, the staffs in county RO, Town RO and village levels is experienced with PRC resettlement policies and procedures, but are not familiar with ADB policy and procedures. Therefore the training will focus on county level and lower.

178. A staff training and human resources development system for the county, township, and village level resettlement agencies will be established. Training will be conducted in such forms as expert workshop, skills training course, visiting tour and on-site training. The scope of training includes:  ADB’s Safeguard Policy Statement (involuntary resettlement policy)  Differences between ADB and PRC polices,  Resettlement implementation planning and management  Key points require attention during RP implementation  RP implementation M&E  The training budget for resettlement agencies is CNY 50,000, which has been included in the technical training budget.

54

8 Resettlement Budget

8.1 Resettlement Budget

179. Based on the prices in 2016, the estimated resettlement costs covered by this RP are CNY 7,265,072, including basic costs of CNY 3,521,916. Seeing from the category, permanent collective land acquisition costs are CNY 1,975,384, housing demolition and relocation costs are CNY 959,750, compensation fees for ground attachments are CNY 403,682, and compensation fees for special facilities are CNY 172,900.

180. Other fees include RP formulating fee, implementation & management fee, land acquisition fee, technical training fee, external monitoring evaluation fee and contingencies. See table 8-1 for details.

Table 8-1 Resettlement Budget Total Quantity Proportion No. Budget Item Unit Standard amount (unit) (%) (CNY ) Total of 1 Basic relocation costs CNY 1.1-1.5 \ 3,521,916 48.48 items Permanent land 1.1 CNY \ 1,975,384 27.19 acquisition 1.1.1 Farmland mu 5,670 160.01 907,257 1.1.2 Forest land mu 3,969 210.20 834,284 1.1.3 Residential land mu 5,670 24.31 137,838 1.1.4 Subsidies for young crops CNY /mu 600 160.01 96,006 Compensation fee for 1.2 CNY 959,750 13.21 housing demolition 1.2.1 Rural brick-wood structure ㎡ 600 624 374,400 1.2.2 Rural earth-wood structure 310 1,545 478,950 Fees for temporary 1.2.3 CNY /HH 300×6 38 68,400 resettlement 1.2.4 Moving subsidy CNY /HH 1,000 38 38,000 Compensation for 1.3 ground ancillary CNY 403,682 5.56 facilities 1.3.1 Brick wall CNY /m 80 321 25,680 1.3.2 Toilets CNY /single 280 2 560 1.3.3 Pine(DBH <15cm) CNY /single 28 2,164 60,592 1.3.4 Locust tree(DBH <15cm) CNY /single 28 6,098 170,744 1.3.5 Poplar(DBH >15cm) CNY /single 42 668 28,056 1.3.6 Weed tree(DBH >15cm) CNY /single 42 145 6,090 1.3.7 Weed tree(DBH <15cm) CNY /single 28 815 22,820 1.3.8 Fruit tree(Full Fruit Period) CNY /single 420 15 6,300 1.3.9 Nursery CNY /mu 4,000 20.71 82,840 Compensation fee for 1.4 temporary land CNY /mu 600 17 10,200 0.14 occupation Compensation fee for 1.5 special-purpose CNY 172,900 2.38 facilities

55 Total Quantity Proportion No. Budget Item Unit Standard amount (unit) (%) (CNY ) Support fund for 2 CNY 75,000 1.03 vulnerable groups RP formulating and 3 CNY 90,000 1.24 monitoring fee 3.1 Fee for formulation of RP CNY 30,000 M&E cost for relocation 3.2 CNY 60,000 and resettlement Training cost for 4 CNY 50,000 0.69 affected people Taxes related to land 5 CNY 2,867,695 39.47 acquisition 5.1 Farmland occupation tax CNY /mu 3,334 160.01 533,393 5.2 Farmland reclamation fee CNY /mu 2,667 160.01 426,715 Forest vegetation 5.3 CNY /mu 4,000 210.2 840,800 restoration fee Paid use fee for newly- 5.4 CNY /mu 6,667 160.01 1,066,787 added construction land (10% of 6 Contingencies CNY 660,461 9.09 item 1-5) 2~6 Subtotal CNY 3,743,156 51.52 7 Total CNY 7,265,072 100.00

8.2 Resettlement investment plan and source of fund

181. The source of resettlement funds is Jingyuan County government financial supporting funds and domestic loans. Before or during the construction phase, the investment plan will be implemented in stages in order to not affect the production and livelihood of the affected households. See details in Table 8-2.

Table 8-2 Resettlement Investment Plan Year 2017 2018 Total Amount of investment (CNY) 4359043 2906029 7265072 Proportion (%) 60 40 100

8.3 Management and Disbursement of Resettlement Funds

182. Land compensation fees and resettlement subsidies should be used in full consultation with the APs; young crop fees are paid directly to the affected persons; compensation fees for infrastructure and attachments are paid to the affected entities or individuals.

183. To ensure that the resettlement funds are available both timely and completely, and the APs’ production, livelihoods and income are restored, the following measures will be taken: (i) All costs related to this RP shall be included in the total budget of the project. (ii) Land compensation fees and resettlement subsidies shall be fully paid up before land acquisition, so as to ensure that all affected people are properly resettled. (iii) For AH who choose cash compensation, 50% of compensation fees for HD shall be paid to the APs upon execution of the HD compensation agreement, and the balance shall be paid when house is handed over for demolition..

56

(iv) To ensure the smooth implementation of land acquisition, relocation and resettlement, the finance and supervision institutions at all levels will be established to ensure that all funds will be paid both timely and completely. (v) The resettlement costs may be increased due to the increase of the compensation standards and price inflation, but the Jiyuan County Government will ensure that compensation fees are fully paid.

184. Figure 8-1 shows the resettlement funds distribution flow.

Figure 8-1 Resettlement Funds Flow of Distribution

8.4 Approval of Budget Increase

185. The project implementation unit has the authority to adjust the budget among categories and the use of contingencies within the budget. Costs exceeding total RP budget should be reported to Ningxia Hui Autonomous Region Development and Reform Commission and Financial Department of Ningxia Hui Autonomous Region by the project office and the increase of the budget subject to the approval. The whole process shall not be more than one month.

57 9 Public Participation and Grievance Redress

9.1 Public Participation

186. According to relevant policies and regulations of ADB, the PRC, Transportation Department of Ningxia Hui Nationality Autonomous Region and Jingyuan County, it is required to conduct public participation at the preparation and implementation stages in order to protect the lawful rights and interests of the APs, reduce grievances and disputes, and realize the resettlement objectives. It is necessary to develop a sound framework and implementation rules, preparing an effective RP, and organizing proper implementation.

9.1.1 Stakeholder identification and information disclosure

187. The main stakeholders refer to the groups directly affected by or involved in the project, including: (1) those suffering land loss and property loss; (2) the villages to be benefited in the project area; and (3) all organizations and companies directly participating in project construction and operation, including the construction contractor.

188. Other stakeholders include government organizations participating in the project activities as well as the people who are interested in the project and also participate in the relevant project activities in the process of land acquisition and demolition.

189. Early stage information disclosure will be through agencies involved in project design and administrative line agencies at various levels. The main content includes project rationale, scope, road standard, alignment selection, and potential affected people by land acquisition and house demolition. During the PPTA phase, information disclosure occurred mainly through project management office at provincial and county level, and survey teams of RP, poverty and social analysis and environment assessment. Key information including resettlement principles and compensation standard, resettlement options and assistance measures, and up to date negotiation process and results were shared with the APs. Future information disclosure will be conducted through information booklet distribution and website, village bulletins and public media as well as through public consultation. Key information related to compensation standard, implementation schedules, resettlement budget and funds flow, organizational responsibility and contact persons, grievance redress, and internal and external M&E are included in the booklet and will be distributed to all affected households in mid July 2016. Project implementation progress will also be disclosed to the APs and posted in village bulletins. The draft and final RPs will be posted on ADB website and made available to APs in the Town ROs and affected villages.

9.1.2 Participation during project preparation

190. At the feasibility study, PPTA phase, intensive consultations with stakeholders have been conducted with project executing agency, focusing on project scope and component, the alignment selection/shaping, design standards, and alternatives of reducing affected population. During the PPTA, surveys were undertaken from April to July 2016. A total of 220 households in 7 affected villages including all AHs were surveyed. In addition, a total of 6 key informant interviews, 4 focus group discussions and 2 consultation workshops have been held with women, the poor, the elderly and village representatives in the project area and a number of key informant interviews were held with various bureaus. See Figure 9-1 for details. Over 800 people were interviewed/surveyed or consulted in the process. The participants include

58 individual villagers, village leaders, worker and government institution like Transportation Bureau, Development and Reform Committee. The quantitative and qualitative material provided in evaluation, investigation and discussion were used to formulate Resettlement Plan and other documents according to policy requirements of ADB and the PRC.

Figure 9-1 Public survey site

191. Methods and tools used include (i) field visits to collect basic information on the project impact from project beneficiaries and APs; (ii) household survey to understand family situations, livelihood status and living conditions; (iii) focus group discussion to learn expectations and requirements of affected people; (iv) interviews with representatives of households, villages or communities to find potential impacts, coping strategies and demands for support; (iv) interviews with government agencies, development organizations and industrial parks to identify existing programs that can help the poor to take advantages of the project benefits, and (v) workshops were held to collect feedback on the draft RP.

192. The consultation during project preparation shows in Table 9-1 for details. The resettlement information booklet (RIB) has been formulated, and will be distributed in July 2016. The updated RP is subject to the detailed measurement survey, and will be handed over to ADB for approval before the land acquisition and resettlement and issuing of civil engineering contracts. Meanwhile, the updated RP will be disclosed to the APs and published on the website of ADB.

