Kye Prigg, PMP, Vodafone UK, Newbury, England

Total Page:16

File Type:pdf, Size:1020Kb

Kye Prigg, PMP, Vodafone UK, Newbury, England Kye Prigg, PMP, Vodafone UK, Newbury, England 28 PM NETWORK SEPTEMBER 2016 WWW.PMI.ORG PMN0916 c-first features.indd 28 8/10/16 11:29 AM High Wireless Act As a next-gen mobile network standard emerges, project teams are making global connections. BY MATT ALDERTON PORTRAITS BY JON ENOCH PMN0916 c-first features.indd 29 8/10/16 11:29 AM A mobile infrastructure revolution is coming —and fast. Wireless upgrade projects are underway around the world, promising to deliver more robust net- works that act as the backbone for a data-rich future. With the rapid development of the Inter- net of Tings (IoT), 25 billion “things”—includ- ing buildings, cars, machines and appliances—are projected to be connected to the internet by 2020. To communicate with their owners and each other, they will need access to reliable new ffth-generation (5G) networks boasting network data speeds 10 to 100 times faster than the fastest existing networks. How’s this for 5G network project benefts? 5G infrastructure will make it possible to download catch up to global digital norms, they also leave feature flms to smartphones in less than 5 seconds, breadcrumbs for teams that someday will complete enable self-driving cars to swerve around obstacles the 5G future. automatically and allow doctors to perform com- “Mobile upgrade projects are critical for a 5G plex surgery remotely using robots. future,” says Kye Prigg, PMP, head of mobile net- Tis hyperconnected future remains well beyond works, Vodafone UK, Newbury, England. “When it the horizon in most parts of the world, however. comes to the possibilities with 5G, we are talking Projects to expand 3G and 4G technologies are still about massive data speeds and very low latency. needed in many parts of Africa, Asia Pacifc and Tis will put tougher requirements on how the Latin America. Tese projects not only help people sites are built, the locations of the sites and the 30 PM NETWORK SEPTEMBER 2016 WWW.PMI.ORG PMN0916 c-first features.indd 30 8/10/16 11:29 AM backhaul of infrastructure required to carry and route all this trafc.” By 2025, the global None of these mobile transformations come cheap. With the frst 5G trial networks expected to go live 5G market could reach this year and full-fedged deployments in the United States slated to follow next year, mobile operators and US$247 billion worldwide. vendors are expected to invest US$6 billion alone on Source: ABI Research 5G network R&D over the next four years. By 2025, the global 5G market could reach US$247 billion worldwide, according to a 2016 study by ABI Research. SEPTEMBER 2016 PM NETWORK 31 PMN0916 c-first features.indd 31 8/10/16 11:30 AM 5G Innovation Centre at the University of Surrey in England middle of the action. For instance, tiny helmet cameras connected to the 5G network will deliver a live stream of what skiers see when they sweep down slopes. No matter the type of network to be built, project and program teams face major stakeholder man- agement challenges due to evolving requirements. With the number of users and devices on networks steadily increasing, lessons learned today are crucial for meeting tomorrow’s network demands. “Strong, very well-defned project management processes are critical for the next wave of mobile IMAGE COURTESY OF UNIVERSITY OF SURREY infrastructure projects,” Mr. Prigg says. A fve-year, £80 million joint venture project between the University of Surrey in Guildford, Eng- MAKING NEW CONNECTIONS land and organizations including Fujitsu, Huawei, To deliver on the promises of a 5G world, project Samsung, Telefonica and Vodafone will complete and program managers must foster new kinds a 5G network for Surrey’s campus by 2018 and of collaboration. Building previous network gen- provide a testing ground for future 5G projects. In erations primarily was a two-team efort: Mobile South Korea, mobile operators SK Telecom, KT service providers worked with phone and tablet and LG Uplus already are working on a US$1.5 makers. But a wider variety of organizations already billion project to deploy a nationwide 5G network occupy the IoT space—from automobile to appli- by 2020. Te frst phase of the network is sched- ance manufacturers—so project managers must be uled to be ready for the 2018 Winter Olympics in ready to work closely with multiple partners and Pyeongchang—and will help put viewers in the business units on 5G projects. Practitioner “The key word is “I’ve been Perspectives ‘uncertainty.’ 