Investment Opportunities in

Gujarat Industrial Development Corporation GIDC Sanand-III(Khoraj) Industrial Estate

Under the flagship Make in and further enhance partnership with Japan, GIDC has established exclusively Japan Industrial Township at Khoraj (Sanand-III). It spans across 1438 ha of land, out of which 612 ha of land is developed as Japan Industrial Township Connectivity International Airport 45 KM Ahmedabad Railway Junction 45 KM Kandla Dahej Hazira Mundra JNPT Mumbai 266 KM 272 KM 318 KM 324 KM 586 KM Infrastructure Facilities Rates • Provide by GIDC at doorstep. • Permissible limit of 11 KLD/ ha area of land allotted • Planning of 30 lakhs ltr capacity of Sump & 15 lakh ltr. Yet to finalized Capacity ESR • Planning of 3.68 capacity SUMP in residential zone • Five 66/11 KV substation and one 200KV substation is under INR 7.50 per planning kwh (USD 0.09*) • Three 66/11 KV substation is under planning exclusively for Japanese zone. • GSPL would supply GAS at doorstep of factory INR 32 per SCM • The gas distribution within the factory will be done by (USD 0.4*) Company's own cost. Available Space Target Sectors 450 ha. ( including 36 ha. for Japanese • Aerospace residential zone) • Defense Allotment Price • Automobile & Ancillary Engineering INR 3735/- (Tentative) (USD 49.5*) • Electronics 10,000- 25,000- 50,000- >10,000 >1,00,000 Land Parcel Size (sqm) 25,000 50,000 100,000 INR 1=75 USD* GIDC Sanand-II Industrial Estate

Sanand –II spread over 2056 ha of land with well developed infrastructure facilities for industries. Located just 25- 30kms from Ahmedabad City and hub of automobile sector

Connectivity Ahmedabad International Airport 45 KM Ahmedabad Railway Junction 45 KM Kandla Dahej Hazira Mundra JNPT Mumbai 266 KM 272 KM 318 KM 324 KM 586 KM Infrastructure Facilities Rates • Provide by GIDC at doorstep. • Permissible limit of 13.5 KLD/ ha area of land allotted INR 33 per KL (USD 0.4*)

• Four 66/11 KV substation area operational • One 66/11 KV substation is under planning INR 7.50 per • 400/200 KV substation located within estate to be kwh (USD 0.09*) operational soon

• GSPL would supply GAS at doorstep of factory INR 32 per SCM • The gas distribution within the factory will be done by (USD 0.4*) Company's own cost.

Available Space Target Sectors 493 ha • Engineering, • Automobile & ancillary Allotment Price • Plastics • Electronics INR 3780/- (USD 50.1*) • Pharma

10,000- 25,000- 50,000- >10,000 >1,00,000 Land Parcel Size (sqm) 25,000 50,000 100,000 INR 1=75 USD* GIDC Japanese Zone Industrial Estate

To Promote Japanese investment in the State, GIDC has earmarked and developed Gujarat’s first country-specific industrial estate spreading over 123 ha near Vithalapur, Mandal Connectivity Ahmedabad International Airport 90 KM Viramgam Railway Station 30 KM Kandla Mundra Dahej Hazira JNPT Mumbai 275 KM 325 KM 330 KM 381 KM 633 KM Infrastructure Facilities Rates • Water supply available from Narmada main canal NC-14. INR 47.3 per • Zinzuwada branch canal passes through Bechraji Mandal and KL (USD 0.6*) Dasada taluka • One 66 KV substation is operational and one 220 KV INR 7.50 per substation is to be proposed by GETCO . To be operational kwh (USD 0.09*) in near future

• Existing pipeline from Vapi to Mehsana by GSPL. INR 32 per SCM • GSPC network to be extended from Mehsana to Becharaji. (USD 0.4*)

Available Space Target Sectors 22 ha • Engineering • Automobile & ancillary Allotment Price INR 2900 (USD 38.4*)

