Ireka Corporation

Total Page:16

File Type:pdf, Size:1020Kb

Ireka Corporation Ireka Corporation Recommendation: HOLD Stock Code: 8834 Bloomberg: IREKA MK Price: MYR0.84 12-Month Target Price: MYR0.88 Date: April 9, 2010 Board: Main Pr ice 30 Day Movi ng Aver age Price (MYR) 2.00 Sector: Construction 1.80 1.60 GICS: Industrials/Construction & Engineering 1.40 Market Value - Total: MYR96.3 mln 1.20 1.00 0.80 0.60 Summary: Ireka is a construction, engineering and property 0.40 development and investment company with assets primarily in Malaysia and Vietnam. Volume Vol ('000) 3,000 Analyst: Kum Seng, Wan 2,000 1,000 0 Apr 07 Jun 07 Aug 07 Oct 07 Jan 08 Mar 08 May 08 Jul 08 Sep 08 Dec 08 Feb 09 Apr 09 Jun 09 Sep 09 Nov 09 Jan 10 Mar 10 Recent Developments Recommendation & Investment Risks Ireka has secured a MYR36.2 mln contract from the Iskandar Regional We cut Ireka’s recommendation to Hold (from Buy), but leave our 12- Development Authority for the construction of an interchange for the month target price of MYR0.88 unchanged. proposed Bandar Indahpura, Kulai-Second Link Expressway. The project, which is allocated under the Ninth Malaysia Plan, will Our 12-month target price remains derived from a blended relative commence this month and completed in October 2011. approach. We ascribe P/B of 0.8x, P/Sales of 0.3x, and relative target PER multiple of 9x (all unchanged) to its respective FY11 (unchanged) Although the value of the contract is relatively small, is it welcomed as metrics and by discounting expected dividend payments using the it is Ireka’s first external project in more than a year that boosts its dividend discount model (unchanged WACC of 10.5% and terminal unbilled orderbook MYR570 mln (from MYR534 mln). We expect the growth of rate of 3%). We also include an unchanged net DPS project to command an EBIT margin of 6%-8% and with the bulk of the estimate of 4.0 sen to arrive at our target price. project to be recognized in FY11 (Mar), we lift our FY11 net profit estimate to MYR17.9 mln (from MYR17.1 mln). Our FY10 net profit We downgrade our call to Hold after its share price gained nearly 20% estimates remain unchanged. in the past two months. Although Ireka’s FY11 PER of 5.4x remains undemanding (vs. 8x-11x PER range of small-and medium sized Earnings Outlook contractors under our coverage), we think that further share price upside will be capped until Ireka secures more contracts to underpin its longer term earnings as most of its present projects will be completed Ireka’s MYR570 mln unbilled construction orderbook will underpin its in FY11. earnings over the next 12-18 months. In tandem with the recovering property market, its orderbook replenishment outlook is also Risks to our recommendation and target price include: (i) delays in the improving, where it is bidding for about MYR2.5 bln worth of new launch of the KLCC project that will hurt its outlook, (ii) unexpected projects. Ireka also plans to launch a MYR272 mln high-end serviced rises in building materials cost affecting its margins, and (iii) delays in apartment in the KLCC precinct in FY11 that will sustain its longer- Aseana’s property projects that would curtail its project management term earnings growth. Property management fees from Aseana earnings. Properties Ltd (ASPL LN, USD0.4425, Not Ranked), however, will only recover in FY11 when Aseana’s Vietnamese projects commence. Key Stock Statistics Per Share Data FY Mar. 2009 2010E FY Mar. 2007 2008 2009 2010E Reported EPS (sen) 5.3 9.0 Book Value (MYR) 0.81 2.08 2.05 2.11 PER (x) 16.0 9.4 Cash Flow (sen) -25.2 136.3 8.0 11.8 Dividend/Share (sen) 5.0 5.0 Reported Earnings (sen) -29.6 134.2 5.3 9.0 NTA/Share (MYR) 2.05 2.10 Dividend (sen) 8.8 10.0 5.0 5.0 Book Value/Share (MYR) 2.05 2.11 Payout Ratio (%) NM 5.4 69.9 40.9 No. of Outstanding Shares (mln) 113.9 PER (x) NM 0.6 16.0 9.4 52-week Share Price Range (MYR) 0.60 - 0.88 P/Cash Flow (x) NM 0.6 10.6 7.2 Major Shareholders: % P/Book Value (x) 1.0 0.4 0.4 0.4 Ideal Land Holdings Sdn Bhd 43.0 Dividend Yield (%) 10.4 11.8 5.9 5.9 Magnipact Resources Sdn Bhd 13.5 ROE (%) -26.5 93.1 2.6 4.3 *Stock deemed Shariah compliant by the Securities Commission Net Gearing (%) 95.1 18.6 36.0 43.5 All required disclosures and analyst certification appear on the last two pages of this report. Additional information is available upon request. Redistribution or reproduction is prohibited without written permission. Copyright © 2010 The McGraw-Hill Companies, Inc. Page 1 of 4 Ireka Corporation Recommendation: HOLD Stock Code: 8834 