Of Unstarred Question No.1082 by Shri Yogi
Total Page:16
File Type:pdf, Size:1020Kb
STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF UNSTARRED QUESTION NO.1082 BY SHRI YOGI ADITYANATH, SHRI HUKUM SINGH, SHRIMATI SUPRIYA SULE, SHRI ARJUN MEGHWAL AND SHRI GANESH SINGH TO BE ANSWERED IN LOK SABHA ON 17.07.2014 REGARDING ELECTRIFICATION OF RAILWAY LINES. (a): Yes, Madam. Ministry of Railways is taking steps to fast track electrification projects. (b): Indian Railways have already embarked upon a major Electrification Programme to speed up the electrification of Railway Lines as can be seen from the targets and achievements of 10th, 11th and 12th Five Year Plans (FYP). Plan Route Kilometers Electrified 10th 1810 11th 4556 12th 6500 (Target) During the first two years of 12th Five Year Plan i.e. (2012-13 & 2013-14), 2667 Route Kilometres (RKM) have been electrified as against the proportionate target of 2600 Route Kilometres(RKM). State/Zone-wise details and present status of the on-going electrification projects under Plan Head “Railway Electrification” including Ghaziabad-Moradabad and Gorakhpur-Lucknow sections are as under: Contd....2/- -2- S. State(s) Zonal NAME OF Route Balance No. Rail PROJECT Kilo RKM to way(s) (& YEAR OF meters be SANCTION) (RKM) electri ! TOTAL fied as on on 01.04. 2014 1 Andhra South Guntakal-Bellary- 138 138 Pradesh/ Central, Hospet section Karnataka South including ! Western Tornagallu- Ranjitpura branch line (2012-13) 2 Andhra South Nallapadu- 426 426 ! Pradesh Central Guntakal (2012- 13) 3 Bihar, East Barauni-Katihar- 836 457 West Central, Guwahati incl. ! Bengal/ North Katihar-Barsoi Assam East (2008-09) Frontier 4 Delhi, Northern, Delhi Sarai 1087 1087 Haryana, North Rohilla-Rewari- Rajas Western, Phulera-Palanpur- than, Western Ahmedabad Gujarat including Kalol- ! Gandhinagar Khodiyar & Alwar- Bandikui-Jaipur- Phulera (2013- 14) Haryana, Northern Ambala- 353 52 5 Uttar Moradabad Pradesh, including Laksar- Uttara Dehradun khand (Material khand (Material Modification for Laksar-Dehradun sanctioned in August’2011) Contd..3/- -3- State(s) Zonal NAME OF PROJECT Route Balance S. Rail (& YEAR OF Kilo RKM to No. way(s) SANCTION) meter be (RKM) electri TOTAL fied as on 01.04. 2014 6 Haryana Northern Manheru-Hisar 74 74 (2012-13) 7 Haryana Northern Jakhal-Hisar (2013- 79 79 14) Haryana, Northern Jakhal-Dhuri- 123 123 8 Punjab Ludhiana (2013-14) 9 Haryana, Northern Rohtak-Bhatinda- 252 252 Punjab Lehra Muhabhat (2010-11) 10 Jharkhand/ East Garwa Road-Chopan- 257 257 Madhya Central Singrauli (2012-13) Pradesh/ Uttar Uttar Pradesh 11 Karnataka/ South Yelahanka- 306 0 Andhra Western, Dharmavaram –Gooty Pradesh South including Penukonda- Central Dharmavaram via Sri Satya Sai Prashanti Nilayam (2010-11) 12 Kerala/ Southern Shoranur-Mangalore- 328 28 Karnataka Penambur (2010-11) Contd..4/- -4- S. State(s) Zonal NAME OF PROJECT Route Balance No. Rail (& YEAR OF SANCTION) Kilo RKM to way(s) meter be (RKM) electri TOTAL fied as on 01.04. 2014 13 Madhya Central, Amla-Chhindwara-Kalumna 257 220 Pradesh/ South (2012-13) East Maha Central rashtra 14 Maha South Gondia-Ballarshah (2010-11) 250 183 rashtra East Central 15 Maha Central Daund-Manmad including 255 0 rashtra Punthamba-Shirdi (2010-11) 16 Madhya West Itarsi-Katni-Manikpur-Chheoki 653 653 Pradesh/ Central, including Satna-Rewa (2012-13) Uttar North Pradesh Central 17 Odisha/ East Vizianagaram-Rayagada-Titlagarh- 465 346 Chhatis Coast Raipur (2011-12) garh/ Andhra Pradesh 18 Odisha East Sambalpur-Angul (2012-13) 156 156 Coast 19 Odisha East Jharsuguda-Sambalpur-Titlagarh 238 238 Coast section including Jharsuguda-Ib (By pass line) (2012-13) Contd..5/- -5- S. State(s) Zonal NAME OF PROJECT Route Balance No. Rail (& YEAR OF SANCTION) Kilo RKM to way(s) meter be (RKM) electri TOTAL fied as on 01.04. 2014 20 Odisha East Damanjodi- Singapur Road 152 152 Coast (2013-14) 21 Punjab/ Northern Jalandhar-Jammu Tawi 275 19 21 Punjab/ Northern Jalandhar-Jammu Tawi 275 19 Himachal incl. Jammu Tawi- ! Pradesh/ Udhampur (2007-08) . Jammu & Kashmir 22 Punjab Northern Rajpura-Dhuri-Lehra 151 151 ! Muhabhat (2013-14) ! 