22854 Federal Register / Vol. 70, No. 84 / Tuesday, May 3, 2005 / Notices

ESTIMATED ANNUAL REPORTING BURDEN

Annual 17 CFR section number of Total annual Hours per re- Total hours respondents responses sponse

Part 190 ...... 376 6173 0.05 309.05

There are no capital costs or operating DEPARTMENT OF DEFENSE BASIN and maintenance costs associated with COMMISSION this collection. Department of the Air Force Notice of Commission Meeting and Dated: April 26, 2005. Intent to Grant an Exclusive License Public Hearing Jean A. Webb, Notice is hereby given that the Secretary of the Commission. Pursuant to the provision of part 404 of title 37, Code of Federal Regulations, Delaware River Basin Commission will [FR Doc. 05–8758 Filed 5–2–05; 8:45 am] hold an informal conference followed which implements Public Law 96–517, BILLING CODE 6351–01–M by a public hearing on Wednesday, May as amended, the Department of the Air 18, 2005. The hearing will be part of the Force announces its intention to grant Commission’s regular business meeting. UES, Inc., a corporation of Ohio, having Both the conference session and DEPARTMENT OF DEFENSE a place of business at 4401 Dayton- business meeting are open to the public Xenia Road, Dayton, OH, an exclusive and will be held at the Shawnee Inn, Office of the Secretary right, title and interest the Air Force has Shawnee-on-the-Delaware, in: United States Patent Application . Notice of Closed Meeting Serial Number—11/083,919—High The conference among the Speed & Repeatability Serial Sectioning commissioners and staff will begin at 10 AGENCY: Defense Intelligence Agency, Device for 3–D Reconstruction of a.m. Topics of discussion will include: Joint Military Intelligence College, DoD. Microstructures by Jonathan Spowart a status report on the PCB Stage 2 TMDL ACTION: Notice of closed meeting. and Herbert Mullens United States development process; a report on the Patent Application Serial Number—11/ Delaware Estuary Science Conference of SUMMARY: Pursuant to the provisions of 083,920—High Speed & Repeatability May 10–11, 2005, Linking Science and subsection (d) of section 10 of Pub. L. Serial Sectioning Method for 3–D Management for the Delaware Estuary; 92–463, as amended by section 5 of Pub. Reconstruction of Microstructures by an update on the Pennsylvania Act 220 state water planning process, including L. 94–409, notice is hereby given that a Jonathan Spowart and Herbert Mullens regional priorities; a presentation on the closed meeting of the DIA Joint Military United States Patent Application Serial DRBC Water Monitoring and Number—11/083,918—High Speed & Intelligence College Board of Visitors Assessment Program (EPA ‘‘Ten has been scheduled as follows: Repeatability Serial Sectioning Method Elements Plan’’); and a presentation on for 3–D Reconstruction of DATES: Tuesday, 7 June 2005, 0800 to the April 2005 flooding in the Delaware Microstructures Using Scanning 1700; and Wednesday, 8 June 2005, River Basin by National Weather Service Electron Microscope by Jonathan 0800 to 1200. and Pennsylvania Emergency Spowart and Herbert Mullens United Management Agency representatives. ADDRESSES: Joint Military Intelligence States Patent Application Serial The subjects of the public hearing to College, Washington, DC 20340–5100. Number—11/083,921—High Speed & be held during the 1:30 p.m. business Repeatability Serial Sectioning Method meeting include the dockets listed FOR FURTHER INFORMATION CONTACT: Mr. below: A. Denis Clift, President, DIA Joint for 3–D Reconstruction of Microstructures Using Optical 1. Fry Farms, Inc. D–82–36–1. An Military Intelligence College, application for approval of a ground and Washington, DC 20340–5100, (202) 231– Microscopy Jonathan Spowart and Herbert Mullens surface water withdrawal project to 3344). supply up to 100 million gallons per A license for these patent applications SUPPLEMENTARY INFORMATION: The entire thirty days (mg/30 days) of water to the and for any subsequent patents issued applicant’s agricultural irrigation system meeting is devoted to the discussion of will be granted unless a written classified information as defined in from new Wells Nos. 1 and 2 in the objection is received within 15 days Columbia Formation, and up to 76 mg/ section 552b(c)(1), Title 5 of the U.S. from publication of this Notice. Written Code and therefore will be closed. The 30 days from Intakes Nos. 1, 2, 3 and 4 objection should be sent to : Air Force in the farm pond, and to limit the Board will discuss several current Material Command Law Office, withdrawal from all sources to 176 mg/ critical intelligence issues and advise AFMCLO/JAZ, 2240 B Street, Rm 100, 30 days. The project is located in the the Director, DIAK, as to the successful Wright-Patterson AFB OH 45433–7109. Mispillion River Watershed in the Town accomplishment of the mission assigned of Milford, Sussex County, Delaware. to the Joint Military Intelligence College. Albert Bodnar, 2. Artesian Water Company, Inc. D– Dated: April 28, 2005. Federal Register Liaison Officer. 2002–34 CP–2. An application for L.M. Bynum, [FR Doc. 05–8756 Filed 5–2–05; 8:45 am] approval of a ground water withdrawal BILLING CODE 5001–5–P project to supply up to 43.2 mg/30 days Alternate OSD Federal Register-Liaison for of water to the applicant’s public water DoD. supply distribution system from a new [FR Doc. 05–8811 Filed 5–2–05; 8:45 am] aquifer storage and recovery (ASR) well BILLING CODE 5001–06–M in the Upper Potomac Formation in the

