Yeargain, Snyder
Total Page:16
File Type:pdf, Size:1020Kb
There are three cover slide options with variations of the logo used, depending upon your photo. For example, if you have a photo with a dark background, use the white logo option (slide 3) Proposal cover slides can be found in an InDesign template file and will need to be designed and added separately. June 16, 2016 Agenda • Project Overview • Unique Challenges and Solutions • Permitting • Water Management Districts • US Army Corps of Engineers • Federal Emergency Management Agency • Current Status Project Overview • 61 Miles • Deland to Poinciana • Phases • Phase 1 • Phase 2 South • Phase 2 North Phase 1 • 35 Miles • Debary to Sand Lake Road • 12 Stations • Park and Ride Stations • Debary Station • Sanford Station • Longwood Station • Lake Mary Station • Altamonte Springs Station • Sand Lake Road Station • Other Stations (Maitland, Winter Park, Florida Hospital, Lynx Central, Church St. and Orlando Health Phase 2 South • 17 Miles • Sand Lake Road to Poinciana • 4 Stations • Meadow Woods • Osceola Parkway • Kissimmee • Poinciana Phase 2 North • 12 Miles • Deland to Debary • 1 Station • Deland Station Stormwater Approach • Corridor • Stations Corridor Challenges • Right-of-Way • Environmental Constraints • Floodplain • Existing Structures Corridor Stormwater Approach • Water Quality • Utilities • Coordination with Stakeholders • Schedule Corridor Stormwater Approach • Swales along the Corridor Corridor Stormwater Approach • Underdrain along the Corridor Corridor Stormwater Approach • Floodplain Compensation Corridor Stormwater Approach • Bridge Hydraulics/No-Rise Altamonte Springs Station • Challenges • Limited Property Area • Parking Requirements Altamonte Springs Station • Stormwater Requirements • Water Quality • Water Quantity • Solutions: • Dry Retention Pond • Underground Chambers Altamonte Springs Station Dry Retention Pond Storm Chambers Altamonte Springs • Solutions: • Underground Chambers Altamonte Springs • Solutions: • Underground Chambers Altamonte Springs • Solution: • Dry Retention Pond Sand Lake Road Station • Challenges • Limited Property • Parking Requirements • Adjacent Land Use • Stake Holders • Nutrient Removal • Solutions • Wet Detention Pond • Storm Chambers • Rain Gardens Sand Lake Road Station • Stormwater Requirements • Water Quality • SJRWMD (Pollutant) • SFWMD (Nutrient) • Water Quantity • Solutions • Wet Detention Pond • Storm Chambers • Rain Gardens Sand Lake Road Station Rain Gardens Storm Chambers Wet Detention Pond Existing FDOT Pond Sand Lake Road Station • Solution: • Wet Detention Pond Sand Lake Road Station • Solution: • Wet Detention Pond Sand Lake Road Station • Shared Point Facilities • Sand Lake Road (FDOT) • McDonald’s Sand Lake Road Station • Solution: • Rain Gardens Sand Lake Road Station • Solution: • Storm Chambers Osceola Station • Challenges • Limited Property • Parking Requirements • Floodplain Impacts • Wetland Impacts • Nutrient Removal • Solutions • Wet Detention Pond • Storm Trap (Storm Chambers) Osceola Station Wetland Impacts Floodplain Impacts Osceola Station Master Outfall Storm Chambers Wet Detention Pond Osceola Station Storm Chambers Osceola Station Wet Detention Pond Permitting • St. Johns River Water Management District • South Florida Water Management District • US Army Corps of Engineers • Federal Emergency Management Agency • Florida Fish and Wildlife Conservation Commission Schedule and Status • Phase 1 – Constructed and in operation • Phase 2 – Under construction and scheduled for operation in 2017. • Phase 2 North – Under design and scheduled for operation TBD. Paul Yeargain| [email protected] | 407.965.0531 Karen Snyder| [email protected] | 386.943.5434 www.vhb.com Offices located throughout the east coast Questions? .