Land Parcel Size (sqm) 25,000-50,000 50,000-100,000 >1,00,000

INR 1=75 USD* GIDC Bhagapura Industrial Estate

To create value chain with the auto giants such as Maruti Suzuki, GIDC has identified & acquired approximately 273 ha of land in Bhagapura, Ahmedabad for developing Maruti Suzuki Vendors Park Connectivity Ahmedabad International Airport 90 KM Viramgam Railway Station 30 KM Kandla Mundra Dahej Hazira JNPT Mumbai 275 KM 325 KM 330 KM 381 KM 633 KM Infrastructure Facilities Rates • Water supply available from Narmada canal INR 47.3 per KL (USD 0.6*)

• One 66 KV substation is operational by 2021 and two 66KV INR 7.50 per and one 220 KV substation is under planning kwh (USD 0.09*)

• Existing pipeline from Vapi to Mehsana by GSPL. INR 32 per SCM • GSPC network to be extended from Mehsana to Becharaji. (USD 0.4*)

Available Space Target Sectors 100 ha • Engineering • Automobile & ancillary Allotment Price • Plastics • Electronics INR 3550 (USD 47.0*)

Land Parcel Size (sqm) 25,000-50,000 50,000-100,000 >1,00,000

INR 1=75 USD* GIDC Saykha Industrial Estate Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR) comprise of 453 sq.km(45,300 ha) Bharuch district , is the first operational and most developed PCPIR in the country. Within PCPIR GIDC has existing Industrial estates as Dahej I, Dahej II, Dahej III, Vilayat, Saykha and Dahej SEZ Connectivity Vadodara International Airport Surat Airport 85 KM 93 KM Bharuch Dahej Railway Station 62 KM Adani Petronet GCPTCL Liquid LNG Petronet Chemical Terminal (Gas Terminal) Within 30 Reliance Liquid Fuel Birla Copper Bulk cargo km Jetty Jetty Infrastructure Facilities Rates • Permissible limit for Chemical zone is 55 KL/ per ha /per day INR 39.5 per • Permissible limit for Engineering zone is 22 KL/per ha/per KL (USD 0.5*) day • Effluent collection network is laid down Norms : 33kl/ha/day Drainage Cess • If the quantity of effluent is more than permissible limit, INR 21,975 per factory shall have to lay down the line from their Kl (USD 291*) premises upto the drainage pumping station. • Common Effluent Treatment Facility: 40 MLD • ONGC, Gujarat Gas Limited would supply GAS at INR 32 per SCM doorstep of factory (USD 0.4*) Target Sectors Available Space • Chemical & Petrochemical, 201 ha • Dyes & Pigments • Textile Allotment Price • Plastics INR 2100 (USD 27.8*) • Engineering

Land Parcel Size (sqm) >10,000 10,000-15,000 INR 1=75 USD* GIDC Dahej SEZ Industrial Estate Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR) comprise of 453 sq.km(45,300 ha) Bharuch district , is the first operational and most developed PCPIR in the country. Within PCPIR GIDC has existing Industrial estates as Dahej I, Dahej II, Dahej III, Vilayat, Saykha and Dahej SEZ Connectivity Vadodara International Airport Surat Airport 130 KM 136 KM Bharuch Dahej Railway Station 44 KM Adani Petronet GCPTCL Liquid LNG Petronet Chemical Terminal (Gas Terminal) Within 30 Hazira 100 KM km Infrastructure Facilities Rates • Provide by GIDC at doorstep. INR 38.2 per • Permissible limit of 55 KLD/ ha area of land allotted for KL (USD 0.5*) chemical & 33 KLD/Hac area of land allotted for Engineering • Four 33/66 KV substation area operational. INR 7.50 per • Torrent Power Ltd:- 1200 Mega KV power plant functional kwh (USD 0.09*) co-developer for power distribution • Gujarat State Petronet Limited would supply GAS at INR 32 per SCM doorstep of factory (USD 0.4*) • The gas distribution within the factory will be done by Company's own cost. Available Space Target Sectors Multi Products 158.1 ha Allotment Price INR 1650 (USD 21.8*) Depending upon the requirement of individual Land Parcel Size (sqm) companies contiguous land can be carved out. INR 1=75 USD* GIDC Halol II Industrial Estate Halol estate is located in Panchmahal District and has an area of 461 hectares while Halol Expansion has an area of 601 hectares. Additionally, Halol-Savli has been declared as a Special Investment Region, under the Special Investment Region Act - , spread over an area of 123 sq kms