5G projects involved in Project managers weigh will be very complex and 2G, 3G and 4G in on the skills and tools very diverse in nature, so projects, and the needed to build project managers need a challenges always next-gen mobile infrastructure. very detailed risk management plan come down to people. The that helps them manage uncertainty technology will get worked by monitoring and controlling the small out, but the project will still variations that can have a big impact fail if you don’t have the right on their project.” team in place.” —Manuel Salero Coca, PMP, innovation director and service —Kye Prigg, PMP, head of mobile networks, culture program manager, Ericsson, Mexico City, Mexico Vodafone UK, Newbury, England 32 PM NETWORK SEPTEMBER 2016 WWW.PMI.ORG PMN0916 c-first features.indd 32 8/10/16 11:30 AM “With 5G, there are lots more vendors and lots “When you approach enterprise customers, espe- more stakeholders in diferent areas, which can cially in other industries, the most important thing make communication very difcult,” says Toshiaki you need to get from them is what their technical Hattori, PMP, senior engineer, Sangikyo Corp., requirements are to enable the services they desire,” Yokohama, Japan. “Knowing how to communicate says Oluseyi Lala, PMP, manager of internet pro- with stakeholders is the most important skill that tocol planning and enterprise solutions at Etisalat “With 5G, project managers can develop in this space.” Nigeria, Abuja, Nigeria. “Sometimes they are not Manuel Salero Coca, PMP, innovation director even sure about the details of what services they there are lots and service culture program manager, PMI Global want to enable. Tat’s where they rely on the mobile more vendors Executive Council member Ericsson, Mexico City, operator’s expertise to shine more light on what is and lots more Mexico, agrees. “You have to take a consultative possible—and that’s where project management stakeholders approach and be very open to understanding the helps to tie everything together.” IMAGE COURTESY OF UNIVERSITY OF SURREY in different dynamics of an industry,” he says. “You have to U.S. mobile provider Verizon Wireless is connect- areas, which learn the language of that industry and learn the ing all the dots to build the world’s frst 5G network, unique challenges that an industry faces.” the frst phase of which will debut by 2017. In April, can make All that starts by meeting with each organiza- the organization pledged to spend US$300 million communication tion’s technical experts to build knowledge about on a six-year project to install 800 miles (1,287 kilo- very difficult.” various devices’ respective technical requirements. meters) of fber-optic cable to connect cell towers in —Toshiaki Hattori, PMP, For instance, 5G networks will bind autonomous Boston, Massachusetts, USA, where the 5G network Sangikyo Corp., Yokohama, vehicle sensor infrastructure, allowing self-driving will debut in phases, with other major U.S. cities Japan cars to determine the shortest travel times and to follow. To ensure the network thrives from the avoid collisions. So project managers must engage start, Verizon has collaborated with other U.S. tech automakers, microchip developers and public infra- giants on trials that identify risks and opportunities. structure specialists to ensure projects meet techno- For instance, 5G tests at an Intel lab in the state of logical requirements and strategic objectives. Oregon have helped Verizon determine how weather “Demand planning “As mobile operators evolve from well in advance is 2G to 3G, from 3G to 4G and, the key to ensuring eventually, from 4G to 5G, there’s the right expertise a need to have a lessons-learned is available for a document that details all the 5G project. Generally, it is not challenges you faced on previous straightforward to fnd the right projects and how you resolved them. competency, especially for new This can be used to enhance the technologies, so appropriate learning abilities and knowledge to time should be invested.” avoid previous mistakes.” —Atiq ur Rehman, PMP, project director, Nokia —Oluseyi Lala, PMP, manager of internet protocol planning Networks, Dubai, United Arab Emirates and enterprise solutions, Etisalat Nigeria, Abuja, Nigeria SEPTEMBER 2016 PM NETWORK 33 PMN0916 c-first features.indd 33 8/10/16 11:30 AM and atmospheric conditions can impact 5G perfor- have a very high cost, so project managers should mance. Sharing such results with other stakeholders, preferably seek sign-of from every major stake- such as device manufacturers, helps teams fne-tune holder involved to ensure common understanding.” their launch plans, Mr. Prigg says. Japanese carrier NTT DoCoMo is well-versed “Communication is everything, and it can fall to in the challenges of establishing new mobile stan- pieces very easily unless you get the message across dards. Although the organization won’t introduce to all stakeholders in a way that’s clear and easy to the country’s frst 5G network until the 2020 Sum- understand,” Mr. Prigg says. “For example, I can rat- mer Olympics in Tokyo, Japan, it began collaborat- tle of a million technical abbreviations and the stake- ing with other global vendors in 2014 to develop holders won’t necessarily understand any of them.