VerDate jul<14>2003 15:43 May 02, 2005 Jkt 205001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\03MYN1.SGM 03MYN1 Federal Register / Vol. 70, No. 84 / Tuesday, May 3, 2005 / Notices 22855

Llangollen wellfield, and to retain the Blackwood District distribution system million gallons per thirty days (mg/30 existing withdrawal from the applicant’s includes a total of 16 wells, of which 10 days) of water from existing Well No. 3 15 wellfields supplying the New Castle are located inside the Delaware River in the Kirkwood-Cohansey Formation County distribution system at 593.06 Basin. The system serves an area located and up to 491.04 mg/30 days from mg/30 days. The project is located in the primarily within the Basin. Proposed existing surface water Intakes Nos. 1 Army Creek Watershed in New Castle Well No. 20, located within the Basin, through 3 and new Intakes Nos. 4 and County, Delaware. will replace Well No. 8, located outside 5 for sand and gravel processing. The 3. William Chandler D–2005–9–1. An of the Basin. Well No. 8 has become surface water ponds are in connection application for approval of a ground contaminated with MTBE. The project is with and fed by groundwater. The water withdrawal project to supply up located in the Big Timber Creek groundwater allocation of 6.7 mg/30 to 32 million gallons per thirty days Watershed in Gloucester Township, days is used for non-contact cooling (mg/30 days) of water to the applicant’s Camden County, New Jersey. water which is returned to the ponds. irrigation system from new Wells Nos. 8. Township of Florence D–94–82 CP– The surface water is used to process the 1 and 2 in the Columbia Formation. The 2. An application for approval of a sand and gravel in a loop system which water will be used to irrigate ground water withdrawal project to returns approximately 90% of the water approximately 118 acres of corn and supply up to 31.54 million gallons per to the ponds. The combined allocation soybeans. The project is located in the 30 days (mg/30 days) of water to the will be limited to 491.04 mg/30 days Murderkill River Watershed in the applicant’s public water supply and 3,910.96 million gallons per year. Town of Felton, Kent County, Delaware. distribution system from new Well No. The project is located in the Maurice 4. Haddon Township D–66–65 CP–2. 6 in the Potomac-Raritan-Magothy River Watershed in Commercial An application for approval of a ground Aquifer, and to increase the combined Township, Cumberland County, New water withdrawal project to supply withdrawal from all wells by 31.54 mg/ Jersey. water to the applicant’s public supply 30 days, to 115 mg/30 days. The project 13. NGC Industries D–2005–4–1. An distribution system from replacement is located in the Delaware River application for approval of a surface Wells Nos. 1A, 2A, 3A and 5 in the Watershed in the Township of Florence, water withdrawal project to supply up Potomac-Raritan-Magothy Formation Burlington County, New Jersey. to 19 million gallons per thirty days of and to increase the existing withdrawal 9. Borough of Clayton D–95–45 CP–2. water to the applicant’s manufacturing from all wells from 60 million gallons An application for the renewal of facility from intake No. 1 on the per thirty days (mg/30 days) to 62 mg/ ground water withdrawal project to Delaware River. The project is located in 30 days. The project is located in the increase withdrawal from 31.0 mg/30 the Delaware River Watershed in Newton Creek Watershed in Haddon days to 41.85 mg/30 days to supply the Pennsauken Township, Camden Township, Camden County, New Jersey. applicant’s public water distribution County, New Jersey. 