~EERING DMSION~ , Depar1l.4ENT of PUBLIC WORKS

Total Page:16

File Type:pdf, Size:1020Kb

~EERING DMSION~ , Depar1l.4ENT of PUBLIC WORKS Q INFORMATION FOR BIDDERS PROPOSAL - SPECIFICATIONS FOR REPLACEMENT OF lHE ONEIDA DRIVE BRIDGE OVER SMITH COVE (BRIDGE NO. 056-009) PROJECT NO. 14-20 MARCH 2019 0 0 ~~EERING DMSION~ , DEPAR1l.4ENT OF PUBLIC WORKS ~ .4" INVITATION TO BID Sealed bids, one (I) original and two (2) copies, will be received in the Office of the Purchasing Department and shall be opened and read aloud in the Gisborne Conference Room, Town Hall, 101 Field Point Road, Greenwich, Connecticut at 2 o'clock pm (prevailing time) on Wednesday, Apri110, 2019 for the following work: Replacement of the Oneida Drive Bridge over Smith Cove (Bridge No. 056-009) Town Project No. 14-20 A Bid Bond for 10% of the total bid must accompany each bid. Bidders may be required to submit data covering financial resources, equipment and ability to perform the work rapidly and in a satisfactory manner. The right is expressly reserved to reject any or all bids, to waive any informalities in the bids, or to accept such bids as appear to be in the best interest of the Town. Specifications may be obtained on the Town ·s website, www.greemvicbcl.om. It is the responsibility of the prospective bidder to check the website for any addenda issued up to 48 hours prior to the bid opening. Drawings and specifications will be posted to the Town's website and may be downloaded at no cost. Drawings taken from the Town's website and printed on the bidder's equipment may not be to scale. Full size hard c~ies of the drawings may be purchased from Greenwich Blueprint, LLC, 255 Greenwich Avenue, 2" floor, Greenwich, CT 06830, ph. (203) 869-0305 for a non-refundable fee of $124.43 including tax. Bidders shall complete the Vendor Information & Signatory Form for all Contracts equal to or in excess of $250,000.00. Failure to complete the Vendor Information & Signatory Form, located in Section 2, will cause the contractors bid to be disqualified. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed, insurance coverage requirements, minimum wage rates to be paid under the contract and construction safety and health course requirements. This contract is subject to state contract compliance requirements, including non-discrimination statutes and set-aside requirements. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification from the Connecticut Department of Administrative Services. The contractor must demonstrate good faith effort to meet the 25% set-aside goals. Bidders shall complete the "Bidder Contract Compliance Monitoring Report" and the "Prohibition of Wastes Generated from Oil and Gas Drilling and Extraction Activities Certification" for all Contracts. Failure to complete the noted report and certification, located in Section 2, will cause the contractors bid to be disqualified. Date: March 21, 2019 Replacement of the Oneida Drive Bridge Town Project No. 14-20 over Smith Cove (Bridge No. 056-009) SECTION 1 INFORMATION FOR BIDDERS TITLE ARTICLE RECEIPT AND OPENING OF BIDS 1.1 LOCATION AND DESCRIPTION OF WORK TO BE DONE 1.2 CONTRACT DOCUMENTS 1.3 NON-REFUNDABLE FEE FOR DRAWINGS AND DOCUMENTS 1.4 QUESTIONS REGARDING DRAWINGS AND DOCUMENTS 1.5 BIDDERS TO INVESTIGATE 1.6 INFORMATION NOT GUARANTEED 1.7 BLANK FORM FOR BID 1.8 TIME LIMITS AND TIME CHARGE 1.9 WITHDRAWAL OF BIDS 1.10 CONTRACT BONDS 1.11 ABILITY AND EXPERIENCE OF BIDDER 1.12 BIDS 1.13 RIGHT TO REJECT OR ACCEPT BIDS 1.14 RIGHT TO ALTER FORM, QUANTITY, ETC., OF WORK 1.15 EXECUTION OF AGREEMENT 1.16 INSURANCE CERTIFICATES 1.17 COMPARISON OF BIDS 1.18 BID SECURITY 1.19 ITEMS 1.20 MINIMUM PREVAILING WAGE RATES 1.21 CONSTRUCTION SAFETY AND HEALTH COURSE 1.22 NON-CONNECTICUT CONTRACTORS 1.23 SUPPLIERS AND