Initial Environmental Examination July 2017 KGZ: Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project —Additional Financing Prepared by Japan Overseas Consultants/DI KYRGYZDORTANSPROEKT for the Ministry of Transport and Roads and for the Asian Development Bank. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Initial Environmental Examination Reports 1. Section “Balykchy [Km 0] to Kilometer Post 43 [Km43]” 2. Section “Kochkor [Km 64] to Epkin [Km 89]” KbIPIbI3 PECIIYEJIIIKAC hIHbIH MIIHIICTEPCTBO TPAHCTIOPT XAHA XOJI TPAHCTTOPTA r{ AOPOI MI,IHTICTPJII,III,I KbIPTbI3 C KOII PE C IIYBJI}IKTI 720017, Er,rrurer ru., llcauor xes.,42 720017, n Er.rurer, yt. I4cauorla, 42 (3 -43 -85, ren. +996 (312) 3 l-43-85, 3 l-43-13, 1sr. +996 12) 3 I 3l -43-13, +996 $arc: +996 (312) 3l-28-ll Saxc: (312) 31-28-11 E-mail:
[email protected] E-mail:
[email protected] www.mtd.gov.kg www.mtd.gov.kg n, t u-{f *o{,( ,r0 7, 0( zotfrx.1n1 Ha J\b ' Susan Lim Transport Specialist Central and West Asia Department Central and West Asia Transport and Communications Division CWTC Asian Development Bank Subject: CAREC Corridors I and 3 Connector Road Project (Bishkek-Osh and Bishkek-Naryn-Torugart Road).