5. Colorite Polymers D–84–46–2. An system from existing Wells Nos. 3, 4, 5, 14. Newtown Artesian Water application for the renewal of a ground and 6 in the Potomac-Raritan-Magothy, Company D–78–29 CP–2. An application water withdrawal project to supply up Wenonah-Mt. Laurel, and Kirkwood- for approval of a ground water to 114 million gallons per thirty days Cohansey formations in the Maurice withdrawal project to supply up to 11.1 (mg/30 days) of water to the applicant’s River watershed. The project is located million gallons per thirty days (mg/30 industrial plant site from supply Wells in Clayton Borough, Gloucester County, days) of water to the applicant’s public Nos. 4, 7, 8, 9 and 10 and up to 12 mg/ New Jersey. (This was NAR’d as D–95– water supply distribution system from 30 days from Well No. 1. The project is 45 CP Renewal.) Replacement Well No. 4 in the Stockton located in the Delaware River 10. Township of Medford D–95–55 Formation, and to limit the existing Watershed in Burlington Township, CP–2. An application to replace the withdrawal from all wells to 44.81 mg/ Burlington County, New Jersey. (This withdrawal of water from Well No. 4 in 30 days. In addition, the total annual was NAR’d as D–84–46 Renewal 2.) the applicant’s water supply system that withdrawal from Replacement Well No. 6. Larchmont Farms, Inc. D–86–37–3. has become an unreliable source of 4 and Wells Nos. 5, 6 and 18 (located An application for the renewal of a supply and that the total withdrawal in the Newtown Creek Subbasin) will be ground and surface water withdrawal from all wells remain limited to 77 mg/ limited to 340 mg/30 days. Replacement project to continue withdrawal of 100 30 days. The project is located in the Well No. 4 will replace former Well No. million gallons per 30 days to supply South Branch Rancocas Creek 4 which declined substantially in yield. the applicant’s agricultural irrigation Watershed in Medford Township, The project also includes a primary system from an existing pond; existing Burlington County, New Jersey. interconnection with the Bucks County Wells Nos. 1, 2 and 3; and new Wells 11. Borough of Branchville D–2000–27 Water and Sewer Authority for up to 3 Nos. 4, 5, 6, 7, 8, 9, 10 and 11. The CP–1. An application for approval of a mgd. The project is located in the project is located in the Cohansey ground water and surface water Newtown Creek and Lower Neshaminy Formation in Upper Pittsgrove withdrawal project to supply up to 6.2 Creek watersheds in Newtown Borough Township, Salem County and Upper mg/30 days of water to the applicant’s and Newtown and Middletown Deerfield Township, Cumberland public water distribution system from townships, Bucks County, Pennsylvania County, both in New Jersey. Wells Nos. 1 and 2 in the Kittatinny and is located in the Southeastern 7. Aqua New Jersey, Inc. (Formerly Aquifer, and 6.2 mg/30 days from Dry Ground Water Protected Area. Consumers New Jersey Water Company, Brook Reservoir, and to limit the 15. Rock-Tenn Company D–80–25–1. Inc.) D–93–13 CP–2. An application for combined total withdrawal from all An application for approval of a ground approval of a ground water withdrawal sources to 6.2 mg/30 days. The project and surface water withdrawal project to project to supply up to 21.6 mg/30 days is located in Branchville Borough, supply up to 13.89 million gallons per of water to the applicant’s Blackwood Sussex County, New Jersey. (This thirty days (mg/30 days) of water to the District public water supply distribution docket was NAR’d as D–2000–27 CP.) applicant’s paper processing facility via system from new Well No. 20 in the 12. U.S. Silica Company D–2004–30– the Brodhead Creek intake and 0.0039 Cohansey Formation, and to retain the 1. An application for approval of a mg/30 days from the Warehouse Well existing combined withdrawal of 198.5 ground water and surface water and the Boiler House Well and to limit mg/30 days from all wells. The withdrawal project to supply up to 6.7 the existing withdrawal from all sources