SUBCONTRACTORS 1.24 PROHIBITION OF WASTES GENERATED FROM OIL AND GAS DRILLING AND EXTRACTION ACTIVITIES 1.25 2 Replacement of the Oneida Drive Bridge Town Project No. 14-20 over Smith Cove (Bridge No. 056-009) CT SET-ASIDE REQUIREMENTS RE: NON-DISCRIMINIATION STATUTES 1.26 3 Replacement of the Oneida Drive Bridge Town Project No. 14-20 over Smith Cove (Bridge No. 056-009) INFORMATION FOR BIDDERS 1.1 RECEIPT AND OPENING OF BIDS. Sealed bids, one (1) original and two (2) copies, will be received in the Office of the Purchasing Department and shall be opened and read aloud in the Gisborne Conference Room, Town Hall, 101 Field Point Road, Greenwich, Connecticut at 2 o’clock pm (prevailing time) on Wednesday April 10, 2019 for the following work: Replacement of the Oneida Drive Bridge over Smith Cove (Bridge No. 056-009) Town Project No. 14-20 1.2 LOCATION AND DESCRIPTION OF WORK TO BE DONE. The work herein specified to be done consists of the complete replacement of the Oneida Drive Bridge Greenwich Connecticut, all as more particularly indicated, shown or described in the drawings, specifications and other contract documents and as described by the Engineer. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies and all other things necessary to do all work required for the completion of each item of the work and as herein specified. The location, general characteristics and principal details of the work are indicated on drawings which are listed as follows: SHEET NUMBER TITLE 01.01 Title Sheet 01.02 Detailed Estimate Sheet 02.01 List of Revisions 03.01 Index of Drawings 03.02-03.03 Typical Sections & Details 03.04 Existing Conditions 03.05 Alignment & ROW Plan 03.06 Roadway Profile 03.07 Roadway Plan 03.08 Erosion Control Plan 03.09 Planting Plan 03.10 Detour Plan 03.11 Site Details 03.12-03.21 Cross Sections 04.01 Index of Drawings 04.02 General Plan 04.03 General Notes & Quantities 04.04-04.07 Boring Logs-(1-4) 04.08-04.09 Construction Staging (1-2) 04.10 Cofferdam and Dewatering 04.11 Pile Plan. 04.12-04.13 Abutment (1-2) 04.14 Abutment Details 04.15 Pay Limits 04.16 Framing Plan 04.17-04.18 Voided Slab Details (1-2) 04.19 Slab Plans 04.20 Slab Details 04.21 End Block Details 4 Replacement of the Oneida Drive Bridge Town Project No. 14-20 over Smith Cove (Bridge No. 056-009) SHEET NUMBER TITLE 04.22 3 Tube Curb Mounted Bridge Rail HW_INX (1-2) Highway Standard Sheet Index HW-651_01 C.C.M. Pipe Installations in Fill & Rock Slopes & Pipe Trench Detail HW-822_01 Temporary Precast Concrete Barrier Curb HW-910_01 W-Beam Metal Beam Rail Hardware HW-910_02 Metal Beam Rail (Type R-B 350) Guiderail HW-910_04 Metal Beam Rail Type R-B 350 Systems 5, 5A, & 6 HW-910_07 R-B 350 Bridge Attachment Vertical Shape Parapet HW-910_17 R-B Terminal Section HW-911_01 R-B End Anchorage Type I and II HW-921_01 Driveway Ramps and Sidewalks HW-949_01 Planting Details for Trees HW-949_02 Planting Details for Shrubs TR-STD_Index Traffic Standard Sheet Index TR-1208_02 Metal Sign Posts and Sign Mounting Details TR-1210_04 Pavement Marking Lines and Symbols TR-1210_08 Pavement Markings for Non Freeways TR-1220_01 Signs for Construction and Permit Operations TR-1220_02 Construction Sign Supports and Channelizing Devices The above drawings are the contract drawings, sometimes referred to herein as the "Drawings". Additional drawings showing details in accordance with which the work is to be done will be furnished from time to time by the Engineer, if found necessary, and shall then become a part of the contract drawings. 1.3 CONTRACT DOCUMENTS. The 'Drawings', 'Invitation to Bid', 'Information for Bidders', Forms for 'Bid', 'Agreement' and ‘Bonds’, 'General Conditions' and 'Technical and Materials Specifications' become the contract documents and may be obtained on the Town’s website, www.greenwichct.org. Drawings and specifications will be posted to the Town’s website and may be downloaded at no cost. Drawings taken from the Town’s website and printed on the bidder’s equipment may not be to scale. 