Recommended publications
  • Free Space Optics for 5G Backhaul Networks and Beyond Wael G
    Free Space Optics for 5G Backhaul Networks and Beyond Thesis by Wael G. Alheadary In Partial Fulfillment of the Requirements For the Degree of Doctor of Philosophy King Abdullah University of Science and Technology, Thuwal, Makkah Province, Kingdom of Saudi Arabia July, 2018 2 EXAMINATION COMMITTEE PAGE The thesis of Wael G. Alheadary is approved by the examination committee Committee Chairperson: Professor Mohamed-Slim Alouini Committee Members: Professor Boon Ooi, Professor Taous-Meriem Laleg-Kirati, Professor Chengshan Xiao. 3 © July 2018 Wael G. Alheadary All Rights Reserved 4 ABSTRACT Free Space Optics for 5G Backhaul Networks and Beyond Wael G. Alheadary The exponential increase of mobile users and the demand for high-speed data services has resulted in significant congestions in cellular backhaul capacity. As a solution to satisfy the traffic requirements of the existing 4G network, the 5G net- work has emerged as an enabling technology and a fundamental building block of next-generation communication networks. An essential requirement in 5G backhaul networks is their unparalleled capacity to handle heavy traffic between a large number of devices and the core network. Microwave and optic fiber technologies have been considered as feasible solutions for next-generation backhaul networks. However, such technologies are not cost effective to deploy, especially for the backhaul in high-density urban or rugged areas, such as those surrounded by mountains and solid rocks. Addi- tionally, microwave technology faces alarmingly challenging issues, including limited data rates, scarcity of licensed spectrum, advanced interference management, and rough weather conditions (i.e., rain, which is the main weather condition that affects microwave signals the most).
    [Show full text]
  • Case No COMP/M.4297 - NOKIA / SIEMENS
    EN Case No COMP/M.4297 - NOKIA / SIEMENS Only the English text is available and authentic. REGULATION (EC) No 139/2004 MERGER PROCEDURE Article 6(1)(b) NON-OPPOSITION Date: 13/11/2006 In electronic form on the EUR-Lex website under document number 32006M4297 Office for Official Publications of the European Communities L-2985 Luxembourg COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 13.11.2006 SG-Greffe(2006) D/206841 In the published version of this decision, some PUBLIC VERSION information has been omitted pursuant to Article 17(2) of Council Regulation (EC) No 139/2004 concerning non-disclosure of business secrets and other confidential information. The omissions are shown thus […]. Where possible the information MERGER PROCEDURE omitted has been replaced by ranges of figures or a general description. ARTICLE 6(1)(b) DECISION To the notifying party Dear Sir/Madam, Subject: Case No COMP/M.4297 – NOKIA/SIEMENS Notification of 5 October 2006 pursuant to Article 4 of Council Regulation No 139/20041 1. On 05/10/2006, the Commission received a notification of a proposed concentration pursuant to Article 4 of Council Regulation (EC) No 139/2004 by which the undertaking Nokia Corporation (“Nokia”, Finland) acquires within the meaning of Article 3(1)(b) of the Council Regulation control of the undertaking Nokia Siemens Networks (“NSN”), a newly created company to which Nokia and Siemens Aktiengesellschaft (“Siemens”, Germany) will contribute their worldwide mobile and fixed-line telecommunications network equipment businesses. Nokia and Siemens are hereinafter referred to as “the Parties”. 2. After examination of the notification, the Commission has concluded that the notified operation falls within the scope of the Merger Regulation and does not raise serious doubts as to its compatibility with the common market and the EEA Agreement.