Bloomberg: IREKA MK Price: MYR0.84 12-Month Target Price: MYR0.88 Date: April 9, 2010 Profit & Loss FY Mar. / MYR mln 2008 2009 2010E 2011E Reported Revenue 299.7 323.7 363.9 518.1 Reported Operating Profit 164.2 12.4 17.8 30.2 Depreciation & Amortization -2.4 -3.1 -3.1 -3.2 Net Interest Income / (Expense) -5.8 -5.5 -6.9 -9.3 Reported Pre-tax Profit 158.4 7.0 11.0 21.1 Effective Tax Rate (%) 4.2 13.5 6.8 15.0 Reported Net Profit 152.9 6.0 10.3 17.9 Reported Operating Margin (%) 54.8 3.8 4.9 5.8 Reported Pre-tax Margin (%) 52.8 2.2 3.0 4.1 Reported Net Margin (%) 51.0 1.9 2.8 3.5 Source: Company data, S&P Equity Research All required disclosures and analyst certification appear on the last two pages of this report. Additional information is available upon request. Redistribution or reproduction is prohibited without written permission. Copyright © 2010 The McGraw-Hill Companies, Inc. Page 2 of 4 Required Disclosures Standard & Poor’s Equity Research Services Standard & Poor's and its affiliates provide a wide range of services to, or relating Standard & Poor’s Equity Research Services U.S. includes Standard & Poor’s to, many organizations, including issuers of securities, investment advisers, broker- Investment Advisory Services LLC; Standard & Poor’s Equity Research Services dealers, investment banks, other financial institutions and financial intermediaries, Europe includes Standard & Poor’s LLC- London; Standard & Poor’s Equity and accordingly may receive fees or other economic benefits from those Research Services Asia includes Standard & Poor’s LLC’s offices in Hong Kong organizations, including organizations whose securities or services they may and Singapore, Standard & Poor’s Malaysia Sdn Bhd, and Standard & Poor’s recommend, rate, include in model portfolios, evaluate or otherwise address. Information Services (Australia) Pty Ltd. CMDF-Bursa Research Scheme (“CBRS”) Glossary This report has been prepared by S&PM for purposes of CBRS administered by Bursa Malaysia Berhad, independent from any influence from CBRS or the subject Strong Buy: Total return is expected to outperform the total return of the KLCI or company. S&P will receive total compensation of RM15,000 each year for each KL Emas Index respectively, by a wide margin over the coming 12 months, with company covered by it under CBRS. For more information about CBRS, please shares rising in price on an absolute basis. visit Bursa Malaysia’s website at: http://www.bursamalaysia.com/website/bm/ Buy: Total return is expected to outperform the total return of the KLCI or KL Emas Index respectively, over the coming 12 months, with shares rising in price on an Disclaimers absolute basis. Hold: Total return is expected to closely approximate the total return of the KLCI or This material is based upon information that we consider to be reliable, but neither KL Emas Index respectively, over the coming 12 months with shares generally S&P nor its affiliates warrant its completeness, accuracy or adequacy and it should rising in price on an absolute basis. not be relied upon as such. With respect to reports issued to clients in Japan and in Sell: Total return is expected to underperform the total return of the KLCI or KL the case of inconsistencies between the English and Japanese version of a report, Emas Index respectively, over the coming 12 months and share price is not the English version prevails. With respect to reports issued to clients in Germany anticipated to show a gain. and in the case of inconsistencies between the English and German version of a Strong Sell: Total return is expected to underperform the total return of the KLCI or report, the English version prevails. Neither S&P nor its affiliates guarantee the KL Emas Index respectively, over the coming 12 months by a wide margin, with accuracy of the translation. Assumptions, opinions and estimates constitute our shares falling in price on an absolute basis. judgment as of the date of this material and are subject to change without notice. Neither S&P nor its affiliates are responsible for any errors or omissions or for results obtained from the use of this information. Past performance is not S&P 12 Month Target Price – The S&P equity analyst’s projection of the market necessarily indicative of future results. price a given security will command 12 months hence, based on a combination of intrinsic, relative, and private market valuation metrics. This material is not intended as an offer or solicitation for the purchase or sale of any security or other financial instrument.