59 Table 9-1 Public Participation during Project Preparation δFinishedε Time Organizer Participants Objective comments and contents 2015.12~2016.2 Project Feasibility Affected people, town, village Project feasibility Introducing project background and purpose Report formulation leaders, engineering personnel, study, on-site Site selection should minimize Farmland institute, Foreign local agency of traffic inspection and Route selection should minimize impact on APs Capital management organization in preliminary Division of project implementation county assessment of Transportation and district project impact Department of Ningxia Hui Nationality Autonomous Region 2016.4~2016.5 Design personnel, Relevant government agencies, Relocation plan Assisting project impact survey Shaanxi Academy of villager representatives and preparation, Villager representatives expressed strong needs of Social Science, grass-roots cadres socioeconomic the project and proposed suggestions for route Foreign Capital survey of adjustment Division of resettlement impact Socioeconomic survey and investigation on Transportation resettlement households Department of Ningxia Hui Nationality Autonomous Region 2016.6 Shaanxi Academy of Relevant government agencies Preparation of Negotiate compensation plan and income recovery Social Science, and villager representatives income recovery plan Foreign Capital plan Division of Transportation Department of Ningxia Hui Nationality Autonomous Region, Jingyuan PMO 2016.6.29~7.2 Jingyuan PMO, Affected towns, villages and Public consultation Land acquisition and demolition data verification Shaanxi Academy of villagers and situation with local government and villagers on site Social Science verification

60

Time Organizer Participants Objective comments and contents 2016.8~2016.9 Jingyuan PMO, Affected towns, villages and Public consultation 1) Distribution and allocation method of Shaanxi Academy of villagers and survey on compensations for land acquisition Social Science resettlement option 2) Distribution method and use of land reserved for placement 3) Impact degree of land acquisition and demolition on the income of AHs 4) Development planning of affected villages 5) Employment status and employment resettlement willingness of AHs 6) Training needs of AHs 7) Current status and willingness of AHs for endowment insurance 8) Relocation method selection of AHs 9) Relocation site selection of AHs 10) Suggestions of APs on the form of housing construction and infrastructure construction 11) Women’s unique role in resettlement

Source: from Jingyuan PMO.

61 9.1.3 Participation plan during implementation

193. Along with project implementation, the Jingyuan PMO and RO will conduct further public participation. The arrangement of public participation is shown in Table 9-2.

Table 9-2 Project Public Participation Scheme Objective Approach Time Agency Participant Topic Disclosing draft Village 2016.7 Jingyuan APs, town, Compensation Resettlement Plan announcement County PMO village and standard, and information and villagers village group complaint booklet meeting channels, etc. Disclosing draft Website 2016.7 ABD website Jingyuan PMO Compensation Resettlement Plan and ADB standard, complaint channels, etc. Land acquisition Village 2016.10 Jingyuan All APs Announcing land announcement announcement County PMO, acquisition area, and villagers DRB, LRB, compensation meeting Highway standard, Bureau in resettlement affected method, etc. counties, LRB and town, village leaders Announcement for Village 2016.10 Jingyuan All APs Compensation compensation and announcement County PMO, amounts and resettlement and villagers DRB, LRB, mode of scheme of land meeting Highway payment acquisition Bureau in affected counties, LRB and town, village leaders Detailed Field survey 2016.11~ JCPMO, All APs Confirm the final Measurement 2016.12 DRB, LRB, affection quantity Survey (DMS) Highway Bureau in Details of assets affected of loss and the counties, LRB occupied land of and town, resettlement village households leaders Preparation of the basis contract for compensation agreement Prepare final RP Village 2016.12~ Jingyuan APs, town, Detailed impact based on detailed announcement 2017.1 County PMO village and numbers, AHs, design and DMS and villagers village group compensation and disclose meeting standards and RP budget Confirming income Villagers Before JCPMO, All APs Discussing the

62

Objective Approach Time Agency Participant Topic recovery plan and meeting implementation DRB, LRB, final scheme for its implementation (several times) Highway income recovery Bureau in and usage affected scheme for counties, LRB compensation and town, village leaders Selecting residential Villagers Three months LRB, town, 3 or 4 AHs that Viewing of plot land plots for meeting before and village have housing options and related HHs demolition leaders completely selecting final demolished plots Training plan Villagers 2016.10~2017.5 LSPB, town All APs Discussing the meeting and village training needs leaders Monitoring Villagers 2017.3~2019.6 Town, village All APs 1) Resettlement participates in leaders progress and meeting impacts 2) Payment of compensation 3) Information disclosure 4) income restoration Source: from Jingyuan PMO.

9.1.4 Adaptation of RP based on public opinions

194. According to public consultation done by RP survey team of SASS, PPTA consultants, and Jingyuan PMO, some reasonable opinions and suggestions of the affected people are included in the resettlement plan as follows: (i) The views and concerns towards the project have been included in the RP. (ii) All resettlement options fully reflect the needs and wishes of APs. (iii) Based on the survey results, the compensation standard for housing demolition was then updated based on the current local market replacement price8. The updated compensation standard has been greatly increased compared with the existing rate of the government documents, compensation is made in strict accordance with the market replacement price, and the compensation standard compared with that in other government projects is increased, ensuring the implementation of ADB’s resettlement guarantee policy and benefits of AHs. 195. In the public consulting activities, besides publishing project implementation information to the masses in the affected areas, opinions of the masses for project implementation are also collected and mainly concluded as follows: (i) The project is implemented in the rural mountain areas with poor roads and natural conditions; it has direct and positive impact on the improvement of going out and economic activities of local people. For instance, the villagers in Tuyao Village of Huanghua Town expect the immediate implementation of the project, and have given suggestions on road repair to the town government several times.

8 According to current effective regulations, the compensation rates for HD range from CNY 210/m2 to CNY650/m2. The consultations and field survey shows that they are not adequate to rebuild the house now with development of local economics. The rates therefore are improved for the subproject. See details in Table 5-3 in Section 5.5.

63 Because Tuyao Village is located at a high altitude, the outward transportation of economic crops and landscape seedlings is extremely inconvenient and villagers’ income is thus affected. (ii) The masses wish the project can absorb more local labor forces to engage in the transportation of earthwork, construction materials, etc. after the project is implemented. Women expect to be involved in the project implementation more. (iii) Most of the APs think training activities are necessary if possible. For instance, the masses wish to pursue agricultural production expect the training on agricultural skills, or relevant trainings on planting good agricultural varieties and increasing the value of agricultural production; women expect the training on handicraft and housekeeping; and some masses wish the skill training on e- commerce.

9.2 Grievances and Redress 196. To ensure rehabilitation and improvement of the affected persons’ production, livelihood and living conditions, the provincial and county PMO closely consulted with the affected persons to reduce complaints. A mechanism is set up to provide AP with opportunities to complain and to solve problems during implementation.

9.2.1 Grievances

197. Contents of grievances include any aspect of resettlement, for example, house compensation, quantity of assets, land compensation, selection of housing sites, and income loss, relocation fees and compensations during house rebuilding, temporary land occupation, other construction impacts, etc.

9.2.2 Grievance Procedures

198. The public participation is always encouraged in the process of compiling and implementing the RP. No substantial dispute is expected to arise; however there may be some unforeseeable problems that occur in the process. In order to solve such potential problems effectively and ensure the project construction and land acquisition to be carried out successfully, a transparent and effective appeal channel has been set up.

199. The grievance procedures will be operative throughout the entire construction period so that they can be used by villagers to deal with problems relating to infrastructure rehabilitation, such as the reconstruction of irrigation networks, the positioning and design of drainage culverts, local road access, the use of temporary land, etc. In this way villagers will have an effective procedure to bring these matters to the attention of Jingyuan PMO and the contractors, as well as a forum, for their timely resolution. As an additional measure, village leaders will be provided with a name and contact point (e.g. Telephone number), to whom they can raise matters relating to the road construction as and when they arise.

200. The basic procedure of the grievance solution is: APs-Village committees- town resettlement office - Township or town government- county resettlement office-Jingyuan PMO and Ningxia PMO.

201. The basic grievance redress system is as follows: (i) Stage 1: If APs have any dissatisfaction with RP or implementation, they may report to the villagers’ committee. Alternatively, the villagers’ committee or the APs may directly appeal to the town resettlement office for negotiated resolution

64

or put forward an oral or written grievance. The town resettlement office records the complaints and resolve the problems within two weeks after the receipt of the complaints if the grievance is oral. (ii) Stage 2: If the APs who lodge the complaints are not satisfied with the results of the Stage 1, they may lodge a grievance to Jingyuan county RO or PMO. The latter will make resolution within two weeks. (iii) Stage 3: If the persons who lodge the complaints are still not satisfied, they may after receiving the decision, lodge complaints to the Ningxia PMO for arbitration. The latter will make arbitration decision within a month.

202. If the persons are still dissatisfied with the decision of the Stage 2 or 3, they may, after receiving the arbitration decision, appeal to administrative setups step by step (township office, county office, authorities of letters and calls, administrative supervision, disciplinary inspection and procurement department) according to Administrative Procedure law.

203. The complaints and appeal procedures will be conveyed to APs through public meetings and other information dissemination procedures such as village notice boards, to ensure they fully understand their rights and the mechanisms for complaint and appeal. Any complaints raised by APs and resolutions must be registered in written form by the resettlement office that receives these grievances.

204. At any point, if the appellant is dissatisfied, he/she may bring a suit in a civil court in accordance with the Civil Procedure Law of the PRC.