    [Show full text]
  • Nokia Networks – APAC Update
    Nokia Networks – APAC Update Simon Beresford-Wylie Senior Vice President, APAC Nokia Networks 1 © NOKIA Talks Vision and Strategy in China 2004 Outline • APAC Review 2003 • The mobile infrastructure market in APAC 2004-2007 • Focus on India • Summary 2 © NOKIA Talks Vision and Strategy in China 2004 Nokia Networks in APAC • Leading provider of network infrastructure, service delivery platforms and related services S.Korea • Leader in GSM, EDGE and Japan WCDMA networks • Regional HQ in Singapore Taiwan • Offices in 12 countries across India the region Philippines • Nearly 1000 people Thailand Vietnam supporting Sales & Marketing, Malaysia Delivery Services and Support Singapore • Networks represented 19% of Indonesia Nokia’s net sales in 2003 Australia New Zealand 3 © NOKIA Talks Vision and Strategy in China 2004 Review of Networks in APAC 2003 • 2H 2003 - Resumption of Capex investment by operators • Strong Growth in key markets of Philippines and Thailand • Significant WCDMA wins in Taiwan and Singapore • Strong market share gains in India, Indonesia and Thailand • Good progress on EDGE deployment 4 © NOKIA Talks Vision and Strategy in China 2004 Networks gained market share in 2003 Overall global market share all mobile standards, 12 month rolling average 30 % Ericsson Nokia 20 % Siemens Nor t el Lucent Mo t o r o la 10 % Alcat el Ot h er NEC 0 % Q2-02 Q3-02 Q4-02 Q1-03 Q2-03 Q3-03 Q4-03 Q1-04 (Includes infrastructure & services – all technologies) Source: Nokia May 2004 5 © NOKIA Talks Vision and Strategy in China 2004 The Mobile Infrastructure
    [Show full text]
  • 5G Wireless Infrastructure Semiconductor Analysis
    5G WIRELESS INFRASTRUCTURE SEMICONDUCTOR ANALYSIS SIA CONFIDENTIAL | 5G INFRASTRUCTURE ANALYSIS | 1 2 | 5G INFRASTRUCTURE ANALYSIS EXECUTIVE SUMMARY On behalf of SIA, a wireless market intelligence firm has analyzed all of the semiconductor function product families within the key elements of a 5G radio access network (RAN)- baseband unit (BBU) and active antenna unit (AAU)/remote radio unit (RRU) systems for 5G base stations along with the current domestic United States and foreign/international semiconductor suppliers. Our conclusion is that despite the United States maintaining overall market-share leadership in semiconductors with a 45% share of the global market, substitutes for U.S. components exist for nearly every semiconductor product family required to build a complete RAN infrastructure. In fact, our analysis indicates that of the more than fifty critical semiconductor elements necessary to design, manufacture, and sell a competitive 5G RAN network1, only 3 components could face supply constraints outside the United States in the event of an export restriction. For each of those three components, we have further concluded that alternatives are currently being deployed or under active development, especially within China by Huawei’s semiconductor design arm, HiSilicon. 8 | 5G INFRASTRUCTURE ANALYSIS | SIA CONFIDENTIAL OUR CONCLUSION FOR THE BASEBAND UNIT SYSTEM FOR A 5G BASE STATION IS THAT THE TWO KEY SEMICONDUCTOR PRODUCT FAMILIES THAT MAY PRESENT SUPPLY ISSUES OUTSIDE OF THE UNITED STATES ARE: • Commercial off-the-shelf Field
    [Show full text]
  • A Fugitive Success That Finland Is Quickly Becoming a Victim of Its Own Success
    Professor Charles Sabel from Columbia Law School and Professor AnnaLee Saxenian from UC Berkeley argue in their book A Fugitive Success that Finland is quickly becoming a victim of its own success. In recent decades Finnish firms in the forest products and telecommunications industries have become world leaders. But the kind of discipline that made this success possible, and the public policies that furthered it, is unlikely to secure it in the future. Efficiency improvements and incremental A Fugitive Success innovations along the current business trajectory will gradually lead these industries into a dead-end unless they use innovation as a vehicle for transforming themselves into new higher value businesses. Saxenian and Sabel raise some serious concerns about the readiness of these industries, and the Finnish innovation system as a whole, for the needed transformation. A Fugitive Success is