VerDate jul<14>2003 15:43 May 02, 2005 Jkt 205001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\03MYN1.SGM 03MYN1 22856 Federal Register / Vol. 70, No. 84 / Tuesday, May 3, 2005 / Notices

to 13.9 mg/30 days. The project is gallons per thirty days (mg/30 days) to development located off Black Rock located in the Brodhead Creek supply the applicant’s snow making Road and State Route 29 in Upper Watershed in Delaware Water Gap operations from an existing surface Providence Township, Montgomery Borough, Monroe County, Pennsylvania. water intake in Big Boulder Lake, on an County, Pennsylvania. For most of the 16. Mid-Atlantic Canners Association unnamed tributary of Tunkhannock year, STP effluent will be spray irrigated D–86–83–3. An application for the Creek. The project is located in Kidder on approximately 142 acres of golf renewal of a ground water withdrawal Township, Carbon County, course grounds and about 27 acres of project to continue withdrawal of 5.7 Pennsylvania. turf at the development. However, million gallons per 30 days to supply 21. Newstech PA, LLP D–94–22–2. An during prolonged cold and wet weather the applicant’s bottling and canning application to expand a 0.36 million periods, effluent will flow from two facility from existing Wells Nos. 1, 2 gallon per day (mgd) industrial waste storage ponds to unnamed tributaries of and 3. The project is located in the treatment plant to process 1.728 mgd. the Schuylkill River, an area Schuylkill River Watershed in Hamburg The project is located at the applicant’s conditionally designated as ‘‘Modified Borough, Berks County, Pennsylvania. Northampton pulp mill, formerly owned Recreational’’ in the DRBC’s 17. Roamingwood Sewer and Water by Ponderosa Fibers of PA, in Comprehensive Plan. Association D–88–45 CP–3. An Northampton Borough, Northampton 25. Borough of Strausstown D–2005– application for the renewal of a ground County, Pennsylvania. Following 6 CP–1. An application to construct a water withdrawal project to reduce advanced wastewater treatment 0.065 million gallon per day (mgd) withdrawal from 26.69 million gallons processes, effluent will be discharged to sewage treatment plant (STP) to provide per thirty days (mg/30 days) to 20.0 mg/ the Lehigh River through the existing advanced secondary treatment via 30 days to supply the applicant’s outfall, which is located in the drainage activated sludge and chemically-aided Hideout Development distribution area of the Lower Delaware River phosphorus removal processes. The system from existing Wells Nos. 1, 2, 3, Management Plan. proposed STP and sewage collection 4 and 5. The project is located in the 22. DS Waters of America, LP D–97– system will serve Strausstown Borough Arial Creek Watershed in Lake and 46–2. An application to continue the and a portion of Upper Tulpehocken Salem townships, Wayne County, withdrawal of up to 300,000 gallons per Township, both in Berks County, Pennsylvania. day (gpd) (9.0 mg/30 days) of spring Pennsylvania. Following ultraviolet 18. Hansen Nurseries D–88–66–3. An water at the Arrowhead Springs Farm light disinfection, STP effluent will be application for the renewal of a ground with the addition of a new source discharged to Jackson Creek, a tributary water withdrawal project to continue designated Spring No. 1, also known as of Little Northkill Creek in the withdrawal of 10.02 million gallons per Big Spring. Spring No. 1 will be used in Tulpehocken Creek Watershed. The thirty days (mg/30 days) to supply the conjunction with the existing source, proposed STP will be situated off the applicant’s nursery from existing Wells Spring No. 3, as the primary sources for intersection of Pennsylvania Route 183 Nos. 1 and 33. The