Recommended publications
  • Download Brochure
    A STRATEGIC & ESTABLISHED BUSINESS ADDRESS Eco Business Park I is one of the most sought-after business addresses in Iskandar Johor. Its strategic location in Tebrau, situates it just a few minutes away from Johor Bahru city centre and Singapore, as well as in proximity to major land and sea routes, making it logistically ideal for a range of industries and businesses. EXPRESSWAYS RAILWAYS SEAPORTS INDUSTRIAL ESTATES • North-South Expressway • Future KL-Singapore high-speed rail • Port of Tanjung Pelepas, 40 km • Pasir Gudang Industrial Estate, 30 km • Eastern Dispersal Link (EDL) • JB-Singapore rapid transit system • Johor Port, 40 km • Sembawang Industrial Estate, 30 km • Pasir Gudang Highway • Sungei Kadut Industrial Estate, 27 km • Johor-Singapore Causeway Link AIRPORTS AMENITIES • Woodlands Industrial Estate, 27 km • Johor-Singapore Second Link Expressway • Changi Industrial Estate, 52 km • Senai-Desaru Expressway • Senai International Airport, 17 km • Aeon Mall Bandar Dato’ Onn, 4 km • Changi International Airport, 53 km • Fairview International School, 4 km • Kuala Lumpur International Airport, 295 km • MCHM Malaysian College of Hospitality & Management, 4 km • Bandar Dato’ Onn Specialist Hospital, 6 km MASTER PLAN LEGEND CLUSTER RETAIL WAREHOUSE CLUSTER RETAIL WAREHOUSE 60’ x 120’ 60’ x 150’ Type A1 Type B1 Type A2 Type B2 SETTING A GREEN PRECEDENT Eco Business Park I is Malaysia’s first eco industrial park, offering world-class industrial facilities with intelligent, environmentally-friendly and resource-saving features. The extensive open areas and lush landscaping sets Eco Business Park I apart from other industrial parks. This green and sustainable environment offers the perfect platform for businesses and industries to flourish in the long term.
    [Show full text]
  • Sungai Pulai Bridge 565 60% 147 CHEC 56.3
    MMC CORPORATION BERHAD 1Q FY2021 ANALYST BRIEFING PRESENTATION 27th MAY 2021 TABLE OF CONTENTS Group Financial Performance Overview Ports & Logistics Energy & Utilities Engineering Corporate & Others Group Outlook Industrial Development’s Business Updates MMC CORPORATION BERHAD P A G E 2 GROUP FINANCIAL PERFORMANCE OVERVIEW QUARTERLY GROUP FINANCIAL PERFORMANCE Revenue PBT PATMI (RM million) (RM million) (RM million) 5% YoY 93% YoY 115% YoY 221.0 114.8 124.7 1,086.8 1,143.7 57.9 Q1FY2020 Q1FY2021 Revenue • 5% YoY increase was due to:- ➢ Higher volume handled at Pelabuhan Tanjung Pelepas Sdn Bhd (“PTP”) and Northport Malaysia Berhad (“NMB”) and contribution from Graphite project and Langat Sewerage project by Engineering division. ➢ Offset by lower work progress from KVMRT-SSP Line, lower passenger and cargo volumes at Senai Airport, and lower volume handled at Penang Port Sdn Bhd (“PPSB”). PBT • 93% YoY increase was due to:- ➢ Higher volume handled at PTP and NMB, and strict cost management at all our ports ➢ Higher contribution from Langat Sewerage project ➢ Gain on sublease of land at PTP. ➢ Lower finance cost. ➢ However, offset by lower contribution from KVMRT-SSP Line, Senai Airport and PPSB. MMC CORPORATION BERHAD P A G E 4 Q1FY2021 KEY FINANCIAL HIGHLIGHTS Ports & Logistics Engineering Energy & Utilities Others REVENUE REVENUE REVENUE REVENUE 5% YoY 12.86% 13.33% <1% 69.03% Revenue PBT PBT PBT LBT RM1,143.7 mil 93.38% 18.26% 19.74% 9.99% • Higher volume • Lower work progress • Lower revenue from • Lower passengers handled at from KVMRT-SSP Aliran Ihsan Resources and cargo volume 93% YoY Pelabuhan Tanjung Line due to Berhad (“AIRB”) due handled at Senai Pelepas (“PTP”) and completion of lesser water project, Airport due to the Profit Before Tax Northport (Malaysia) tunnelling works and however, cushioned by COVID-19 (“PBT”) Berhad (“NMB”).
