MEDICAL SERVICES & INFRASTRUCTURE DEVELOPMENT CORPORATION Plot No.9, Survey No.49, IT Park, Mangalagiri - 522 503, Guntur District. Amaravathi Region, Andhra Pradesh, email: [email protected] Tender Notice No.1/APMSIDC/TECHNICAL/2020-21 Dated.27.07.2020. Tenders are invited through e-procurement platform for the following works from registered firms and contractors: Approx. Last Date Sl. ECV receipt Name of the work No. (Rs. in upto Lakhs) 5.00 PM Upgradation / Strengthening of AHs / CHCs at various places in Srikakulam, Vizianagaram, Visakhapatnam, East Godavari & West Godavari districts under Regional Package-I I) SRIKAKULAM 1) Upgradation of 50 - 100 bedded CHC at Narasannapeta, 2) Upgradation of 30 - 100 bedded CHC at Seethampeta 3) Strengthening of 100 bedded AH at Rajam 4) Strengthening of 30 bedded CHC at Ponduru 5) Strengthening of 30 bedded CHCat Amadalavalasa 6) Strengthening of 30 bedded CHC at Baruva 7) Strengthening of 30 bedded CHC at Sompeta 8) Strengthening of 50 bedded CHC at Palasa 9) Strengthening of 30 bedded CHC at Haripuram 10) Strengthening of 50 bedded CHC at Pathapatnam 11) Strengthening of 30 bedded CHCat Kotturu (Tribal) 12) Strengthening of 30 bedded CHC at Kotabommali II) VIZIANAGARAM Placed in 1) Upgradation of 30 - 100 bedded CHC at Gajapathinagaram 2) Upgradation of 30 - 100 website: bedded CHC at Salur 3) Upgradation of 50 - 100 bedded CHC at S.Kota 4) Upgradation of http://msidc. 30 - 50 bedded CHC at Badangi 5) Strengthening of 30 bedded CHC at Kurupam 6) ap.nic.in Upgradation of 30 - 50 bedded CHC at Bhadragiri 7) Strengthening of 30 bedded CHC at Nellimarla 8) Strengthening of 30 bedded CHC at Bhogapuram III) VISAKHAPATNAM 1) Strengthening of 100 bedded AH at Narsipatnam, 2) Upgradation of 100 - 150bedded AH at Araku 3) Upgradation of 50 - 100 bedded CHC at Aganampudi 4) Upgradation of 30 - 50 bedded CHC at Chintapalli 5) Upgradation of 50 - 100 bedded CHC at Chintapalli 6) Upgradation of 30 - 50 bedded CHC at K.Kotapadu 7) Strengthening of 30 beded CHC at Madugula (Tribal) 8) Upgradation of 30 - 50 bedded CHC at Kotauratla 9) Upgradation of 30 - 50 bedded CHC at Nakkapalli 9) Strengthening of 30 beded CHC at Pendurthi 10) Strengthening of 30 beded CHC at Gopalapatnam 11) Upgradation of 30 - 50 bedded CHC at Yelamanchili 1 33119.02 13.08.2020 IV) EAST GODAVARI 1) Strengthening of 100 bedded AH at Amalapuram 2) Strengthening of 30 bedded CHC at Allavaram 3) Strengthening of 100 bedded AH at Ramachandrapuram 4) Upgradation of 50 - 100 bedded CHC at Rampachodavaram 5) Strengthening of 30 bedded CHC at Y.Ramavaram 6) Strengthening of 100 bedded AH at Tuni 7) Strengthening of 30 bedded CHCat Pedapudi 8) Upgradation of 30 - 50 bedded CHC at P. Gannavaram 9) Strengthening of 30 bedded CHC at Jaggampeta 10) Strengthening of 30 bedded CHC at Gokavaram 11) Strengthening of 50 bedded CHC at Kothapeta 12) Strengthening of 30 bedded CHC at Alamuru 13) Strengthening of 30 bedded CHC at Mandapeta 14) Strengthening of 30 bedded CHC at Tallarevu 15) Strengthening of 30 bedded CHC at T.Kothapalli 16) Strengthening of 30 bedded CHC at Mummidivaram 17) Upgradation of 30 - 50 bedded CHC at Yeleswaram 18) Upgradation of 30 - 50 bedded CHC at Prathipadu 19) Strengthening of 30 bedded CHCat Rowthulapudi 20) Strengthening of 30 bedded CHC at Kadiyam 