project is located in the withdrawal. The applicant will and Old Route 22 (Main Street) in the Schlegel Run Creek Watershed in continue to utilize spring water for bulk Upper Tulpehocken Township. Douglass Township, Montgomery water supply to its bottling plants 26. Pennsylvania Department of County, Pennsylvania and is located in located in Lancaster and Ephrata, Conservation and Natural Resources D– the Southeastern Pennsylvania Ground Pennsylvania. The project intakes are 2005–8 CP–1. An application to replace Water Protected Area. located on a tributary to Mill Creek in a 33,000 gallon per day (gpd) extended 19. Aqua Pennsylvania, Inc. (Formerly the Tulpehocken Creek Watershed, in aeration sewage treatment plant (STP) Pennsylvania Suburban Water Millcreek Township, Lebanon County, with a 60,000 gpd sequencing batch Company) D–91–86 CP–2. An Pennsylvania. reactor process. The new STP will application to provide up to 50.0 23. Northampton Bucks County continue to serve visitors and staff at the million gallons per thirty (mg/30 days) Municipal Authority D–2001–13 CP–2. Hickory Run State Park facility, located from ten existing wells to the API ‘‘ An application for renewal of a ground off State Route 534 at the head of the Great Valley Division public water water withdrawal project to continue to Hickory Run Trail in Kidder Township, supply distribution system. This supply up to 66.0 million gallons per Carbon County, Pennsylvania. STP allocation represents a decrease from thirty days of water for public water effluent will continue to be discharged 74.76 mg/30 days based on the removal supply from existing Wells Nos. 1 to Hickory Run, a tributary of the Lehigh of several declining ground water through 13, 16 and 17, all located in the River in the drainage area of the Lower sources in the distribution system. The . No increase in Delaware River Management Plan. The project also includes three existing allocation is proposed. The project is existing STP outfall will be demolished. interconnections; two from Aqua located in the and Ultraviolet light disinfection will be Pennsylvania, Inc. Main and West Ironworks Creek watersheds in provided. Chester Divisions, and one from Chester Northampton Township, Bucks County, In addition to the public hearing on Water Authority. The project is located Pennsylvania and is located in the the dockets listed above, the in Hunters Run, Ridley Creek, Chester Southeastern Ground Water Protected Commission’s 1:30 p.m. business Creek, Plum Run, Broad Run, Radley Area. meeting will include possible action on Run and Brandywine watersheds in East 24. RiverCrest Community a resolution to amend the Water Quality Goshen, West Goshen, Westtown, Association, Inc. D–2001–45–2. An Regulations, Water Code and Birmingham, West Whiteland and East application to rerate a sewage treatment Comprehensive Plan by establishing Bradford townships, Chester County, plant (STP) from a maximum monthly Pollutant Minimization Plan and is located in the Southeastern flow of 0.1 mgd to process up to 114,675 Requirements for point and non-point Pennsylvania Ground Water Protected gpd, while continuing to provide source discharges following issuance of Area. advanced secondary level treatment via a TMDL or assimilative capacity 20. Big Boulder Corporation D–93–53– extended aeration and rapid sand determination; a resolution for the 2. An application for the renewal of a filtration processes. Construction of the minutes to solicit public comment on surface water withdrawal project to River Crest STP is nearing completion at permanent designation of the Lower continue withdrawal of 121 million the River Crest golf course community Delaware River as Special Protection