    [Show full text]
  • Freehold Freehold
    FREEHOLD FREEHOLD WE DON’T JUST BUILD LANDMARKS, WE CREATE COMMUNITIES. ICONIC . INNOVATED . INSPIRED Envisioned by “Master Landmark Maker”, R&F Ltd. of Guangzhou China, the iconic R&F Princess Cove is an ingenious 20-year integrated master development, built on the 3 Principles of Iconic, Integrated & Inspired. Signature LANDMARK OF MALAYSIA-SINGAPORE CAUSEWAY 新马门户耀眼地标 A fundamental moment for both Malaysia and Singapore, R&F Properties have finally made their way to our shores, making their debut in the southern region. Dubbed as the most comprehensive property developer in China, this renowned global real estate specialist is to create a completely integrated community through HOPSCA – hotels, offices, parks, shopping malls, clubhouses and apartments. Being the first new project by R&F Properties to be constructed in Malaysia, this development acts as a link, and more importantly a vision of a momentous landmark coming to life, holding much promise, excitement and investment opportunity on a scale unlike any other. SCAN FOR MALAYSIA HOTLINE SINGAPORE HOTLINE KUALA LUMPUR HOTLINE 1800 18 7777 1800 755 7777 +603 2742 7277 R&F DEVELOPMENT SDN. BHD. Experience Our World-Class Sales Gallery - Monday to Sunday from 9am to 9pm LOCATION MAP (CO.NO. 1069248-H) This sales kit is ONLY FOR INTERNAL CIRCULATION and prohibited for any printing or production without prior approval from R & F Properties Sdn. Bhd • Disclaimer: The ad images and content are for reference only, not as a sales contract commitments and accessories, the rights and obligations of buyers and sellers to government approvals and the final contract documents shall prevail.
    [Show full text]
  • Johor Premium Outlets Fact Sheet
    JOHOR PREMIUM OUTLETS FACT SHEET Who We Are Johor Premium Outlets is a collection of 80 designer and name brand outlet stores featuring savings of 25% to 65% every day. The center is held by "Genting Simon Sdn Bhd" (GSSB), a wholly owned subsidiary of Simon Genting Ltd ("SGL"). SGL in turn is a 50:50 joint venture between Azzon Ltd ("Azzon"), which is a wholly owned subsidiary of Genting Plantations Bhd, and Premium Outlets®, the outlet division of Simon Property Group. Location and accessibility Johor Premium Outlets, located at the intersection of the North-South Expressway and the Second Link Expressway, is scheduled to open December 2011. The center is highly accessible to all traffic going to and from Johor and Singapore. It is about an hour drive from the City of Singapore, about 3 hours from Kuala Lumpur and only a short distance from Senai International Airport. Target customers and expected traffic Johor Premium Outlets is targeting a wide range of shoppers including area residents as well as international visitors from South East Asia. It will also serve as a hub between Resorts World Genting, which is about 3.5 hours drive and Resorts World at Sentosa in Singapore, which is about an hour’s drive from Johor Premium Outlets. Land size and gross built-up Johor Premium Outlets takes up 45 acres of land. Upon completion, the gross built-up of Johor Premium Outlets will be approximately 330,000 sq. ft., comprising gross leasable area or GLA (same as net lettable area) of 175,000 sq. ft.