205. The APs may also express grievance to the external monitoring agency, who would then report it to Jingyuan County Resettlement Office, Jingyuan Land and Resource Bureau, and PMO of the Ningxia Hui Autonomous Region. Alternatively, the APs may submit a complaint to the ADB’s Project Team to try to resolve the problem. If good faith efforts are still unsuccessful, and if there are grievances that stemmed from a violation of ADB’s safeguard policy, the APs may appeal directly to ADB in accordance with ADB’s Accountability Mechanism (2012).9

206. All the grievances received, oral or written will be recorded and their redress will be recorded as well and these will be made available to the external monitoring agency or ADB review missions on request. All agencies will accept grievances and appeals from the APs for free, and costs so reasonably incurred will be disbursed from the contingencies. During the whole construction period of the Project, these appeal procedures shall remain effective to ensure that the APs can use them to address relevant issues. The above grievance redress system will be communicated to the APs at a meeting or through the RIB, so that the APs know their right of appeal. In addition, the appeal process will be published to affected population on mass media.

9.2.3 Grievance Redress Principle

207. The resettlement offices at each level must perform on site investigations on the complaints from the people and closely consult with them on their opinions before providing practical and justified redress opinions in accordance with the principles and standards specified in national laws and ADB’s involuntary resettlement safeguards principles enshrined in the RP. The complaints that could not be solved must be timely submitted to the higher resettlement department, and the RO at each level are required to provide assistance on investigations.

9 http://www.adb.org/site/accountability-mechanism/main

65 9.2.4 Contents and Form of Reply to Complaints

a.) Contents  Description of the complainants’ grievance;  Results of investigations;  National policies, and the ADB’s principles and standards specified in RP;  Resolution and its basis;  The complainant has the rights to appeal to the higher resettlement department or to the courts.

b.) Form of Reply

208. For complaint concerning individual case, the reply can be directly delivered to the complainant in written form.

209. For complaints frequently addressed, notify the local village or sub-village by convening village meeting or issuing documents.

9.2.5 Report of Grievance

210. During implementation of the RP, the resettlement units shall make proper records and management of the complaints and solutions, and report them to the Ningxia PMO in written form monthly.

66

10 Implementation Plan of land Acquisition and Resettlement

10.1 Principle for Implementation Of land Acquisition and Resettlement

211. The schedule for land acquisition and resettlement will be integrated with the schedule of Project construction. The basic principles for RP implementation are as follows.  LA and HD should be completed at least 3 months prior to the commencement of construction, and the starting time will be determined as necessary for LA, HD and resettlement. There will no commencement of related civil works until all compensation is paid.  During resettlement, the APs shall have opportunities to participate in the Project. Before the commencement of LA and HD, the DMS results will be disclosed and confirmed with the APs.  All compensation fees will be paid to the affected proprietors directly and fully within 3 months of approval of the compensation and resettlement program for LA. No entity or individual should use such compensation fees on their behalf, nor should such compensation fees be discounted for any reason. (i) After project approval and completion of detailed design, the Jingyuan resettlement office will organize a survey team along with town resettlement office as well as village leaders to conduct detailed measurement and investigation. (ii) Jingyuan PMO will update the Resettlement Plan based on the detailed measurement and investigation results, and the plan will be submitted to Ningxia PMO. (iii) Ningxia PMO shall submit the updated Resettlement Plan to ADB for concurrence; this is a condition for ADB award of civil works contracts.

10.2 RP Implementation Schedule

212. The general resettlement schedule of the project has been drafted based on the planned progress of road project construction, LA and implementation. The exact implementation schedule may be adjusted due to deviations in overall project progress. See details in Table 10- 1.

Table 10-1 Schedule of Land Acquisition and Resettlement Activities No. Resettlement Task Target Responsible unit Time Remark 1 Information disclosure 3 towns Jingyuan County PMO and 1.1 Information booklet and 7 July 2016 each town governments villages RPs need Disclosure draft RP on Implementation agency, PMO 1.2 July 2016 to be ADB website and ADB endorsed 2 RP and budget 2.1 Approve the draft RP Government, Jingyuan 10.3 C and budget (including July 2016 County PMO ompleted compensation standard) 2.2 If any Update RP based on changes detailed design and Jingyuan County PMO, Jan ~ Feb from this DMS and submit to Ningxia PMO, ADB 2017 RP (as ADB for concurrence required)

67 No. Resettlement Task Target Responsible unit Time Remark 3 Detailed measurement survey 3.1 November~ Detailed measurement 7 villages Jingyuan County PMO December on LA and HD 2016 4 Compensation agreements 4.1 Village-level land compensation 7 villages LRB March 2017 agreement 4.2 Household land 7 villages March~ April compensation and 432 VCs, supervised by LRB 2017 agreements APs 4.3 Household house March ~ compensation and 38 HHs Jingyuan RO April 2017 relocation agreements 5 Implementation of income restoration measures 5.1 Distribution land compensation to AHs May ~ June 7 villages Township and VCs and/or allocation of land 2017 (if possible) 5.2 Village-level Dec 2016 ~ 7 villages VCs development plan Feb 2017 5.3 Income restoration April Township, VCs and labor through business and 112 HHs 2017~April bureau employment 2018 5.4 Implementation of AP Apr 2017 ~ 112 HHs Labor bureau training plan Apr 2018 5.5 Vulnerable groups identification and 82 Since April PMO and civil affairs assistance measures persons 2017 implementation 5.6 Hiring APs for employment under July PMO, labor bureau and project during 30 APs 2017~July Contractors construction and for 2018 operations 5.7 Hiring APs for road 20 APs Jingyuan Transport Bureau July 2018 maintenance 6 Implementation of House Relocation 6.1 Train relevant personnel 15 Jan ~ Dec in Jingyuan County ADB and Ningxia PMO ongoing persons 2016 PMO 6.2 Train relevant personnel Dec 200 in county, town, and Jingyuan PMO and RO 2016~Apr, persons village 2017 6.3 Payment of house February~ compensation and 38 HHs March 2017 allowances 6.4 Allocation of housing 3 or 4 February VCs plots HHs 2017 6.5 Provision of services to 3 or 4 March ~ Contractors, PMO plots HHs April 2017 6.6 April~ Construction of new 38 HHs APs December houses 2017

68

No. Resettlement Task Target Responsible unit Time Remark 6.7 3 or 4 September Move into new houses APs HHs 2017 7 Monitoring and evaluation 7.1 Build internal monitoring Based on Ningxia PMO and IAs Dec 2016 system RP 7.2 Engage external 1 Monitor Ningxia PMO Dec 2016 monitoring unit 7.3 Sample Baseline survey nal monitoring unit Feb 2017 of AHs 7.4 Internal monitoring Quarterly PMO and implementation Start Jan

report report agency 2017 7.5 Semi- July 2017 1st report External monitoring annual External monitoring unit report Jan 2018 2nd report report rd 7.6 External monitoring Annual Jan 2019 3 report External monitoring unit report report Jan 2020 4th report 7.7 1 combined Resettlement Ningxia PMO and 7 county report for March 2020 completion report PMOs the Project 8 Consultation and Participation Jingyuan PMO Ongoing records 9 Grievance records Jingyuan PMO Ongoing 10 Process of land compensation and resettlement capital flows 10.1 PMO already CNY 7.265 Jingyuan County -To Jingyuan PMO Jan 2017 has initial million Government start up funds 10.2 CNY 1.975 Feb ~Mar - To village Jingyuan PMO and RO million 2017 10.3 CNY Jingyuan PMO, RO and 7 Start from - To household 2.0~2.5 village committees April 2017 million 11 Start civil works 11.1 Jingyuan County project Jingyuan County PMO July 2017

69 11 Monitoring, Evaluation and Report

213. In order to ensure the successful implementation of the RP, two types of supervision modes will be applied at the same time and it will be supervised by two organizations from different channels: First, internal supervision system comprised of government departments (autonomous region, PMOs at county level with resettlement focal persons with support from Project Management System consultant) conduct supervision according to RP provisions from the perspective of public administration. Second, external supervision system comprised of sociology experts conduct evaluation and supervision through social survey.

11.1 Internal Monitoring

214. The internal resettlement monitoring agencies will include Jingyuan County PMO, Finance Bureau and other departments concerned (e.g., Land and Resources Bureau). The PMO shall develop a detailed internal monitoring plan for land acquisition and resettlement, including: (i) Investigation, coordination of and suggestion on key issues of the resettlement and implementing agencies during implementation; (ii) Status of LA and HD and any variations for the final RP; (iii) Restoration of the household income of the APs after LA; (iv) Preparation of housing plots and relocation after HD; (v) Restoration and resettlement of women and vulnerable persons; (vi) Payment, use and availability of compensation fees for resettlement; (vii) Degree of public participation and consultation during resettlement; (viii) Resettlement training and its effectiveness; (ix) Establishment, staff training and working efficiency of resettlement management agencies; and (x) Any unexpected changes from the final RP and corrective plans prepared to deal with the changes.

215. The Ningxia PMO shall submit progress sheet and an internal monitoring report to ADB. Such report shall indicate the statistics of the past months in tables, and reflect the progress of LA, resettlement and use of compensation fees. Ningxia PMO will also be responsible to prepare a resettlement completion report; this can be done in conjunction with the external monitor. This report will be submitted to ADB.

11.2 External Monitoring

216. According to ADB’s policies, the Ningxia PMO shall employ a qualified, independent and experienced resettlement institute/firm as the external RP M&E agency.

217. The external M&E agency shall conduct follow-up M&E of resettlement activities periodically, monitor resettlement progress, quality and funding, and give advice. It will also conduct follow-up monitoring of the APs production levels and living standard, and submit M&E reports to the Ningxia PMO and Jingyuan PMO for their review, follow-up and disclosure to APs. Ningxia PMO shall submit the external M&E report to ADB semiannually for their review, comment and disclosure on website.