VerDate jul<14>2003 15:43 May 02, 2005 Jkt 205001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\03MYN1.SGM 03MYN1 Federal Register / Vol. 70, No. 84 / Tuesday, May 3, 2005 / Notices 22857

Waters with a classification of DEPARTMENT OF EDUCATION Title: Evaluation of the Impact of Significant Resource Waters, including Teacher Induction Programs. numeric values for existing water Submission for OMB Review; Frequency: On Occasion. quality in the Lower Delaware River; a Comment Request Affected Public: State, local, or tribal resolution authorizing the executive gov’t, SEAs or LEAs; Individuals or AGENCY: Department of Education. director to enter into an agreement with household. the U.S. Army Corps of Engineers for SUMMARY: The Leader, Information Reporting and Recordkeeping Hour the removal of debris from the Port Management Case Services Team, Burden: Jervis Ice Diversion Channel; a Regulatory Information Management Responses: 8,515. resolution for the minutes authorizing Services, Office of the Chief Information Burden Hours: 2,844. Officer invites comments on the the executive director to engage the firm Abstract: Data collection for impact submission for OMB review as required of Public Affairs Management LLC for evaluation of teacher induction by the Paperwork Reduction Act of programs. A sample of teachers are the up to three months to communicate the 1995. primary respondents. benefits of DRBC to various government Requests for copies of the submission bodies and to advance the restoration of DATES: Interested persons are invited to for OMB review; comment request may federal funding in accordance with submit comments on or before June 2, 2005. be accessed from http:// Section 13.3 of the Compact; a edicsweb.ed.gov, by selecting the resolution authorizing the executive ADDRESSES: Written comments should ‘‘Browse Pending Collections’’ link and director to accept funds from the be addressed to the Office of by clicking on link number 2689. When Pennsylvania Department of Information and Regulatory Affairs, you access the information collection, Environmental Protection for biological Attention: Carolyn Lovett, Desk Officer, click on ‘‘Download Attachments ‘‘to sampling and assessment to support Department of Education, Office of view. Written requests for information Pennsylvania’s Regional Environmental Management and Budget, 725 17th should be addressed to U.S. Department Monitoring and Assessment Program Street, NW., Room 10235, New of Education, 400 Maryland Avenue, (REMAP); and a resolution providing for Executive Office Building, Washington, SW., Potomac Center, 9th Floor, the election of the Commission Chair, DC 20503 or faxed to (202) 395–6974. Washington, DC 20202–4700. Requests Vice Chair and Second Vice Chair for SUPPLEMENTARY INFORMATION: Section may also be electronically mailed to the DRBC Fiscal Year 2005–2006. 3506 of the Paperwork Reduction Act of Internet address [email protected] or The meeting will also include: 1995 (44 U.S.C. Chapter 35) requires faxed to 202–245–6621. Please specify adoption of the Minutes of the January that the Office of Management and the complete title of the information 19, 2005 and March 16, 2005 business Budget (OMB) provide interested collection when making your request. meetings; announcements; a report on Federal agencies and the public an early Comments regarding burden and/or basin hydrologic conditions; a report by opportunity to comment on information the collection activity requirements the executive director; a report by the collection requests. OMB may amend or should be directed to Bennie Jessup at waive the requirement for public Commission’s general counsel; and an her e-mail [email protected]. consultation to the extent that public Individuals who use a opportunity for public dialogue. Draft participation in the approval process telecommunications device for the deaf dockets and the resolutions scheduled would defeat the purpose of the (TDD) may call the Federal Information for public hearing or action on May 18, information collection, violate State or Relay Service (FIRS) at 1–800–877– 2005, will be posted on the Federal law, or substantially interfere 8339. Commission’s Web site, http:// with any agency’s ability to perform its [FR Doc. 05–8739 Filed 5–2–05; 8:45 am] www.drbc.net, where they can be statutory obligations. The Leader, accessed through the Notice of Information Management Case Services BILLING CODE 4000–01–P Commission Meeting and Public Team, Regulatory Information Hearing. Additional documents relating Management Services, Office of the to the dockets and other items may be Chief Information Officer, publishes that DEPARTMENT OF ENERGY examined at the Commission’s offices. notice containing proposed information Please contact William Muszynski at Federal Energy Regulatory collection requests prior to submission Commission 609–883–9500, extension 221 with any of these requests to OMB. Each docket-related questions. proposed information collection, [Docket Nos. ER05–639–000] Individuals in need of an grouped by office, contains the Brascan Power Piney & Deep Creek accommodation as provided for in the following: (1) Type of review requested, LLC; Notice of Issuance of Order Americans with Disabilities Act who e.g. new, revision, extension, existing or wish to attend the informational reinstatement; (2) Title; (3) Summary of April 25, 2005. meeting, conference session or hearings the collection; (4) Description of the Brascan Power Piney & Deep Creek should contact the commission need for, and proposed use of, the LLC (Brascan Power PDC) filed an secretary directly at 609–883–9500 ext. information; (5) Respondents and application for market-based rate 203 or through the Telecommunications frequency of collection; and (6) authority, with an accompanying rate Relay Services (TRS) at 711, to discuss Reporting and/or Recordkeeping tariff. The proposed rate tariff provides how the Commission may accommodate burden. OMB invites public comment. for the sales of capacity, energy, and your needs. Dated: April 27, 2005. ancillary services at market-based rates. Dated: April 26, 2005. Angela C. Arrington, Brascan Power PDC also requested Leader, Regulatory Information Management waiver of various Commission Pamela M. Bush, Group, Office of the Chief Information Officer. regulations. In particular, Brascan Commission Secretary. Power PDC requested that the Institute of Education Sciences [FR Doc. 05–8733 Filed 5–2–05; 8:45 am] Commission grant blanket approval BILLING CODE 6360–01–P Type of Review: New. under 18 CFR part 34 of all future

VerDate jul<14>2003 15:43 May 02, 2005 Jkt 205001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\03MYN1.SGM 03MYN1