1.4 NON-REFUNDABLE FEE FOR DRAWINGS AND DOCUMENTS. Full size hard copies of the drawings may be purchased from Greenwich Blueprint, LLC, 255 Greenwich Avenue, 2nd floor, Greenwich, CT 06830, ph. (203) 869-0305 for a non-refundable fee of $124.43 including tax. 1.5 QUESTIONS REGARDING DRAWINGS AND DOCUMENTS. In general, no answer will be given to prospective bidders in reply to an oral question if the question involves an interpretation of the intent or meaning of the drawings or other contract documents or the equality or use of products or methods other than those designated or described on the drawings or in the specifications. Any information given to bidders other than by means of the drawings and other contract documents, including addenda, as described below, is given informally, for information and the convenience of the bidder only, and is not guaranteed. The bidder agrees that such information shall not be used as the basis of nor shall the giving of any such information entitle the bidder to assess any claim or demand against the Town or the Engineer on account thereof. 5 Replacement of the Oneida Drive Bridge Town Project No. 14-20 over Smith Cove (Bridge No. 056-009) To receive consideration, such questions shall be submitted in writing to the Project Engineer, Sean Cardwell, Civil Engineer, Engineering Division, 101 Field Point Road, Greenwich, CT 06830 or by email to [email protected] at least 5 days before the established date for receipt of Bids.
Recommended publications
  • Classification of Engineering Materials, and Their Properties: 1
    ACS College of Engineering, Bangalore Assistant professor/Aeronautical Classification Of Engineering Materials, And Their Properties: 1] Material classification: There are different ways of classifying materials. One way is to describe five groups or families 1 ACS College of Engineering, Bangalore Assistant professor/Aeronautical Metals and alloys; Ceramics, glasses, and glass-ceramics; Polymers (plastics); Semiconductors Composite materials Metals and Alloys: Metals and alloys include steels, aluminum, magnesium, zinc, cast iron, titanium, copper, and nickel. An alloy is a metal that contains additions of one or more metals or non-metals. In general, metals have good electrical and thermal conductivity. Metals and alloys have relatively high strength, high stiffness, ductility or formability, and shock resistance. They are particularly useful for structural or load-bearing applications. Although pure metals are occasionally used, alloys provide improvement in a particular desirable property or permit better combinations of properties. Ceramics: Ceramics can be defined as inorganic crystalline materials. Beach sand and rocks are examples of naturally occurring ceramics. Advanced ceramics are materials made by refining naturally occurring ceramics and other special processes. Advanced ceramics are used in substrates that house computer chips, sensors and capacitors, wireless communications, inductors, and electrical insulation. Some ceramics are used as barrier coatings to protect metallic substrates in turbine engines. Ceramics are also used in such consumer products as paints, and tires, and for industrial applications such as the tiles for the space shuttle. Traditional ceramics are used to make bricks, tableware, toilets, bathroom sinks, refractories (heat-resistant material), and abrasives. In general, due to the presence of porosity (small holes), ceramics do not conduct heat well; they must be heated to very high temperatures before melting.