21) Strengthening of 50 bedded CHC at Razole V) WEST GODAVARI 1) Upgradation of 50 - 100 bedded CHC at Bhimavaram 2) Upgradation of 50 - 100 bedded CHC at Jangareddy Gudem 3) Upgradation of 30 - 50 bedded CHC at Chintalapudi 4) Upgradation of 50 - 100 bedded CHC at Chintalapudi 5) Upgradation of 50 - 100 bedded CHC at Palakol 6) Strengthening of 100 bedded AH at Tadepalligudem 7) Strengthening of 30 bedded CHC at Achanta 8) Strengthening of 30 bedded CHC at Penugonda 9) Strengthening of 30 bedded CHC at Denduluru 10) Strengthening of 50 bedded CHC at Narasapur 11) Strengthening of 30 bedded CHC at Polavaram 12) Strengthening of 30 bedded CHC at Akiveedu 13) Strengthening of 30 bedded CHC at Bhimadole Approx. Last Date Sl. ECV receipt Name of the work No. (Rs. in upto Lakhs) 5.00 PM Upgradation / Strengthening of AHs / CHCs at various places in Krishna, Guntur, Prakasam & districts under Regional Package-II A) KRISHNA DISTRICT - 1) Strengthening of 100 bedded, A.H at Gudivada (NABRD XXV) 2) Strengthening of 100 bedded, A.H at Nuzvid (NABRD XXV) 3) Upgradation of 30 - 50 bedded, CHC at Jaggiahpeta (NABRD XXIV) 4) Strengthening of 30 bedded CHC at Guduru (Navaratnalu) 5) Strengthening of 50 bedded CHC at Avanigadda (Navaratnalu) 6) Strengthening of 30 bedded CHC at Challapalli (Navaratnalu) 7) Upgradation of 30 - 50 bedded, CHC at Mylavaram (NABRD XXIV) 8) Strengthening of 50 bedded CHC at Nandigama (Navaratnalu) 9) Strengthening of 30 bedded CHC at Vuyyuru (Navaratnalu) 10) Strengthening of 30 bedded CHC at Kankipadu (Navaratnalu) 11) Strengthening of 50 bedded CHC at Tiruvuru (Navaratnalu) 12) Strengthening of 30 bedded CHC at Vissannapeta (Navaratnalu) in Krishna District. B) GUNTUR DISTRICT – 1) Upgradation of 100 bedded A.H at Bapatla (NABRD XXV) 2) Strengthening of 30 bedded CHC at P.V.Palem (Navaratnalu) 3) Upgradation of 50 - 100 bedded CHC at Sattenapalli (NABRD XXV) 4) Upgradation of 30 - 50 bedded CHC at Macherla (NABRD XXIV) 5) Upgradation of 20 - 30 bedded CHC at V.P.South (Navaratnalu) 6) Strengthening of 30 bedded CHC at Pedakurapadu (Navaratnalu) 7) Strengthening of 30 bedded CHC at Amaravathi (Navaratnalu) 8) Strengthening of 30 bedded CHC at Prathipadu (Navaratnalu) 9) Strengthening of 30 bedded CHC at Repalle (Navaratnalu) 10) Strengthening of 30 bedded CHC at Kolliparra (Navaratnalu) 11) 2 21105.82 13.08.2020 Strengthening of 30 bedded CHC at Vemuru (Navaratnalu) 12) Strengthening of 30 bedded CHC at Vinukonda (Navaratnalu) 13) Strengthening of 30 bedded CHC at Ipur (Navaratnalu) in Guntur District. C) PRAKASAM DISTRICT – 1) Upgradation of 50 - 100 bedded CHC at Giddaluru (NABRD XXV) 2) Upgradation of 30 - 50 bedded CHC at Cumbum (NABRD XXV) 3) Strengthening of 100 bedded A.H at Kandukur (NABRD XXIV) 4) Upgradation of 30 - 100 bedded CHC at Yerragondapalem (Navaratnalu) 5) Upgradation of 30 - 50 bedded CHC at Dornala (Navaratnalu) 6) Upgradation of 30 - 50 bedded CHC at Darsi (Navaratnalu) 7) Strengthening of 30 bedded CHC at Kondepi (NABRD XXIV) 8) Strengthening of 30 bedded CHC at Podili 9) Strengthening of 50 bedded MCH at Ongole (Navaratnalu) in Prakasam District. D) – 1) Strengthening of 100 bedded A.H at (NABRD XXV) 2) Strengthening of 50 bedded CHC at Alluru (NABRD XXV) 3) Strengthening of 100 bedded A.H at (Navaratnalu) 4) Strengthening