11.3 Scope and methodology of external monitoring

70

(i) Baseline survey

218. The external M&E agency will conduct a baseline survey on the affected villages to obtain baseline data on the sample AHs’ production levels and living standard (living, production and income level). The production level and living standard sample surveys will be conducted semiannually to track variations of the APs. This survey will adopt typical sample tracking investigation, (sample size: 30% of land acquisition AHs, 100% of DHs; the sample households will be selected in form of random selection), random interview and field observation to acquire necessary information. Statistical analysis and evaluation will be made on this basis.

(ii) Periodic M&E

219. During the implementation of the RP, the external M&E agency shall conduct periodic follow-up resettlement monitoring semiannually of the following activities by means of field observation, key informants interview, random interview and focus group discussion:  Payment and amount of compensation fees;  Livelihood training;  Support of women and the vulnerable groups;  Restoration and reconstruction of infrastructure and special facilities;  Income restoration options and results  House demolition and reconstruction;  Compensation for lost property;  Time table of the above mentioned activities (applicable for any time);  Performance of resettlement organizations;  Use of collective land compensation and the income of APs;  Income growth of labor through employment; and  Whether the APs benefited from the project.

(iii) Public consultation and participation

220. The external M&E agency will attend public consultation meetings held during resettlement implementation to evaluate the effectiveness of public participation.

(iv) Grievance redress

221. The external M&E agency will visit the affected villages and groups regularly, and interviewing the township RO and county PMO that accept grievances about how grievances have been handled. It will also meet complainants, and propose corrective measures and advice for existing issues so as to make the resettlement process more effective.

(v) External monitoring reports

222. The external M&E agency will submit a monitoring or evaluation report to the ADB and Ningxia PMO semiannually. See Table 11-1 for external monitoring activity and report submitting time. The TOR for External M&E can be found in Annex C.

Table 11-1 Schedule of Monitoring and Evaluation No Report Date Socioeconomic baseline survey 1 March 2017 report

71 No Report Date 2 First monitoring report July 2017 3 Second monitoring report Jan 2018 4 First evaluation report Jan 2019 5 Second evaluation report Jan 2020

11.4 Post Evaluation Resettlement Completion Report

223. After project implementation, the post-evaluation will be implemented to evaluate the Project’s resettlement activities on the basis of M&E to (i) confirm the RP objectives have been met and (ii) to obtain successful experience and lessons in land acquisition and property demotion as a reference for future work.

224. Post evaluation will be led by Jingyuan RO, with support from the Monitor. It should be started earlier when records are fresh but it can only be finalized when evaluation reports confirm satisfactory restoration.

72

Annexes

Annex A Resettlement Information Booklet

NINGXIA LIUPANSHAN POVERTY REDUCTION RURAL ROAD DEVELOPMENT PROJECT FINANCED BY THE ADB

Resettlement Information Booklet for Shatang (Huanghua Town)–Gaodian Road and Dongxia–Digou Road project of Jingyuan County of Guyuan City in Ningxia Hui Autonomous Region

July 2016

Prepared by Transportation Department of Ningxia Hui Nationality Autonomous Region

73 1 Project Background

1. Transportation Department of Ningxia Hui Nationality Autonomous Region grasps the opportunity of historical development, starts from eliminating the phenomenon that undeveloped traffic and infrastructure restrict the development of contiguous destitute areas in Liupanshan, and now plans to implement Liupanshan rural highway development project for poverty alleviation in Ningxia Hui Autonomous Region with the ADB loan, which includes seven subprojects, involving Xiji County, Pengyang County, Jingyuan County and zhou District in Guyuan City, Hai County in Zhongwei City, and Tongxin County in Wuzhong City.

2. The construction of Liupanshan rural road development project for poverty alleviation in Ningxia Hui Autonomous Region (the Project) with the ADB loan mainly targets at: 1) improving the technical grade for road network project, increasing network capacity, and perfecting regional road network; 2) enhancing the connection between the project area and surrounding area, improving regional traffic condition, and promoting the economic development of the project area and region; 3) constructing seven trunk roads and 21 branches in Xiji County, Pengyang County, Jingyuan County, and zhou District in Guyuan City, Hai County in Zhongwei City, and Tongxin County in Wuzhong City.

3. Jingyuan County subproject is one of subprojects of the Project, which includes one trunk road and one feeder road. (i) Trunk road Shatang (Huanghua Town)–Gaodian Road is a trunk road, with length of 15.019 km. The project is composed of a main line and a branch. The main line is 13.237 km long while the branch is 1.782 km long. The main line is constructed with the standard of tertiary road, design speed of 20 km/h, width of right of way (ROW) of 9.5 m including subgrade width of 7.5 m and pavement width of 6.5 m. The branch is constructed with the standard of the fourth-grade road, design speed of 20 km/h, width of ROW of 8.5m including subgrade width of 6.5 m, and pavement width of 6.0 m. The total investment in the project is estimated to be CNY 46,591,274. (ii) feeder road: Dongxia-Digou road is the feeder road, including one main line and three branches. The main line starts from Line S101 in Dongxia Town, goes southeastward and then northeastward via Pangdong Village along the old road, and ends at Digou Forest Protection Station of Longtan Forest Farm via the west part of Dongxia Village and Shidi Village, with the stake number of K8+200 (ending point).  Branch A starts from Pangdong Village, connects stake K1+242.1 of main line, and ends at the unsurfaced road at the east end of Pangdong Village via Group 3 of Pangdong Village along the old road, with stake number of AK0+661 (ending point);  Branch B starts from the intersection of the west part of Dongxia Village and main line K4+354.79, goes southward via Dongxia Village, and then southward at K0+725, and stops at the end of Shangxia Village along the old road, with stake number of BK2+162 (ending point);  Branch C starts from Shidi Village, and intersects main line K5+123.81, goes westward along the old road, and ends at the unsurfaced road of the west end of the village.

4. The total distance of construction is 11.717 km and the total investment is estimated to be CNY 24,542,200.

74

Wangtuan- Yuwang Road

Zhengji-Jiucai- Wanzhang- Sikouzi Road Sanying Road

Guanting-Gu Sectin of Gu-Xiji Road

Jiangtai-Xitan- Pingfeng Road

Shatang-Haodian Road in Huanghua Town

Figure 1 Sketch Map of Rural Trunk Road Distribution

75 2 Project Impact

2.1 Project Impact Scope and Overview

5. The impact of land acquisition and demolition of the project involves three towns and 7 administrative villages.

Table 1 Towns and Administrative Villages Affected by Land Acquisition and Demolition of the Project Construction content Name of town/ street Name of village/ neighborhood committee Shatang (Huanghua Town)– Liupanshan Town and Shatang Village, Tuyao Village, and Nonglin Gaodian Road Huanghua Town Village Pangdong Village, Dongxia Village, Shidi Dongxia-Digou road Jingheyuan Town Village and Digou Village

2.2 Impact of Permanent Collective Land Acquisition

6. The project will permanently acquire 394.52 mu rural collective land of the above- mentioned areas, including Farmland of 160.01 mu (40.6%), Residential land of 24.31 mu (6.2%), Forest land of 210.2 mu (53.3%).

Table 2: Permanent Acquisition of Collective Land (by affected village) Village Permanent land acquisition (mu) Affected Affected Road Town committee/ Forest Residential Farmland Subtotal HH person community land land Shatang Huanghua Shatang 12.97 30.46 0 43.43 11 38 (Huanghua Town Tuyao 0 91.56 1 92.56 2 9 Town)– Liupanshan Gaodian Nonglin 0 44.18 0 44.18 0 0 Trunk Road Town

Subtotal 2 3 12.97 166.2 1 180.17 13 47 Pangdong 22.15 9 9.55 40.7 25 104 Dongxia- Jingheyuan Dongxia 64.92 15 5.43 85.35 33 110 Digou Town Feeder Road Shidi 31.86 10 5.75 47.61 15 46 Digou 28.11 10 2.58 40.69 26 78 Subtotal 1 4 147.04 44 23.31 214.35 99 385 Total 3 7 160.01 210.2 24.31 394.52 112 432 Proportion 37.04% 48.66% 5.63% \ \ \

2.3 Temporary Land Occupation

7. Up to now, the temporary land use in project design scheme is 17 mu, and the land of temporary occupation all belongs to unused land. Main purposes and restoration measures for temporal land occupation are as follows: (i) Mixing station, precast yard and living quarter are set in the place 400 m away from the right side of the end point of mainline K13+237.32, and it is a flat unused land. After the construction, the mixing plant shall be cleared and leveled,

76

and partial greening or use for other purposes shall be conducted, so as to avoid land waste. (ii) Borrow area is located at the brook, 0.5m away from the right side of Liujiagou along road S101. Combining with the local refuse landfill planning, the borrow pit can be used for refuse landfill after soil borrowing, so as to benefit the local overall planning and environmental protection. (iii) Spoil ground is located at the borrow pit, 0.5 km way from the right side of Liujiagou along road S101. The spoil shall be of regular shape, suitable for the landform. Upon completion of spoil, greening shall be conducted.

2.4 Analysis of Impact of Residential House Demolition

8. The residential houses involved in the demolition are rural houses of 2,169 ㎡, are brick- wood houses of 624 ㎡ and earth-wood houses of 1,545 ㎡. A total of 38 households with 134 people are affected in total.