required reading for A Fugitive Success those involved in the development of the Finnish innovation environment and Finland’s Economic Future implementing the new national innovation strategy. Charles Sabel and AnnaLee Saxenian Sitra Reports 80 Sitra Reports the Finnish Innovation Fund ISBN 978-951-563-639-3 Itämerentori 2, P.O. Box 160, FI-00181 Helsinki, Finland, www.sitra.fi/en ISSN 1457-5728 80 Telephone +358 9 618 991, fax +358 9 645 072 URL: http://www.sitra.fi A Fugitive Success Finland’s Economic Future Sitra Reports 80 A Fugitive Success Finland’s Economic Future Charles Sabel AnnaLee Saxenian Sitra • HelSinki 3 Sitra Reports 80 Layout: Sisko Honkala Cover picture: Shutterstock © Sabel, Saxenian and Sitra ISBN 978-951-563-638-6 (paperback) ISSN 1457-571X (paperback) ISBN 978-951-563-639-3 (URL:http://www.sitra.fi) ISSN 1457-5728 (URL:http://www.sitra.fi) The publications can be ordered from Sitra, tel.
    [Show full text]
  • Nokia Brochure
    Nokia In Greece Nokia Hellas has a presence of 30 years in Greece a strong collaboration with Universities and giving a vote of confidence to the Greek economy innovation institutions across Greece. Overall, a & labor market. The company is among the top well-recognized brand in the Greek ICT market, as 100 corporations in Greece according to proved by several awards. headcount and among the top 200 corporations in Greece according to revenues across all At NOKIA Hellas we lead the implementation of industries & public sector. It has a Global technology edge in software, networks and Technology Center facility and is the #1 ICT R&D communications. We develop and export the hub in Greece with more than 900 employees of software that powers 5G for the international 34 years average age, out of which, 80% market. University graduates, 50% postgraduates and with strong diverse country and line management Our technology stack includes cloud native team. architecture, software defined networks, DevOps and end-to-end automation. The company has a very diverse DNA starting initially as Nokia and then by acquiring Siemens Being a member of NOKIA Hellas means that you Networks, Motorola Networks, Alcatel Lucent and are a member of the most innovative teams in Bell labs. Nokia is present in all local telecom the world, building an international career while operators where it has installed most of Nokia working in Greece. portfolio. Currently building presence in governmental and enterprise networks and holds Largest ICT R&D Hub in Greece Established
    [Show full text]
  • Nokia Networks Shrinks an Entire LTE Network Into a Box
    Press Release Nokia Networks shrinks an entire LTE network into a box Ultra-compact LTE network for quick deployment to support first responder communications in disaster areas Provides stand-alone wireless communications at industrial sites like mines and petrochemical plants Enables reliable, high-bandwidth services in remote and rural areas with zero or limited coverage Espoo, Finland – 19 May 2015 Nokia Networks is launching a compact, rapidly deployable LTE network in a box with macro site capacity and coverage to provide real-time communication services. Nokia Network in a box can serve as a dedicated small network for major industrial sites. It also enables vital public safety communications to be implemented at emergency scenes where wide area network coverage is not available. In addition, mobile operators can use the miniature LTE network to bring high-bandwidth connectivity to rural and remote areas. Offering voice and data services in areas with limited or no network coverage is a big challenge which is addressed by the Nokia Networks LTE network in a box. Click to Tweet: Launch: @nokianetworks shrinks complete #LTE network into a box http://nokia.ly/1Hpt3Vu #NetworksPerform Solution details at a glance: Nokia Network in a box is a compact macro base station with an integrated core network ready to operate on either FDD or TD-LTE bands, along with built-in ports for external IP connectivity. Based on Nokia Flexi Multiradio 10 Base Station, Network in a box supports thousands of users, weighs only about 40 kg and requires a power supply of less than 1 kW. It can be easily powered by a car-based inverter or a small portable generator.