    [Show full text]
  • An Inventory of US Navy Courses Suitable for Use in Training Civiliam
    DOCUMENT RESUME ED 118 915 CE 006 479 AUTHOR Rogers, William A., Jr.; Nisos, Michael J. TITLE An Inventory of U.S. Navy Courses Suitable for Use in Training Civiliam Personnel in Basic Technical Skills. INSTITUTION Aerospace Education Foundation, Washington, D.C.; Naval Inst., Annapolis, Md. SPONS AGENCY Maryland State Dept. of Education, Baltimore. PUB DATE 15 Apr 75 NOTE 336p. AVAILABLE. FROM For more detailed information about course contents, contact U.S. Naval Institute, Annapolis, Maryland 21402 (No price given) EDRS PRICE MF-$0.83 HC-$18.07 Plus Postage DESCRIPTORS Auto Mechanics (Occupation); Aviation Technology; *Catalogs; Construction Industry; Course Content; *Course Descriptions; *Educational Equipment; Electrical Occupations; Food Service Occupations; Marine Technicians; Medical Services; *Military Training; *Technical Education; Technical Occupations; Trade and Industrial Education IDENTIFIERS *Navy ABSTRACT An inventory of courses of study developed by the United States Navy which might be useful to other private and public institutions in training civilian students in basic technological skills is presented. Individual course reports contain the following information: course description, comments, course content (including blocks of instruction and hours), support materials,, training aids, equipment, tools, and supplies and materials. Courses are listed for the following career fields: air conditioning and refrigeration, audiovisual equipment (operation), audiovisual equipment (repair) , automotive trades, aviation trades,
    [Show full text]
  • Argyle Police Department
    ARGYLE POLICE DEPARTMENT Policy 1.1 Mission, Values, and Written Directive System Effective Date: 02Feb12 Replaces: Reference: TBP 1.04.1 I. POLICY Law enforcement agencies provide essential services to foster safe communities through crime reduction and deterrence. Administrators of these law enforcement agencies are obligated to train, supervise, and guide personnel in performing the variety of tasks which create safe communities. At the same time, these administrators seek to improve employees' confidence and competence in performing tasks while reducing vulnerability to liability. To meet these obligations, agencies must manage themselves according to written directives. A manual of policies and procedures guides the day-to-day legal and ethical functioning of a law enforcement agency. To that end, this manual furnishes a blueprint for the performance of this agency’s activities in accordance with established state and national standards. Providing all members of the department with an understanding of the department’s mission and values provides guidance for decision making when situations are not covered by direct policy or procedure. II. PURPOSE This document outlines the organization of the Department, its Policy and Procedure Manual, its authority, and defines three kinds of statements that appear in these documents: policy, rule, and procedure. It also states the department’s mission and core values. III. AGENCY MISSION AND VALUES A. Mission The mission of the Argyle Police Department is to work with the citizens of Argyle to maintain effectively and efficiently provide for the protection of lives and property, preserve the public peace, and promote individual responsibility and community commitment with the highest level of professionalism and ethical standards.
    [Show full text]
  • The Importance of Proper Inspection
    The Importance of Proper Inspection Rocky Capehart How Do We Help Prevent: PROPER INSPECTION All of the below should be performed as specified in the contract documents: •product specified is being used, •specified surface preparation has been completed, •product is applied as per manufacture’s recommendation, •AND Post application INSPECTION Manhole Preparation Quality Assurance and Testing •Substrate surface preparation requirements – Hydroblasting, Sand blasting, Grinding •Inspection before material application – Clean, dry, sound, surface profile, pH Test – Equipment KEY FACTORS FOR PREP SUCCESS Obtain a clean, dry and sound surface! • Understand repair procedures: • infiltration or substrate loss • Understand preparation procedures • Know how to test preparation results Coating • Know common termination methods of: keys • cleaning power • abrasive choices • coating removal Moisture Level Definition Saturated Surface Dry describes the condition of the aggregate in which the pores in each particle of the aggregate particle are filled with water and no excess water is on the particle surface. This allows the absorption and the specific gravity of the aggregate to be measured. Moisture content of aggregate is described by four categories: pH Test Complications with a product application may occur if pH levels (number designation) are: – too high (alkaline) or too low (acid). EQUIPMENT • Equipment is product dependent • Some can be mobilized into underground structures as necessary • Material output is meeting proper ratio Manhole Preparation
    [Show full text]
  • Titanium, Aluminum Or Steel?
    Titanium, Aluminum or Steel? Thomas G Stoebe Professor Emeritus, University of Washington, Seattle, WA and National Resource Center for Materials Technology Education Edmonds Community College 20000 68 Ave West Lynnwood, WA 98036 425-890-4652; [email protected] Copyright Edmonds Community College 2008 Abstract: Testing of metals is usually undertaken with sophisticated instruments. However, you can demonstrate to your students the basic differences between certain classes of metals using the simple spark test, presented here. You can even have your students test their “titanium” sports equipment to see if it really titanium! In many cases, they will find that the name “titanium” is used for marketing but little will be found in the product. In the process, students see the visible result of the carbon content in steel, and the lack of carbon in other materials, plus realize the reactivity of titanium metal. Module Objective: This simple demonstration provides an introduction to materials and materials testing. Even though this technique is limited to certain metals, it helps the student understand that different materials are different, and that materials that look alike are not necessarily the same. It also provides an opportunity to describe ferrous and non-ferrous materials and their basic differences, and one effect of heating on these different materials. Titanium is sufficiently reactive in air that it gives off sparks even with no carbon present. Since so many products today indicate that they are made of titanium, this test also provides a simple means to test for titanium in a product. This demonstration can also be expanded into a lab experiment to identify unknown materials.