Connectivity

Vadodara Airport Ahmedabad International Airport 42 KM 155 KM Broad Gauge track line from Baroda to Godhra 6 KM Dahej Hazira Kandla JNPT Mumbai Mundra 175 KM 220 KM 450 KM 485 KM 500 KM

Infrastructure Facilities Rates • Water supply network is laid. Adequate water available INR 50 per KL (USD 0.6*)

• 220 KV power station and 220 KV power line passing INR 7.50 per through Halol kwh (USD 0.09*) • Two 66 KV substation has been proposed in GIDC Halol • Gujarat gas limited would supply GAS at doorstep of INR 32 per SCM factory (USD 0.4*)

Available Space Target Sectors

116 ha • Automobile & ancillary units • Engineering Allotment Price • Plastics • Electronics INR 1520 (USD 20.1*) 10,000- 25,000- 50,000- >10,000 >1,00,000 Land Parcel Size (sqm) 25,000 50,000 100,000 INR 1=75 USD* Dholera Investment Region Dholera SIR spread over 920 kms, is a proposed industrial hub located 100 km of South of Ahmedabad and 130 km from Gandhinagar. It’s the first investment region to be designed under DMIC proejct

Connectivity

• Ahmedabad International Airport 125 Km • Proposed Dholera International Airport by 15 Km AAI • Rail Connection – Proposed Bhimnath – Dholera Freight Line connecting to Dedicated Freight Corridor (DFC)

Pipava Port 209 KM Kandla Port 330 KM Mundra Port 396 KM

Infrastructure Facilities Rates • Water Treatment Plant having Portable Water INR 40 per KL (USD 0.5*) capacity of 50 MLD Treated Water INR 20 per KL (USD 0.2*) • 24x7 uninterrupted Power Supply with Lowest Tariff in INR 4.50-5.50 per the country kwh (USD 0.05- 0.07*) • Provision for supply of Natural Gas to Industries and USD 8.5-10* MMBTU Residential Areas • Common Effluent Treatment Plant having capacity of 20 MLD • Sewage Treatment Plant having capacity of 15 MLD

Available Space Target Sectors

400 ha Multi Products (Non Chemical) Allotment Price INR 2750 (USD 36..4*) Land Parcel Size 20,000-50,000 >1,00,000 INR 1=75 USD* Industrial Incentives Electronics Policy Incentive Incentive Type Ceiling/Cap Incentives to Electronics Manufacturing Clusters (EMCs)

• INR 25 crores (USD 3,750,000) for Greenfield EMCs of area Capital less than 200 acres • Up to 25% of project cost Assistance • INR 100 crores (USD 15,000,000) for Greenfield EMCs of area more than 200 acres

• Reimbursement of 100% of Stamp Duty & Stamp Duty & Registration fees paid to the Registration Fee • Nil Government of Gujarat towards the Reimbursement lease/sale/transfer of land for the EMC

• Power tariff subsidy of INR 1 (USD 0.015) per unit on the billed amount on Power & Power reimbursement basis for 5 years • None Tariff Subsidy • 100% reimbursement of electricity duty paid from date of approval of EMC

Support for • Financial contribution for creation of a continuous feeder or a sub station for supply of • INR 5 crores (USD power supply continuous and good quality power 750,000) availability supply to EMCs on a need basis Incentives to the ESDM Units • INR 1 crore (USD 150,000) for ESDM units Capital Subsidy on the Gross Fixed Capital with GFCI up to INR 10 Investment (GFCI): Crores (USD 1,500,000) • 10% of GFCI for ESDM units with GFCI up to • INR 25 Crores (USD INR 10 Crore (USD 1,500,000) 3,750,000) for ESDM • INR 1 Crores (USD 150,000) plus 5% of units with GFCI incremental GFCI above INR 10 crores (USD Capital between INR 10 crores 1,500,000) for ESDM units with GFCI Subsidy (USD 1,500,000) and between INR 10 core to INR 1000 crores INR 1000 crores (USD (USD 150,000,000) 150,000,000) • INR 25 Crores (USD 3,750,000) plus 5% of • INR 100 crores (USD GFCI above 1000 Crores (USD 150,000,000) 15,000,000) for ESDM for ESDM units with GFCI greater than 1000 units with GFCI greater crores (USD 150,000,000) than INR 1000 crores (USD 150,000,000) Industrial Incentives Electronics Policy