    [Show full text]
  • Finland Case Study the Telecom Equipment Industry
    TAD/TC/WP(2008)6/PART2/A/FINAL OECD Trade Policy Working Paper No. 73 TRADE AND INNOVATION PROJECT CASE STUDY NO. 1: MARKET OPENNESS, TRADE LIBERALISATION AND INNOVATION CAPACITY IN THE FINNISH TELECOM EQUIPMENT INDUSTRY by Caroline Lesser Unclassified TAD/TC/WP(2008)6/PART2/A/FINAL Organisation de Coopération et de Développement Économiques Organisation for Economic Co-operation and Development 29-Jul-2008 ___________________________________________________________________________________________ _____________ English - Or. English TRADE AND AGRICULTURE DIRECTORATE TRADE COMMITTEE Unclassified TAD/TC/WP(2008)6/PART2/A/FINAL Working Party of the Trade Committee TRADE AND INNOVATION PROJECT CASE STUDY NO. 1: MARKET OPENNESS, TRADE LIBERALISATION AND INNOVATION CAPACITY IN THE FINNISH TELECOM EQUIPMENT INDUSTRY OECD Trade Policy Working Paper No. 73 By Caroline Lesser Contact: Caroline Lesser; Tel. + 33-1-45249046; [email protected] English - Or. English JT03249289 Document complet disponible sur OLIS dans son format d'origine Complete document available on OLIS in its original format TAD/TC/WP(2008)6/PART2/A/FINAL ABSTRACT There is today a great interest in understanding how governments can promote innovation and the benefits it brings, as evidenced by the discussions at the 2007 OECD Ministerial Council Meeting. Against this background, the OECD Trade Committee decided to undertake a ―Trade and Innovation Project‖, to gain a better understanding of how trade and investment patterns and policies affect innovation capacity, and interact with other key policies influencing innovation performance. This paper is one of the five case studies conducted in the framework of this project. It examines how recent trade and investment patterns (including ―trade in tasks‖ resulting from supply chain fragmentation) and Finnish and global policies promoting market openness and free trade have affected the innovation process in Finland’s (mobile) telecom equipment industry.
    [Show full text]
  • Nokia in 2014 at Nokia, We’Re Excited by Where Technology Will Lead Us
    Nokia in 2014 At Nokia, we’re excited by where technology will lead us. We’re reimagining a world where technology blends into our lives. Technology that works for us, discreetly yet magically in the background, enriching our lives. But for some, this new technology world, where everything and everybody are connected, can be challenging. Fear of intrusion, technology that seems hard to understand or control, and the complexity of choice, can be overwhelming. That’s why our focus is, and has always been, on people. We work together, with our partners, customers, and across our businesses, to create human technology that helps people thrive. Effortless, simple, and intuitive technology, designed to enable new and extraordinary experiences in people’s lives each day. We see the possibilities of technology. The human possibilities. Read more online: company.nokia.com The year 2014 was one of fundamental rapidly evolving world of technology which is change for Nokia, a new chapter in our storied as much about connecting things as about history, which stretches back to the founding connecting people. We expect to see more of a small paper mill in southern Finland in than 50 billion connected things—devices, 1865. Following the sale of substantially all of modules and sensors—by year 2025. The our Devices & Services business to Microsoft opportunity is extraordinary—not just for us, (the “Sale of the D&S Business”), which was but for the world at large. completed on April 25, 2014, Nokia emerged with three businesses—Nokia Networks, HERE We have a powerful role to play in this and Nokia Technologies—and a significantly increasingly connected world.