    [Show full text]
  • Proxy for Iskandar's Industrial Boom
    REIT MALAYSIA March 18, 2013 Axis REIT COMPANY NOTE AXRB MK / AXSR.KL Current RM3.34 SHORT TERM (3 MTH) LONG TERM Market Cap Avg Daily Turnover Free Float Target RM3.68 Previous Target N/A US$488.2m US$0.38m 83.8% RM1,525m RM1.16m 989.7 m shares Up/downside 10.3% Conviction| | Notes from the Field Proxy for Iskandar's industrial boom Axis REIT is the first listed Islamic industrial/office REIT globally. We like the stock as it offers exposure to the industrial property boom in Iskandar Malaysia. Management's proactive style means that growth will be driven by acquisitions, apart from organic enhancement plans. Foong Wai Mun, CFA We initiate coverage with an serves as an attractive low-cost T (60) 3 20849277 E [email protected] Outperform and a target price based alternative for firms seeking to on its DDM value. Rerating catalysts relocate out of Singapore. Axis AME are 1) further yield-accretive asset IP plans to expand the development Company Visit Expert Opinion acquisitions, and 2) upside surprises of its “clean and green” industrial to rental rates post asset parks under the brand names i-Park Channel Check Customer Views enhancement initiatives. and SME City nationwide. We are positive as such plans will give more “Singapore faces land Malaysia's largest industrial visibility to potential future asset constraints and there is a REIT injections for Axis REIT. big industrial component Axis REIT is Malaysia's largest Proven acquisition track there. It's getting industrial REIT with a total portfolio record expensive to do business size of RM1.5bn (31 assets).
    [Show full text]
  • For Rent - 3 Sty Cluster Factory @ Jln Cemerlang Lancar X, Tmn Cemerlang Lancar, Saleng Senai
    iProperty.com Malaysia Sdn Bhd Level 35, The Gardens South Tower, Mid Valley City, Lingkaran Syed Putra, 59200 Kuala Lumpur Tel: +603 6419 5166 | Fax: +603 6419 5167 For Rent - 3 Sty Cluster Factory @ Jln Cemerlang Lancar x, Tmn Cemerlang Lancar, Saleng Senai Reference No: 102160978 Tenure: Freehold Address: Jalan Cemerlang Lancar 1, Occupancy: Vacant Taman Cemerlang Lancar, Furnishing: Unfurnished Saleng, 81400 Senai, Johor , Jln Cemerlang Lancar x, Tmn Unit Type: Corner lot Cemerlang Lancar, 81400, Land Title: Industrial Johor Facing Direction: South east State: Johor Posted Date: 26/05/2021 Property Type: Cluster Factory Facilities: Parking, 24-hours security Rental Price: RM 6,000 Built-up Size: 5,922 Square Feet Name: Linda So Built-up Price: RM 1.01 per Square Feet Company: The Roof Realty - Johor Land Area Size: 10,771 Square Feet Email: [email protected] Land Area Price: RM .56 per Square Feet *Factory For rent* *3 Sty Cluster Factory @ Jln Cemerlang Lancar x, Tmn Cemerlang Lancar, Saleng Senai* - Land area 10,771 sqft - Built up area 5,922 sqft - Unfurnished - Original condition - Corner lot - Facing - G & G - Rent RM 5000 to RM6000 EXCELLENT CONNECTIVITY - Located in Flagship E - A 2 minutes walking distance to medium-low cost residential area - 0.7 km2minsto Senai Highway - 5 km8minsto Senai-Desaru Highway - 8 km10minsto Nort-South Highway and Senai International Airport - 29 km30minsto CIQ - 40 km30minsto Second Link Expressway, Port of Tanjung Pel.... [More] View More Details On iProperty.com iProperty.com Malaysia Sdn Bhd Level 35, The Gardens South Tower, Mid Valley City, Lingkaran Syed Putra, 59200 Kuala Lumpur Tel: +603 6419 5166 | Fax: +603 6419 5167 For Rent - 3 Sty Cluster Factory @ Jln Cemerlang Lancar x, Tmn Cemerlang Lancar, Saleng Senai.