Incentive Incentive Type Ceiling/Cap

Incentives to the ESDM Units

• Reimbursement of 100% of Stamp Duty Stamp Duty & & Registration fees paid to the Registration Fee • Nil Government of Gujarat towards the Reimbursement lease/sale/transfer of land Interest Subsidy for the interest on borrowing at: • INR 1 crore (USD • 7% per annum for ESDM units with 150,000) for ESDM units borrowings up to INR 10 Crore (USD with GFCI up to INR 10 1,500,000) Crores • INR 1 Crores (USD 150,000) plus 2% of • INR 5 Crores (USD borrowings in excess of INR 10 crores 750,000) for ESDM units Interest Subsidy (USD 1,500,000) for ESDM units with with GFCI between INR borrowings between INR 10 core 10 crores and INR 1000 (1,500,000) to INR 1000 crores (USD crores 150,000,000) • INR 10 crores (USD • INR 5 Crores (USD 750,000) plus 5% of 1,500,000) for ESDM borrowings in excess of 1000 Crores units with GFCI greater (USD 150,000,000) for ESDM units with than INR 1000 crores borrowings greater than 1000 crores

• To be finalized under Tax Incentive • Reimbursement of tax GST regime

Tax Incentive on • To be finalized under • Reimbursement of tax on Inter State sales GST regime Sales

• Power tariff subsidy of INR 1 (USD 0.015) per unit on the billed amount on Power & Power reimbursement basis for 5 years • None Tariff Subsidy • 100% reimbursement of electricity duty paid from date of approval of EMC

• Reimbursement of EPF contribution Employment made for employees: • INR 1 crore (USD Generation • 100% of EPF of female employees 150,000) per annum Incentive • 75% of EPF for male employees

• Set up of an empowered ‘Single Window Competent Authority’ for Single Window expediting approval processes, • Not Applicable Clearance System supported by a 24*7 centralized helpdesk call center Industrial Incentives Electronics Policy

Incentive Incentive Type Ceiling/Cap

• INR 2 Lakhs (USD 3,000) per patent for domestic and INR 5 Lakhs (USD 7,500) for International Patent • Up to 50% of expenditure incurred on patents with a maximum Assistance obtaining the patent cap of INR 10 lakhs (USD 15,000) for domestic and INR 25 Lakhs (USD 37,500) for International patents • Financial Assistance of up to 50% of expenditure incurred towards rental • INR 2 Lakhs (USD 2,000) expenses, creation of catalogues/ product literature and Display material • Financial Assistance of up to 50% of the Market total rental expenses incurred in Development • INR 10 Lakhs (USD 15,000) participation in International Trade Support Fairs as Gujarat Pavilion outside India • INR 4 Lakhs (USD 6,000) • Viability Gap Funding to Industrial for National and INR 8 Associations for organizing Lakhs (USD 12,000) for Seminars/Exhibitions outside Gujarat International Events • Financial Assistance of 60% of Project Cost, excluding land and building for set • INR 50 Lakhs (USD 75,000) up of new R&D institutes, testing of project cots for set up Support to centers, finishing schools of new facilities R&D • Up to 50% of cost incurred on • INR 50 Lakhs (USD 75,000) Institutions contract/sponsored research work from incurred on the research industrial units/ industry associations to projects recognized R&D Institutions & Colleges recognized by AICTE • Financial Assistance to cover the expenditure incurred on obtaining the quality certification including fees Quality charged by certification agency, • INR 6 Lakhs (USD 9,000) Certification consulting fees and training charges, cost of testing equipment, calibration charges and other charges incurred Assistance to • New Scheme with customized courses Training with on-floor training for skill • Not Applicable Institutions & development to be set up by State Trainees Labor & Employment Department Industrial Incentives Aerospace and Defense Policy