of 30 bedded CHC at Kota (Navaratnalu) 5) Strengthening of 30 bedded CHC at Vakadu (Navaratnalu) 6) Strengthening of 30 bedded CHC at (Navaratnalu) 7) Strengthening of 30 bedded CHC at Indukurupeta (Navaratnalu) 8) Strengthening of 30 bedded CHC at Sullurupet (Navaratnalu) 9) Strengthening of 30 bedded CHC at (Navaratnalu) 10) Strengthening of 30 bedded CHC at (Navaratnalu) 11) Upgradation of 30 - 50 bedded CHC at (NABRD XXIV) in Nellore District. Upgradation / Strengthening of AHs / CHCs at various places in Chittoor, YSR , Anantapuramu & Kurnool districts under Regional Package-III. 1. Chittoor District : 1.Strengthening of 100 bedded AH at Srikalahasti (NABARD XXV) 2. Strengthening of 100 bedded AH at Palamaner (NABARD XXV) 3.Strengthening of 100 bedded Area Hospital at Nagari (Navaratnalu) 4. Upgradation of 50 - 100 bedded CHC at Piler (NABARD XXV) 5. Up-gradation of 30 - 50 bedded CHC at Vayalapdu (NABARD XXV) 6. Strengthening of 30 bedded CHC at Kalikiri (Navaratnalu) 7. Up-gradation of 30 - 50 bedded CHC at Chandragiri (NABARD XXV) 8. Construction of 30 bedded CHC at Chinnagottigallu (NABARD XXV) 9. Construction of 30 bedded CHC at Sodum (NABARD XXV) 10. Strengthening of 50 bedded CHC at Punganur (Navaratnalu) 11. Strengthening of 30 bedded CHC at Bangarupalyam (Navaratnalu) 12. Strengthening of 30 bedded CHC at 3 Thamballapalle (Navaratnalu) in Chittoor District 36683.23 13.08.2020 2.YSR Kadapa District : 1)Strengthening of 100 bedded ,AH at Pulivendula(NABRD XXV) 2)Upgradation of 30 - 50 bedded CHC at Vempalli (NABRD XXV 3)Upgradation of 50 - 100 bedded CHC at Rayachoti (NABRD XXV) 4)Strengthening of 30 bedded CHC at L.R.Palli (Navaratnalu) 5)Upgradation of 50 - 100 bedded CHC at Rajampet (NABRD XXV) 6)Strengthening of 30 bedded CHC at Sidhout (Navaratnalu) 7)Upgradation of 50 - 100 bedded CHC at Jammalamadugu (NABRD XXV) 8)Upgradation of 30 - 50 bedded CHC at Badvel (NABRD XXIV) 9) Upgradation of 30 - 50 bedded CHC at Porumamilla (NABRD XXIV) 10)Strengthening of 30 bedded CHC at Chennur (Navaratnalu) 11) Strengthening of 30 bedded CHC at Kamalapuram (Navaratnalu) 12) Strengthening of 30 bedded CHC at Mydukur (Navaratnalu) 13) Strengthening of 30 bedded CHC at Railway Kodur (Navaratnalu) in YSR Kadapa District Approx. Last Date Sl. ECV receipt Name of the work No. (Rs. in upto Lakhs) 5.00 PM 3. Ananthapuramu District: 1)Strengthening of 100 bedded ,AH at Kadiri(NABRD XXV) 2) Strengthening of 30 bedded CHC at Tanakal (Navaratnalu) 3)Strengthening of 100 bedded AH at Guntakal (NABRD XXV) 4)Construction of 30 bedded CHC at Pamidi (NABRD XXV) 5)Strengthening of 50 bedded CHC at Gooty (Navaratnalu) 6)Upgradation of 50 – 100 bedded CHC at Tadipatri (NABRD XXV) 7)Upgradation of 30-100 bedded CHC at Rayadurg (NABRD XIV) 8)Upgradation of 50 - 100 bedded CHC at Dharmavaram (NABRD XXIV & 9) Upgradation of 30 - 100 bedded CHC at Madakasira (NABRD XXV) 10) Upgradation of 30 - 50 bedded CHC at Kalyanduragam (NABRD XIV) 11) Strengthening of 50 bedded CHC at Penugonda (Navaratnalu) 12) Upgradation of PHC to CHC at Kothacheruvu (NABRD XIV) 13) Strengthening of 30 bedded CHC at Nallamada (Navaratnalu) 14) Strengthening of 60 bedded CDH at Anantapuram (Navaratnalu) 15) Upgradation of 30 bedded CHC at Uravakonda (NABRD XXV) 16)Strengthening of 30 bedded CHC at Konakondla (Navaratnalu) 17) Strengthening of 30 bedded CHC at Singanamala (Navaratnalu) in Ananthapuramu District 4. Kurnool District: 1) Strengthening of 100 bedded A.H at Adoni (NABARD XXV) 2) Upgradation of 50 - 100 bedded CHC at Banaganapalli (NABARD XXV) 3) Strengthening of 30 bedded CHC at Koilakuntla (Navaratnalu) 4) Strengthening of 30 bedded CHC at OWK (Navaratnalu) 5) Upgradation of 30 - 50 bedded CHC at Dhone (NABARD XXIV 6) Construction of 100 bedded A.H at Dhone (NABARD XXV) 7) Upgradation of 50 - 100 bedded CHC at Yemmiganur (NABARD XXIV) 8) Upgradation of 30 - 50 bedded CHC at Allagadda (NABRD XXIV) 9) Strengthening of 30 bedded CHC at Aluru (Navaratnalu) 10) Strengthening of 30 bedded CHC at Kodumur (Navaratnalu) 11) Strengthening of 30 bedded CHC at Nandikotkur (Navaratnalu)12) Strengthening of 30 bedded CHC at Yallur (Navaratnalu) 13) Strengthening of 30 bedded CHC at Orvakal (Navaratnalu) 14) Strengthening of 30 bedded CHC at Veldurthi (Navaratnalu) 15) Strengthening of 30 bedded CHC at Atmakur (Navaratnalu)16) Strengthening of 30 bedded CHC at Velugodu (Navaratnalu) in Kurnool District Construction of building for "National Programme for Prevention & Management of Burn 4 178.35 07.08.2020 Injuries" in SV Medical College, Tirupati in Chittoor District (5th Call)

5 Construction of Govt. ITI buildings, Vijayapuram, Chittoor District. (4th Call) 373.80 07.08.2020

Note: 1) The contractors/ firms desired to participate in the tenders should invariably get registered at free of cost on e-procurement platform in Website www.apeprocurement.gov.in 2) The submission of both Technical bid with all enclosures and Price bid will be on the electronic procurement platform of Andhra Pradesh i.e. https://tender.apeprocurement.gov.in 3) Price Adjustment is applicable only as per G.O.Ms.No.94 of T, R&B (R.I) Department Dated.16.04.2008 only for Steel & Cement and no other Price adjustment G.Os are applicable.4 ) APMSIDC may cancel the tenders at any time without assigning any reasons.

Sd/- MANAGING DIRECTOR ANDHRA PRADESH MEDICAL SERVICES & INFRASTRUCTURE DEVELOPMENT CORPORATION Plot No.9, Survey No.49, IT Park, Mangalagiri - 522 503, Guntur District. Amaravathi Region, Andhra Pradesh, email: [email protected] Tender Notice No.1/APMSIDC/TECHNICAL/2020-21, Dated.27.07.2020. Tenders are invited for Civil Works 1) Upgradation / Strengthening of AHs / CHCs at various places in Andhra Pradesh under Regional Package-1 (Srikakulam, Vizianagaram, Visakhapatnam, East Govadavari, West Godavari Districts, No. of Works - 65, ECV Amount-Rs.33119.02 Lakhs), Regional Package-2 (Krishan, Guntur, Prakasam, Nellore Districts, No. of Works - 45, ECV Amount-Rs.21105.82 Lakhs), Regional Package-3 (Chittoor, Kadapa, Anantapuramu, Kurnool Districts, No. of Works - 58, ECV Published in Amount-Rs.36683.23 Lakhs) through Reverse Tender cum e-Auction and 2) Sakshi (Telugu) on Construction of building for "National Programme for Prevention & Management of Burn Injuries" in SV Medical College, Tirupati in Chittoor 29.07.2019 District(5th Call), ECV Amount: Rs.178.35 Lakhs (3) Construction of Govt. ITI buildings, Vijayapuram, Chittoor District (4th Call) ECV Amount: Rs.373.80 Lakhs through e-procurement platform The other details can be seen at the website http://msidc.ap.nic.in. Sd/- MANAGING DIRECTOR