    [Show full text]
  • Ts-63-34.00-001
    IDM UID YHM3FJ VERSION CREATED ON / VERSION / STATUS 09 Jun 2020 / 2.1 / Approved EXTERNAL REFERENCE / VERSION Technical Specifications (In-Cash Procurement) TS-63-34.00-001 - IOTS - 000001 : Technical Specifications B50s Grouting and related works This document provides requirements for grouting works and accompanied surface preparation and oil-resistant painting works to be performed on IO platform in B50s (B51/B52/A53) in order to complete the interface between PBS63 and each of PBS34.10 and PBS34.40. PDF generated on 15 Jun 2020 DISCLAIMER : UNCONTROLLED WHEN PRINTED – PLEASE CHECK THE STATUS OF THE DOCUMENT IN IDM ITER_D_YHM3FJ v2.1 Table of Contents 1 PURPOSE ............................................................................................................................ 2 2 SCOPE ................................................................................................................................. 2 3 DEFINITIONS .................................................................................................................... 2 4 DURATION ......................................................................................................................... 3 5 WORK DESCRIPTION ..................................................................................................... 3 5.1 Scope of Works ............................................................................................................. 3 5.2 Grouting volume and preparation work ...................................................................
    [Show full text]
  • Invitation to Bid 3
    ,o , INFORMATION FOR BIDDERS PROPOSAL - SPECIFICATIONS FOR REPLACEMENT OF BRIDGE NO. 05012 DAVIS AVENUE OVER INDIAN HARBOR TOWN PROJECT NO. 17-16 STATE LOTCIP PROJECT NO. L056-0003 AUGUST 2020 TOWN OF GREENWICH CONNECTICUT 742 Q 0 ~E~NEERING DM»""'SIO-vN • DEPARTMENT OF PUBLIC WORKS ~ .a.· Replacement of Bridge No. 05012 Davis Avenue Bridge over Indian Harbor Town of Greenwich, Connecticut Town Project No. 17-16 State LOTCIP Project No. L056-0003 TABLE OF CONTENTS Section Page No. Invitation to Bid 3 BIDDING REQUIREMENTS Section 1 Information for Bidders 4 to 13 Section 2 Bid 14 to 43 Section 3 Bid Bond 44 to 47 CONTRACT FORMS Section 4 Agreement 48 to 78 Section 5 Performance, Maintenance and Payment Bond 79 to 83 CONTRACT CONDITIONS Section 6 General Conditions 84 to 91 OTHER DOCUMENTS Section 7 Technical Provisions 92 to 229 Section 8 State of Connecticut Prevailing Wage Rates 230 to 261 Appendix A CT DEEP Certificate of Permission License 262 to 284 Appendix B CTDOT Required Contract Provisions 285 to 311 TECHNICAL PROVISIONS List of NTCs Page No. Notice to Contractor – Use of Connecticut DOT Form 817 94 Notice to Contractor – Protection of Existing Utilities 95 to 96 Notice to Contractor – Procurement of Materials 97 Notice to Contractor – All - Inclusive Drainage 98 Notice to Contractor – Use of Municipal Police Officers 99 Special Provision Sections Page No. Section 1.05 – Control of The Work 100 to 101 Section 1.07 – Legal Relations and Responsibilities 102 to 103 Section 1.08 – Prosecution and Progress 104 Section 2.86 – Drainage Trench Excavation, Rock in Drainage Trench Excavation 105 to 108 Section 4.06 – Bituminous Concrete 109 to 131 Section 5.86 – Catch Basins, Manholes, And Drop Inlets 132 to 135 Section 6.86 – Drainage Pipes, Drainage Pipe Ends 136 to 139 Section M.04 – Bituminous Concrete Materials 140 to 159 1 Replacement of Bridge No.