Area of Assistance Incentive

• Mega/ Large A&D enterprises, with investment of >INR. 200 crore and having potential for cluster formation, would be given preference in allotment of government land or Land incentives land in GIDC estates. • Govt. land would be provided @ 50% of prevailing rate • 100% reimbursement of stamp duty and registration charges paid for on purchase of land

• Interest subsidies upto a maximum amount of INR 10 Crore for Mega and INR 5 Crore for Large A&D projects Interest subsidy • Subsidies valid on interest against both External Commercial Borrowing (ECB) and Domestic borrowing

• A&D enterprise would be allowed reimbursement of 100% Reimbursement of Net SGST with maximum cap of 90% of Gross Fixed Capital taxes Investment • All A&D units shall be given 100% exemption on Electricity Duty for the first 5 years from the date of commencement Electricity Duty and of commercial production Power Tariff • Power tariff subsidy of INR 1 per unit in the billed amount incentives for all units purchasing power only from Government of Gujarat discoms for a period of 5 years

• Reimbursement of employee training and skill development costs Miscellaneous • R&D investments within A&D units to be eligible for 25% assistance Industrial Incentives Incentives under Mega and Innovative Policy

Industry which falls in the following sectors and having investment of at least Rs. 1,000 Crore and provides employment to at least 2000 people, may be given incentives on case to case basis • Auto and auto components • Ship building and ship repair • Semi conductor fabrication • Industries having nanotechnology applications • Maintenance, Repair and Overhaul (MRO) hub for aircraft Industrial Incentives Gujarat Industrial Policy 2015

Incentive Incentive Type Ceiling/Cap

For Sanand II , Sanand III (Khoraj), Halol II and Saykha For Sanand II , Sanand III (Khoraj), • 70% Net SGST reimbursement Halol II and Saykha will be payable for the period • 70% of Gross Fixed Capital Tax of 10 years Investment Incentive For Bagapura, Vithlapur and For Bagapura, Vithlapur and Dholera Dholera • 90% Net SGST reimbursement • 100% of Gross Fixed Capital will be payable for the period Investment of 10 years

Plastic Industries – Gujarat Industrial Policy 2015

Incentive Incentive Type Ceiling/Cap

Interest • INR 1 Crore (USD 150,000) Per • Interest subsidy at 7% Subsidy Annum

For Sanand II , Sanand III (Khoraj), Halol II and Saykha •70% Net SGST For Sanand II , Sanand III (Khoraj), reimbursement will be Halol II and Saykha payable for the period of 10 • 70% of Gross Fixed Capital Tax years Investment Incentive For Bagapura, Vithlapur and For Bagapura, Vithlapur and Dholera Dholera •90% Net SGST • 100% of Gross Fixed Capital reimbursement will be Investment payable for the period of 10 years Industrial Incentives Labour Intensive Industries- Gujarat Industrial Policy 2015

Incentive Incentive Type Ceiling/Cap

• INR 1200 (USD 18) per person and additional INR 300 per women Payroll employment for new enterprises and • Nil Assistance existing enterprises for one time expansion

• Interest Subsidy of 7% for the period of 5 • Rs. 1 Crore per Interest Subsidy years annum

• 70% of Gross Fixed Tax Incentive • 80% Net SGST reimbursement for 5 years Capital Investment Industrial Incentives Incentive under Textile Policy 2019

• Interest Subsidy to eligible activities for a period of 5 years with a cap of Rs.20 crores per annum as per following rates:

Category Employment Interest subsidy MSME - 6% Up to 100 4% 101 to 200 4.5% Large Enterprise 201 to 500 5% More than 500 6%

• Power Tariff Subsidy Rs. 2 per billed unit • Other incentive benefits such as: • Assistance for Energy and Water Conservation and Environment Compliances • Assistance for Technology Acquisition and Up-gradation