GE Power

Major Overhaul Longblock Complete engine solution for major overhauls

Product description Core return policy Applicable Units Depending on maintenance schedule a Replaced engine needs to be returned to Jenbacher* unit needs a Major Overhaul get deposit refunded. Core criteria: Type 2** Type 4** at 60.000/80.000 operating hours. With • All core returns need to be announced the Jenbacher exchange engine program, prior to shipment GE offers flexible and dependable solutions Type 3** Type 6** for your maintenance needs. All options • On time return shipment ensure that several parts are thoroughly • Core must be returned fully assembled ** Limitation for older generations checked and parts subject to regular wear • No credit issued if engine is incomplete, and tear are replaced according to valid excessively damaged, cracked, welded, maintenance instructions. corroded, mechanical machined or has non genuine parts installed Product Details • Warranty • Full engine test run with protocol • Updated spare parts book • Updated wiring diagram and software • Optional: maintenance book, user manual

Customer Benefits Upfront delivery of a preassembled and complete refurbished exchange engine INSTALL ensures cost savings with reduced plant downtime. This solution combined with UPGRADE MONITOR upgrades to the newest technology is the fastest route to better performance for a second life.

REPAIR CONTRACT

MATERIAL TRAIN

FIELD SERVICE PREDICT

*Trademark of the General Electric Company GE Power

Longblock type 6 Version C Complete engine solution for major overhauls

The following components are completely • Valve control (rockers, push rods) and • Pressure transducer for air mixture refurbished: control covers • Spark plugs • Actuator and console throttle valve, • Water pump • Thermocouples including cable • Brackets for engine lifting device • *** • Cam follower • Transport frame • Vibration damper with protection • Crankcase with covers • Painting • • Testrun, including power and efficiency • heads The following components are new: measurement • Fuel gas / jacket water rail • • Updated spare parts book and wiring • Gas mixer diagram • Cylinder liners • Turbocharger*** • Connecting rods • Geardrive • Exhaust gas manifold, including insulation Not included: • Knocking system • Ignition box and ignition rail (new, up from 1CPU solution) • Air filter system • • Oil pressure regulation valve • Gaskets and sealing elements for onsite • Main bearings and con rod bearings connection • Oil sump • Oil filter inserts • Oil pump • Pickups, including cables • cooling nozzles • • Starter motor • Prechambers, including gas valves and • Step plates feed lines • Turbobypass, including cable

***If customer’s engine is equipped with ABB turbocharger, ABB turbocharger (refurbished) will be used for major overhaul. All other installed turbocharger brands will be replaced by the respective new turbocharger.

GE’s Distributed Power global service network provides life cycle support for more than 48,000 gas engines worldwide to help you meet your business challenges and success metrics – anywhere and anytime. Symbol picture Backed by our service providers in more than 100 countries, our service network connects with you locally for rapid response to your service needs. GE Power’s Distributed Power business is a unit of the General Electric Company. The GE brand and logo are trademarks of the General Electric Company. © 2018 General Electric Company. Information provided is subject to change without notice. All values are design or Find your local support online: typical values when measured under laboratory conditions. www.gepower.com/distributedpower GEA32269-EN