    [Show full text]
  • ISKANDAR MALAYSIA Sustainability and Innovation 10 Years and Beyond
    MALAYSIAISKANDAR 2015 MALAYSIA GLOBAL ISLAMIC FINANCESUSTAINABILITY AND INNOVATION: 10 YEARS AND BEYOND CONTENTS ISKANDAR MALAYSIA SUSTAINABILITY AND INNOVATION 10 YEARS AND BEYOND 4 ISKANDAR Malaysia 36 BUSINESS INTELLIGENCE: IN NUMBERS INVESTING IN DEVELOPMENT AND GROWTH Rhizophora Ventures is committed to modernising the creative and media sector in Iskandar Malaysia, and the wider region, via an extensive and long-term investment programme. 39 CASE STUDY: IKEA SOUTHEAST ASIA 40 FOCUS: Strategic DIRECTIONS: CDPii 6 The CDPii spells out in detail the holistic and multifaceted strategies devised for the next decade of 6 OVERVIEW: A CATALYST FOR Iskandar Malaysia’s exciting journey. STRONG AND SUSTAINABLE GROWTH Iskandar Malaysia has grown steadily and impressively since its launch. All the ingredients are in place to continue and expand this success as it maximises its strengths and reaps the benefits of meticulous planning. 36 44 PERSPECTIVE: MOHAMED KHALED NORDIN, CHIEF MINISTER OF JOHOR The momentum of growth in the state of Johor is aiding development in Iskandar Malaysia, backed by the state’s rising 11 investment in manufacturing and increasing investor confidence. 11 ROUNDTABLE: INCLUSIVE PROSPERITY AND A 46 BUSINESS INTELLIGENCE: sustainable FUTURE DRIVING Sustainable The ten-year anniversary of Iskandar PROPERTY DEVELOPMENT Malaysia provided a perfect Sunway Iskandar is pursuing opportunity for industry leaders to responsible property development and come together and exchange opinions constructing world-class infrastructure on the key issues that will shape the in Iskandar Malaysia via an innovative economic region to 2025 and beyond. sustainability framework. 61 FOCUS: INFRASTRUCTURE 74 BUSINESS INTELLIGENCE: AND CONNECTIVITY Galvanising multi-sector Publisher and Editor-in-Chief Cory D’Abreo The success of a modern world city GROWTH IN ISKANDAR is increasingly dependent on its level Property, healthcare and industry Managing Editor of connectivity and infrastructure.
    [Show full text]
  • Flash Notes Iskandar Malaysia: Treading the Extensive Journey
    UOB Economic-Treasury Research Company Reg No. 193500026Z Jimmy Koh [email protected] Lena Tan [email protected] Tuesday, 17 June 2014 Flash Notes Iskandar Malaysia: Treading The Extensive Journey Investments have been steadily streaming into Iskandar with total cumulative investments reaching MYR131.6bn by end-2013, a strong increase of 24% from the previous year. The JB-Singapore RTS link will serve the needs of increasing demand from individuals traveling between the two countries for work, especially with the continued growth of Iskandar Malaysia. Indeed, this will help to ease up the traffic along the causeway and potentially reduce traveling time. New supply is huge, representing more than 20% of existing residential stocks in Iskandar. We believe these residential units will be completed before the occupancy rate in Iskandar reaches its potential. We expect more Singaporeans, especially the lower-to-middle income group, seeking medical help in Malaysia as medical costs in Singapore continue trending higher. We believe the region will continue to grow as more catalytic projects are being unveiled gradually. Time is of the essence for Iskandar to bear fruits while the successful collaboration between the two countries is also critical. Background It has been more than seven years since Iskandar Malaysia (IM) was incepted in November 2006. A myriad of developments have since sprung across the 2,217 sq km land. A Comprehensive Development Plan (CDP) was developed to steer the overall development framework with special
    [Show full text]
  • The Proposed Forest City Island Reclamation and Detailed