    [Show full text]
  • Critical Materials Handbook
    City of Spokane CRITICAL MATERIALS HANDBOOK Prepared By: Critical Materials Technical Advisory Committee November 16, 2009 This Page is intentionally left blank ii CRITICAL MATERIALS HANDBOOK Table of Contents TECHNICAL ADVISORY COMMITTEE iv ACKNOWLEDGEMENTS iv Section I. Introduction 1 A. Purpose and Use of this Handbook. 1 Section II. 3 Critical Materials 3 A. Critical Materials Definitions. 3 B. Critical Materials List. 4 C. Critical Materials Activity List. 5 D. Identification of Critical Material Use Activities. 5 Section III. Best Management Practices for the Prevention and Control of Spills 7 A. Selecting a Secondary Containment Site 7 B. Constructing a Secondary Containment Site 7 C. Containment Options 8 D. Operating and Maintaining a Secondary Containment System 9 E. Construction/Management Alternatives for Storm Water 11 F. Who to Contact 11 Section IV. Spill Control A. Application of spill control technology and methodology. 13 B. Structural methods for the control of spills. 13 C. Containment Volume of Secondary Containment Systems. 13 D. Model spill prevention, control and clean-up plan. 15 APPENDIX A CRITICAL MATERIALS LIST and CRITICAL MATERIALS ACTIVITY LIST 18 APPENDIX B NORTH AMERICAN INDUSTRIAL CLASSIFICATION CODES for 20 Activities Most Likely to Involve Chemicals 20 APPENDIX C Best Management Practice (BMP) design concepts 27 List of Exhibits 28 APPENDIX D Sample Inspection Checklists 65 iii TECHNICAL ADVISORY COMMITTEE The original Technical Advisory Committee was created in 1977 to oversee the technical aspects of the development of the Water Quality Management Plan. This group has evolved to those agencies that are responsible for aquifer protection and enforcement within the City of Spokane.
    [Show full text]
  • HUMBOLDT-CATALOG-2017 COVER.Indd
    Air Meters 140-143 Beam Testing 151 Compression Testing 162-171 Consistency 147 Corrosion 178-180 Crack Monitors 190-191 Cube Molds 152 Cylinder Capping 160-161 Cylinder Molds 153 Cylinder Testing 154-155 Cylinder Prep 158-159 Freeze-Thaw 186-187 Ground Penetrating Radar 176 Humidifiers 156 Humidity 157 Initial Set 146 Linear Traverse 192 Maturity 148 Mixers 150 Moisture (Slabs) 188-189 Pull-Off 175 Pulse Echo 183 Rebar Locators 176-177 Rebound Test Hammers 172-173 Resistivity 184-185 Self Consolidating Concrete 149 Slump 144-145 Strain 192 Strength 174 Ultrasonic 181-183 Unit Weight 143 CONCRETE 140 Air Meters H-2784.500 H-2783 H-2784 Humboldt Super Air Meter bubbles meets the recommendations of the ACI piece, self-locking clamps that quickly seal the lid ASTM C231, AASHTO T152 201 Concrete Durability Committee. to the base with proper tension aided by an o-ring The H-2784 Super Air Meter (SAM) is a testing This new air meter has been investigated using to assure a watertight seal. A large, easy-to-read, device that measures both the air void spacing and more than 300 lab and field mixtures at Oklahoma 4-inch diameter, direct percentage gauge with air volume of plastic (fresh) concrete in about 10 State University and the FHWA Turner Fairbanks calibration adjustments is accurate to the nearest minutes. Air void spacing has been shown to be Laboratories. As part of an ongoing Pooled Fund 0.1%. The bucket features cast handles, which a better indicator of concrete freeze-thaw dura- Study, the SAM is being used by 10 different DOTs improve usability, especially when using bucket as bility than total air content; however, until now, it on field concrete.
