Agenda

• Project Overview • Unique Challenges and Solutions • Permitting • Water Management Districts • US Army Corps of Engineers • Federal Emergency Management Agency • Current Status Project Overview

• 61 Miles • Deland to Poinciana • Phases • Phase 1 • Phase 2 South • Phase 2 North Phase 1

• 35 Miles • Debary to Sand Lake Road • 12 Stations • Park and Ride Stations • Debary Station • • Longwood Station • • Altamonte Springs Station • • Other Stations (Maitland, Winter Park, Hospital, Central, Church St. and Orlando Health Phase 2 South

• 17 Miles • Sand Lake Road to Poinciana • 4 Stations • Meadow Woods • Osceola Parkway • Kissimmee • Poinciana Phase 2 North

• 12 Miles • Deland to Debary • 1 Station • Deland Station Stormwater Approach

• Corridor • Stations Corridor Challenges

• Right-of-Way • Environmental Constraints • Floodplain • Existing Structures Corridor Stormwater Approach

• Water Quality • Utilities • Coordination with Stakeholders • Schedule Corridor Stormwater Approach

• Swales along the Corridor Corridor Stormwater Approach

• Underdrain along the Corridor Corridor Stormwater Approach

• Floodplain Compensation Corridor Stormwater Approach

• Bridge Hydraulics/No-Rise Altamonte Springs Station

• Challenges • Limited Property Area • Parking Requirements Altamonte Springs Station

• Stormwater Requirements • Water Quality • Water Quantity • Solutions: • Dry Retention Pond • Underground Chambers Altamonte Springs Station

Dry Retention Pond

Storm Chambers Altamonte Springs

• Solutions: • Underground Chambers Altamonte Springs

• Solutions: • Underground Chambers Altamonte Springs

• Solution: • Dry Retention Pond Sand Lake Road Station

• Challenges • Limited Property • Parking Requirements • Adjacent Land Use • Stake Holders • Nutrient Removal

• Solutions • Wet Detention Pond • Storm Chambers • Rain Gardens Sand Lake Road Station

• Stormwater Requirements • Water Quality • SJRWMD (Pollutant) • SFWMD (Nutrient) • Water Quantity • Solutions • Wet Detention Pond • Storm Chambers • Rain Gardens

Sand Lake Road Station

Rain Gardens Storm Chambers

Wet Detention Pond

Existing FDOT Pond Sand Lake Road Station

• Solution: • Wet Detention Pond

Sand Lake Road Station

• Solution: • Wet Detention Pond

Sand Lake Road Station

• Shared Point Facilities • Sand Lake Road (FDOT) • McDonald’s Sand Lake Road Station

• Solution: • Rain Gardens

Sand Lake Road Station

• Solution: • Storm Chambers

Osceola Station

• Challenges • Limited Property • Parking Requirements • Floodplain Impacts • Wetland Impacts • Nutrient Removal • Solutions • Wet Detention Pond • Storm Trap (Storm Chambers) Osceola Station

Wetland Impacts Floodplain Impacts Osceola Station

Master Outfall Storm Chambers

Wet Detention Pond Osceola Station

Storm Chambers Osceola Station

Wet Detention Pond Permitting

• St. Johns River Water Management District • South Florida Water Management District • US Army Corps of Engineers • Federal Emergency Management Agency • Florida Fish and Wildlife Conservation Commission Schedule and Status

• Phase 1 – Constructed and in operation • Phase 2 – Under construction and scheduled for operation in 2017. • Phase 2 North – Under design and scheduled for operation TBD. Paul Yeargain| [email protected] | 407.965.0531 Karen Snyder| [email protected] | 386.943.5434