Table 3 List of Impact of Demolished Rural Residential House Housing demolition (㎡) Affected population Road Town Village Brick- Population Earth-wood Subtotal Household wood (person) Shatang (Huanghua Huangh Tuyao 144 0 144 2 9 Town)–Gaodian ua Town Road Pangdong 400 520 920 9 34 Jinghey Dongxia-Digou Dongxia 0 485 485 11 39 uan road Shidi 0 400 400 11 34 Town Digou 80 140 220 5 18 Total 624 1,545 2,169 38 134

2.5 Impact of Demolished Buildings of Enterprises and Public Institutions

9. No enterprises and public institutions will be affected by land acquisition and demolished.

2.6 Affected Infrastructure and Ground Ancillary Facilities

10. The subproject will affect toilets, tombs, trees and other two categories. See Table 2-6 for details.

Table 4 Affected Ground Ancillary Facilities Item Unit Quantity Brick wall m 321 Toilet single 2 Pine(DBH <15cm) Single 2,164 Locust tree(DBH <15cm) Single 6,098 Poplar(DBH >15cm) Single 668 Weed tree(DBH >15cm) Single 145 Weed tree(DBH <15cm) Single 815

77 Item Unit Quantity Fruit tree(Full Fruit Period) Single 15 Nursery mu 20.71 Electric pole Unit 47

3 Legal Framework and Policies and compensation rates

3.1 Policy Basis ] 11. The resettlement policies of this project are based on ADB’s policies and on the laws and regulations of the People’s Republic of China (PRC). These are as follows.  ADB Safeguard Policy Statement (2009), Safeguard requirement 2: Involuntary Resettlement  The Land Administration Law of the People’s Republic of PRC  Regulations on the Protection of Basic Farmland  Interim Regulations on Farmland Use Tax of the People’s Republic of PRC  Decision on Furthering Reform of Land Management of the State Council (Guofa [2004] No. 28)  Notice on the Suggestions for Completing Compensation and Relocation System of Land Expropriation by the Ministry of Land Resources of People’s Republic of PRC (November 3, 2004, Guotuzifa [2004] No. 238)  Notice on Further Specification of the Land Type Identification of Farm Road of General Office of Ministry of Land and Resources of the People’s Republic of PRC (Guo Tu Zi Ting [2013] No. 581)  Notice on Publishing the Compensation Standard for Land Acquisition of Ningxia Hui Autonomous Region of the People’s Government of Ningxia Hui Autonomous Region (Ning Zheng Fa [2015] No.101)

3.2 Cut-off Date of Compensation

12. The cut-off date for the eligibility for compensation is on November 1, 2016, which is also the date of Jingyuan PMO and RO conducting resettlement DMS. Any newly claimed land, newly built house or settlement in the project area by the APs after this date is not entitled to compensation or subsidization. Any building constructed or tree planted purely for extra compensation is not counted in the inventory of losses.

3.3 Compensation Rate for Permanent Land Acquisition

13. According to the Notice of Releasing the Compensation Standard for Land Acquisition in Ningxia Hui Autonomous Region by the People’s Government (Ning Zheng Fa [2015] No.101)(see the attachments) issued on January 1, 2016, the project is being implemented in Area V in Jingyuan County, Guyuan City, where the compensation standard for mountainous dryland and Residential land is CNY 5,670 /mu.

14. The acquisition of Forest land is executed by the 70% of that of dryland and Farmland of the same area, the compensation standard for Forest land of the RP is CNY 3,969 /mu.

78

15. According to the compensation policy for the same crop by the average annual output value in the first three years for the common crops (inclusive of manual seeding), the compensation standard for young crops is CNY 600 /mu:

Table 5 Compensation Standard for the Project Land (Unit: CNY /mu) mountainous Residential Category Forest land Young crops dryland land Compensation 5,670 5,670 3,969 (70% of Farm land) 600 standard

3.4 Temporary Land Occupation

16. Temporary land occupation of the subproject is 17 mu, and is the land belongs to unused land. According to the document of Jingyuan County People’s Government of Notice on Compensation Standard for Land Acquisition, Demolition and Resettlement of Highway Engineering Construction of Qingshizui-Jingyuan Section of G344 (JingZheng Fa [2014] No. 36), the compensation standard is determined as CNY 600 per mu per year. It will be for a maximum of 2 years and the land will be restored to its pre-occupation standards prior to its redistribution to the owners.

3.5 Compensation Rate for House Demolition

17. According to the policy of Asian Development Bank and regulations of PRC, market price evaluation is adopted for the rural residential houses of the RP. The houses to be demolished will receive compensation according to the “replacement price”, the compensation price will be determined through market price evaluation, and will not be lower than the compensation base price of the RP.

Table 6 Compensation Standard for Demolition of Residential House and Ancillary Facilities Type Structure type Unit Base price Remark Residential land CNY/mu 5,670 brick-concrete CNY/m² 1,000 The compensation for the house shall Brick-timber CNY/m² 600 Compensation not be lower than Brick, and earth-timber CNY/m² 410 for house the proposed base Earth-timber CNY/m² 310 price. Makeshift house CNY/m² 100 1000 CNY 1,000 per relocation subsidy CNY/HH household for one House time. on Transition subsidy: collective CNY 300 per land household each Other subsidy month. Generally, for house Subsidy for temporal and the transition resettlement / transition CNY/HH 300 period is 6 months. subsidy The exceeded time should be calculated in accordance with actual condition.

79 3.6 Compensation for Ground Attachment and Infrastructure

18. The compensation standard for the ground attachment facilities and infrastructure of the subproject is determined based on the principle of “replacement price”.

Table 7 Compensation Standard for Ground Attachments and Infrastructure Item Unit Compensation standard Brick wall m 80 Toilet CNY /single 280 Pine tree(DBH <15cm) CNY /single 28 Locust tree(DBH <15cm) CNY /single 28 Poplar tree (DBH >15cm) CNY /single 42 Weed tree(DBH >15cm) CNY /single 42 Weed tree(DBH <15cm) CNY /single 28 Fruit tree(Full Fruit Period) CNY /single 420 Nursery CNY /mu 4000

3.7 Compensation for Young Crops

19. According to the compensation policy for the same crop by the average annual output value in the first three years for the common crops (inclusive of manual seeding), the compensation standard for young crops is CNY 600 /mu.

3.8 Entitlement Matrix

20. The entitlement matrix has been established in accordance with the applicable policies.

80

Table 8 Compensation Entitlement and Resettlement Policy Matrix Applicable Entitled No. of entitled Compensation Implementation item Type of loss Compensation policy targets person/collective person/collective entitlement The village meeting will determine the a. Pay land acquisition fund using, re- compensation to the rural allocation of land, collectives according to investment and the compensation development project standard The supervising b. Re-allocation of Land compensation authority shall Land within the a) Rural a) Three village farmland OR payment by allocation: The share approve and project collectives collectives affected village division among the supervise the implementation owning the land b) 432 APs of collectives of cash farmers losing land is Permanently proposals and area - road b) Farmers with 112 HHs losing compensation (100%) to decided by villager acquired farmland requirements of right of way land use rights land (all with AHs losing land with user meeting; cash village and provide (estimated as c) Farmers land use rights) rights if land is compensation shall convenience for 394.52 mu) renting the land c) no APs contracted to APs be directly paid to training project. renting the land c. Cash compensation individual. Those agreed for all the ground compensation for attachment (e.g., trees) individual shall be according to standards paid according to and standing (young) the agreement and crops prior to dispossession. Land Cash compensation for temporarily the annual loss during The village used as land loss period. Restore The villagers losing committee must construction To be a) Farmers with to the status prior to the crops will get total inform the original area within the determined Temporary loss of land use rights construction, and compensation land user and make project during land b) Farmers maintain the life of APs according to the corresponding implementation construction renting the land at the former level at compensation compensation. area or close period least. The compensation standard Maximum period of by area standard is CNY 600 /mu use is 2 years. (estimated as per year. 17 mu) Residence and HHs or APs 134 APs of 38 Cash compensation for Cash compensation Village and APs will Loss of property within losing buildings HHs, of which 4 AHs, including residential paid to the owners of determine the residence/property the project or housing due HHs suffer land, and housing, and housing/building and location of new implementation to demolition complete loss attachments. Cash attachments. The residence. The

81 Applicable Entitled No. of entitled Compensation Implementation item Type of loss Compensation policy targets person/collective person/collective entitlement area or and require compensation for various compensation for contractor shall be affected by the relocation housing type. The residential land shall responsible for filling project moving compensation is be paid to collective and leveling the (estimated as CNY 1,000 per HH, the and residential land area of new 2169 m2) transitional shall be re-allocated residence and compensation is CNY to the affected connect it to the 300 /month of standard households by the existing public subsidy, and the villages. facilities. transitional period is six months. Compensation Non-Farmland according to the RP. within the Rural collective Funds can be used Loss of non- project 7 project affected owning land Cash compensation Village collective for village Farmland implementation villages ownership development as area (estimated decided in a village as 234.51 mu) committee meeting. All facilities within the project Cash compensation Proprietor receives Affected public implementation Proprietor of all Proprietor of all based on the market the total facilities area (no facilities facilities price and negotiation with compensation impacts have proprietor been identified yet) Refers to the old and weak, The project will assist the women, children, villages and towns in the disabled, or 25 HHs with 82 meeting the demands of In the same Any affected those lacking persons the vulnerable groups, condition, enjoy the Assistance by person who is Vulnerable groups living ability, and belonging to the and each household will priority of project government also vulnerable the poverty vulnerable receive about CNY 3,000 compensation and department

HHs, HHs groups special subsidy for the assistance lacking labor or economic recovery of the with heavy vulnerable groups. burden

82

4 Institutional Arrangements

21. Since resettlement is a very comprehensive task that needs the assistance and cooperation of various departments, relevant departments including transportation department, department of land and resources, department of finance, etc. shall participate in and support resettlement implementation. Each affected town/township or village has one or two chief leaders responsible for resettlement. The agencies responsible for the LA and the HD in the Project are:  Leading Group for Poverty Relief Road Project with ADB Loan of Transportation Department of Ningxia Hui Autonomous Region  Project Management Office for Poverty Relief Road with ADB Loan of Transportation Department of Ningxia Hui Autonomous Region  Jingyuan County Transport Bureau (implementing agency which also has a PMO)  Jingyuan County Project Resettlement Office of Poverty Relief Project with ADB Loan  Project town/township governments  Village committees  Project design institute  External monitoring and evaluation agency  Other departments: Land Resources Bureau (LRB), Demolition and Relocation Office, Women’s Federation, Labor and Social Security Bureau.