23 Rajasthan/ North Alwar-Rewari (2011-12) 82 0 Haryana Western 24 Tamil Southern Madurai-Tuticorin-Nagercoil 262 0 ! Nadu (2008-09) 25 Tamil Southern Coimbatore North- 33 3 ! Nadu Mettupalayam (2012-13) 26 Uttar North *Barabanki-Gonda- 757 39 ! Pradesh / Eastern, Gorakhpur-Barauni incl. Bihar East Siwan-Thawe (2007-08) Central 27 Uttar Northern Ghaziabad-Moradabad 140 38 ! Pradesh (2010-11) *Lucknow-Barabanki is already electrified. Contd..6/- -6- State(s) Zonal NAME OF PROJECT Route Balance Rail (& YEAR OF SANCTION) Kilo RKM to S. way(s) meter be No. (RKM) electri TOTAL fied as TOTAL fied as on 01.04. 2014 28 Uttar Northern Varanasi-Janghai-Unchahar 207 0 Pradesh incl. Phaphamau-Prayag- Allahabad (2008-09) 29 Uttar Northern Khurja-Meerut-Saharanpur 254 0 Pradesh including Ghaziabad- Meerut (2007-08) Uttar Northern, Rosa-Sitapur-Burhwal 181 86 30 Pradesh North (2011-12) Eastern 31 Uttar North Jhansi-Kanpur incl. Ait- 241 01 Pradesh Central, Konch & North KanpurAnwarganj- Eastern Kalyanpur (2008-09) 32 Uttar North Mathura-Alwar (2010-11) 121 0 Pradesh Central, /Rajasthan North Western ! Contd..7/- -7- State(s) Zonal NAME OF Route Balance Rail way PROJECT Kilo RKM to S. (& YEAR OF meter be electri No. SANCTION) (RKM) fied as on TOTAL 01.04. 2014 33 West Eastern Kumedpur-Malda- 153 113 Bengal/ Singhabad and Jhar Pakur-Malda khand (2012-13) 34 West Eastern Andal-Sitarampur 57 57 Bengal via Jamuria-Ikra and Sripur(2012- 13) 35 West Eastern Pandabeshwar- 205 0 Bengal/ Sainthia- Pakur Jhar khand incl. Khana- Sainthia (2011-12) 36 West Eastern Katwa-Azimganj- 200 200 Bengal Nalhati & Azimganj- Tildanga/New Farakka incl. Nalhati & Azimganj bypass line (2013- 14) (c): During the last three years (2011-12 to 2013-14) and current year (2014-15 upto June2014), the targets and achievements Zone-wise for Railway Electrification in Route Kilometres(RKM) are as under: Contd...8/- -8- Zonal Railway Target (in RKM) Achievement (in RKM) Central 330 343 Eastern 260 271 East Central 154 166 East Coast 124 135 Northern 605 654 North Central 240 261 North Eastern 340 365 North East Frontier 249 265 North Western 80 87 Southern 597 618 South Central 281 248 South Eastern 85 89 South East Central 64 67 South Western 206 277 Western 40 43 West Central 0 0 Total 3655 3889 Contd...9/- -9- (d): The details of the funds allocated and spent for Railway Electrification under Plan Head “Railway Electrification” during the last three years and the current year ( upto June2014) are as follows: (Rs. in crores) !!!!!!!!!!!!!!!!Year Allocation (Budget Expenditure Estimate) 2011-12 978 832.09 2012-13 830 967.61 2013-14 1005 1254.58 2014-15 1206 300.54 (Upto June2014) (e): No proposal has been recently received from the State Governments of Rajasthan and Madhya Pradesh. However, the following proposals for electrification of Rail Routes have been received from various other State Governments and their present status is as under:- S.No. Name of the State Status/ Action taken proposed Government section(s) for electrification 1. Delhi-Rohtak Delhi/ Completed and electric Haryana traction has been introduced. 2. Trivendrum- Kerala/ Completed and electric Kanyakumari Tamil Nadu traction has been introduced. 3. Koraput- Odisha Koraput-Damanjodi rail Damanjodi - line has already been Rayagada electrified. Damanjodi- Rayagada is a sanctioned Railway Electrification work. Contd...10/- Contd...10/- -10- S.No. Name of the State Status/ Action taken proposed Govern section(s) for ment electrification 4. Shoranur- Kerala This is a sanctioned Railway Mangalore Electrification work. 5. Titlagarh- Odisha Electrification of both Sambalpur- sections have been Jharsaguda and sanctioned. Talcher- Sambalpur 6. Haridaspur- Odisha Electrification work is Paradeep sanctioned as part of “New Line”. 7. Laksar-Dehradun Uttara This is a sanctioned Railway khand Electrification work. 8. Kollam-Punalur Kerala At present, not feasible due to operational considerations. 9. Shoranur-Nilambur Kerala At present, not feasible due to operational considerations. 10. Ernakulam South – Kerala At present, not feasible on Cochin Harbour operational Terminus considerations. 11. Panvel-Pen-Roha Maha At present, not feasible on 11. Panvel-Pen-Roha Maha At present, not feasible on & Pen- Alibaug rashtra operational considerations. ****** .