    [Show full text]
  • VTC2018-Fall Final Program
    The 88th IEEE Vehicular Technology Conference Final Programme 27 – 30 August 2018 Chicago, USA Welcome from the General Chair I am extremely pleased to have the honor of welcoming Skyscrapers and Modern “Glass and Steel” you to the 88th IEEE Vehicular Technology Architecture, nuclear energy, and of course two-way Conference, VTC2018-Fall, and to its host city, the radios and the cellphone. Greater Chicago is home to a great International City of Chicago. very vibrant academic environment with nearly 100 Beyond the slate of outstanding tutorials, workshops, colleges and universities. and technical sessions, VTC2018-Fall will feature I’d like to take this opportunity to thank all the members world-class keynote speakers, exciting plenary panels, of the Organizing Committee and Technical Program and a three-day Industry Program. Marty Cooper, Committee and their leaders for the outstanding work Honorary Conference Chair, a native Chicagoan, and they have done to create this incredible event. I am among other contribution, the “Father of the Cellphone” literally amazed by the dedication and diligence of the will provide our lead-off keynote. The four-day hundreds of experts in our research community who program features Tutorials, Workshops and a mini- have devoted their time to paper review process. Finally Conference on Monday followed by Theme Days I would like to recognize the excellence and the focusing on 5G and Applications, Autonomous tremendous research and preparation shown by the Vehicles, and Smart Cities and IoT. Attendees will numerous authors who submitted their works for have the opportunity to hear from some of the world’s consideration and especially those involve with the most distinguished industry leaders and researchers.
    [Show full text]
  • Connecting the World in a Responsible Way
    Connecting the world in a responsible way Nokia People & Planet Report 2015 About this Thank you for taking the time to report read our People & Planet Report 2015. It covers the key ethical, socio-economic and environmental issues most relevant to Nokia’s business and stakeholders during the 2015 fiscal year. For an explanation of how we decided what would be included in the report, please see the ‘Materiality: How we have identified our priorities’ section. Nokia People & Planet Report 2015 2 About Letter from Key sustainability About Our Improving Respecting Protecting Making change Independent Nokia this the President achievements and Nokia responsibility people’s lives people in the happen Assurance sustainability report and CEO challenges approach with technology everything we do environment together Report data The scope of this report Initiative index is available as a separate PDF In addition to our own reports, Your feedback The scope of this report is Nokia Group functions, document on our website and some more detailed We welcome your views we provide detailed information on our activities and our Nokia Networks and Nokia Technologies in 2015. The sustainability data is included as a separate chapter performance. If you’d like HERE digital mapping and location services business at the end of this report. through various external reports. to share your opinions, which was acquired by a German automotive please contact us at In 2015, we reported our climate sustainability.global@ industry consortium during 2015, is excluded from Our selected key sustainability indicators have nokia.com this report unless otherwise indicated. been assured by an independent auditor of Nokia, impacts to CDP – a leading PricewaterhouseCoopers Oy.
    [Show full text]
  • Nokia Networks Reinvented
    To change the document information in the footer, press [Alt + F8] and use the “FORM“ Nokia Networks Reinvented Samih Elhage Chief Financial and Operating Officer Nokia Networks 1 14/11/14 © Nokia Confidential Core and background colors: R 18 R 0 R 104 R 168 R 216 G 65 G 201 G 113 G 187 G 217 B 145 B 255 B 122 B 192 B 218 To change the document information in the footer, press [Alt + F8] and use the “FORM“ Our evolution to continuous improvement TO: continuous improvement 1. Winning in key markets, expanding FROM: restructuring partnering and leveraging targeted and transformation acquisitions 2. Protecting our gross margin performance › 3. Managing our OPEX: focus and discipline 4. Protecting our operating profit performance 5. Differentiating through quality and operating model Core and background colors: R 18 R 0 R 104 R 168 R 216 G 65 G 201 G 113 G 187 G 217 B 145 B 255 B 122 B 192 B 218 To change the document information in the footer, press [Alt + F8] and use the “FORM“ 1. Winning in key markets (1/2) Net sales (year-on-year change) 20% Nokia Networks 10% 13% • Execution is critical 3% 0% • Extremely well-organized global Customer -10% Operations -20% -26% • Tight sales funnel control -30% Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 • Sales effectiveness KPIs 2012 2013 2014 • Structures and governance in place 40% 33% 30% • 20% Mobile Clearly defined steps and decision gates Broadband 10% 6% • 0% Leverage customer base for continued -5% -10% 2% upsell opportunities Global -20% Services -30% -23% Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2012 2013 2014 *) Numbers shown are non-IFRS results as reported by Nokia.
    [Show full text]