22. The Organizational Chart is show in Figure 2.

83 Ningxia Transportation Department Project Leading Group with

Project Management office with ADB Loan of Ningxia Transportation Department

Jingyuan Transportation Bureau

Internal monitoring Project Jingyuan Project Resettlement Office design institute

town/township Gov External monitoring

Village/ Community

Affected people

AH by HD AH by LA Infrastructure

Figure 2 Project Relocation Organizations

84

5 Resettlement Budget

23. Based on the prices in 2016, the estimated resettlement costs covered by this RP are CNY 7,265,072, including basic costs of CNY 3,521,916. Seeing from the category, permanent collective land acquisition costs are CNY 1,975,384, housing demolition and relocation costs are CNY 959,750, compensation fees for ground attachments are CNY 403,682, and compensation fees for special facilities are CNY 172,900.

24. Other fees include RP formulating fee, implementation & management fee, land acquisition fee, technical training fee, external monitoring evaluation fee and contingencies.

25. Land compensation fees and resettlement subsidies should be used in full consultation with the APs; young crop fees are paid directly to the affected persons; compensation fees for infrastructure and attachments are paid to the affected entities or individuals.

26. To ensure that the resettlement funds are available both timely and completely, and the APs’ production, livelihoods and income are restored, the following measures will be taken: (i) All costs related to this RP shall be included in the total budget of the project. (ii) Land compensation fees and resettlement subsidies shall be fully paid up before land acquisition, so as to ensure that all affected people are properly resettled. (iii) For AH who choose cash compensation, 50% of compensation fees for HD shall be paid to the APs upon execution of the HD compensation agreement, and the balance shall be paid when house is handed over for demolition.. (iv) To ensure the smooth implementation of land acquisition, relocation and resettlement, the finance and supervision institutions at all levels will be established to ensure that all funds will be paid both timely and completely. (v) The resettlement costs may be increased due to the increase of the compensation standards and price inflation, but the Jiyuan County Government will ensure that compensation fees are fully paid.

85

Figure 3 Resettlement Funds Flow of Distribution

86

6 Grievances and Redress

27. To ensure rehabilitation and improvement of the affected persons’ production, livelihood and living conditions, the provincial and county PMO closely consulted with the affected persons to reduce complaints. A mechanism is set up to provide AP with opportunities to complain and to solve problems during implementation.

28. The basic procedure of the grievance solution is: APs-Village committees- town resettlement office - Township or town government- county resettlement office-Jingyuan PMO and Ningxia PMO.

29. The basic grievance redress system is as follows: (i) Stage 1: If APs have any dissatisfaction with RP or implementation, they may report to the villagers’ committee. Alternatively, the villagers’ committee or the APs may directly appeal to the town resettlement office for negotiated resolution or put forward an oral or written grievance. The town resettlement office records the complaints and resolve the problems within two weeks after the receipt of the complaints if the grievance is oral. (ii) Stage 2: If the APs who lodge the complaints are not satisfied with the results of the Stage 1, they may lodge a grievance to Jingyuan county RO or PMO. The latter will make resolution within two weeks. (iii) Stage 3: If the persons who lodge the complaints are still not satisfied, they may after receiving the decision, lodge complaints to the Ningxia PMO for arbitration. The latter will make arbitration decision within a month.

30. If the persons are still dissatisfied with the decision of the Stage 2 or 3, they may, after receiving the arbitration decision, appeal to administrative setups step by step (township office, county office, authorities of letters and calls, administrative supervision, disciplinary inspection and procurement department) according to Administrative Procedure law.

31. The complaints and appeal procedures will be conveyed to APs through public meetings and other information dissemination procedures such as village notice boards, to ensure they fully understand their rights and the mechanisms for complaint and appeal. Any complaints raised by APs and resolutions must be registered in written form by the resettlement office that receives these grievances.

32. At any point, if the appellant is dissatisfied, he/she may bring a suit in a civil court in accordance with the Civil Procedure Law of the PRC.

33. The APs may also express grievance to the external monitoring agency, who would then report it to Jingyuan County Resettlement Office, Jingyuan Land and Resource Bureau, and PMO of the Ningxia Hui Autonomous Region. Alternatively, the APs may submit a complaint to the ADB’s Project Team to try to resolve the problem. If good faith efforts are still unsuccessful, and if there are grievances that stemmed from a violation of ADB’s safeguard policy, the APs may appeal directly to ADB in accordance with ADB’s Accountability Mechanism (2012).10

34. All the grievances received, oral or written will be recorded and their redress will be recorded as well and these will be made available to the external monitoring agency or ADB

10 http://www.adb.org/site/accountability-mechanism/main

87 review missions on request. All agencies will accept grievances and appeals from the APs for free, and costs so reasonably incurred will be disbursed from the contingencies. During the whole construction period of the Project, these appeal procedures shall remain effective to ensure that the APs can use them to address relevant issues. The above grievance redress system will be communicated to the APs at a meeting or through the RIB, so that the APs know their right of appeal. In addition, the appeal process will be published to affected population on mass media.

88

7 Implementation Plan of land Acquisition and Resettlement

35. The general resettlement schedule of the project has been drafted based on the planned progress of road project construction, LA and implementation. The exact implementation schedule may be adjusted due to deviations in overall project progress.

Table 9 Schedule of Land Acquisition and Resettlement Activities No. Resettlement Task Target Responsible unit Time Remark 1 Information disclosure 3 towns Jingyuan County PMO and 1.1 Information booklet and 7 July 2016 each town governments villages RPs need Disclosure draft RP on Implementation agency, PMO 1.2 July 2016 to be ADB website and ADB endorsed 2 RP and budget 2.1 Approve the draft RP Government, Jingyuan and budget (including July 2016 County PMO compensation standard) 2.2 If any Update RP based on changes detailed design and Jingyuan County PMO, Jan ~ Feb from this DMS and submit to Ningxia PMO, ADB 2017 RP (as ADB for concurrence required) 3 Detailed measurement survey 3.1 November~ Detailed measurement 7 villages Jingyuan County PMO December on LA and HD 2016 4 Compensation agreements 4.1 Village-level land compensation 7 villages LRB March 2017 agreement 4.2 Household land 7 villages March~ April compensation and 432 VCs, supervised by LRB 2017 agreements APs 4.3 Household house March ~ compensation and 38 HHs Jingyuan RO April 2017 relocation agreements 5 Implementation of income restoration measures 5.1 Distribution land compensation to AHs May ~ June 7 villages Township and VCs and/or allocation of land 2017 (if possible) 5.2 Village-level Dec 2016 ~ 7 villages VCs development plan Feb 2017 5.3 Income restoration April Township, VCs and labor through business and 112 HHs 2017~April bureau employment 2018 5.4 Implementation of AP Apr 2017 ~ 112 HHs Labor bureau training plan Apr 2018 5.5 Vulnerable groups identification and 82 Since April PMO and civil affairs assistance measures persons 2017 implementation

89 No. Resettlement Task Target Responsible unit Time Remark 5.6 Hiring APs for employment under July PMO, labor bureau and project during 30 APs 2017~July Contractors construction and for 2018 operations 5.7 Hiring APs for road 20 APs Jingyuan Transport Bureau July 2018 maintenance 6 Implementation of House Relocation 6.1 Train relevant personnel 15 Jan ~ Dec in Jingyuan County ADB and Ningxia PMO ongoing persons 2016 PMO 6.2 Train relevant personnel Dec 200 in county, town, and Jingyuan PMO and RO 2016~Apr, persons village 2017 6.3 Payment of house February~ compensation and 38 HHs March 2017 allowances 6.4 Allocation of housing 3 or 4 February VCs plots HHs 2017 6.5 Provision of services to 3 or 4 March ~ Contractors, PMO plots HHs April 2017 6.6 April~ Construction of new 38 HHs APs December houses 2017 6.7 3 or 4 September Move into new houses APs HHs 2017 7 Monitoring and evaluation 7.1 Build internal monitoring Based on Ningxia PMO and IAs Dec 2016 system RP 7.2 Engage external 1 Monitor Ningxia PMO Dec 2016 monitoring unit 7.3 Sample Baseline survey nal monitoring unit Feb 2017 of AHs 7.4 Internal monitoring Quarterly PMO and implementation Start Jan

report report agency 2017 7.5 Semi- July 2017 1st report External monitoring annual External monitoring unit report Jan 2018 2nd report report rd 7.6 External monitoring Annual Jan 2019 3 report External monitoring unit report report Jan 2020 4th report 7.7 1 combined Resettlement Ningxia PMO and 7 county report for March 2020 completion report PMOs the Project 8 Consultation and Participation Jingyuan PMO Ongoing records 9 Grievance records Jingyuan PMO Ongoing 10 Process of land compensation and resettlement capital flows 10.1 PMO already CNY 7.265 Jingyuan County -To Jingyuan PMO Jan 2017 has initial million Government start up funds

90

No. Resettlement Task Target Responsible unit Time Remark 10.2 CNY 1.975 Feb ~Mar - To village Jingyuan PMO and RO million 2017 10.3 CNY Jingyuan PMO, RO and 7 Start from - To household 2.0~2.5 village committees April 2017 million 11 Start civil works 11.1 Jingyuan County project Jingyuan County PMO July 2017

91 8 Monitoring, Evaluation and Report

36. In order to ensure the successful implementation of the RP, two types of supervision modes will be applied at the same time and it will be supervised by two organizations from different channels: First, internal supervision system comprised of government departments (autonomous region, PMOs at county level with resettlement focal persons with support from Project Management System consultant) conduct supervision according to RP provisions from the perspective of public administration. Second, external supervision system comprised of sociology experts conduct evaluation and supervision through social survey.