    [Show full text]
  • Events 4 Jan's Notes 6 Corkscrew Contest 7 Tech Stuff 8 Fling Photos
    Events 4 Jan’s Notes 6 Corkscrew contest 7 Tech Stuff 8 Fling Photos 12 Drilling Holes 14 Nail Tools 15 Gallery 16 ABANA 18 May/June 2001 The Blacksmiths’ Guild of the Potomac The Newsletter 1 2001 Board of Directors Committee Chairmen President Vice-President Building Ross Sullivan 540-775-2067 *Keith Kuck (2001) *Chris Worsley (2001) Claude Moore Park Pat McGuire 703-437-9034 5310 Nutting Drive 4203 Javins Drive Springfield VA 22151 Alexandria VA 22310 Corporation Fay LeCompte 540-743-1812 703-321-8109 703-960-9030 Demonstrations Jan Kochansky 301-937-6538 Treasurer Secretary Door Prize Tom Coker 301-937-6538 *George Anderton (2003) * Ross Sullivan (2002) Hospitality Ed Jackson 410-549-2829 5325 Ringold Place 11548 Pine Hill Road Springfield VA 22151 King George VA 22485 Hotline Tug Tuggle 304-876-0909 703-321-9737 540-775-2067 Library Steve Crist 703-754-9678 Tom Coker (2002) Fay LeCompte (2003) 12611 Bluhill Road 1016A East Main St. Membership George Anderton 703-321-9737 Wheaton MD 20906 Luray VA 22835 301-942-8573 Newsletter George McConnell 703-620-6454 *Bill Wojcik (2001) Phil Heath (2002) 4116 Kingchase Lane 4600 S Four Mile Run Dr Shop Rules And Etiquette The Plains VA 20198 Arlington VA 22204 540-253-5121 703-671-3134 The Guild shop is available for use by members whenever the Nature Center park is open. Shop is locked, so call Shopmaster or a Board member for access. Follow all Ken Zastrow (2003) Call the HOTLINE at safety rules. Record number of visitors on log sheet near 12800 Hammonton Rd 703-527-0409 for door.
    [Show full text]
  • CERN Microscopy
    Post-Mortem analysis: SEM imaging review Anité Pérez Fontenla EN-MME-MM CLIC workshop 2015 – Geneva Outline • Introduction • What does a hot cell look like? • Have we made progress joining disks? (B-field arcs) • How do DC and RF BDs compare? • Catalogue of features related with BD activity Introduction The aim of the SEM observations is: 1. To identify the machining quality (machining marks, burrs) and the general surface quality of AS before operation at high power; 2. To characterize the surface after operation. 3. To compare and if it is possible to put in relation individual post mortem features with features observed before operation; What does a hot cell look like? Most recent example: TD24R05 tested at CERN 4 High gradient summary Cell 5 hot cell/ iris developed during high power operations (W. Farabolini) TD24 R= 0.5 mm, is the radius between bottom part of waveguide and it's wall Nomenclature US Cell 25: last Cell 26: output Cell 2: first regular coupler regular Beam Cell 1: input coupler DS CELL #5 EDM wire cutting at CERN* Transverse cutting of the two extremities Slicing of cells number 4-5-6 & 22-23 for iris inspection by SEM Cell 22 (cutting in quarters) sent to collaborators SEM CERN SEM CERN & CLIC collaborators 5 What does a hot cell look like? US cell #5_Example of the general aspect of the iris region In previous structures, hot cell implies higher surface degradation, but not in TD24 R05 Conditioning effect?? 30 um • The marking and counting of craters and affected sites was done manually due to the current absence of an automatic analysis software that can recognize the variable shapes and sizes.
    [Show full text]
  • Fupublic MISSOUR I
    fuPUBLIC MISSOUR I G RlH" I>' G TOG LT t-! [f, I Exhibit F I AGENDA ITEM STAFF ANALYSIS Project/Issue Name: Resolution #17-R-44 A Resolution of the City Council of the City of Republic, Missouri, Accepting the Bidding Processes and Cooperative Purchasing Terms Between Visu-Sewer of Missouri, LLC and the City of Monett and Carthage Water and Electric Plant and Authorizing the City Administrator to Execute a Contractor Agreement for the Rehabilitation of Sanitary Sewer Infrastructure. Submitted By: David Brock, Public Works Director Date: June 6, 2017 Issue Statement Contract sanitary sewer collection system rehabilitation utilizing cooperative purchasing agreements. Discussion and/or Analysis Utilizing cooperative purchasing agreements for sewer rehabilitation has proven to be a highly valued means to contract for inflow and infiltration (l&I) work. The 2017 operating budget includes $60,000 for smoke testing and manhole rehabilitation. Under this proposed contract the City will hire Visu-Sewer to perform smoke testing on 30,000 feet of sewer main and install a structural relining on three manholes at a total cost of $29,228.12. The remaining appropriated funds will be utilized for sewer main rehabilitation; the contract for which is expected to be presented to City Council in the near future. The Contractor Agreement that provides basic structure to govern the work meets all Republic standards. The pricing and technical specifications are associated with awarded competitive bids conducted by the City of Monett (smoke testing) and Carthage Water and Electric Plant (manhole repair and rehabilitation). The bid specifications and executed contracts for both Monett and Carthage included cooperative pricing provisions that allow Republic or other public agencies to piggyback on their formal process.
    [Show full text]