    The Proposed Forest City Island Reclamation and Mixed Development, Johor Detailed Environmental Impact Assessment Volume 1: Executive Summary Country Garden Pacificview Sdn. Bhd. October 2014 DR. NIK & ASSOCIATES SDN. BHD. No. 22 & 24, Jalan Wangsa Delima 6, Seksyen 5, Pusat Bandar Wangsa Maju (KLSC), 53300 Kuala Lumpur. T 603 4145 8888 F 603 4145 8877 THE PROPOSED FOREST CITY ISLAND RECLAMATION & MIXED DEVELOPMENT, JOHOR DETAILED ENVIRONMENTAL IMPACT ASSESSMENT Volume 1: Executive Summary October 2014 COUNTRY GARDEN PACIFICVIEW SDN. BHD. Galeri Jualan, Tingkat 2, Lot PTB 22056, Teluk Danga, Jalan Skudai, 80200 Johor Bahru T 607 504 2222 F 607 504 2288 Prepared by: DR. NIK & ASSOCIATES SDN. BHD. No. 22 & 24, Jalan Wangsa Delima 6, Seksyen 5, Pusat Bandar Wangsa Maju (KLSC), 53300 Kuala Lumpur T 603 4145 888 F 603 4145 8877 Executive Summary 1 Contents 1 Introduction ES-1 2 Project Background & Chronology ES-1 3 Project Initiator ES-5 4 Statement of Need ES-5 4.1 Concept of “Forest City” ES-5 4.2 Strengthen Malaysia Singapore Bilateral Relations ES-6 4.3 Southern Johor’s Surging Economy Creates a Booming Business Opportunity ES-6 4.4 Johor Bahru as an International City ES-6 4.5 Realisation of the State of Johor as being a Global Economic Hub ES-6 4.6 Generating Local Economic Growth ES-6 4.7 Modernisation of Infrastructure Development and Urban Development ES-7 5 Project Description ES-7 5.1 Project Location ES-7 5.2 General Site Descriptions ES-9 5.2.1 Project Site ES-9 5.2.2 Sungai Pulai ES-9 5.2.3 Western Shoreline ES-10 5.2.4 Eastern Shoreline ES-10 5.3 Project Concept and Components ES-10 5.4 Project Phases ES-10 5.5 Project Activities ES-12 5.5.1 Reclamation ES-12 5.5.1.1 Silt Curtain Installation ES-12 5.5.1.2 Placement of Fill Material ES-12 5.5.1.3 Construction of Parameter Bund ES-12 5.5.1.4 Treatment of Fill Material ES-12 DR.
    [Show full text]
  • ANNUAL REPORT 2015 & © 2016 Genting International Management Limited
    GENTING BERHAD (7916-A) 2015 annual report ANNUAL REPORT 2015 Genting Berhad (7916-A) 24th Floor, Wisma Genting Jalan Sultan Ismail 50250 Kuala Lumpur, Malaysia T : +603 2178 2288 / 2333 2288 F : +603 2161 5304 www.genting.com Genting, the Genting logo and all Genting elements and related indicia TM & © 2016 Genting International Management Limited. All rights reserved. Puss In Boots © 2016 DreamWorks Animation L.L.C Battlestar Galactica TM Universal Studios & © 2016 Universal Cable Productions LLC. All rights reserved. UNIVERSAL STUDIOS, UNIVERSAL STUDIOS SINGAPORE, Universal Globe logo, and all Universal elements and related indicia TM & © Universal Studios. All Rights Reserved. Resorts World, the Resorts World logo and all Resorts World elements and related indicia TM & © Genting International Management Limited. All rights reserved. GENTING BERHAD (7916-A) GENTING BERHAD (7916-A) 2015 annual report ANNUAL REPORT 2015 Genting Berhad (7916-A) 24th Floor, Wisma Genting Jalan Sultan Ismail 50250 Kuala Lumpur, Malaysia T : +603 2178 2288 / 2333 2288 F : +603 2161 5304 www.genting.com Genting, the Genting logo and all Genting elements and related indicia TM & © 2016 Genting International Management Limited. All rights reserved. Puss In Boots © 2016 DreamWorks Animation L.L.C Battlestar Galactica TM Universal Studios & © 2016 Universal Cable Productions LLC. All rights reserved. UNIVERSAL STUDIOS, UNIVERSAL STUDIOS SINGAPORE, Universal Globe logo, and all Universal elements and related indicia TM & © Universal Studios. All Rights Reserved. Resorts World, the Resorts World logo and all Resorts World elements and related indicia TM & © Genting International Management Limited. All rights reserved. GENTING BERHAD (7916-A) 61 GENTING BERHAD ANNUAL REPORT 2015 CELEBRATING 50 YEARS OF EXCELLENCE and Forging Ahead 2014 • Resorts World Genting launched Horizon 50, showcasing Genting’s history 2001 2006 2012 and its latest developments 2010 • Completion of First • First World Hotel was • Opening of S.E.A.