37. According to ADB’s policies, the Ningxia PMO shall employ a qualified, independent and experienced resettlement institute/firm as the external RP M&E agency.

38. The external M&E agency shall conduct follow-up M&E of resettlement activities periodically, monitor resettlement progress, quality and funding, and give advice. It will also conduct follow-up monitoring of the APs production levels and living standard, and submit M&E reports to the Ningxia PMO and Jingyuan PMO for their review, follow-up and disclosure to APs. Ningxia PMO shall submit the external M&E report to ADB semiannually for their review, comment and disclosure on website.

39. The external M&E agency will submit a monitoring or evaluation report to the ADB and Ningxia PMO semiannually.

Table 10 Schedule of Monitoring and Evaluation No Report Date Socioeconomic baseline survey 1 March 2017 report 2 First monitoring report July 2017 3 Second monitoring report Jan 2018 4 First evaluation report Jan 2019 5 Second evaluation report Jan 2020

92

Annex B Key Excerpts of Local Regulations

A. Key articles of Land Administration Law of PRC, SC [2004] No.28 and MLR [2004] No.238

40. Land Administration Law of PRC (2004) and the Decision of the State Council on Deepening the Reform and Rigidly Enforcing Land Administration (SC [2004] No.28) promulgated in October 2004 defines the principles and rates of compensation for land acquisition and resettlement, land acquisition procedures, and monitoring system, and the Guidelines on Improving Compensation and Resettlement Systems for Land Acquisition (MLR [2004] No.238) play a similar role. These legal documents have become the legal basis for resettlement of the Project. The key provisions of the above policies are as follows:

Table A2.1: Abstract of the Land Administration Law and Relevant Policies Item Key points Index Land The People's Republic of China resorts to a socialist public Article 2 of the ownership ownership i.e. an ownership by the whole people and Land ownerships by collectives, of land. Administration Law The State introduces the system of compensated use of land of the PRC owned by the State except the land has been allocated for use by the State according to law. Application for Any unit or individual that need land for construction purposes Articles 43 and 44 construction should apply for the use of land owned by the State according to of the Land land law; Whereas occupation of land for construction purposes Administration Law involves the conversion of agricultural land into land for of the PRC construction purposes, the examination and approval procedures in this regard shall be required. All applications for land use for construction shall be accepted Article 17 of the by the administrative department in charge of land of the county Land government in a unified manner, and submitted to higher Administration authorities level by level after examination by the county Regulations of government. If the acquisition or use of land for construction Shaanxi Province involves farmland conversion, the administrative department in charge of land of the county government shall file an application, which shall be submitted to higher authorities level by level after examination by the county government. In case of acquisition or use of woodland, or acquisition or use of land in the urban planning area, the land user shall obtain the approval of the forestry and construction departments at or above the county level, and go through the construction land approval formalities as stipulated herein. The approved construction land must be used for the approved purpose and its use shall not be altered without authorization. If the change of use is necessary, Article 56 of the Land Administration Law of the PRC shall apply. Land The acquisition of basic farmland exceeding 35 hectares Article 45 of the acquisition outside the basic farmland, and other land exceeding 70 Land authority hectares shall be approved by the State Council. Acquisition Administration Law of land other than prescribed in the preceding paragraph shall of the PRC be approved by the governments of provinces, autonomous regions and municipalities and submitted to the State Council for the record The acquisition of not more than 35 hectares of cultivated land Article 20 of the

93 Item Key points Index other than basic farmland, and not more than 70 hectares of other Land land than cultivated land shall be approved by the provincial Administration government. Regulations of Shaanxi Province Land For the acquisition of land by the State the local governments at acquisition and above the county level shall make an announcement and announcement organize the implementation after the approval according to the system legal procedures. After the plan for land compensation and resettlement fees is finalized, related local governments shall make an announcement and hear the opinions of the rural collective economic organizations and peasants whose land has been acquired. Rural collective economic organizations shall make public to its Articles 46, 48 and members the 49 of the Land receipts and expenditures of the land compensation fees for land Administration Law acquired and accept their supervision. of the PRC Compensation In acquiring land, compensation should be made according to the Article 47 of the rates for land original purposes of the land acquired. Land acquisition Compensation fees for land acquired include land compensation Administration Law fees, of the PRC resettlement fees and compensation for attachments to or green crops on the land. The land compensation fees shall be 6-10 times the average output value of the three years preceding the acquisition of the cultivated land. The resettlement fee shall be calculated according to the number of agricultural population to be resettled. The number of agricultural population to be resettled shall be calculated by dividing the amount of cultivated land acquired by the per capital land occupied of the unit whose land is acquired. The resettlement fees for each agricultural person to be resettled shall be 4-6 times the average annual output value of the three years Article 23 of the preceding the acquisition of the cultivated land. However, the Land maximum resettlement fee per hectare of land acquired shall not Administration exceed 15 times of the average annual output value of the three Regulations of years prior to the acquisition. Shaanxi Province

(1) Acquired vegetable land or irrigated land shall be compensated for at 8-10 times the average annual output value (AAOV) of the three years prior to acquisition of such land, acquired irrigable land, garden land or lotus root pond at 7-9 times, acquired rain-fed farmland or non-irrigated land at 6-8 times, crop rotation land at 6 times, and pasture land or fishpond at 3-5 times; (2) Acquired newly reclaimed farmland that has been cultivated for less than 3 years shall be compensated for at twice the AAOV, and the investment in development shall be compensated for; (3) Acquired housing land, threshing ground or sunning ground shall be compensated for based on the original land type; (4) The compensation rate for allocated state-owned farm, forest farm, pasture or fishing ground shall be based on subparagraphs (1), (2) and (3) of this paragraph. The compensation rate for acquired or allocated woodland shall be as stipulated by the state. Temporary Users who use the land temporarily should use the land according Article 57 of the land use to the purposes agreed upon in the contract for the temporary use Land

94

Item Key points Index of land and should not build permanent structures. The term for Administration Law the temporary use of land shall not usually exceed two years. of the PRC If state-owned or collectively owned land is to be used temporarily Article 31 of the for project construction, geologic investigation or any other Land Administration purpose, an application shall be filed along with the application for Regulations of construction land and approved by the administrative department Shaanxi Province in charge of land; in case of separate application for temporary land use, it shall be approved by the administrative department in charge of land of the county government in case of non-cultivated land, by the administrative department in charge of land of the prefecture or municipal government in case of cultivated land, or the administrative department in charge of land of the provincial government in case of basic farmland. Temporary land use in the urban planning area shall be first approved by the municipal administrative department in charge of construction before submission for approval. The user of temporarily used land shall use the land for the approved purpose and shall not construct any permanent building thereon. The period of temporary land use shall not exceed 2 years in general.

Table A2.2: Key Provisions of SC [2004] No.28 and MLR [2004] No.238, and their Application SC [2004] No.28—Improvement of Compensation and Resettlement Systems MLR [2004] for Land Acquisition No.238 Article 12 County-level and above local governments shall take practical Fixation of Improvement measures so that the standard of living of LEFs is not reduced by uniform AAOV of measures land rates compensation acquisition. Determination of land Land compensation, resettlement subsidy and compensation for uniform AAOV acquisition ground attachments and crops shall be paid in full and timely multiples Fixation for for pursuant to law. If the land compensation and resettlement of integrated land subsidy pursuant to the prevailing laws and regulations are prices for land insufficient to maintain the former standard of living of the LEFs acquisition areas or to pay the social security expenses of farmers who lose all Distribution of land land due to land acquisition, governments of provinces, compensation autonomous regions and municipalities directly under the central government shall approve an increased resettlement subsidy. If the sum of the land compensation and the resettlement subsidy attains the statutory upper limit and is still insufficient to maintain the former standard of living of the LEFs, local governments may pay a subsidy from the income from compensated use of state land. Governments of provinces, autonomous regions and municipalities directly under the central government shall fix and publish the uniform AAOV rates or integrated land prices for land acquisition of all cities and counties, so that the same price applies to the same kind of land. For key construction projects of the state, land acquisition expenses must be listed in the budgetary estimate in full. Article 13 County-level and above local governments shall take specific Resettlement for Proper measures to guarantee long-term livelihoods of LEFs. agricultural resettlement of For projects with a stable income, farmers may become a production LEFs shareholder using the right to use of land used for construction Resettlement by

