Transport Connectivity Improvement Project Preparatory Facility (RRP BAN 50333)

LIST OF ENSUING AND RAILWAY PROJECTS FOR THE PROPOSED TRANSPORT CONNECTIVITY IMPROVEMENT PROJECT PREPARATORY FACILITY

List of road investments - Package 1 Sl Name of the Road with Class Status Unit Length Significance No of FS & DD Kushtia-Alamdanga-Chuadanga- 1 FS KM 70 Darshana Land Port Darshana Road (R 747, R 748) Kashiani -Gopalganj- Fakirhat- Mongla Port Connecting 2 FS, DD KM 73 Katakhali () Road (N805) Road Gopalganj-Tungipara-Nazirpur- Gopalganj-Pirojpur 3 FS, DD KM 52 Pirojpur Road (Z-7704) Connecting Road Khulna-Dumuria- Satkhira Road (R Mongla-Bhomra Port 4 FS, DD KM 65 760) connecting Road Barishal-Jhalokhati-Bekutia-Pirojpur- Mongla-Payra Port 5 Bagerhat-Khulna (at N7) Road FS, DD KM 92 Connectivity Road (R770, R870, Z7709, Z 8702) Barishal-Bhola-Lakshmipur Road Barishal-Chattogram 6 FS KM 68 (N809) Connecting Road Goalando-Nazirganj-Baderhat- N7 to Hatikumrul 7 Kashinathpur-Hatikumrul Road FS, DD KM 103 Connectivity Road (,R601, R711, R710) Gobindaganj-Ghoraghat-Hakimpur 8 FS, DD KM 47 (Hili) Road (R 585, Z 5836, Z 5509) Beldanga-Dinajpur- Biral Road (N 9 FS KM 37 Biral Land Port 508, Z 5803) Madaripur (Mostafapur)-Shariatpur- FS KM 165 Mongla-Chattogram Port Chandpur-Lakshmipur-Begumganj Connectivity Road 10 Road and Shariatpur to Padma Link Road (R140, R860, R862) Jaldhaka-Domar-Debiganj-Boda 11 FS, DD KM 58 N5 Bypass Road Road (Z 5003, Z5703, Z5704) Sub-Total 830

List of road investments - Package 2 Status Sl Name of the Road with Class of FS & Unit Length Significance No DD Phulpur-Haluaghat-Gobrakura Road 1 FS KM 28 Gobrakura Land Port (R 371, Z 3711) Bhulta-Araihazar-Bancharampur- Nabinagar-Radhika and -Chattogram and 2 Bancharampur-Muradnagar- FS, DD KM 108 Dhaka- alternate Companiganj Road (R 203, Z 1042 , alignment Z 1205) 2

Status Sl Name of the Road with Class of FS & Unit Length Significance No DD Cumilla (By Pass Point)- Bibirbazar 3 FS, DD KM 15 Bibirbazar Land Port Road (N101) Feni- Fulgazi- Parshuram-Bilunia 4 FS KM 33 Bilunia Land Port Road ( Z-1033) -Kaliganj-Ghorashal- 5 FS, DD KM 33 and Connecting Road Panchdona Road (R301) 6 Elenga-Madhupur-Jamalpur- FS, DD KM 109 Connecting Road Sherpur-Nakla Road (N4, R460, R371) Nandir Bazar (Sherpur)- Bakshiganj- FS KM 80 Rowmari Border Connecting 7 Rajibpur-Rowmari Road (Z4606) Road Bhaluka-Gafargaon-Kishoreganj FS, DD KM 46 Connecting Kishoreganj with 8 Road ( Z-3031, Z-3604, Z-3033) N3 Mostofi-Kurigram-Nageshwari- 9 Bhurungamari- Road (R FS KM 73 Sonahat Land Port 506, Z 5622) Shayestagonj-Chunarughat-Balla FS, DD KM 25 Balla Land Port 10 Road (N204, Local Road) Sunamganj-Polash-Laorghor- FS KM 100 Border Connecting Road 11 Manikola-Durgapur Border Road Sub-Total 650 12 Pangaon ICT connecting Road with Integration among road, rail multi-modal integration facilities FS, DD and waterways 13 Khanpur ICT connecting Road with Integration among road, rail multi-modal integration facilities FS, DD and waterways

14 Dhirasram ICD connecting Road Integration between road FS, DD with multi-modal integration facilities and rail 15 Conflict mitigation and ensuring safety at level crossings on RHD FS, DD Ensuring road safety Road Network * FS-Feasibility Study & DD-Detailed Design ** The highlighted are added as per recommendation of the meeting.

3

List of railway investments SI Project Name Km Significance 1 New bridge parallel to the existing – Corridor strengthening BG line parallel to existing BG line between Abdulpur- 2 198 Corridor strengthening , and Abdulpur – Santahar-Parbatipur sections. 3 New BG line from Santahar to Rohanpur/Amnura 60 Border connection Conversion from MG single line into DG double line Corridor strengthening 4 167 between Santahar-Bogura-Kaunia-Lalmonirhat section and border connection Conversion from MG single line into DG double line Corridor strengthening 5 115 between Bhairab Bazar– section and border connection Corridor strengthening 6 Cord line from to Laksham/ 177 and border connection Construction of a new BG line parallel to the existing line Corridor strengthening 7 37 in - rail section and border connection Conversion from MG single line into DG double in East-Tarakandi-Jamalpur- Corridor strengthening 8 68 Dewanganj Bazar section including construction of and border connection Tongi bypass Assessment of RS, new RS maintenance installations of 9 – Sector wide issue BR Core/Non-Core business plan including assessment and analysis of various traffic demand, land use master plan, plan for optical fiber telecommunication business, and 10 – Sector wide issue increasing passengers’ facilities including related infra development and access control system in important stations Introducing intermediate block system & ATS/ATP with 11 – Sector wide issue existing CBI and CTC system