    [Show full text]
  • Tiong Nam Properties Group of Companies Is Proud to Add the Tiong Nam Business Park @ Silc, Nusajaya, Johor Bahru to Its Fold
    TIONG NAM BUSINESS PARK SiLC, NUSAJAYA • JB PREMIUM SHOP OFFICES We are COMMITTED TO GREATER SUCCESS As a name synonymous with iconic commercial and industrial properties, Tiong Nam Properties Group of Companies is proud to add the Tiong Nam Business Park @ SiLC, Nusajaya, Johor Bahru to its fold. Premium Quality The premium shop ofce development spanning across 19.39 acres of FREEHOLD land will feature 59 premium three and four-storey shop ofces. Contemporary Design Build-up size: 24ft x 80ft - 35ft x 116ft Prime Location Situated in a highly populated locale, each development would be well suited for retail, dining, entertainment, accommodation, servicing and ofce working purposes. N agreement. No discrepancy or misdescription whatsoever shall annul or invalidate the contract between the developer, the land owner and the purchaser. the and owner land the developer, the between contract the invalidate or annul shall whatsoever misdescription or discrepancy No agreement. adjustment. The developer reserves the right to modify any parts of the building prior to completion. Interested parties should rely on the sale and purchase purchase and sale the on rely should parties Interested completion. to prior building the of parts any modify to right the reserves developer The adjustment. cannot form any part of an offer or contract and are intended as a guide only. All measurements are approximate only and subject to nal survey and and survey nal to subject and only approximate are measurements All only. guide a as intended are and contract or
    [Show full text]
  • Aspira Square Brochure 29042020
    New Gerbang Nusajaya Interchange MALAYSIA-SINGAPORE STRATEGIC COLUMBIA ASIA (Construction works in progress) PONTIAN HIGHWAY HOSPITAL ESSWAY NK EXPR 2ND LINK EXPRESSWAY COND LI PORE SE IA-SINGA TESCO LOCATION MALAYS AEON SILC SOUTHERN INDUSTRIAL BUKIT INDAH & LOGISTICS CLUSTERS NUSA 5km IDAMAN KO Aspira Gardens TA BIO-XCELL IS • EduCity KA N D AR • Ledang Urban Retreat H IG H W • Southern Industrial & A GELANG Y Logistics Clusters (SILC) HORIZON HILLS GOLF PATAH & COUNTRY CLUB • Sultan Abu Bakar CIQ Complex Pickup point for e-hailing services Aspira Lakehomes MARLBOROUGH 10km G STADIUM N 7 COLLEGE MALAYSIA A AND SPORTS L A Y COMPLEX L A RAFFLES AMERICAN • Legoland Malaysia G W 8 N H SCHOOL U G • Mall of Medini 6 P I H M EDUCITY A R • Big Box K A 1 Aspira Square 5 D MALL OF N NUSAJAYA 2 N A A MEDINI • Gleneagles Medini Hospital TECH PARK 3 L A K 4 S B.I.G J I • Marlborough College Malaysia N KOTA A T GLENEAGLES ISKANDAR ANJUNG L • Raffles American School U MEDINI NEIGHBOURHOOD S ® HOSPITAL • Horizon Hills CENTRE LEGOLAND PUTERI HARBOUR • Kota Iskandar EAST PUTERI HARBOUR • Iskandar Malaysia Studio GERBANG LEDANG MEDINI FERRY TERMINAL • Puteri Harbour Proposed Kuala Lumpur– NUSAJAYA • Puteri Harbour International Singapore High-Speed Rail Ferry Terminal (HSR) Station Proposed Petrol Station PORESIA GOLF • Columbia Asia Hospital Fastrackcity & COUNTRY CLUB ISKANDAR MALAYSIA STUDIOS 15km M R AL O A H • AEON Bukit Indah YS BIG BOX IA O -S J • Tesco Hypermarket Bukit Indah IN G F AP JAYA GROCER O O RE S S E T CO I N D A LI R 20km N T K EX S
    [Show full text]