95 SC [2004] No.28—Improvement of Compensation and Resettlement Systems MLR [2004] for Land Acquisition No.238 approved pursuant to law. reemployment Within the urban planning area, local governments shall bring Resettlement farmers who lose all land due to land acquisition into the urban by dividend employment system, and establish a social security system; out distribution Non- of the urban planning area, in acquiring land collectively owned local by farmers, local governments shall reserve necessary arable resettlement land or arrange appropriate jobs for LEFs within the same administrative area; farmers without land who do not have the basic living and production conditions shall be subject to non- local resettlement. The labor and social security authorities shall propose guidelines for the employment training and social security systems for LEFs as soon as possible. Article 14 During land acquisition, the ownership of collective land of Disclosure of Improvement of farmers and the right to contracted management of farmers’ land information on land land acquisition shall be maintained. acquisition procedures Before acquisition is submitted for approval pursuant to law, the Confirmation of use, location, compensation rate and mode of resettlement of the land acquisition land to be acquired shall be notified to LEFs; the survey results survey results of the present situation of the land to be acquired shall be Organization of confirmed by rural collective economic organizations and farmers land acquisition to be affected by land acquisition; if necessary, the land and hearing resources authorities shall organize a hearing in accordance with the applicable provisions. The materials for notification to and confirmation by the LEFs shall be taken as requisite materials for approval for land acquisition. Accelerate the establishment and improvement of the coordination and judgment mechanism for disputes over compensation and resettlement for land acquisition to protect the lawful rights and interests of LEFs and land users. Approved matters of land acquisition shall be disclosed unless in special cases. Article 15 If the compensation and resettlement for land acquisition has not Disclosure of Strengthening been implemented, the acquired land shall not be used forcibly. approval items of Supervision Governments of provinces, autonomous regions and land over the municipalities directly under the central government shall acquisition implementation formulate the procedures for the distribution of the land Payment of of land compensation within rural collective economic organizations on compensation and acquisition the principle that the land compensation is used for rural resettlement households affected by land acquisition mainly. expenses for Rural collective economic organizations affected by land land acquisition acquisition shall disclose the receipt, disbursement and allocation Post-approval of land compensation fees to their members and accept supervision and supervision. The agricultural and civil affairs authorities shall inspection of land strengthen the supervision over the allocation and use of land acquisition compensation fees within rural collective economic organizations.

B. Notice on Publishing the Compensation Standard for Land Acquisition of Ningxia Hui Autonomous Region of the People’s Government of Ningxia Hui Autonomous Region,Ning Zheng Fa [2015] No.101

96

41. The various departments and organizations directly under the people’s government of the various cities, counties (districts) and autonomous regions:

42. To promote the scientific and sustained use of land resources, it was decided to publish Compensation Standard for Land Acquisition of Ningxia Hui Autonomous Region (hereinafter referred to as the new compensation standard for land acquisition) in accordance with The Law of Land Administration of the People’s Republic of China and Land Administration Regulations of Ningxia Hui Autonomous Region as well as other laws and regulations and through the deliberation of the executive meeting of the People’s Government of Ningxia Hui Autonomous Region, to be implemented from January 1, 2016. The relevant matters are notified as follows:

43. The new compensation standard for land acquisition is farmland-based. The compensation for the garden acquired shall be equal to that for farmland in the same area, that for forest land acquired shall be equal to 70% of that for farmland in the same area, that for new irrigable land (within three years) acquired shall be equal to 60% of that for farmland in the same area, that for artificial grassland acquired shall be equal to that for dry farmland in the same area, that for natural grassland and shrubland shall be equal to 60% of that for dry farmland in the same area, that for unused land acquired shall be equal to 20% of that for dry farmland in the same area, and that for homestead and threshing ground acquired shall be equal to that for farmland in the same area. For use of state-owned agricultural (forestry, animal husbandry) land, refer to the compensation standard for acquisition of the neighboring collective lands.

Compensation Standard for Land Acquisition of Ningxia Hui Autonomous Region (Jingyuan) No. County Area Area (region) Area (region) Compensation Remark (district), (regio No. scope standard for land city n) acquisition Quant Yuan/mu Yuan/ha. ity 5 Guy Jing 5 V Mountain All mountain land 5,760 86,400 uan yua land in some villages City n of Xinmin Town, Cou Jingheyuan nty Town, Xingsheng Town, Huanghua Town, Liupanshan Town, Dawan Town and Xiangshui Town

97 Annex C Terms of Reference for External Monitoring and Evaluation Agency

A. Purpose resettlement monitoring and evaluation

44. According to ADB’s SPS 2009 on involuntary resettlement, the resettlement work of this Project will be subject to external M&E. The monitoring will ensure that the resettlement processes are being implemented in accordance with the requirements set out in Resettlement Plans (RPs). The external M&E will also undertake an evaluation of changes in peoples’ standard of living as a result of the project and project-related LAR activities.

45. A TOR is drafted and a specialist with 8~10 years of relevant social and resettlement experience will be engaged by CQS method.

46. M&E reports will be submitted to ADB and the PMO of Ningxia Hui Autonomous Region Transport Department regularly twice a year during the land acquisition and resettlement (LAR) implementation period and once a year following LAR completion. Through external M&E, ADB and the EAs can fully understand if the LAR work is implemented on schedule and according to the quality standard, point out existing issues, and propose suggestions for improvement.

B. Scope and Methods of External Monitoring

(i) Baseline Survey

47. The external monitor will undertake a baseline survey of the villages affected by land acquisition and house demolition of the Project, and collect baseline data on the production level and standard of living of the monitored displaced households (standard of living, production, and income levels). The survey methods include follow-up survey of sample households (minimum sample size: 10% of households affected by land acquisition, 20% of households affected by house demolition, 40% households significantly affected, 50% of affected villages; the households will be sampled randomly). A statistical analysis will be made on this basis for evaluation.

(ii) Regular Monitoring and Evaluation

48. During the RP implementation, the external monitor will perform regular follow-up resettlement monitoring of the following activities twice a year through field observation, follow- up survey of the sample households, and random interview with affected persons. The external monitor will monitor:  the progress of disbursement of compensation for LAR and house demolition;  the progress of selection and preparation of resettlement sites including provisions for civic amenities, construction of new houses, and adequacy of construction;  institutional capacity of the resettlement office—adequate trained staffing, office space and equipment, and provisions for ongoing training;  financial capacity of the PMO and IAs, particularly the budgetary arrangements and cash flow for resettlement activities;

98

 the process of public participation and consultation, ensuring that the public participation and consultation schedule is being followed and outcomes are being incorporated in resettlement implementation process;  the functioning of the GRM;  the progress of livelihood rehabilitation plans and training, restoration of productive assets, and livelihood systems;  rehabilitation of affected shops;  that the vulnerable groups are being provided support in accordance to the criteria set out in the RP;  the progress of restoration and reconstruction of infrastructure and special  facilities;  implementation schedule for the RP activities; and  the overall RP implementation process and if any significant involuntary resettlement are identified, the agency will prepare a corrective action plan to address such issues.

49. In addition, the external monitor will be responsible for verifying the internal monitoring reports of IAs on implementation and progress of the RPs. These internal monitoring reports are prepared by the IAs and the PMO as part of the quarterly progress report.

50. On the basis of the baseline survey, the external monitoring agency will evaluate the project impacts and will provide a “without” and “with” project comparative analysis.

(iii) Monitoring Indicators

51. The following indicators shall be monitored and evaluated in accordance with principles, entitlements, and rehabilitation strategies/plans set out in the RPs:  Progress: including preparation, implementation of land acquisition, house demolition, resettlement site construction, housing relocation and rehabilitation of livelihoods and living conditions;  Quality: including resettlement implementation, civil construction quality, timeliness, minimal disturbance/inconvenience and transition time, and degree of APs’ satisfaction;  Entitlements: timely allocation of full compensation entitlements and proper and timely use of funds, and adequate and timely availability of funds for resettlement site construction;  Economic/income conditions: household economic development before and after resettlement, including assets, production materials, subsistence materials, income, savings and debts, income generation potential, etc.;  Living conditions: living environment before and after resettlement, including traffic, education, sanitation, social services, commercial service facilities, etc. in the new resettlement sites;  Livelihood/employment: change in livelihood (income sources) and employment, including employment rate, assistance to the different APs, especially for women, and vulnerable APs, and seriously-affected households, such as those at risk of impoverishment due to land loss or housing loss; training and skill enhancement;  Community development: local economy in resettlement sites, environmental development, neighborhood relations and safety, and public opinions (by gender and age groups) after resettlement; and

99  Conditions of the vulnerable groups and seriously-affected households: including before and after situations of those people.

(iv) Monitoring and Evaluation Method

52. The external monitor will use both quantitative and qualitative methods to undertake the M&E such as:  Surveys – questionnaire surveys based on random sampling with a minimum sample size of 10% of households affected by land acquisition, 20% of households affected by house demolition and 50% of the affected villages. These surveys will be done on annual basis to assess the impact on yearly basis. Out of the above indicated survey population, the external monitor will select a suitable sample size and will undertake follow-up surveys by using tracer survey method. It will require following the same respondents on a yearly basis to assess the project impacts.  Qualitative interviews and focus group discussions – with project affected persons, village and community representatives, officials in PMO, IAs and other government departments that are involved in the resettlement process; and,  Along with written materials, photos, audio and video records, real objects shall also be used.

C. Reporting

53. The RP monitoring report will include: 1) Summary of findings and conclusion of investigations and evaluation; 2) Major problems identified (existing and potential); 3) Recommended mitigation or prevention measures which need to be taken; and 4) Assessment of previous follow-up actions.

54. Reports will be submitted to ADB every 6 months during the resettlement implementation. After the preparation of resettlement completion reports, annual evaluations will be conducted for 2 years, or until all issues have been successfully resolved. The final evaluation report should summarize monitoring results and should clearly establish whether resettlement has been successfully completed.

55. All reports will be provided in English and Chinese. It should be ensured that information on the progress and status on all aspects of LAR activities will be provided to the external monitor for verification, including records of grievances.

D. Consultant Specifications and Inputs

56. The specialist shall have a degree in a relevant subject (sociology, anthropology, or related subject) with 8~10 years’ experience in M&E of projects funded by ADB or other international development funding agencies. The consultant’s inputs will be spread intermittently over the life of the Project for a total of 6 months.

E. Monitoring Budget

57. A total budget for RP is about $150,000.

100